CN104594357A - Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method - Google Patents

Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method Download PDF

Info

Publication number
CN104594357A
CN104594357A CN201510023403.2A CN201510023403A CN104594357A CN 104594357 A CN104594357 A CN 104594357A CN 201510023403 A CN201510023403 A CN 201510023403A CN 104594357 A CN104594357 A CN 104594357A
Authority
CN
China
Prior art keywords
pile
grouting
precast
slip casting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510023403.2A
Other languages
Chinese (zh)
Inventor
董相东
赵连平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510023403.2A priority Critical patent/CN104594357A/en
Publication of CN104594357A publication Critical patent/CN104594357A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a grouting device after statically pressing or hammering a concrete precast tubular pile base and a grouting method. A precast pile toe is mounted at the bottom part of a precast tubular pile; the precast pile toe is provided with a grouting outlet; a grouting tube is arranged inside the precast tubular pile; the grouting tube is communicated to the grouting outlet through a grouting channel inside the precast pile toe; the grouting tube is tightly connected with a mouth part at one end of the grouting channel through a connector; a locator is arranged between the inner wall of the precast tubular pile and the outer wall of the grouting tube; the precast pile toe is mounted at the bottom part of the precast tubular pile, and the lower opening of the grouting outlet is blocked by a soft plug; the upper opening of the channel inside the precast pile toe is connected with the grouting tube through the connector, and the locator is arranged; the installation of the precast tubular pile is completed by static pressing or hammering, and cement slurry is grouted after 24 hours, wherein the water cement ratio of the cement slurry is 0.5-0.7; a water reducing agent is added when the water cement ratio is small; the grouting tube is pulled out after finishing grouting to reuse. The grouting device and method have the beneficial effects that the single pile bearing capacity can be improved and the cost is reduced.

Description

Static pressure or hammering concrete precast pipe pile pile bottom post-grouting device and grouting method
Technical field
The invention belongs to technical field of building construction, relate to static pressure or hammering concrete precast pipe pile pile bottom post-grouting device and grouting method.
Background technology
Current construction market adopts static pressure (hammering) concrete precast pipe pile more.When static pressure (hammering) concrete precast pipe pile uses, due to the requirement of prefabricated, transport, lifting, pile strength is very high, but bearing capacity is relatively low; Some stratum is as medium-sand seam, and compacted rear generation concentrated stress, passes in time instantaneously, and the concentrated stress that construction produces dribbles, and causes depression of bearing force; Some stratum needs when not reaching designing pile length to draw Kong Houzai static pressure (hammering) concrete precast pipe pile, and this situation easily produces pile top or soil around pile reset condition is destroyed, and causes bearing capacity not play very well, and single pile bearing capacity declines.In the construction technology of conventional piles, the priming concrete pile hole bottom post-grouting technique extensive use of first pore-forming, but static pressure (hammering) concrete precast pipe pile pile bottom post-grouting construction method is difficult to implement always.
Summary of the invention
The object of the present invention is to provide static pressure or hammering concrete precast pipe pile pile bottom post-grouting method, when solving soil plug effect, the low bearing capacity of traditional static pressure or hammering concrete precast pipe pile, higher concrete strength can not play a role, some geological conditions Single Pile supporting capacity can pass the problem that generation reduces gradually in time.
Another object of the present invention is to provide static pressure or hammering concrete precast pipe pile pile bottom post-grouting device.
The technical solution adopted in the present invention comprises precast pile tip, precast pile tip is arranged on bottom prefabricated tubular pile, precast pile tip is provided with the slip casting passage connecting slip casting outlet, Grouting Pipe is arranged on prefabricated tubular pile inside, Grouting Pipe is by the slip casting passage of non retern valve and precast pile tip inside and slip casting outlet, one end oral area of Grouting Pipe and non retern valve is linked together by connector, non retern valve is together with slip casting expanding channels, locator is provided with between prefabricated tubular pile inwall and Grouting Pipe outer wall, locator makes Grouting Pipe can not transverse shifting in prefabricated tubular pile inside, locator can in Grouting Pipe lower slider on the surface, the end face of Grouting Pipe is lower than the end face of pile tube.
Further, described precast pile tip is steel bar concrete material or iron and steel material quality.
Further, described slip casting passage end is several openings, and the corresponding slip casting outlet of each opening, the lower outlet of slip casting outlet is straight mouth or curved mouth.
Further, described connector adopts cast iron pipe collar or steel union; Described Grouting Pipe adopts steel pipe.
Static pressure or hammering concrete precast pipe pile pile bottom post-grouting device carry out the method for slip casting, carry out according to following steps:
Step 1: precast pile tip is arranged on bottom prefabricated tubular pile, and export end opening with cork shutoff slip casting, the slip casting passage in precast pile tip is suitable for reading to be connected Grouting Pipe by connector and installs locator, and static pressure or hammering complete the installation of prefabricated tubular pile;
Step 2:24 hour post-infusion cement slurry, the water/binder ratio of cement paste is 0.5 ~ 0.7, and water/binder ratio hour adds water reducing agent;
Step 3: extract Grouting Pipe after completing slip casting, reuse.
Further, in described step 2, after concrete final set, use clear water to open plug, when concrete reaches design strength, carry out slip casting by Grouting Pipe, form the concrete of guncreting pile and the structure of combining closely of surrounding soil.
Further, in described step 3, after completing slip casting, pile end groundwork soil and Pile side soil are reinforced, increase end resistance and the collateral resistance of stake.
The invention has the beneficial effects as follows and can improve single pile bearing capacity, reduce costs.
Accompanying drawing explanation
Fig. 1 is static pressure of the present invention or hammering concrete precast pipe pile pile bottom post-grouting apparatus structure schematic diagram.
In figure, 1. precast pile tip, 2. prefabricated tubular pile, be 3. with the slip casting outlet of non retern valve, 4. Grouting Pipe, 5. slip casting passage, 6. connector, 7. locator, 8. non retern valve.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention is described in detail.
Static pressure of the present invention or hammering concrete precast pipe pile pile bottom post-grouting device comprises precast pile tip 1 as shown in Figure 1, precast pile tip 1 is provided with slip casting passage 5 and slip casting outlet 3 (is installed on precast pile tip 1 after can independently making, or make one with precast pile tip 1), precast pile tip 1 is arranged on bottom prefabricated tubular pile 2, also comprises Grouting Pipe 4 and connector 6.Slip casting exports 3 configurable non retern valves suitable for reading, prevents slurry reflux.
Precast pile tip 1 can be steel bar concrete pile top and also can be iron and steel material quality, appearance and size makes pertinent regulations according to precast pile tip 1 as required and makes, reserve slip casting passage 5 during making and slip casting exports 3 positions, hole, also only ready-made slip casting outlet 3 can be made one with precast pile tip 1; One or more slip casting outlet 3 can be set in slip casting passage 5 lower end according to actual needs, upper end pools an entrance, grout outlet 3 can be straight mouth, also can be prevent grout outlet 3 pile body press down in process meet soil block after be difficult to slip casting, being made into syphon shape makes outlet avoid meeting native face, slip casting passage 5 upper end connects non retern valve 8, and non retern valve 8 is connected with Grouting Pipe 4 by connector 6; Connector 6 can adopt cast iron pipe collar, steel union etc.; Grouting Pipe 4 adopts steel pipe, and Grouting Pipe 4 will be carried out shutoff to upper end, and ensure that the shutoff end face of Grouting Pipe 4 is lower than prefabricated tubular pile 2 end face after being connected at every turn, in order to avoid Grouting Pipe 4 is in piling or (piling) and drop into foreign material and cause gambling to fill in.When prefabricated tubular pile 2 is longer, Grouting Pipe 4 is also longer, for ensureing stability and the integrity of Grouting Pipe 4, Grouting Pipe 4 arranges locator 7, and the outside dimension of locator 7 should be less than the internal diameter of prefabricated tubular pile 2, and to ensure in prefabricated tubular pile 2 free sliding and along Grouting Pipe 4 outer wall free sliding.It is firm that each connecting portion of Grouting Pipe 4 must connect, and itself and slip casting passage 5 departed from after Grouting Pipe 4 completes slip casting, except slip casting passage 5, comprises locator 7 and Grouting Pipe 4 is all taken out from prefabricated tubular pile 2.
Implementation method of the present invention is as follows:
When static pressure or the construction of hammering concrete precast pipe pile, prefabricated precast pile tip 1 (with slip casting outlet 3) is connected with first segment concrete precast pipe pile and uses cork shutoff slip casting to export 3 end openings, connect Grouting Pipe 4 top shutoff and install locator 7, after static pressure or hammering complete first segment concrete precast pipe pile, again second section concrete precast pipe pile is inserted in after can first connecting second section Grouting Pipe and locating rack, also first can be inserted in and installs after lifting simultaneously.Pile driving construction completes 24 hours post-infusion cement slurries, the water/binder ratio of cement paste is preferably between 0.5 ~ 0.7, and water/binder ratio hour should add water reducing agent, and grouting amount and termination slip casting condition can control by the pertinent regulations of industry standard, Grouting Pipe 4 can be extracted after completing, reuse.
Grouting device of the present invention, via Grouting Pipe in prefabricated tubular pile 24 by the pile bottom post-grouting (cement injection or other reinforcing slurries) of precast pile tip 1 to static pressure of having constructed (hammering) concrete precast pipe pile, pile end groundwork soil and Pile side soil are reinforced, increase end resistance and the collateral resistance of stake, thus improve bearing capacity of single pile; Eliminate stratum or draw the adverse effect that the reasons such as hole play bearing capacity; The single pile bearing capacity of the stake with the method construction can be matched with pile shaft concrete strength as much as possible, the concrete strength of prefabricated tubular pile can be made full use of; Eliminate the soil plug effect that the construction of uncovered prefabricated tubular pile produces; The impact reducing or eliminate the concentrated construction stress produced instantaneously owing to constructing to pass dissipation in time and cause bearing capacity to reduce; Eliminate building hidden danger, reduce building costs simultaneously.
Method and apparatus of the present invention can improve the bearing capacity of stake, and reduce cost, easy Laying injection pipe, easy and simple to handle, Grouting Pipe and locating rack can reuse, energy-conserving and environment-protective, saves cost, economic and practical.The concrete tubular pile technique of various soil layer can be applicable to.The object of the invention is clear and definite, discards the dross and selects the essential, easy construction, reliable in quality, Grouting Pipe material have multiple choices, with low cost, be convenient to promote, increase social benefit.
The above is only to better embodiment of the present invention, not any pro forma restriction is done to the present invention, every any simple modification done above embodiment according to technical spirit of the present invention, equivalent variations and modification, all belong in the scope of technical solution of the present invention.

Claims (7)

1. static pressure or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: comprise precast pile tip (1), precast pile tip (1) is arranged on prefabricated tubular pile (2) bottom, precast pile tip (1) is provided with the slip casting passage (5) connecting slip casting outlet (3), it is inner that Grouting Pipe (4) is arranged on prefabricated tubular pile (2), Grouting Pipe (4) exports (3) by the slip casting passage (5) that non retern valve (8) is inner with precast pile tip (1) with slip casting and is communicated with, Grouting Pipe (4) is linked together by connector (6) with one end oral area of non retern valve (8), non retern valve (8) and slip casting passage (5) link together, locator (7) is provided with between prefabricated tubular pile (2) inwall and Grouting Pipe (4) outer wall, locator (7) makes Grouting Pipe (4) can not transverse shifting in prefabricated tubular pile (2) inside, locator (7) can in Grouting Pipe (4) lower slider on the surface, the end face of Grouting Pipe (4) is lower than the end face of pile tube (2).
2. according to static pressure described in claim 1 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: described precast pile tip (1) is steel bar concrete material or iron and steel material quality.
3. according to static pressure described in claim 1 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: described slip casting passage (5) one end is several openings, corresponding slip casting outlet (3) of each opening, the lower outlet of slip casting outlet (3) is straight mouth or curved mouth.
4. according to static pressure described in claim 1 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: described connector (6) adopts cast iron pipe collar or steel union; Described Grouting Pipe (4) adopts steel pipe.
5. carry out the method for slip casting according to static pressure described in claim 1 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: carry out according to following steps:
Step 1: precast pile tip (1) is arranged on prefabricated tubular pile (2) bottom, and export (3) end opening with cork shutoff slip casting, slip casting passage (5) in precast pile tip (1) is suitable for reading to be connected Grouting Pipe (4) by connector (6) and is installed locator (7), and static pressure or hammering complete the installation of prefabricated tubular pile (2);
Step 2:24 hour post-infusion cement slurry, the water/binder ratio of cement paste is 0.5 ~ 0.7, and water/binder ratio hour adds water reducing agent;
Step 3: extract Grouting Pipe after completing slip casting, reuse.
6. the method for slip casting is carried out according to static pressure described in claim 5 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: in described step 2, after concrete final set, use clear water to open plug, concrete carries out slip casting by Grouting Pipe (4) when reaching design strength, forms the concrete of guncreting pile and the structure of combining closely of surrounding soil.
7. the method for slip casting is carried out according to static pressure described in claim 5 or hammering concrete precast pipe pile pile bottom post-grouting device, it is characterized in that: in described step (3), after completing slip casting, pile end groundwork soil and Pile side soil are reinforced, increase end resistance and the collateral resistance of stake.
CN201510023403.2A 2015-01-19 2015-01-19 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method Pending CN104594357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510023403.2A CN104594357A (en) 2015-01-19 2015-01-19 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510023403.2A CN104594357A (en) 2015-01-19 2015-01-19 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method

Publications (1)

Publication Number Publication Date
CN104594357A true CN104594357A (en) 2015-05-06

Family

ID=53120384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510023403.2A Pending CN104594357A (en) 2015-01-19 2015-01-19 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method

Country Status (1)

Country Link
CN (1) CN104594357A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105842430A (en) * 2016-06-02 2016-08-10 天津大学 Test method and test device for transverse microorganism cement grouting
CN105926588A (en) * 2016-05-07 2016-09-07 哈尔滨共阳科技咨询有限公司 Novel building steel pile
CN106869117A (en) * 2017-01-25 2017-06-20 中铁大桥局集团有限公司 A kind of steel-pipe pile stake bottom pre-load means and method
CN106906822A (en) * 2017-03-08 2017-06-30 威海齐德新型建材有限公司 A kind of prefabricated foundation stake and construction method
CN107152026A (en) * 2017-06-15 2017-09-12 中铁大桥局集团有限公司 The mud jacking pipe support and its distribution method of a kind of steel-pipe pile
CN107794925A (en) * 2017-10-31 2018-03-13 浙江大学城市学院 The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN108005078A (en) * 2017-12-05 2018-05-08 北京航天地基工程有限责任公司 Column is hammered into shape and column hammer rammed bulb pile composite foundation construction method
CN108179743A (en) * 2018-02-09 2018-06-19 浙江大学城市学院 A kind of synchronous grouting pile for prestressed pipe and construction method
CN109915043A (en) * 2019-03-19 2019-06-21 安徽联开建设工程有限责任公司 A kind of construction method of spiral Squeezing Soil Pile hole drill tool and bored concrete pile
CN114991136A (en) * 2022-06-22 2022-09-02 江苏交水建智能装备研究院有限公司 Intelligent penetration pipe pile capable of achieving grouting at different depths and manufacturing method and using method thereof
CN115977097A (en) * 2023-01-18 2023-04-18 上海勘察设计研究院(集团)有限公司 Hollow pile bottom can be rotated out grouting device and pile bottom grouting method
CN115977096A (en) * 2023-01-18 2023-04-18 上海勘察设计研究院(集团)有限公司 Hollow pile post-grouting device and pile bottom post-grouting method thereof
CN116516970A (en) * 2023-04-07 2023-08-01 山东高速岩土科技有限公司 Stable post-grouting device suitable for vibrating immersed tube filling pile

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3939664A (en) * 1973-07-09 1976-02-24 Solmarine S.A. Large diameter tubular piles and the bedding thereof
CN1078519A (en) * 1992-05-12 1993-11-17 王英权 Pile-making method by drilling-slurry and drilling tool rotary spray apparatus
CN1143137A (en) * 1995-01-19 1997-02-19 叶长生 Injecting method for steel rod concrete prefabricated pile end
JP2004027796A (en) * 2002-06-24 2004-01-29 Kazuo Iki Self-drilling injection device for use in high-pressure injection/agitation pile construction method
CN2756706Y (en) * 2004-11-05 2006-02-08 宁波市机电工业研究设计院 Pile bottom pust filling prestress pipe pile
CN2858774Y (en) * 2005-12-29 2007-01-17 王永强 Gunite type pile tip for prestressed pipe pile
CN101182716A (en) * 2007-12-05 2008-05-21 中北大学 Pile sinking method of synchronous grouting static pressure prefabricated pile
CN102660946A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 A kind of pipe pile grouting pile head and using method thereof
CN204491617U (en) * 2015-01-19 2015-07-22 赵连平 A kind of static pressure or hammering concrete precast pipe pile pile bottom post-grouting device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3939664A (en) * 1973-07-09 1976-02-24 Solmarine S.A. Large diameter tubular piles and the bedding thereof
CN1078519A (en) * 1992-05-12 1993-11-17 王英权 Pile-making method by drilling-slurry and drilling tool rotary spray apparatus
CN1143137A (en) * 1995-01-19 1997-02-19 叶长生 Injecting method for steel rod concrete prefabricated pile end
JP2004027796A (en) * 2002-06-24 2004-01-29 Kazuo Iki Self-drilling injection device for use in high-pressure injection/agitation pile construction method
CN2756706Y (en) * 2004-11-05 2006-02-08 宁波市机电工业研究设计院 Pile bottom pust filling prestress pipe pile
CN2858774Y (en) * 2005-12-29 2007-01-17 王永强 Gunite type pile tip for prestressed pipe pile
CN101182716A (en) * 2007-12-05 2008-05-21 中北大学 Pile sinking method of synchronous grouting static pressure prefabricated pile
CN102660946A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 A kind of pipe pile grouting pile head and using method thereof
CN204491617U (en) * 2015-01-19 2015-07-22 赵连平 A kind of static pressure or hammering concrete precast pipe pile pile bottom post-grouting device

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926588A (en) * 2016-05-07 2016-09-07 哈尔滨共阳科技咨询有限公司 Novel building steel pile
CN105842430A (en) * 2016-06-02 2016-08-10 天津大学 Test method and test device for transverse microorganism cement grouting
CN106869117A (en) * 2017-01-25 2017-06-20 中铁大桥局集团有限公司 A kind of steel-pipe pile stake bottom pre-load means and method
CN106906822A (en) * 2017-03-08 2017-06-30 威海齐德新型建材有限公司 A kind of prefabricated foundation stake and construction method
CN107152026B (en) * 2017-06-15 2019-02-22 中铁大桥局集团有限公司 A kind of grouting pipe frame for steel pipe pile and its laying method
CN107152026A (en) * 2017-06-15 2017-09-12 中铁大桥局集团有限公司 The mud jacking pipe support and its distribution method of a kind of steel-pipe pile
CN107794925A (en) * 2017-10-31 2018-03-13 浙江大学城市学院 The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN108005078A (en) * 2017-12-05 2018-05-08 北京航天地基工程有限责任公司 Column is hammered into shape and column hammer rammed bulb pile composite foundation construction method
CN108005078B (en) * 2017-12-05 2021-01-15 北京航天地基工程有限责任公司 Column hammer and column hammer rammed pile-expanding composite foundation construction method
CN108179743A (en) * 2018-02-09 2018-06-19 浙江大学城市学院 A kind of synchronous grouting pile for prestressed pipe and construction method
CN109915043A (en) * 2019-03-19 2019-06-21 安徽联开建设工程有限责任公司 A kind of construction method of spiral Squeezing Soil Pile hole drill tool and bored concrete pile
CN114991136A (en) * 2022-06-22 2022-09-02 江苏交水建智能装备研究院有限公司 Intelligent penetration pipe pile capable of achieving grouting at different depths and manufacturing method and using method thereof
CN114991136B (en) * 2022-06-22 2024-05-28 江苏交水建智能装备研究院有限公司 Intelligent penetration pipe pile capable of realizing grouting at different depths and manufacturing method and using method thereof
CN115977097A (en) * 2023-01-18 2023-04-18 上海勘察设计研究院(集团)有限公司 Hollow pile bottom can be rotated out grouting device and pile bottom grouting method
CN115977096A (en) * 2023-01-18 2023-04-18 上海勘察设计研究院(集团)有限公司 Hollow pile post-grouting device and pile bottom post-grouting method thereof
CN116516970A (en) * 2023-04-07 2023-08-01 山东高速岩土科技有限公司 Stable post-grouting device suitable for vibrating immersed tube filling pile

Similar Documents

Publication Publication Date Title
CN104594357A (en) Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN204491617U (en) A kind of static pressure or hammering concrete precast pipe pile pile bottom post-grouting device
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN103410182B (en) Unilateral pile foundation unloading horizontal top-level pull deviation rectifying and broken pile reinforcement construction method
CN102444118A (en) Sleeve valve pipe grouting reinforcement construction method
CN101070702A (en) Single-hole composite anchoring pile
CN102296617A (en) Post-grouting reinforcement construction method of flexible joints of diaphragm walls
CN201826315U (en) Grouting sleeve valve pipe
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN102877470A (en) Combined soil nailing construction method
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN203796288U (en) Water seepage prevention structure used for shield entrance door employing SMW piles
CN117605036A (en) Spiral winding integrated pile end grouting device and construction method
CN204728350U (en) For the ruggedized construction that artificial earth fill's slope reinforcement is administered
CN109763391A (en) Base and roadbed construction method are reinforced in disease road single hole combined casting
CN103452115A (en) Casing pipe type bottom feeding post-pipe-plugging and post-grouting device and construction method
CN201513182U (en) Broken rock advance curtain grouting double-channel sectional grouting device
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN201963315U (en) Mold-bagged grouting device for fast and uniformly reinforcing soft stratum
CN208650049U (en) A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN105735331A (en) Grouting reinforcement construction method for underground engineering
CN206916543U (en) Structure is repaired in a kind of non-fragment orbit railway tunnel arch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150506

WD01 Invention patent application deemed withdrawn after publication