CN107045366B - building equipment control method, device and robot - Google Patents

building equipment control method, device and robot Download PDF

Info

Publication number
CN107045366B
CN107045366B CN201710236172.2A CN201710236172A CN107045366B CN 107045366 B CN107045366 B CN 107045366B CN 201710236172 A CN201710236172 A CN 201710236172A CN 107045366 B CN107045366 B CN 107045366B
Authority
CN
China
Prior art keywords
peripheral region
building equipment
control
building
environmental parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710236172.2A
Other languages
Chinese (zh)
Other versions
CN107045366A (en
Inventor
李元阳
杨国忠
王命仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meikong Intelligent Building Co ltd
Shanghai Meikong Smartt Building Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710236172.2A priority Critical patent/CN107045366B/en
Publication of CN107045366A publication Critical patent/CN107045366A/en
Application granted granted Critical
Publication of CN107045366B publication Critical patent/CN107045366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D27/00Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
    • G05D27/02Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D1/00Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
    • G05D1/02Control of position or course in two dimensions
    • G05D1/021Control of position or course in two dimensions specially adapted to land vehicles
    • G05D1/0212Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory
    • G05D1/0221Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory involving a learning process

Abstract

The present invention relates to field of intelligent control, a kind of building equipment control method, device and robot are disclosed, wherein the method includes:When patrol is near building equipment, judge the building equipment peripheral region whether someone;In the peripheral region of the building equipment in the case where someone, the environmental parameter of the peripheral region of the building equipment is acquired;And the building equipment is controlled according to the environmental parameter.By judging whether someone and combining environmental parameter can effectively realize automatic control to building equipment for building equipment peripheral region.

Description

Building equipment control method, device and robot
Technical field
The present invention relates to field of intelligent control, and in particular, to building equipment control method, device and robot.
Background technique
In modern building, the building equipments such as air-conditioning and illumination are the main power consumption sources of building.These equipment were using Because the awareness of saving energy of manual control is not strong in journey, cause the energy unrestrained when frequently resulting in nobody because forgetting pass hull closure Take, or the setting of indoor environment is always held at and is initially set because personnel do not pay attention to the variation of outdoor environment It is fixed, it cannot be according to actual demand unlatching or adjustment equipment.
The group control system proposed in the prior art usually relies on indoor end electric appliance such as air-conditioning internal machine to obtain for control room The control foundation of outside unit, or only estimate indoor for the demand of load from the operation of outdoor unit.These are all It is indirect control means, and usually because the sensor of indoor is very little either because can not know whether from indoor There is user using, and the judgement of unit is caused to have very big error.But if require the region tool that machine is managed in each There are various sensors sensor cost can be made to increase to be monitored to temperature, humidity, light sensation, and these parameters are also simultaneously Real-time perfoming monitoring is not needed, with certain stationary phase.
It can lead to the waste of the energy, and centralized control system in the prior art from the control process of above-mentioned group control system It can not be carried out changing setting automatically according to the variation that personnel are accustomed to, require manually to go to change.If frequent without administrator Operation set control equipment is gone, the use of integral air conditioner and light not only will not be energy saving, nor can hold automatically according to the actual situation It opens or closes.
Summary of the invention
The purpose of the invention is to provide a kind of building equipment control method, device and robot, to solve or at least Part solves above-mentioned the technical problems existing in the prior art.
To achieve the goals above, one aspect of the present invention provides a kind of building equipment control method, and this method includes:It is patrolling When patrolling near building equipment, judge the building equipment peripheral region whether someone;The feelings of someone in the peripheral region Under condition, the environmental parameter of the peripheral region is acquired;And the building equipment is controlled according to the environmental parameter.
Optionally, the environmental parameter includes at least one or more of following:Temperature, humidity, radiation intensity, brightness And what is obtained and the dress of the people to the peripheral region is analyzed wears parameter.
Optionally, described to control the building equipment according to the environmental parameter and include:According to the environmental parameter come Calculate the optimum temperature value and/or optimum humidity value of the peripheral region;And according to the optimum temperature value and/or it is described most Suitable humidity angle value is come the temperature and/or humidity that controls air-conditioning to adjust in the peripheral region.
Optionally, described to control the building equipment according to the environmental parameter and include:According to the peripheral region Brightness controls the unlatching and/or closing of the light in the peripheral region;And/or the radiation intensity according to the peripheral region To control the unlatching and/or closing of the curtain in the peripheral region.
Optionally, the method also includes:Count the time point and/or number of users that the building equipment is used;With And according to the time point and/or the number of users come building equipment described in pre-control.
Optionally, the method also includes:In the peripheral region nobody in the case where, control the building equipment and close It closes.
Optionally, the method also includes:Draw the plane map of the building;With plane earth building marked in the figure Space equipment is that target plans patrol route;And it is gone on patrol according to the patrol route planned.
Another aspect of the present invention also provides a kind of control device for building equipment, which includes:Judgment module, in institute When stating device patrol near building equipment, judge the building equipment peripheral region whether someone;Acquisition module, in institute It states in peripheral region in the case where someone, acquires the environmental parameter of the peripheral region;And control module, it is used for basis The environmental parameter controls the building equipment.
Optionally, the environmental parameter includes at least one or more of following:Temperature, humidity, radiation intensity, brightness And what is obtained and the dress of the people to the peripheral region is analyzed wears parameter.
Optionally, described device further includes:Computing module, for calculating the building equipment according to the environmental parameter The peripheral region optimum temperature value and/or optimum humidity value;And the control module is used for according to the most thermophilic Angle value and/or the optimum humidity value are come the temperature and/or humidity that controls air-conditioning to adjust in the peripheral region.
Optionally, the control module is used for:It is controlled according to the brightness of the peripheral region in the peripheral region The unlatching and/or closing of light;And/or curtain in the peripheral region is controlled according to the radiation intensity of the peripheral region Unlatching and/or closing.
Optionally, described device further includes:Statistical module, for count time point that the building equipment is used and/ Or number of users;The control module is also used to according to the time point and/or the number of users come building described in pre-control Equipment.
Optionally, in the case that the control module is also used in the peripheral region nobody, the building is controlled and are set It is standby to close.
Optionally, described device further includes:Map drawing module, for drawing the plane map of the building;Route rule Module is drawn, for planning using plane earth building equipment marked in the figure as target patrol route;And patrol mould Block, for being gone on patrol according to the patrol route planned.
Another aspect of the invention also provides a kind of robot, which includes above-mentioned control device for building equipment.
Through the above technical solutions, first determining whether the peripheral region of the building equipment when near patrol to building equipment Whether someone;In the peripheral region for determining building equipment in the case where someone, the ring of the peripheral region of building equipment is acquired Border parameter simultaneously controls building equipment according to the environmental parameter, and the automatic control to building equipment is realized by combining environmental parameter System.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 shows the schematic flow diagram of building equipment control method according to an embodiment of the invention;
Fig. 2 shows the plane map for the building drawn and the schematic diagrames for the route planned in the plane map;With And
Fig. 3 shows the schematic block diagram of control device for building equipment according to an embodiment of the invention.
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
Fig. 1 shows the schematic flow diagram of building equipment control method according to an embodiment of the invention.As shown in Figure 1, The embodiment of the present invention provides a kind of building equipment control method, which can for example be executed by patrol formula robot, This method may comprise steps of:
Step S11, when patrol is near building equipment, judge the building equipment peripheral region whether someone.
Patrol robot can go on patrol the building equipment in building according to preset route, and building equipment can To include air-conditioning, light or some other electromechanical equipments etc..When near every patrol a to building equipment, the building can be first determined whether In the peripheral region of space equipment whether someone.For example, can be judged by video equipment or scanning device be in peripheral region No someone.Optionally, peripheral region can be the certain area around the preset building equipment, such as can be circumference In two meters or in three meters of circumference etc..
Step S12 in the peripheral region of the building equipment in the case where someone, acquires the described of the building equipment The environmental parameter of peripheral region.
Here, environmental parameter for example, at least may include one or more of following:It is temperature, humidity, radiation intensity, bright It spends and what is obtained and the dress of the people of the peripheral region to the building equipment is analyzed wears parameter.Its In, the various sensors installed in robot or detector can be used to measure above-mentioned environmental parameter, temperature can be used for example Sensor is spent to measure temperature, humidity is measured using humidity sensor, radiation intensity is measured using radiation sensor, is used Luminance sensor measures brightness etc..Alternatively, temperature can be measured by installing suitable Comfort Sensor in robot Degree, humidity, radiation intensity and realization dress analysis.
Step S13 controls the building equipment according to the environmental parameter.
For example, air-conditioning can be controlled by temperature or humidity collected etc., and/or brightness collected can be passed through To control the brightness of light or opening or closing for control light.
It is alternatively possible to building equipment be controlled by transmitting infrared remote-controlled signal, for example, the unlatching of remote control air-conditioning Or close or control the lifting of air-conditioner temperature, control air conditioning operating mode etc..For the equipment of different manufacturers, equipment institute is controlled The infrared remote-controlled signal needed may be different, therefore, it is possible to the equipment that each producer is distinguished by learning, and then corresponded to by transmitting Infrared remote-controlled signal control equipment.
It or optionally, can be by carrying out network with building centralized control system with building centralized control system Communication is to control building equipment.The automatic control to building equipment is realized by combining environmental parameter.
Optionally, in addition, in the peripheral region for determining the building equipment nobody in the case where, can control building and set It is standby to close with energy saving, it is then departed from the no man's land, continuation is gone on patrol according to preset route to subsequent region.
In one embodiment, can be learnt by each layer to building to draw the plane earth for each layer Figure, such as each layer of the study to building can be realized by video capture equipment and scanning device, to draw out building Each layer of electronic plane map.
It is can wrap in the electronic plane map containing barrier and the information that region can not be reached.Furthermore, it is possible to pass through view Frequency identification building equipment, such as air-conditioning, lamp or some other electromechanical equipment, and identified building equipment is obtained in floor Position distribution, then by the position mark of the building equipment on the electronic plane map drawn.
It is possible to further carry out route planning to the region that can reach shown in electronic plane map.Preferably, Patrol route can be planned as target using the building equipment marked in plane map.Patrol formula robot can basis The route of the planning is gone on patrol.
Fig. 2 shows the plane map for the building drawn and the schematic diagrames for the route planned in the plane map.Such as Shown in Fig. 2, air-conditioning and lamp are marked in plane map, as shown in Figure 2 " air-conditioning 1 ", " air-conditioning 2 ", " air-conditioning 3 ", Label corresponding to " lamp 1 ", " lamp 2 ", " lamp 3 ".Route indicated by arrow is the patrol route of patrol formula robot in Fig. 2. Personnel's distribution of this layer is also marked in Fig. 2, " people 1 " as shown in Figure 2, " people 2 ", " people 3 ", " people 4 " are corresponding Label, to personnel distribution be marked after can only go on patrol someone region.It is appreciated that personnel can not also be distributed into Line flag, but when every patrol is under a building equipment, judge around the building equipment whether someone, for example, patrol is to every When under platform air-conditioning, judge the air-conditioning nearby whether someone.
In one embodiment, a preset route can be stored in patrol formula robot, for different in building Floor can store different preset routes, patrol formula robot is gone on patrol according to the pre-stored route.
Patrol formula robot can periodically go on patrol building according to patrol route, so that the work in building Making personnel can work in comfortable environment.
Optionally, in a further embodiment, each building equipment can be determined according to environmental parameter collected Then optimum temperature value in peripheral region sets the optimum temperature value for the temperature value of air-conditioning in the peripheral region.
Specifically, by taking building equipment is air-conditioning as an example, Comfort Sensor temperature collected, humidity, spoke can be passed through It penetrates intensity and performed dress is analyzed to obtain the local comfort level field under each air-conditioning, then come according to optimum reelability quality Determine the optimum temperature value in the region.It is, for example, possible to use PMV, (Predicted Mean Vote predicts average ballot Number) hot comfort model determines optimum temperature value, specifically, measured environmental parameter can be substituting to PMV thermal comfort Model is spent, and by the value of PMV hot comfort model, that is, pmv value is preset value, may then pass through and is calculated most Thermophilic angle value and/or optimum humidity value.Sky can be adjusted according to optimum temperature value calculated and/or optimum humidity value later The temperature value and/or operational mode of tune.Preferably, the setting range of pmv value is -0.5 to+0.5.
It is possible to further determine the opening and closing of light according to brightness collected.Specifically, it is greater than in brightness In the case where preset brightness, light closing can control, it, can be in the case where brightness is less than preset brightness Light is controlled to open.
It is possible to further determine the opening and closing of curtain according to radiation intensity collected.Specifically, it is radiating In the case that intensity is greater than preset value, curtain closing can control, be less than the feelings of preset value in radiation intensity Under condition, curtain opening can control.
In a further embodiment, the time point or user that the peripheral region of building equipment is used can be counted Number, it is alternatively possible to used time point and number of users be obtained by big data study, so as to be building equipment Determine a preparatory opening time, patrol formula robot can control building equipment and open when reaching the preparatory opening time. It is alternatively possible to by big data study obtain to air-conditioner host, the especially Energy Saving Control of the Load Regulation of water dispenser system according to According to when opening air-conditioning equipment while air-conditioner host load can be adjusted, to achieve the purpose that energy saving.
It is obtained in addition, the embodiment of the present invention can extend to according to the Analysis of Human Comfort of building and set temperature field analysis The directional analysis of building energy saving.
Fig. 3 shows the schematic block diagram of control device for building equipment 30 according to an embodiment of the invention.As shown in figure 3, The embodiment of the present invention also provides a kind of control device for building equipment 30, and building equipment can be air-conditioning, lamp or other electromechanical equipments. Control device for building equipment 30 may include:Judgment module 31, when near described device patrol to building equipment, judgement The peripheral region of the building equipment whether someone;Acquisition module 32, for someone in the peripheral region of the building equipment In the case of, acquire the environmental parameter of the peripheral region of the building equipment;And control module 33, for according to the ring Border parameter controls the building equipment.Wherein environmental parameter is it is alternatively possible to include one or more of the following:Temperature, It humidity, radiation intensity, brightness and is obtained and the dress of the people of the peripheral region to the building equipment is analyzed What is obtained wears parameter.The environmental parameter can be obtained using various sensors, detector or Comfort Sensor.Pass through knot It is energy saving to automatically control building equipment, staff can be made to work in a home from home and reach to close environmental parameter Purpose.
The concrete operating principle and benefit of control device for building equipment provided in an embodiment of the present invention and above-mentioned building equipment The concrete operating principle and benefit of control method are similar, will not be described in great detail here.
Correspondingly, the embodiment of the present invention also provides a kind of robot, which includes above-mentioned building equipment control dress It sets.
The embodiment of the present invention manages building equipment using patrol formula robot, and the machine of environmental parameter can be measured using this Device people solves the problems, such as that script needs to arrange that big quantity sensor could solve come the scheme gone on patrol, and has saved equipment cost And it is adaptable.Method or apparatus provided by the embodiment of the present invention is suitable for building that are various existing and will building, Not needing to add to fill for existing equipment various sensors and not needing to re-lay a large amount of communication line can realize to building The intelligent control of space equipment.
The optional embodiment of example of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously unlimited Detail in above embodiment can be to the embodiment of the present invention in the range of the technology design of the embodiment of the present invention Technical solution carry out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
It will be appreciated by those skilled in the art that implementing the method for the above embodiments is that can pass through Program is completed to instruct relevant hardware, which is stored in a storage medium, including some instructions are used so that one The whole of a (can be single-chip microcontroller, chip etc.) or processor (processor) execution each embodiment the method for the application Or part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey The medium of sequence code.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (15)

1. a kind of building equipment control method, which is characterized in that this method includes:
When patrol is near building equipment, judge the building equipment peripheral region whether someone;
In the peripheral region in the case where someone, the environmental parameter of the peripheral region is acquired;And
The building equipment is controlled according to the environmental parameter.
2. the method according to claim 1, wherein the environmental parameter is including at least one of following or more Person:It temperature, humidity, radiation intensity, brightness and is obtained and the dress to the people in the peripheral region is analyzed Wear parameter.
3. according to the method described in claim 2, it is characterized in that, described control the building according to the environmental parameter and set It is standby to include:
The optimum temperature value and/or optimum humidity value of the peripheral region are calculated according to the environmental parameter;And
The temperature for controlling air-conditioning according to the optimum temperature value and/or the optimum humidity value to adjust in the peripheral region And/or humidity.
4. according to the method described in claim 2, it is characterized in that, described control the building according to the environmental parameter and set It is standby to include:
The unlatching and/or closing of the light in the peripheral region are controlled according to the brightness of the peripheral region;And/or
The unlatching and/or closing of the curtain in the peripheral region are controlled according to the radiation intensity of the peripheral region.
5. the method according to claim 1, wherein the method also includes:
Count the time point and/or number of users that the building equipment is used;And
According to the time point and/or the number of users come building equipment described in pre-control.
6. the method according to claim 1, wherein the method also includes:
In the peripheral region nobody in the case where, control the building equipment and close.
7. the method according to claim 1, wherein the method also includes:
Draw the plane map of the building;
Patrol route is planned using plane earth building equipment marked in the figure as target;And
It is gone on patrol according to the patrol route planned.
8. a kind of control device for building equipment, which is characterized in that the device includes:
Judgment module, for when described device patrol is near building equipment, judge the building equipment peripheral region whether Someone;
Acquisition module, in the case where someone, acquiring the environmental parameter of the peripheral region in the peripheral region; And
Control module, for controlling the building equipment according to the environmental parameter.
9. device according to claim 8, which is characterized in that the environmental parameter includes at least one of following or more Person:It temperature, humidity, radiation intensity, brightness and is obtained and the dress to the people in the peripheral region is analyzed Wear parameter.
10. device according to claim 9, which is characterized in that described device further includes:
Computing module, the optimum temperature value of the peripheral region for calculating the building equipment according to the environmental parameter And/or optimum humidity value;And
The control module is used to control air-conditioning according to the optimum temperature value and/or the optimum humidity value described to adjust Temperature and/or humidity in peripheral region.
11. device according to claim 9, which is characterized in that the control module is used for:
The unlatching and/or closing of the light in the peripheral region are controlled according to the brightness of the peripheral region;And/or
The unlatching and/or closing of the curtain in the peripheral region are controlled according to the radiation intensity of the peripheral region.
12. device according to claim 8, which is characterized in that described device further includes:
Statistical module, for counting the time point and/or number of users that the building equipment is used;
The control module is also used to according to the time point and/or the number of users come building equipment described in pre-control.
13. device according to claim 8, which is characterized in that the control module is also used in the peripheral region In the case where nobody, controls the building equipment and close.
14. device according to claim 8, which is characterized in that described device further includes:
Map drawing module, for drawing the plane map of the building;
Route planning module, for planning using plane earth building equipment marked in the figure as target patrol route; And
Module is gone on patrol, for being gone on patrol according to the patrol route planned.
15. a kind of robot, which is characterized in that the robot includes according to any one of claim 8 to 14 claim The control device for building equipment.
CN201710236172.2A 2017-04-12 2017-04-12 building equipment control method, device and robot Active CN107045366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710236172.2A CN107045366B (en) 2017-04-12 2017-04-12 building equipment control method, device and robot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710236172.2A CN107045366B (en) 2017-04-12 2017-04-12 building equipment control method, device and robot

Publications (2)

Publication Number Publication Date
CN107045366A CN107045366A (en) 2017-08-15
CN107045366B true CN107045366B (en) 2018-11-16

Family

ID=59544444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710236172.2A Active CN107045366B (en) 2017-04-12 2017-04-12 building equipment control method, device and robot

Country Status (1)

Country Link
CN (1) CN107045366B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108312150A (en) * 2017-12-31 2018-07-24 天津木牛流马科技发展股份有限公司 Building service robot
CN108919855A (en) * 2018-04-04 2018-11-30 广州高新兴机器人有限公司 A kind of multi-zone temperature control method
CN110087369B (en) * 2019-03-12 2022-11-11 平安科技(深圳)有限公司 Office area light control method and device, storage medium and electronic equipment
CN110187644B (en) * 2019-05-30 2021-01-26 日立楼宇技术(广州)有限公司 Building control method, building control device, building control equipment, building control system and storage medium
CN110488813A (en) * 2019-07-29 2019-11-22 广州启盟信息科技有限公司 A kind of building robot patrol method and building robot
CN110702114B (en) * 2019-08-29 2021-11-02 万翼科技有限公司 Routing inspection route planning method and related device
CN111836018B (en) * 2020-07-16 2021-12-21 上海锋思城界建筑设计研究院有限公司 Building equipment monitoring and management system and method
CN114445996A (en) * 2021-12-21 2022-05-06 重庆特斯联智慧科技股份有限公司 Building control robot and control method thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1614525A (en) * 2003-11-07 2005-05-11 谷振宇 Intelligent controlling system of electical appliances
CN202110425U (en) * 2010-05-13 2012-01-11 福州冠翔电子有限公司 Security robot system based on internet
CN102221831A (en) * 2011-04-20 2011-10-19 福建省电力有限公司福州电业局 Patrol inspection system of movable remote-controlled visual sense machine
CN102778002A (en) * 2012-07-09 2012-11-14 广东美的电器股份有限公司 Air conditioner for controlling thermal comfort feeling of human body and control method
CN103760879A (en) * 2014-02-19 2014-04-30 深圳市金照明实业有限公司 Intelligent building electricity-saving monitoring system and method
CN204480088U (en) * 2015-02-26 2015-07-15 安徽华斯源新能源科技有限公司 A kind of Intelligent indoor environment adjustment system
CN104898745A (en) * 2015-04-13 2015-09-09 南昌大学 Dormitory safety energy saving device
CN204667239U (en) * 2015-06-17 2015-09-23 浙江海洋学院 A kind of classroom environment control system
CN106094768A (en) * 2016-08-10 2016-11-09 深圳博科智能科技有限公司 A kind of Smart Home robot and intelligent home furnishing control method

Also Published As

Publication number Publication date
CN107045366A (en) 2017-08-15

Similar Documents

Publication Publication Date Title
CN107045366B (en) building equipment control method, device and robot
WO2019114191A1 (en) Internet of things-based building operation device status monitoring and visual analysis system
US8874497B2 (en) Method and system for controlling environmental conditions of different entities
US11662450B2 (en) Occupant detection device
KR20130049254A (en) The intelligent building integrated automatic control and energy goal management system based on 3-dimensional modeling and the method thereof
US20120245740A1 (en) Method and system for controlling environmental conditions of entity
US20180142914A1 (en) Method for controlling activation of air conditioning device and apparatus therefor
CN108614461B (en) A kind of intelligent robot based on indoor environment sensing
US20140135993A1 (en) Method and apparatus for managing energy in home
CN108829074A (en) A kind of artificial intelligence domestic environment system control method based on big data
CN110187645A (en) Intelligent home furnishing control method based on mobile terminal
CN108873729A (en) Artificial intelligence domestic environment management system based on big data
CN105588300A (en) Control method for intelligent air conditioner and intelligent air conditioner
CN101048624A (en) System and method for zone heating and cooling
JP2006331372A (en) Agent device, management manager device, and environment energy management system
KR101659301B1 (en) System for Heating Control Considering Energy Costs
CN210323870U (en) Building energy consumption management system
CN106979582A (en) Air conditioning control method and system based on positional information
CN109164857A (en) Switchgear house intelligent monitor system and switchgear house remote monitoring system
CN111562748A (en) Intelligent household environment control system and control method
CN209198973U (en) Switchgear house intelligent monitor system and switchgear house remote monitoring system
CN105868487A (en) Energy saving expert system based on energy consumption device models
CN107726573A (en) A kind of central air conditioning system
CA3095802A1 (en) Monitoring system for monitoring unattended services
CN105257143B (en) Method and device for controlling window to open and close

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210219

Address after: 200080 Room C, 14th floor, 309 Tanggu Road, Hongkou District, Shanghai

Patentee after: Shanghai Meikong Intelligent Building Co.,Ltd.

Patentee after: GD MIDEA HEATING & VENTILATING EQUIPMENT Co.,Ltd.

Address before: 528311 Penglai Road Industrial Avenue, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Patentee before: GD MIDEA HEATING & VENTILATING EQUIPMENT Co.,Ltd.

Patentee before: MIDEA GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220623

Address after: 528311 zone a, floor 2, building 6, Midea Global Innovation Center, Beijiao Community Industrial Avenue, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Patentee after: Guangdong Meikong Intelligent Building Co.,Ltd.

Patentee after: Shanghai Meikong Intelligent Building Co., Ltd

Address before: 200080 Room C, 14th floor, 309 Tanggu Road, Hongkou District, Shanghai

Patentee before: Shanghai Meikong Intelligent Building Co.,Ltd.

Patentee before: Guangdong Midea HVAC Equipment Co., Ltd