CN107152026B - A kind of the mud jacking pipe support and its distribution method of steel-pipe pile - Google Patents

A kind of the mud jacking pipe support and its distribution method of steel-pipe pile Download PDF

Info

Publication number
CN107152026B
CN107152026B CN201710454537.9A CN201710454537A CN107152026B CN 107152026 B CN107152026 B CN 107152026B CN 201710454537 A CN201710454537 A CN 201710454537A CN 107152026 B CN107152026 B CN 107152026B
Authority
CN
China
Prior art keywords
mud jacking
pipe support
jacking pipe
steel
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710454537.9A
Other languages
Chinese (zh)
Other versions
CN107152026A (en
Inventor
熊仕坤
房尚武
顾科峰
于政权
潘军
余本俊
潘洁
邓鹏举
尚正江
杨金龙
王伟
余阳
张硕
丁岳
陈太雷
陈初远
孙刘洋
刘斌
徐平安
李帅举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201710454537.9A priority Critical patent/CN107152026B/en
Publication of CN107152026A publication Critical patent/CN107152026A/en
Application granted granted Critical
Publication of CN107152026B publication Critical patent/CN107152026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of mud jacking pipe supports of steel-pipe pile, are related to bridge engineering construction field, and mud jacking pipe support includes multiple connected mud jacking pipe support segments, and each mud jacking pipe support segment includes a frame body, and frame body is equipped with several madjack pipes;A high-pressure hose is equipped between the madjack pipe of the adjacent mud jacking pipe support segment of two of them, high-pressure hose is connected to the madjack pipe of two mud jacking pipe support segments, and the frame body of two mud jacking pipe support segments is connected.A kind of mud jacking pipe support of steel-pipe pile provided by the invention, installation and removal are convenient, and construction efficiency is high, use manpower and material resources sparingly, securely and reliably.

Description

A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
Technical field
The present invention relates to bridge engineering construction fields, and in particular to a kind of mud jacking pipe support of steel-pipe pile and its laying side Method.
Background technique
With development and the heavy mechanical equipment application in the construction process of bridge science and technology, stake is long, stake diameter Larger and with stressed collar steel-pipe pile is widely used in bridge structure as a kind of carrying pile foundation.To give full play to The effect of inclined steel-pipe pile bearing course at pile end, it usually needs carry out mud jacking in tubular pole bottom, improve steel-pipe pile ultimate bearing capacity.
Large Steel tubular pole madjack pipe frame long for such stake, that stake diameter is larger and with stressed collar is laid, madjack pipe Frame includes frame body and multiple madjack pipes, in order to adapt to longer steel-pipe pile, needs to be segmented in steel-pipe pile and lays mud jacking pipe support, pass Each segment of mud jacking pipe support of system is attached using all-welded mode, two sections of mud jacking between two adjacent segment frame bodies, adjacent Pipe is welded, and the mode of such welding not only makes mud jacking pipe support installation trouble, time-consuming and laborious, and is removing mud jacking pipe support When, operating personnel needs to enter steel-pipe pile internal cutting mud jacking pipe support, and disassembly trouble, there is also great security risks.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of mud jacking pipe support of steel-pipe pile, Installation and removal are convenient, and construction efficiency is high, use manpower and material resources sparingly, securely and reliably.
To achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of mud jacking pipe support of steel-pipe pile, the mud jacking pipe support include multiple connected mud jacking pipe support segments, Mei Gesuo Stating mud jacking pipe support segment includes a frame body, and the frame body is equipped with several madjack pipes;The adjacent mud jacking pipe support section of two of them A high-pressure hose is equipped between the madjack pipe of section, the high-pressure hose is connected to the madjack pipe of two mud jacking pipe support segments, and The frame body of two mud jacking pipe support segments is connected.
Based on the above technical solution, mud jacking pipe support segment further includes multiple being arranged in the same direction with the madjack pipe Blade fin, the blade fin is set on the outside of the frame body, and the blade fin has to be bonded with the steel-pipe pile inner wall Curved surface, the both ends of the blade fin are separately connected the both ends of the frame body.
Based on the above technical solution, the blade fin is U-shaped shape, and the blade fin further includes two arcs Bending section, described bending section one end is connected with the curved surface, and the other end is connected with the frame body.
Based on the above technical solution, multiple reinforcing ribs are equipped between frame body outside on the inside of the blade fin Plate.
Based on the above technical solution, round steel, the round steel and pressure are equipped between the high-pressure hose and madjack pipe Slurry pipe is connected.
Based on the above technical solution, a limit steel is additionally provided between the madjack pipe of two mud jacking pipe support segments Muscle, the limit steel bar are set to by the high-pressure hose.
Based on the above technical solution, two frame body junctions are equipped with a connection piece, the connector and frame It welds the side of body.
Based on the above technical solution, the madjack pipe of remaining adjacent mud jacking pipe support segment is integrally formed, remaining The frame body junction of adjacent mud jacking pipe support segment is equipped with connecting plate, and the connecting plate is bolted the frame body.
The present invention also provides a kind of distribution methods of mud jacking pipe support, include the following steps: prefabricated mud jacking pipe support segment, Mud jacking pipe support segment is transferred in steel-pipe pile section by section, connects two adjacent frame bodies, and be located at concrete table with high-pressure hose connection The madjack pipe of two neighboring mud jacking pipe support segment near above face.
Based on the above technical solution, the two neighboring frame body junction being located near above concrete surface is set Connector is set, connecting plate is arranged in remaining adjacent frame body junction, and the connecting plate is bolted two neighboring frame body.
Compared with the prior art, the advantages of the present invention are as follows:
(1) madjack pipe that the present invention is located at two mud jacking pipe support segments near concrete surface is connected by high-pressure hose It is logical, in disassembly, it only need to apply upward active force to the mud jacking pipe support segment being located above concrete, can make to be located at coagulation The high-pressure hose fracture being connected between two mud jacking pipe supports near native surface, without artificial cutting, construction efficiency is high, saves manpower Material resources, securely and reliably.
(2) mud jacking pipe support of the present invention is additionally provided with multiple blade fins, reduces the friction of mud jacking pipe support and steel-pipe pile inner wall Power, convenient for decentralization mud jacking pipe support.
(3) it is additionally provided with limit steel bar by high-pressure hose of the present invention, high-pressure hose torsional deformation can be prevented, mud jacking is avoided to seep Leakage.
Detailed description of the invention
Fig. 1 is main view of the mud jacking pipe support near concrete surface in the embodiment of the present invention;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is to be located at mud jacking pipe support schematic diagram above concrete surface in the embodiment of the present invention;
Fig. 4 is the top view of mud jacking pipe support in the embodiment of the present invention.
In figure: 1- mud jacking pipe support segment, 11- frame body, 12- madjack pipe, 13- blade fin, 131- curved surface, 132- bending Section, 133- reinforce floor, 2- high-pressure hose, 3- round steel, 4- limit steel bar, 5a- connector, 5b- connecting plate.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Referring to figure 1 and figure 2, the embodiment of the present invention provides a kind of mud jacking pipe support of steel-pipe pile, and mud jacking pipe support includes Multiple connected mud jacking pipe support segments 1, each mud jacking pipe support segment 1 include a frame body 11, and frame body 11 is equipped with several mud jacking Pipe 12, a high-pressure hose 2 is equipped between the madjack pipe 12 of the adjacent mud jacking pipe support segment 1 of two of them, and high-pressure hose 2 is connected to this The madjack pipe 12 of two mud jacking pipe support segments 1, and the frame body 11 of the two mud jacking pipe support segments 1 is connected.
Round steel 3 is equipped between high-pressure hose 2 and madjack pipe 12, round steel 3 is connected with madjack pipe 12.The two mud jacking pipe support sections A limit steel bar 4 is additionally provided between the madjack pipe 12 of section 1, limit steel bar 4 is set to by high-pressure hose 2.Limit steel bar 4 and the two Madjack pipe 12 welds, and can prevent 2 torsional deformation of high-pressure hose, mud jacking is avoided to leak.
The two 1 junctions of mud jacking pipe support segment are equipped with a connection piece 5a, the side welding of connector 5a and frame body 11.This Connector 5a is steel pipe in embodiment.
Shown in Figure 3, the madjack pipe 12 of remaining adjacent mud jacking pipe support segment 1 is integrally formed, remaining adjacent pressure 11 junction of frame body for starching pipe support segment 1 is equipped with connecting plate 5b, and connecting plate 5b is bolted frame body 11.
Mud jacking pipe support segment 1 further includes multiple blade fins 13 being arranged in the same direction with madjack pipe 12, and blade fin 13 is set to 11 outside of frame body, blade fin 13 have the curved surface 131 being bonded with steel-pipe pile inner wall, and the both ends of blade fin 13 are separately connected frame The both ends of body 11.
Blade fin 13 is U-shaped shape, and blade fin 13 further includes the bending section 132 of two arcs, 132 one end of bending section with Curved surface 131 is connected, and the other end is connected with frame body 11.13 inside of blade fin and frame body are equipped with multiple reinforcing floors between 11 outside 133.Blade fin 13 reduces the frictional force of mud jacking pipe support and steel-pipe pile inner wall, convenient for decentralization mud jacking pipe support.
Shown in Figure 4, frame body 11 is rectangular-shape, and frame body 11 is spliced by multiple channel steels.Four angles of frame body 11 Place's setting blade fin 13, curved surface 131 are fitted in steel-pipe pile inner wall.
The present invention also provides a kind of distribution methods of mud jacking pipe support, include the following steps: prefabricated mud jacking pipe support segment 1, Mud jacking pipe support segment 1 is transferred in steel-pipe pile section by section, connects two adjacent frame bodies 11, and be located at coagulation with the connection of high-pressure hose 2 The madjack pipe 12 of two neighboring mud jacking pipe support segment 1 near native surface.
In the distribution method of the mud jacking pipe support of the present embodiment, two mud jacking pipe support segments near above concrete will be located at Connector 5a, the side welding of connector 5a and frame body 11 is arranged in 1 two 11 junctions of frame body.Remaining is located on concrete Connecting plate 5b is arranged in two 11 junctions of frame body of the adjacent mud jacking pipe support segment 1 of side, and it is adjacent that connecting plate 5b is bolted remaining Two frame bodies 11.
When needing to dismantle mud jacking pipe support, certain work is applied upwards to the mud jacking pipe support segment 1 being located above concrete Firmly, smaller under the action of being born due to limit steel bar 4 and high-pressure hose 2, limit steel bar 4 can take off between madjack pipe 12 From high-pressure hose 2 disconnects, and can will be located in two mud jacking pipe support segments 1 and concrete near above concrete surface Mud jacking pipe support segment 1 disconnects, then the multiple mud jacking pipe supports segment 1 disassembled is decomposed, and removes two neighboring frame section by section Connection bolt between body 11, to complete the multistage disassembly of mud jacking pipe support, and by multiple individual mud jacking pipe supports of disassembly Segment 1 is used in other steel-pipe piles, and mud jacking pipe support is reused, and saves resource, save the cost.
The madjack pipe that the present invention is located at two mud jacking pipe support segments 1 near above concrete surface is connected by high-pressure hose It is logical, in disassembly, it only need to apply upward active force to the mud jacking pipe support segment 1 being located above concrete surface, position can be made The high-pressure hose fracture being connected between two mud jacking pipe supports near above the concrete surface, without artificial cutting, construction efficiency Height uses manpower and material resources sparingly, securely and reliably.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (10)

1. a kind of mud jacking pipe support of steel-pipe pile, which is characterized in that the mud jacking pipe support includes multiple connected mud jacking pipe support sections Section (1), each mud jacking pipe support segment (1) include a frame body (11), and the frame body (11) is equipped with several madjack pipes (12);A high-pressure hose (2) are equipped between the madjack pipe (12) of the adjacent mud jacking pipe support segment (1) of two of them, the high pressure Hose (2) is connected to the madjack pipe (12) of two mud jacking pipe support segments (1), and the frame of two mud jacking pipe support segments (1) Body (11) is connected.
2. the mud jacking pipe support of steel-pipe pile as described in claim 1, it is characterised in that: also wrap mud jacking pipe support segment (1) Multiple blade fins (13) being arranged in the same direction with the madjack pipe (12) are included, the blade fin (13) is set to the frame body (11) Outside, the blade fin (13) have the curved surface (131) that is bonded with the steel-pipe pile inner wall, and the two of the blade fin (13) End is separately connected the both ends of the frame body (11).
3. the mud jacking pipe support of steel-pipe pile as claimed in claim 2, it is characterised in that: the blade fin (13) is U-shaped shape, The blade fin (13) further includes the bending section (132) of two arcs, described bending section (132) one end and the curved surface (131) it is connected, the other end is connected with the frame body (11).
4. the mud jacking pipe support of steel-pipe pile as claimed in claim 3, it is characterised in that: blade fin (13) inside and frame Multiple reinforcing floors (133) are equipped between on the outside of body (11).
5. the mud jacking pipe support of steel-pipe pile as described in claim 1, it is characterised in that: the high-pressure hose (2) and madjack pipe (12) round steel (3) are equipped between, the round steel (3) is connected with madjack pipe (12).
6. the mud jacking pipe support of steel-pipe pile as described in claim 1, it is characterised in that: two mud jacking pipe support segments (1) Madjack pipe (12) between be additionally provided with a limit steel bar (4), it is other that the limit steel bar (4) is set to the high-pressure hose (2).
7. the mud jacking pipe support of steel-pipe pile as described in claim 1, it is characterised in that: two frame body (11) junctions are set Have a connection piece (5a), the side welding of the connector (5a) and frame body (11).
8. the mud jacking pipe support of steel-pipe pile as described in claim 1, it is characterised in that: remaining adjacent mud jacking pipe support segment (1) madjack pipe (12) is integrally formed, and frame body (11) junction of remaining adjacent mud jacking pipe support segment (1) is equipped with connecting plate (5b), the connecting plate (5b) are bolted the frame body (11).
9. the distribution method of mud jacking pipe support as described in any one of claim 1 to 8, which comprises the steps of: prefabricated Mud jacking pipe support segment (1) is transferred in mud jacking pipe support segment (1) section by section in steel-pipe pile, connects two adjacent frame bodies (11), is used in combination High-pressure hose (2) connection is located at the madjack pipe of the two neighboring mud jacking pipe support segment (1) near above concrete surface (12)。
10. the distribution method of mud jacking pipe support as claimed in claim 9, it is characterised in that: will be located at attached above concrete surface Connector (5a) is arranged in close two neighboring frame body (11) junction, and connecting plate is arranged in remaining adjacent frame body (11) junction (5b), the connecting plate (5b) are bolted two neighboring frame body (11).
CN201710454537.9A 2017-06-15 2017-06-15 A kind of the mud jacking pipe support and its distribution method of steel-pipe pile Active CN107152026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710454537.9A CN107152026B (en) 2017-06-15 2017-06-15 A kind of the mud jacking pipe support and its distribution method of steel-pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710454537.9A CN107152026B (en) 2017-06-15 2017-06-15 A kind of the mud jacking pipe support and its distribution method of steel-pipe pile

Publications (2)

Publication Number Publication Date
CN107152026A CN107152026A (en) 2017-09-12
CN107152026B true CN107152026B (en) 2019-02-22

Family

ID=59795587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710454537.9A Active CN107152026B (en) 2017-06-15 2017-06-15 A kind of the mud jacking pipe support and its distribution method of steel-pipe pile

Country Status (1)

Country Link
CN (1) CN107152026B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411902B (en) * 2018-02-08 2020-09-29 中铁大桥局集团有限公司 Method for verifying pile bottom grouting effect of steel pipe pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100946879B1 (en) * 2009-11-09 2010-03-09 장정환 Connection for Steel Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure
CN104480937A (en) * 2014-12-02 2015-04-01 中国能源建设集团广东省电力设计研究院 Grouting connection unit and application method thereof
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN106245765A (en) * 2016-09-23 2016-12-21 沈阳建筑大学 Slip casting joint steel pipe apparatus structure and method of attachment
CN205857190U (en) * 2016-07-08 2017-01-04 上海长凯岩土工程有限公司 A kind of steel-pipe pile segmenting slip casting structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100946879B1 (en) * 2009-11-09 2010-03-09 장정환 Connection for Steel Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure
CN104480937A (en) * 2014-12-02 2015-04-01 中国能源建设集团广东省电力设计研究院 Grouting connection unit and application method thereof
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN205857190U (en) * 2016-07-08 2017-01-04 上海长凯岩土工程有限公司 A kind of steel-pipe pile segmenting slip casting structure
CN106245765A (en) * 2016-09-23 2016-12-21 沈阳建筑大学 Slip casting joint steel pipe apparatus structure and method of attachment

Also Published As

Publication number Publication date
CN107152026A (en) 2017-09-12

Similar Documents

Publication Publication Date Title
US10648152B2 (en) Box-type pipeline with circumferential obtuse angle connection
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN205894364U (en) Prefabricated formula wall body and prefabricated formula housing construction
CN100580195C (en) Large depth underground continuous wall water-stop joint device
CN105484514A (en) Method for strengthening circular reinforced concrete pier column
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN112096419A (en) Supporting structure and method for repairing tunnel secondary lining damage
CN107152026B (en) A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
CN111593741A (en) Pipeline groove supporting device and construction method
CN105040726A (en) Method for applying circular prestress on fan foundation connection
KR20120120565A (en) Joined structure of steel pipe strut
CN110629792A (en) Splicing construction method for corrugated steel pipe gallery
CN206800481U (en) Static load pile crown protection device and static loading experiment system
CN105735308A (en) Prestressed pipe pile
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN204371413U (en) A kind of highstrenghtpiston's pipe for escaping
CN204212153U (en) Assembled steel guard cylinder
CN208473892U (en) Two lining trolley plug mold device of buried water stop installation in tunnel-liner
CN112283446A (en) Reinforced concrete jacking pipe and processing technology thereof
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN207277837U (en) A kind of templates for expansion joints without removing
CN210111558U (en) Cable river-crossing bridge
CN218053201U (en) Vertical concrete member curing means of circulated use
CN210264804U (en) Rotary extension type escape pipeline device
CN216405381U (en) Be used for diaphragm splicing apparatus again of diaphragm wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant