CN111593741A - Pipeline groove supporting device and construction method - Google Patents

Pipeline groove supporting device and construction method Download PDF

Info

Publication number
CN111593741A
CN111593741A CN202010551885.XA CN202010551885A CN111593741A CN 111593741 A CN111593741 A CN 111593741A CN 202010551885 A CN202010551885 A CN 202010551885A CN 111593741 A CN111593741 A CN 111593741A
Authority
CN
China
Prior art keywords
groove
support
pipeline
supporting device
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010551885.XA
Other languages
Chinese (zh)
Inventor
项菲
刘家旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010551885.XA priority Critical patent/CN111593741A/en
Publication of CN111593741A publication Critical patent/CN111593741A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The invention discloses a pipeline groove supporting device which comprises two protection plates and a plurality of horizontal steel supports, wherein the two protection plates are arranged oppositely, vertical adjusting supports are arranged on two sides of each protection plate, a plurality of height adjusting holes are distributed in the vertical adjusting supports, and the horizontal steel supports are arranged between the two protection plates and are connected with the height adjusting holes in the vertical adjusting supports through bolts. The invention also discloses a construction method adopting the pipeline groove supporting device. The pipeline groove supporting device is simple in structure, capable of being used repeatedly, safe and reliable, convenient and efficient in construction method, short in construction period and low in cost.

Description

Pipeline groove supporting device and construction method
Technical Field
The invention relates to a pipeline construction supporting technology, in particular to a pipeline groove supporting device and a construction method.
Background
The groove supporting refers to supporting, reinforcing and protecting measures adopted for the side wall of the groove and the surrounding environment in order to ensure the safety of the underground structure construction and the surrounding environment of the groove, and the groove needs to be supported in the pipeline construction process. At present, a large excavation method is mostly adopted for pipeline construction, the original pavement demolishing area is large, the pavement restoration period is long, a large amount of manpower and material resources are consumed, when a limited area of a field is met and the requirement of a large excavation operation surface cannot be met, pipe jacking and pipe tamping construction are mostly adopted, but the construction period can be obviously prolonged, and the construction cost is greatly improved.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a pipeline groove supporting device and a construction method, and solves the problems of long construction period and high construction cost of the groove supporting when the pipeline construction working face is narrow.
In order to achieve the above purpose, the device of the invention is realized by the following technical scheme:
the utility model provides a pipeline groove supporting device, includes two backplate and a plurality of horizontal steel shotcrete, and two backplate set up relatively, and the backplate both sides all are provided with vertical adjustment and support, and vertical adjustment supports and goes up to distribute has a plurality of altitude mixture control holes, and horizontal steel shotcrete sets up between two backplates to with vertical adjustment support on the altitude mixture control hole bolted connection.
Adopt above-mentioned technical scheme's device, compare with prior art, beneficial effect is: the device simple structure can have enough to meet the need the use, and safe and reliable can not only reduce the destruction scope to original road surface under the narrow, the tight condition of time limit for a project of construction operation face, also can reach the effect of shortening the time limit for a project, saving cost.
Further, the vertical adjusting support comprises a vertical plate with a height adjusting hole and a top plate arranged at the top end of the vertical plate.
Further, horizontal steel shotcrete includes the vaulting pole and sets up the end of dismantling at the vaulting pole both ends.
Furthermore, the supporting rods are made of H-shaped steel, the shaping stiffening plates are arranged between the upper flange plate and the lower flange plate of the H-shaped steel and symmetrically arranged along the two sides of the H-shaped steel, and end plates are arranged at the two ends of the H-shaped steel.
Furthermore, the detachable end comprises an end support pipe and an auxiliary support pipe, one end of the end support pipe is connected with the end plate through a bolt, the other end of the end support pipe is provided with a bolt connector, the bolt connector is connected with a height adjusting hole on the vertical adjusting support through the bolt connector, the upper surface and the lower surface of the end support pipe are respectively connected with one end of the auxiliary support pipe, and the other end of the auxiliary support pipe is provided with a bolt connector, and the bolt connector is connected with the height adjusting hole on the vertical adjusting support through the bolt connector.
Further, the backplate comprises frame and plate body, and the frame adopts four channel-section steels welding to form, and the plate body is formed by many horizontal square tubes welding side by side.
Further, the vertical adjusting support is welded on the frame of the guard plate.
A construction method adopting the pipeline groove supporting device is carried out according to the following steps:
1) adopting machinery to carry out groove excavation;
2) two guard plates provided with vertical adjusting supports are erected on the ground outside the groove by using a crane, two ends of a horizontal steel support are manually connected into corresponding height adjusting holes of the vertical adjusting supports by using bolts respectively, and the bolts are screwed down;
3) when the mechanical excavation is carried out to the height above the pipe bottom elevation by 0.2-0.3 m, stopping the mechanical operation, integrally hoisting the first set of pipeline groove supporting device into the groove by a crane to a position 0.4-0.6 m away from the groove bottom, then manually excavating and cleaning the groove by a worker when the groove cleaning is finished, pressing the first set of pipeline groove supporting device to the groove bottom, and then laying a pipeline;
4) hoisting a second set of pipeline groove supporting devices into the groove according to the method in the step 3), laying another adjacent pipeline, processing the joint part of the two sections of pipelines, hoisting the first set of pipeline groove supporting devices to the rear of the next working section after the processing is finished, and thus repeatedly completing the construction of the whole working section;
5) and after all the sections are constructed, lifting the pipeline groove supporting device out of the groove, and transporting the pipeline groove supporting device to a storehouse for storage after the pipeline groove supporting device is disassembled for repeated use in the next project.
Compared with the prior art, the construction method adopting the technical scheme has the beneficial effects that: the construction is simple and convenient, and good support can be rapidly realized under the conditions of narrow construction operation surface, tight construction period and more dense constructors, so that the stability of the groove slope and the safety of the constructors are ensured.
Further, when the joint part of the two sections of pipelines needs to be provided with an inspection well, a third set of pipeline groove supporting device is hung into the groove according to the method in the step 3) to preset the position of the inspection well.
Drawings
Fig. 1 is a schematic structural diagram of a pipeline trench supporting device in an embodiment of the invention.
FIG. 2 is a schematic view of a horizontal steel support structure according to an embodiment of the present invention.
Fig. 3 is a schematic view of a vertical adjustment support structure in an embodiment of the invention.
FIG. 4 is a schematic view of a guard plate structure according to an embodiment of the present invention.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the following detailed description of the present invention will be made with reference to the accompanying drawings.
Referring to fig. 1, a pipeline groove supporting device comprises two protection plates 1 and a plurality of horizontal steel supports 2, wherein the two protection plates 1 are arranged oppositely, vertical adjusting supports 3 are arranged on two sides of each protection plate 1, a plurality of height adjusting holes 31 are distributed on the vertical adjusting supports 3, and the horizontal steel supports 2 are arranged between the two protection plates 1 and are connected with the height adjusting holes 31 on the vertical adjusting supports 3 through bolts. A plurality of horizontal steel shotcrete 2 sets up along the direction of height, and height adjustment hole 31 makes things convenient for horizontal steel shotcrete 2 to adjust from top to bottom.
Referring to fig. 2, the horizontal steel support 2 includes a supporting rod 21 and detachable ends disposed at two ends of the supporting rod 21.
The support rods 21 are made of H-shaped steel, the shaping stiffening plates 22 are arranged between the upper flange plate and the lower flange plate of the H-shaped steel, the shaping stiffening plates 22 are symmetrically arranged along two sides of the H-shaped steel, and end plates 23 are arranged at two ends of the H-shaped steel. The shaping stiffening plates 22 are flush with the outer edges of the upper and lower flange plates of the H-shaped steel, and the distance between the adjacent shaping stiffening plates 22 on the same side of the H-shaped steel is 600 mm.
Wherein, the end of dismantling includes end stay tube 24 and supplementary stay tube 25, 24 one ends of end stay tube and 23 bolted connections of end board, and the other end is equipped with bolted connection head 26 to through bolted connection head 26 and the height control hole 31 bolted connection on the vertical adjustment support 3, the upper and lower surface of end stay tube 24 is connected with a supplementary stay tube 25 one end respectively, the supplementary stay tube 25 other end is equipped with bolted connection head 26, and through bolted connection head 26 and the height control hole 31 bolted connection on the vertical adjustment support 3.
Referring to fig. 3, the vertical adjusting support 3 includes a vertical plate 32 having a height adjusting hole 31 and a top plate 33 disposed at the top end of the vertical plate 32.
Referring to fig. 4, the guard plate 1 is composed of a frame 11 and a plate body 12, wherein the frame 11 is formed by welding four channel steels, and the plate body 12 is formed by welding a plurality of transverse square tubes side by side. The vertical adjusting support 3 is welded on the frame 11 of the guard plate 1.
In the embodiment of the invention, the thicknesses of the vertical plate 32 and the top plate 33 in the vertical adjusting support 3 are both 10mm, the diameter of the height adjusting hole 31 is 20mm, and the hole distance is 100 mm; the stay bar 21 is made of H-shaped steel with the model number of HW125x125x6.5x9, and the end plate 23 is a square plate of 125x125x8 mm; the end supporting tube 24 is made of a transverse steel tube with the diameter of 60x6mm and the length of 170mm, one end of the transverse steel tube is welded with a circular plate with the diameter of 50mm, round holes with the diameter of 15mm are formed in the circular plate and the end plate 23, the circular plate and the round holes of the end plate 23 are connected through bolts, and a small round ring with the diameter of 15mm is welded on the upper surface and the lower surface of the transverse steel tube at a position 70mm away from the circular plate; the auxiliary supporting tube 25 is a steel tube with the diameter of 50x5mm, a small semicircular head plate with a circular hole with the diameter of 15mm is welded at one end of the auxiliary supporting tube 25 and is connected with a small circular ring bolt on the end supporting tube 24, bolt connectors 26 are welded at the other end of the end supporting tube 24 and the other end of the auxiliary supporting tube 25, and each bolt connector 26 is composed of a blocking plate with the thickness of 60x10mm and two square plates with the thickness of 10mm and the circular hole with the diameter of 20mm at the center; the groove steel type number adopted by the frame 11 of the guard plate 1 is [10 ], the type number of the square tube adopted by the plate body 12 is 80x100x8, and the number of the square tubes is 30. Of course, those skilled in the art can also adopt other sizes and numbers of components according to actual needs, and the components are not limited herein.
When the device is manufactured specifically, the size of the device is determined according to the size and the burial depth of the pipeline. The length of the protection plate 1 is larger than that of the pipeline, the height of the protection plate 1 is the depth from the bottom of the groove to the ground, and after the size of the device is determined, the device can be machined. The length of the stay bar 21 is determined by the size between the two guard plates 1 (the size between the two guard plates is equal to the outer diameter of the pipeline and the width of the operation surface on the two sides of the pipeline), and when the length of the stay bar 21 exceeds 2m, one to two horizontal steel supports 2 are additionally arranged between the two guard plates 1 according to the situation, so that the supporting and reinforcing effects are achieved. The concrete pipe construction will be described as an example, and specific dimensions are shown in table 1,
table 1: comparison table (unit: mm) of pipe diameter, working face width and stay bar length
Inner diameter of pipeline Outside diameter of pipe Width of one side working face of pipeline Length of stay bar Remarks (suitable for pipe inner diameter)
400 480 400 690 d≤400
600 720 500 1130 400<d≤600
800 960 500 1370 600<d≤800
1000 1200 600 1810 800<d≤1000
1200 1440 600 2050 1000<d≤1200
1500 1800 800 2810 1200<d≤1500
1800 2160 900 3370 1500<d≤1800
The construction method adopting the pipeline groove supporting device comprises the following steps:
1) and (5) adopting machinery to perform groove excavation.
2) The two guard plates 1 provided with the vertical adjusting supports 3 are erected on the ground outside the groove by using a crane, the two ends of the horizontal steel supports 2 are manually connected into the corresponding height adjusting holes 31 of the vertical adjusting supports 3 by using bolts respectively, and the bolts are screwed down.
3) And when the mechanical excavation is carried out to the height above the elevation of the pipe bottom by 0.2-0.3 m, stopping the mechanical operation, integrally hoisting the first set of pipeline groove supporting device into the groove by a crane to a position 0.4-0.6 m away from the bottom of the groove, then, manually excavating and cleaning the groove by a worker when the worker descends to the groove, after the cleaning of the groove is completed, pressing the first set of pipeline groove supporting device to the bottom of the groove, and then laying pipelines.
4) And (3) hoisting the second set of pipeline groove supporting device into the groove according to the method in the step 3), laying another adjacent pipeline, processing the joint part of the two sections of pipelines, hoisting the first set of pipeline groove supporting device to the rear of the next working section after the processing is finished, and thus, repeatedly finishing the construction of the whole working section.
5) And after all the sections are constructed, lifting the pipeline groove supporting device out of the groove, and transporting the pipeline groove supporting device to a storehouse for storage after the pipeline groove supporting device is disassembled for repeated use in the next project.
And when the joint parts of the two sections of pipelines are preset with inspection wells, hoisting the third set of pipeline groove supporting device into the preset inspection well position in the groove according to the method in the step 3).
In summary, the pipe trench supporting device provided by the embodiment of the invention is suitable for the construction of concrete pipes under the conditions of limited site, narrow working surface and no large excavation, and is also suitable for the support of pit walls during the welding construction of metal pipe joints and inspection wells. The device can have enough to meet the need the use after the dismantlement finishes being under construction, and convenient and fast practices thrift the cost.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.

Claims (9)

1. The utility model provides a pipeline groove supporting device, includes two backplate and a plurality of horizontal steel shotcrete, its characterized in that, two backplate set up relatively, and the backplate both sides all are provided with vertical adjustment support, and vertical adjustment supports and goes up to distribute has a plurality of altitude mixture control holes, and horizontal steel shotcrete sets up between two backplates to with vertical adjustment support on the altitude mixture control hole bolted connection.
2. The conduit trench support apparatus of claim 1 wherein the vertical adjustment support includes a vertical plate having a height adjustment hole and a top plate disposed at a top end of the vertical plate.
3. The conduit trench support apparatus of claim 1 wherein the horizontal steel supports include brace bars and removable ends disposed at opposite ends of the brace bars.
4. The pipeline trench support device of claim 3, wherein the brace rod is made of H-shaped steel, and a shaping stiffening plate is arranged between the upper and lower flange plates of the H-shaped steel and symmetrically arranged along two sides of the H-shaped steel, and end plates are arranged at two ends of the H-shaped steel.
5. The pipe groove support device according to claim 4, wherein the detachable head includes an end support pipe and an auxiliary support pipe, one end of the end support pipe is bolted to the end plate, the other end of the end support pipe is provided with a bolted joint and is bolted to the height adjustment hole of the vertical adjustment support through the bolted joint, the upper and lower surfaces of the end support pipe are respectively connected to one end of an auxiliary support pipe, and the other end of the auxiliary support pipe is provided with a bolted joint and is bolted to the height adjustment hole of the vertical adjustment support through the bolted joint.
6. The conduit trench support apparatus of claim 1, wherein the guard plate comprises a frame and a plate, wherein the frame is formed by welding four channel steels, and the plate is formed by welding a plurality of transverse square pipes side by side.
7. The conduit trench support apparatus of claim 6 wherein the vertical adjustment support is welded to the skirt rim.
8. A method of constructing a pipe trench support apparatus as claimed in any one of claims 1 to 7, comprising the steps of:
1) adopting machinery to carry out groove excavation;
2) two guard plates provided with vertical adjusting supports are erected on the ground outside the groove by using a crane, two ends of a horizontal steel support are manually connected into corresponding height adjusting holes of the vertical adjusting supports by using bolts respectively, and the bolts are screwed down;
3) when the mechanical excavation is carried out to the height above the pipe bottom elevation by 0.2-0.3 m, stopping the mechanical operation, integrally hoisting the first set of pipeline groove supporting device into the groove by a crane to a position 0.4-0.6 m away from the groove bottom, then manually excavating and cleaning the groove by a worker when the groove cleaning is finished, pressing the first set of pipeline groove supporting device to the groove bottom, and then laying a pipeline;
4) and (3) hoisting the second set of pipeline groove supporting device into the groove according to the method in the step 3), laying another adjacent pipeline, processing the joint part of the two sections of pipelines, hoisting the first set of pipeline groove supporting device to the rear of the next working section after the processing is finished, and thus, repeatedly finishing the construction of the whole working section.
5) And after all the sections are constructed, lifting the pipeline groove supporting device out of the groove, and transporting the pipeline groove supporting device to a storehouse for storage after the pipeline groove supporting device is disassembled for repeated use in the next project.
9. The method for constructing the pipe trench support device according to claim 8, wherein when the joint portion of the two sections of pipes needs to be provided with the inspection well, a third set of pipe trench support device is hoisted into the groove at the position of the inspection well according to the method of the step 3).
CN202010551885.XA 2020-06-17 2020-06-17 Pipeline groove supporting device and construction method Pending CN111593741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010551885.XA CN111593741A (en) 2020-06-17 2020-06-17 Pipeline groove supporting device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010551885.XA CN111593741A (en) 2020-06-17 2020-06-17 Pipeline groove supporting device and construction method

Publications (1)

Publication Number Publication Date
CN111593741A true CN111593741A (en) 2020-08-28

Family

ID=72184442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010551885.XA Pending CN111593741A (en) 2020-06-17 2020-06-17 Pipeline groove supporting device and construction method

Country Status (1)

Country Link
CN (1) CN111593741A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113324097A (en) * 2021-04-20 2021-08-31 中国水利水电第九工程局有限公司 Deep groove excavation construction process
CN113802600A (en) * 2021-09-13 2021-12-17 广西路桥工程集团有限公司 Construction method for excavating and installing pipeline in narrow space
CN114892678A (en) * 2022-04-25 2022-08-12 四川中港建设工程有限公司 Shaped groove box supporting device and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113324097A (en) * 2021-04-20 2021-08-31 中国水利水电第九工程局有限公司 Deep groove excavation construction process
CN113802600A (en) * 2021-09-13 2021-12-17 广西路桥工程集团有限公司 Construction method for excavating and installing pipeline in narrow space
CN114892678A (en) * 2022-04-25 2022-08-12 四川中港建设工程有限公司 Shaped groove box supporting device and using method thereof
CN114892678B (en) * 2022-04-25 2024-04-19 四川中港建设工程有限公司 Shaped groove box supporting device and application method thereof

Similar Documents

Publication Publication Date Title
CN111593741A (en) Pipeline groove supporting device and construction method
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN104989434A (en) Method for treating landslide of tunneling working face with pipe penetration combined lagging jacks
CN111622268B (en) Protection construction method based on large rigid box culvert penetrating under power pipe gallery
CN110541966B (en) Auxiliary equipment for jacking pipe joint in narrow space and application method thereof
CN217105096U (en) Deep well support wall concrete pouring and distributing system
CN213804905U (en) Bailey beam suspension structure
CN108798508B (en) Pile hole excavating method
CN210917394U (en) Foundation pit support pile
CN212316947U (en) Pipeline slot supporting device
CN116608323A (en) Quick construction equipment and construction method for fully assembled concrete drainage pipeline
CN217328763U (en) Counter-force support system for pipe jacking construction
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN209923966U (en) Assembly type steel structure tower crane foundation bearing platform capable of freely adjusting angle and position
CN210031831U (en) Sewage pipeline foundation pit supporting structure
CN203531347U (en) Detachable converter tooling platform
CN214879617U (en) Green construction portal of sewage pipe
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure
CN213477098U (en) Shaft concrete guide cutting structure
CN219061652U (en) Middle-short range underground pipeline jacking pipe tunnel construction device
CN219605296U (en) Construction structure suitable for steel construction skeleton preliminary bracing of large-section tunnel
CN216238605U (en) Well plugging device for dewatering well
CN212026283U (en) Foundation pit backfill chute device
CN220433662U (en) Operating device with pile head overspray mould
CN212534232U (en) Protection device for construction of penetrating large-scale rigid box culvert under power pipe gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination