CN105297757A - Construction method for quicksand layer pile foundation - Google Patents

Construction method for quicksand layer pile foundation Download PDF

Info

Publication number
CN105297757A
CN105297757A CN201510682309.8A CN201510682309A CN105297757A CN 105297757 A CN105297757 A CN 105297757A CN 201510682309 A CN201510682309 A CN 201510682309A CN 105297757 A CN105297757 A CN 105297757A
Authority
CN
China
Prior art keywords
steel pile
hole
concrete
pile casting
pore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510682309.8A
Other languages
Chinese (zh)
Inventor
邹小卫
周虹宇
李家宏
雷志辉
贺对喜
罗皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRCC Harbour and Channel Engineering Bureau Group Survey and Design Institute Co Ltd
China Railway Port and Channel Engineering Group Co Ltd
Shenzhen Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Original Assignee
China Railway Port and Channel Engineering Group Co Ltd
Shenzhen Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Port and Channel Engineering Group Co Ltd, Shenzhen Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Port and Channel Engineering Group Co Ltd
Priority to CN201510682309.8A priority Critical patent/CN105297757A/en
Publication of CN105297757A publication Critical patent/CN105297757A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method for a quicksand layer pile foundation. The construction method comprises the following steps that S10 the depth of a quicksand layer around the pile portion is surveyed, the length of the quicksand layer capable of penetrating through a steel pile casing is determined according to the survey result, and the steel pile casing is prefabricated; S20 the whole steel pile casing is embedded in the pile portion with the adoption of a vibratory hammer; S30 a pore is drilled and formed in the steel pile casing, a reinforcement cage is installed in a pore after the pore is formed, and the reinforcement cage is positioned on the pore opening after the reinforcement cage is installed; and S40 a conduit is installed and fixed in the pore, concrete is injected into the pore through the conduit after the pore is cleaned up, the steel pile casing is lifted immediately after the concrete is injected to the top face of the steel pile casing, the lifting time of the steel pile casing is controlled in the initial set time of the concrete, and the concrete sets and forms the pile foundation after the steel pile casing is lifted out totally. According to the construction method for the quicksand layer pile foundation, the quicksand layer pile pore can be prevented from collapsing effectively, and sand layer loss and the exceeding square amount of the concrete in the pore are controlled well, so that the use amount of the concrete is reduced, mud treatment and discharging are decreased, the mud is prevented from polluting the environment, the construction cost is reduced, the construction period is short, and the benefit is high.

Description

A kind of drifting sand layer pile base construction method
Technical field
The present invention is used for piling Technology field, particularly relates to a kind of drifting sand layer pile base construction method.
Background technology
Whole joint steel pile casting is buried in utilization underground, is the common method preventing stake holes from caving in.But usually steel pile casting verticality, axial location, length, promotion time, promote the more difficult control of speed, easily cause that stake holes off normal, pile verticality are defective and concrete piles is off quality, the duration delays length, and cost increases.
Summary of the invention
For solving the problem, the invention provides a kind of drifting sand layer pile base construction method that effectively can prevent drifting sand layer geology stake holes collapse hole.
The technical solution adopted for the present invention to solve the technical problems is: a kind of drifting sand layer pile base construction method, comprises the following steps:
S10. survey the degree of depth of stake position place drifting sand layer, and determine according to exploration result the length passing steel pile casting, pre-manufactured steel casing;
S20. vibrating hammer is adopted to bury whole joint steel pile casting underground at stake position place;
S30. drilling and forming hole in steel pile casting, installs reinforcing cage after pore-forming in hole, is located by reinforcing cage after installing in aperture;
S40., conduit is installed in hole and fixing, behind clear hole by conduit to concrete perfusion in hole, pour into steel pile casting end face, promote steel pile casting immediately, the promotion time controling of steel pile casting completes within the concrete initial set time, and after steel pile casting is promoted out completely, concrete solidifies formation pile foundation in hole.
Be further used as the improvement of technical solution of the present invention, also step S11 is comprised between step S10 and step S20, the construction plant at step S11. smooth stake position place, guarantee that sidewalk is unimpeded, check and clear up the stone of underground, place, stake position, at smooth good place surveying setting-out, draw the cross fender pile established and can control steel pile casting center and verticality.
Be further used as the improvement of technical solution of the present invention, in step S30, in drilling and forming hole process, record is good through hole depth during drifting sand layer, after lengthening, burying underground, then proceeds to creep into according to layer of sand actual grade to steel pile casting length.
Be further used as the improvement of technical solution of the present invention, in step S40, conduit is installed after waterproof test is qualified, when installing conduit in hole, from bottom hole pitch from being 30cm-50cm at the bottom of the pipe of conduit.
Be further used as the improvement of technical solution of the present invention, in step S40, press during clear hole at the bottom of wind to hole and carry out hole clearly, ensure that at the bottom of hole, slagging thickness is less than 5cm.
Be further used as the improvement of technical solution of the present invention; in step S40; concrete perfusion is to steel pile casting end face; end face laitance, body refuse are all extruded; RC, in concrete, again passes through tremie concrete after promoting steel pile casting 1m with vibrating hammer, guarantees the outer cavity of concrete energy filler opening; and so forth, until steel pile casting promotes out ground completely.
Be further used as the improvement of technical solution of the present invention, in step S40, lower than at the bottom of steel pile casting at least 2 meters at the bottom of conduit, after steel pile casting promotes out ground completely, within the concrete initial set time, extract conduit out.
Beneficial effect of the present invention: pass through drift sand formation carry out pile holes protecting wall by burying long steel pile casting underground, vibrating hammer is adopted to promote steel pile casting to complete the method for concrete perfusion, effectively can prevent drifting sand layer geology stake holes collapse hole, in the good control hole of energy, layer of sand runs off and concrete super side's amount, decreases concrete and slurry consumption, decrease mud conditioning discharge, avoid mud contamination surrounding enviroment, significantly reduce construction cost, the duration is short, high efficiency, avoids human and material resources, financial resources loss.
Detailed description of the invention
The invention provides a kind of drifting sand layer pile base construction method, comprise the following steps:
S10. survey the degree of depth of stake position place drifting sand layer, and determine according to exploration result the length passing steel pile casting, pre-manufactured steel casing;
S11. the construction plant at smooth stake position place, construction material requested, facility are put in smooth enough broad place, guarantee that sidewalk is unimpeded, check and clear up the stone of underground, place, stake position, at smooth good place surveying setting-out, draw the cross fender pile established and can control steel pile casting center and verticality;
S20. adopt vibrating hammer to bury whole joint steel pile casting underground at stake position place, by cross fender pile, adjustment is carried out to steel pile casting verticality and center and control;
S30. drilling and forming hole in steel pile casting, in drilling and forming hole process, record is good through hole depth during drifting sand layer, after lengthening steel pile casting length according to layer of sand actual grade, burying underground, then proceed to creep into, after pore-forming, in hole, reinforcing cage is installed, reinforcing cage merogenesis is installed, adopt single-selded lap joint, after installing, reinforcing cage is located in aperture, in order to avoid there is floating cage phenomenon in concrete perfusion process;
S40., conduit is installed in hole and fixes, described conduit is installed after waterproof test is qualified, from bottom hole pitch from being 30cm-50cm at the bottom of the pipe of conduit, clear hole, press during clear hole at the bottom of wind to hole and carry out hole clearly, ensure that at the bottom of hole, slagging thickness is less than 5cm, behind clear hole by conduit to concrete perfusion in hole, perfusion is to steel pile casting end face, by end face laitance, body refuse all extrudes, after having filled with concrete, promote steel pile casting and conduit immediately, the promotion time controling of steel pile casting and conduit completes within the concrete initial set time, after steel pile casting and conduit are promoted out completely, concrete solidifies formation pile foundation in hole.
In step S40, there is deviation to geological condition, the situation that outside hole, layer of sand runs off; after adopting concrete to fill casing discharge mud, sediment; not Lumen catheter, lower than at the bottom of steel pile casting at least 2 meters at the bottom of conduit, then passes through tremie concrete after promoting 1m steel pile casting with vibrating hammer again; guarantee the outer cavity of concrete energy filler opening; promote steel pile casting should vertically, speed at the uniform velocity, should not be too fast, allow casing inner concrete be diffused into outside hole uniformly; and so forth, until steel pile casting promotes out ground completely.
In the present invention, adopt vibrating hammer to bury whole joint steel pile casting underground and pass through drift sand formation and carry out retaining wall to stake holes, boring procedure is smooth, and effectively prevent collapse hole, cost is low, and efficiency is high, and the duration is short, easy to operate.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (7)

1. a drifting sand layer pile base construction method, is characterized in that comprising the following steps:
S10. survey the degree of depth of stake position place drifting sand layer, and determine according to exploration result the length passing steel pile casting, pre-manufactured steel casing;
S20. vibrating hammer is adopted to bury whole joint steel pile casting underground at stake position place;
S30. drilling and forming hole in steel pile casting, installs reinforcing cage after pore-forming in hole, is located by reinforcing cage after installing in aperture;
S40., conduit is installed in hole and fixing, behind clear hole by conduit to concrete perfusion in hole, pour into steel pile casting end face, promote steel pile casting immediately, the promotion time controling of steel pile casting completes within the concrete initial set time, and after steel pile casting is promoted out completely, concrete solidifies formation pile foundation in hole.
2. drifting sand layer pile base construction method according to claim 1, it is characterized in that: between step S10 and step S20, also comprise step S11, the construction plant at step S11. smooth stake position place, guarantee that sidewalk is unimpeded, check and clear up the stone of underground, place, stake position, at smooth good place surveying setting-out, draw the cross fender pile established and can control steel pile casting center and verticality.
3. drifting sand layer pile base construction method according to claim 1, it is characterized in that: in step S30, in drilling and forming hole process, record is good through hole depth during drifting sand layer, after lengthening steel pile casting length according to layer of sand actual grade, burying underground, then proceed to creep into.
4. drifting sand layer pile base construction method according to claim 1, it is characterized in that: in step S40, conduit is installed after waterproof test is qualified, when installing conduit in hole, from bottom hole pitch from being 30cm-50cm at the bottom of the pipe of conduit.
5. drifting sand layer pile base construction method according to claim 1, is characterized in that: in step S40, presses at the bottom of wind to hole and carry out hole clearly during clear hole, ensures that at the bottom of hole, slagging thickness is less than 5cm.
6. drifting sand layer pile base construction method according to claim 1; it is characterized in that: in step S40; concrete perfusion is to steel pile casting end face; end face laitance, body refuse are all extruded; RC, in concrete, again passes through tremie concrete after promoting steel pile casting 1m with vibrating hammer, guarantees the outer cavity of concrete energy filler opening; and so forth, until steel pile casting promotes out ground completely.
7. drifting sand layer pile base construction method according to claim 6, is characterized in that: in step S40, lower than at the bottom of steel pile casting at least 2 meters at the bottom of conduit, after steel pile casting promotes out ground completely, within the concrete initial set time, extracts conduit out.
CN201510682309.8A 2015-10-21 2015-10-21 Construction method for quicksand layer pile foundation Pending CN105297757A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510682309.8A CN105297757A (en) 2015-10-21 2015-10-21 Construction method for quicksand layer pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510682309.8A CN105297757A (en) 2015-10-21 2015-10-21 Construction method for quicksand layer pile foundation

Publications (1)

Publication Number Publication Date
CN105297757A true CN105297757A (en) 2016-02-03

Family

ID=55195519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510682309.8A Pending CN105297757A (en) 2015-10-21 2015-10-21 Construction method for quicksand layer pile foundation

Country Status (1)

Country Link
CN (1) CN105297757A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894418A (en) * 2017-02-28 2017-06-27 济南轨道交通集团有限公司 A kind of metalling plants the running pulp administering method of prefabricated pile
CN107701109A (en) * 2017-09-08 2018-02-16 浙江江南春建设集团有限公司 The sand foundation of stone flour containing block bored concrete pile drilling preprocess method
CN108457267A (en) * 2018-02-12 2018-08-28 中铁十八局集团有限公司 A kind of basic forming hole method of railway sound barrier stake
CN109914397A (en) * 2019-03-19 2019-06-21 重庆建筑工程职业学院 Bridge Pile Foundation Construction method
CN110387879A (en) * 2019-06-27 2019-10-29 中交第二航务工程局有限公司 A kind of concrete filling pile construction method of hydraulic vibration hammer hidden pipe
CN110485453A (en) * 2019-09-07 2019-11-22 北京华昊水利水电工程有限责任公司 A kind of Pile-supported stand foundation structure and its construction method
CN110700247A (en) * 2019-09-27 2020-01-17 中冶交通建设集团有限公司 Construction method for cast-in-place pile to penetrate through quicksand layer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433875A (en) * 2010-09-29 2012-05-02 中铁五局(集团)有限公司 Method for rapidly forming hole by using rotary drilling rig to penetrate through drift sand layer
JP2013241800A (en) * 2012-05-22 2013-12-05 Tetsudo Onda Resistance pile for preventing foundation fluidization
CN104563126A (en) * 2014-12-22 2015-04-29 中铁十九局集团有限公司 Construction method for bored pile by rotary drilling rig

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433875A (en) * 2010-09-29 2012-05-02 中铁五局(集团)有限公司 Method for rapidly forming hole by using rotary drilling rig to penetrate through drift sand layer
JP2013241800A (en) * 2012-05-22 2013-12-05 Tetsudo Onda Resistance pile for preventing foundation fluidization
CN104563126A (en) * 2014-12-22 2015-04-29 中铁十九局集团有限公司 Construction method for bored pile by rotary drilling rig

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
彭勇峰: "公路桥桩基穿越流砂层施工技术", 《铁道建筑技术》 *
朱伯松等: "成南高速公路分离立交桥流砂层钻孔桩施工技术", 《西部探矿工程》 *
李洪松等: "城市桥梁桩基利用钢护筒跟进穿透流砂层施工技术", 《2012年全国桥梁技术交流会论文集》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894418A (en) * 2017-02-28 2017-06-27 济南轨道交通集团有限公司 A kind of metalling plants the running pulp administering method of prefabricated pile
CN106894418B (en) * 2017-02-28 2019-08-13 济南轨道交通集团有限公司 A kind of metalling plants the running pulp administering method of prefabricated pile
CN107701109A (en) * 2017-09-08 2018-02-16 浙江江南春建设集团有限公司 The sand foundation of stone flour containing block bored concrete pile drilling preprocess method
CN108457267A (en) * 2018-02-12 2018-08-28 中铁十八局集团有限公司 A kind of basic forming hole method of railway sound barrier stake
CN109914397A (en) * 2019-03-19 2019-06-21 重庆建筑工程职业学院 Bridge Pile Foundation Construction method
CN110387879A (en) * 2019-06-27 2019-10-29 中交第二航务工程局有限公司 A kind of concrete filling pile construction method of hydraulic vibration hammer hidden pipe
CN110485453A (en) * 2019-09-07 2019-11-22 北京华昊水利水电工程有限责任公司 A kind of Pile-supported stand foundation structure and its construction method
CN110700247A (en) * 2019-09-27 2020-01-17 中冶交通建设集团有限公司 Construction method for cast-in-place pile to penetrate through quicksand layer

Similar Documents

Publication Publication Date Title
CN105297757A (en) Construction method for quicksand layer pile foundation
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN104612143B (en) Composite pile constructed in drilled hole structure under a kind of solution cavity/soil cave geological conditions
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN211898463U (en) Reinforcing device combining micro-steel pipe pile and anchor rod
US20160340851A1 (en) Method for installing metal piles in permafrost soil
CN108843341A (en) A kind of the cut-and-cover tunnel structure and its construction method of mixture of piles and concrete wall formula
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN208088288U (en) The big areas grain size shiver stone Gao Tian pile foundation fast pore-creating structure
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN103911993B (en) A kind of PHA anchor pole and construction method thereof
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication