CN105839946B CN201610195826.7A CN201610195826A CN105839946B CN 105839946 B CN105839946 B CN 105839946B CN 201610195826 A CN201610195826 A CN 201610195826A CN 105839946 B CN105839946 B CN 105839946B
Authority
CN
China
Prior art keywords
building
concrete
layer
brick
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610195826.7A
Other languages
Chinese (zh)
Other versions
CN105839946A (en
Inventor
贾强
张鑫
刘华军
孙增斌
邢建
李鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201610195826.7A priority Critical patent/CN105839946B/en
Publication of CN105839946A publication Critical patent/CN105839946A/en
Application granted granted Critical
Publication of CN105839946B publication Critical patent/CN105839946B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • E04G23/065Lifting of buildings

Abstract

The invention discloses a kind of building with brick-concrete structure to lift increasing layer method, comprises the following steps:The earthwork of building bottom is excavated, exposes strip footing;Transform beams are laid inside and outside building masonry wall, the building masonry wall in transform beams bottom penetrates pull rope;Exchange pillar is laid through strip footing, column bottom is underpined and is supported on the hard soil layer of strip footing bottom;Traction enhancement device is installed at the top of exchange pillar;The junction of transform beams bottom building masonry wall and strip footing is blocked;Building is promoted to setting position by traction enhancement device;Earth excavation, form foundation ditch;Basement bottom board is built in foundation ditch bottom pour mold, pours one layer of wall of basement wall and building;Carry out the construction of basement and building first floor plate;The earthwork in the external foundation ditch of basement wall is backfilled, recovers ground.Frame structure building is realized using the method for jacking add and layer and set up basement, avoid roof waterproof and the repetition construction of heat-insulation layer and the reinforcing of infrastructure.

Description

Building with brick-concrete structure lifts increasing layer method
Technical field
The present invention relates to a kind of building building technology, especially a kind of side using lifting implementation existing building increasing layer Method, specifically a kind of building with brick-concrete structure lifting increasing layer method.
Background technology
Existing building increasing layer is protection land resource, expands usable floor area, and lifting uses the effective ways of function.Building Building thing top increasing layer needs to remove the insulation of former roofing and waterproof layer, in the new insulation of the top construction of newly-increased structure sheaf and prevents Water layer, easily cause the waste of resource;Meanwhile increasing layer makes the increase of original structure load, the vertical member bearing capacity of building bottom is not Foot is, it is necessary to consolidation process.
The content of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of building with brick-concrete structure lifts increasing layer Method, after building with brick-concrete structure is lifted, with underground increasing layer more than the ground of bottom, expand building usable floor area.
To achieve the above object, the present invention uses following technical proposals:
Building with brick-concrete structure lifts increasing layer method, comprises the following steps:
Step 1:The earthwork of building bottom is excavated, exposes strip footing;
Step 2:Transform beams are laid inside and outside the building masonry wall of strip footing top surface, by building masonry wall It is sandwiched between transform beams, the building masonry wall in transform beams bottom penetrates pull rope;
Step 3:Exchange pillar is laid through strip footing, underpins the hard soil layer that column bottom is supported on strip footing bottom On;
Step 4:Traction enhancement device is installed at the top of exchange pillar, pull rope is connected with traction enhancement device;
Step 5:Traction enhancement device is set to tighten up pull rope, by the connection of transform beams bottom building masonry wall and strip footing Place is blocked;
Step 6:Traction enhancement device is worked on, and building is promoted into setting position;
Step 7:The earthwork below strip footing is excavated, forms foundation ditch;
Step 8:Basement bottom board is built in foundation ditch bottom pour mold, basement wall and building are poured immediately below building masonry wall One layer of wall;
Step 9:Removal traction enhancement device and pull rope, exchange pillar and transform beams are removed, carry out basement and building The construction of first floor plate;
Step 10:The earthwork in the external foundation ditch of basement wall is backfilled, recovers ground.
Preferably, in the step 2, along the connecting key for underpining distance between girders setpoint distance setting passing through building wall, lead Messenger passes through along connecting key in the building wall body of connecting key bottom.
Preferably, the vertical building masonry wall of the connecting key is laid;Easily lay and implement, more save connecting key material Material, traction enhancement process are relatively reliable.
In the step 3, exchange pillar is laid in inside and outside building masonry wall, and the laying position of exchange pillar and pull rope Put corresponding.
The traction enhancement device is hoist engine or Lift-slab machine.
The pull rope is steel wire rope.
The step 4 concretely comprises the following steps:Hoist engine or Lift-slab machine are installed at the top of exchange pillar, pull rope is penetrated into elevator The drum barrel of machine or Lift-slab machine.
The step 5 concretely comprises the following steps:Hoist engine or Lift-slab machine are started, after pull rope is tightened up painstakingly, closes down elevator Machine or Lift-slab machine, the junction of transform beams bottom building masonry wall and strip footing is blocked.
The depth of earth excavation is equal to the floor height of one layer or two layers basement in the step 7.
The present invention operation principle be:
By setting transform beams to clamp building masonry wall, and connecting key is laid between transform beams, penetrated by connecting key Pull rope, the instrument as lifting building;Exchange pillar is laid in building masonry wall both sides, is carried by exchange pillar installation traction Device is risen, after building is promoted into setting position by traction enhancement device after being connected with pull rope, under earth excavation construction ground Room and floor building, existing building increasing layer is realized using lifting.
Beneficial effects of the present invention are:
Method of the invention using jacking realizes frame structure building and adds layer and set up basement, avoids roofing and prevents Water and the repetition construction of heat-insulation layer and the reinforcing of infrastructure.
The method that the present invention is lifted reduces the carrying of cushion block compared with jacking method and resting for process of jacking (jacked Cheng Zhong, the stroke of a jack, about 20cm are often risen to, cushion block is installed with regard to that need to rest).
In addition, lifting process building is walked along lifting circuit, it is not susceptible to offset, process is more easy to control, economy effect It is beneficial notable.
Brief description of the drawings
Fig. 1 --- the building with brick-concrete structure elevation before lifting;
Fig. 2 --- the building with brick-concrete structure plan before lifting;
Fig. 3 --- earth excavation, expose basic schematic;
Fig. 4 --- in the elevation of strip footing both sides construction concrete transform beams;
Fig. 5 --- in the plan of strip footing both sides construction concrete transform beams;
Fig. 6 --- in strip footing both sides construction stake elevation;
Fig. 7 --- in strip footing both sides construction stake plan;;
Fig. 8 --- in the elevation of stake top installation hoist engine;
Fig. 9 --- in the plan of stake top installation hoist engine;
Figure 10 --- block wall and the connection diagram on basis;
Figure 11 --- lifting upper building schematic diagram;
Figure 12 --- excavate the earthwork schematic diagram of infrastructure and basement;
Figure 13 --- the wall schematic diagram of construction basement bottom board, basement wall and one layer of building;
Figure 14 --- stake, transform beams are removed, construct basement and one layer of building beam slab, the backfill earthwork, recover ground Schematic diagram;
In figure, 1. walls;2. strip footing;3. concrete beam plate;4. basic bearing stratum;5. hard soil layer;6. coagulation Native transform beams;7. underpinned pile;8. steel wire rope;9. hoist engine;10. space of the wall after basis is blocked;11. newly-increased basement beam Plate;12. newly-increased wall;13. newly-increased basement bottom board;14. newly-increased bottom beam slab.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Embodiment:
By three layer three exemplified by the building of brick mix structure strip footing, Fig. 1 and Fig. 2 build for original brick mix structure before lifting The schematic diagram of thing is built, the building masonry wall 1 is supported in the basic bottom of bearing stratum 4 by strip footing 2, mixed by 3 layers between wall 1 Coagulate native beam slab 3 to connect, the basic bottom of bearing stratum 4 is supported on hard soil layer 5.
As shown in Fig. 3-Figure 14, by three layer three exemplified by the building of brick mix structure strip footing, building lifting increasing layer Method includes procedure below:
(1) earthwork of building bottom is excavated, exposes strip footing 2.
(2) in the top surface of strip footing 2, the both sides pouring reinforcement concrete transform beams 6 of inside and outside wall 1, to clamp wall. The armored concrete connecting key for passing through wall is set along transform beams 6 every 3 meters or so, to increase the globality of both sides transform beams. Meanwhile steel wire rope 8 is penetrated in connecting key bottom, the instrument as lifting building.
(3) penetrated inside and outside wall 1 and underpinned pile 7, underpinned pile 7 are set the methods of the relevant position of steel wire rope 8 passes through drilling Steel-pipe pile or concrete-pile can be selected.The bottom of underpinned pile 7 is supported on hard soil layer 5.
(4) installation hoist engine 9 (or Lift-slab machine) is pushed up in underpinned pile 7, steel wire rope 8 penetrates the drum of hoist engine 9 (or Lift-slab machine) Cylinder.Start hoist engine 9 (or Lift-slab machine) make steel wire rope 8 tighten up it is painstaking after, stop the rotation of hoist engine 9 (or Lift-slab machine).
(5) connection of wall segment 1 between the bottom wall 1 of concrete transform beams 6 and the top of strip footing 2, the He of wall 1 are blocked Gap, i.e. space 10 of the wall after basis is blocked between strip footing 2 be present.
(6) continue to start hoist engine 9 (or Lift-slab machine) to overall increase to building close to underpinned pile 7 and push up position.
(7) earth excavation below building, depth be one or two layer of basement floor height (according to being needed using function and The buried depth of stake determines), form foundation ditch.
(8) build concrete of basement bottom plate in foundation ditch bottom pour mold, i.e., newly-increased basement bottom board 13, in original building wall 1 just Lower section pours the wall of concrete basement.
(9) construction building one layer of wall of thing is continued, in the newly-increased wall 12 formed below of original building wall 1.
After (10) one layers of wall are connected with original building wall 1, dismounting underpinned pile 7 pushes up hoist engine 9 (or Lift-slab machine) and steel Cord 8, remove underpinned pile 7 and the both sides concrete transform beams 6 of wall 1.
(11) construction basement and one layer of floor, i.e., newly-increased basement beam slab 11 increase bottom beam slab 14 newly.
(12) earthwork in the outer foundation ditch of basement wall is backfilled, recovers ground.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, model not is protected to the present invention The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deformation that creative work can make still within protection scope of the present invention.

Claims (9)

1. building with brick-concrete structure lifts increasing layer method, it is characterized in that, comprise the following steps:
Step 1:The earthwork of building bottom is excavated, exposes strip footing;
Step 2:Transform beams are laid inside and outside the building masonry wall of strip footing top surface, building masonry wall is sandwiched in Between transform beams, the building masonry wall in transform beams bottom penetrates pull rope;
Step 3:Exchange pillar is laid through strip footing, column bottom is underpined and is supported on the hard soil layer of strip footing bottom;
Step 4:Traction enhancement device is installed at the top of exchange pillar, pull rope is connected with traction enhancement device;
Step 5:Pull rope is tightened up with traction enhancement device, the junction of transform beams bottom building masonry wall and strip footing is cut It is disconnected;
Step 6:Traction enhancement device is worked on, and building is promoted into setting position;
Step 7:The earthwork below strip footing is excavated, forms foundation ditch;
Step 8:Basement bottom board is built in foundation ditch bottom pour mold, one layer of basement wall and building are poured immediately below building masonry wall Wall;
Step 9:Removal traction enhancement device and pull rope, exchange pillar and transform beams are removed, carry out one layer of basement and building The construction of floor;
Step 10:The earthwork in the external foundation ditch of basement wall is backfilled, recovers ground.
2. building with brick-concrete structure as claimed in claim 1 lifts increasing layer method, it is characterized in that, in the step 2, edge underpins Distance between girders setpoint distance sets the connecting key of passing through building wall, building wall of the pull rope along connecting key in connecting key bottom Pass through in vivo.
3. building with brick-concrete structure as claimed in claim 2 lifts increasing layer method, it is characterized in that, the connecting key is vertically built Thing wall is laid.
4. building with brick-concrete structure as claimed in claim 1 lifts increasing layer method, it is characterized in that, in the step 3, exchange pillar It is laid in inside and outside building masonry wall, and exchange pillar is corresponding with the installation position of pull rope.
5. building with brick-concrete structure as claimed in claim 1 lifts increasing layer method, it is characterized in that, the traction enhancement device is Hoist engine or Lift-slab machine.
6. building with brick-concrete structure as claimed in claim 1 or 2 lifts increasing layer method, it is characterized in that, the pull rope is steel Cord.
7. building with brick-concrete structure as claimed in claim 5 lifts increasing layer method, it is characterized in that, the specific step of the step 4 Suddenly it is:Hoist engine or Lift-slab machine are installed at the top of exchange pillar, pull rope is penetrated to the drum barrel of hoist engine or Lift-slab machine.
8. building with brick-concrete structure as claimed in claim 5 lifts increasing layer method, it is characterized in that, the specific step of the step 5 Suddenly it is:Hoist engine or Lift-slab machine are started, after pull rope is tightened up painstakingly, hoist engine or Lift-slab machine is closed down, transform beams bottom is built The junction for building thing wall and strip footing is blocked.
9. building with brick-concrete structure as claimed in claim 1 lifts increasing layer method, it is characterized in that, spoil in the step 7 The depth of side is equal to the floor height of one layer or two layers basement.
CN201610195826.7A 2016-03-31 2016-03-31 Building with brick-concrete structure lifts increasing layer method Active CN105839946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610195826.7A CN105839946B (en) 2016-03-31 2016-03-31 Building with brick-concrete structure lifts increasing layer method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610195826.7A CN105839946B (en) 2016-03-31 2016-03-31 Building with brick-concrete structure lifts increasing layer method

Publications (2)

Publication Number Publication Date
CN105839946A CN105839946A (en) 2016-08-10
CN105839946B true CN105839946B (en) 2018-04-06

Family

ID=56597842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610195826.7A Active CN105839946B (en) 2016-03-31 2016-03-31 Building with brick-concrete structure lifts increasing layer method

Country Status (1)

Country Link
CN (1) CN105839946B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836839A (en) * 2016-11-29 2017-06-13 大连久鼎祥瑞特种工程技术研究院有限公司 Fabric structure jacking increasing layer method
CN106498958B (en) * 2016-11-29 2018-05-04 中国电建集团成都勘测设计研究院有限公司 Reservoir submerges area's brick mixed building terrace lift structure and technique
CN108425386A (en) * 2018-05-24 2018-08-21 山东建筑大学 Frame structure building promotes correcting method
CN109025349B (en) * 2018-07-24 2020-12-04 山东建筑大学 Method for correcting inclination of brick-concrete structure building and adding underground layer
CN109680700B (en) * 2019-02-21 2019-12-03 西华大学 A kind of dedicated unit and construction method carrying out foundation underpinning under strip footing

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963111A (en) * 2005-11-10 2007-05-16 张准胜 Method and device for integral lifting of building and rebuilding ground floor of the building into parking space and marketplace
CN201605831U (en) * 2009-12-30 2010-10-13 上海天演建筑物移位工程有限公司 Steel support for jacking building
CN202055270U (en) * 2011-04-15 2011-11-30 上海天演建筑物移位工程有限公司 System and method for underpinning, lifting and top-down storey addition of building

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITBO20060414A1 (en) * 2006-05-26 2007-11-27 Soles Societa Lavori Edili E Serbatoi Spa Method for lifting a building.

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963111A (en) * 2005-11-10 2007-05-16 张准胜 Method and device for integral lifting of building and rebuilding ground floor of the building into parking space and marketplace
CN201605831U (en) * 2009-12-30 2010-10-13 上海天演建筑物移位工程有限公司 Steel support for jacking building
CN202055270U (en) * 2011-04-15 2011-11-30 上海天演建筑物移位工程有限公司 System and method for underpinning, lifting and top-down storey addition of building

Also Published As

Publication number Publication date
CN105839946A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN104895174B (en) The construction method of heavy caliber rain sewage conduct assembled modular construction
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN103510531B (en) A kind of split type open caisson staking Compound Anchorage basis and construction method thereof
CN105386408B (en) Deep-water bridge pile foundation construction method
CN104674846B (en) A kind of construction method utilizing precast construction lid to dig subway station
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN103981898A (en) Integral open-excavation node top-down underground engineering construction method
JP6010070B2 (en) Temporary closing method for existing underwater structures
CN101509263A (en) Digging method foundation pit structure of steel cover and plate cover, and construction method
CN102966114B (en) Tower crane foundation structure and construction method thereof
CN105863287B (en) Frame structure building jacks increasing layer and shock isolation method
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN104878835B (en) Strip footing increases basement structure behind house
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN105155558A (en) Combined retaining structure and construction method thereof
CN205742213U (en) Foundation pit supporting construction
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN107059667B (en) Door shape assembled armored concrete box culvert and its construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
CN1563612A (en) Construction method for underground structure through half reverse course of action of inverting connection
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN104563130B (en) A kind of cross fender post and the double construction method doing agent structure of space enclosing structure
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
GR01 Patent grant