CN107035160B - 一种弯曲变形钢构件的装配式加固装置及方法 - Google Patents

一种弯曲变形钢构件的装配式加固装置及方法 Download PDF

Info

Publication number
CN107035160B
CN107035160B CN201710457219.8A CN201710457219A CN107035160B CN 107035160 B CN107035160 B CN 107035160B CN 201710457219 A CN201710457219 A CN 201710457219A CN 107035160 B CN107035160 B CN 107035160B
Authority
CN
China
Prior art keywords
steel
steel plate
steel sheet
reinforced
steel member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710457219.8A
Other languages
English (en)
Other versions
CN107035160A (zh
Inventor
高作平
周剑波
张畅
周志勇
周舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Jucheng Structure Group Co ltd
Original Assignee
Hubei Wuda Luojia Inspection And Consultation Of Engineering Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Wuda Luojia Inspection And Consultation Of Engineering Structure Co ltd filed Critical Hubei Wuda Luojia Inspection And Consultation Of Engineering Structure Co ltd
Priority to CN201710457219.8A priority Critical patent/CN107035160B/zh
Publication of CN107035160A publication Critical patent/CN107035160A/zh
Application granted granted Critical
Publication of CN107035160B publication Critical patent/CN107035160B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明提出了一种弯曲变形钢构件的装配式加固装置,上钢板呈马鞍状且上钢板通过第一紧固螺栓固定在下钢板上;待加固钢构件端部固定的横梁穿过上钢板和下钢板之间形成的梯形空间,加劲板垂直且外形吻合于上钢板和下钢板的内侧壁设置,新增角钢的端部设置于上钢板的马鞍状边缘部且通过第二紧固螺栓与上钢板和下钢板固定。本发明不直接针对待加固钢构件进行加固,而是寻求新的受力点,根据实际需要新增一根或两根加固构件,形成一种全新的替代加固方案,该加固装置的各部件为提前预制,预制过程可焊接、可打孔,对于不能现场焊接和打孔的施工项目,该装配式加固装置很好的满足了施工现场的安全需要预制。

Description

一种弯曲变形钢构件的装配式加固装置及方法
技术领域
本发明涉及一种弯曲变形钢构件的装配式加固装置及方法。
背景技术
目前诸多工业厂房屋架系统为钢结构,有些厂房工作环境温度较高,钢构件对温度较为敏感,可能会导致某些钢构件受压失稳,影响结构安全,比如铝厂电解槽车间,温度高,同时电解槽车间不允许任何零星火焰,对其屋架钢构件进行加固时,现场必须做到不焊接、不打孔。特别针对在钢构件的原L90×6角钢为需加固的构件时,角钢有可能产生弯曲或不弯曲的情况,现有技术暂时还没有针对此类情况的加固方案。
发明内容
本发明提出一种弯曲变形钢构件的装配式加固装置及方法,针对钢结构中的待加固钢构件在发生弯曲的情况下不能在原构件上进行加固的问题,对待加固钢构件两侧的横梁进行装配紧固,并新增角钢进行加固,可以做到加固现场不焊接、不打孔,很好的满足了特殊场合钢构件加固的要求。
本发明的技术方案是这样实现的:
一种弯曲变形钢构件的装配式加固装置,包括上钢板4、下钢板5、加劲板6、第一紧固螺栓7、第二紧固螺栓8和新增角钢3,所述上钢板4呈马鞍状且所述上钢板4通过第一紧固螺栓7固定在下钢板5上;待加固钢构件1端部固定的横梁2穿过上钢板4和下钢板5之间形成的梯形空间,所述加劲板6垂直且外形吻合于上钢板4和下钢板5的内侧壁设置,所述新增角钢3的端部设置于上钢板4的马鞍状边缘部且通过第二紧固螺栓8与上钢板4和下钢板5固定。
优选地,所述上钢板4、下钢板5之间保持1cm的空隙。
一种弯曲变形钢构件的装配式加固方法,包括以下步骤:
步骤一,制作夹具:将上钢板4压扎呈马鞍状,并在上钢板4和下钢板5两端对应的位置设有开孔,并分别配置对应的第一紧固螺栓7、第二紧固螺栓8;在新增角钢3的一侧翼上也设有配合所述第二紧固螺栓8的开孔;
步骤二,安装夹具:将待加固钢构件1两侧的横梁2置于上钢板4和下钢板5形成的梯形空间内,位置处于待加固钢构件1与横梁2连接部的左右两侧;加劲板6垂直且外形吻合于上钢板4和下钢板5的内侧壁设置,用第一紧固螺栓7紧固上钢板4和下钢板5;
步骤三,新增角钢:新增角钢3的两端分别紧固在待加固钢构件1两侧的横梁2上的夹具的上钢板4上,且新增角钢3两端都采用第二紧固螺栓8固定,即可完成弯曲构件的加固。
本发明产生的有益效果为:本发明不直接针对待加固钢构件进行加固,而是寻求新的受力点,根据实际需要新增一根或两根加固构件,形成一种全新的替代加固方案。该加固装置的各部件为提前预制,预制过程可焊接、可打孔,对于不能现场焊接和打孔的施工项目,该装配式加固装置很好的满足了施工现场的安全需要预制。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明中加固弯曲变形钢构件时的平面示意图。
图2为本发明加固装置的一种实施例的示意图。
图3为本发明加固装置的另一种实施例的示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1-3所示一种弯曲变形钢构件的装配式加固装置,包括上钢板4、下钢板5、加劲板6、第一紧固螺栓7、第二紧固螺栓8和新增角钢3,所述上钢板4呈马鞍状且所述上钢板4通过第一紧固螺栓7固定在下钢板5上;待加固钢构件1端部固定的横梁2穿过上钢板4和下钢板5之间形成的梯形空间,所述加劲板6垂直且外形吻合于上钢板4和下钢板5的内侧壁设置,所述新增角钢3的端部设置于上钢板4的马鞍状边缘部且通过第二紧固螺栓8与上钢板4和下钢板5固定。
优选地,所述上钢板4、下钢板5之间保持1cm的空隙。
一种弯曲变形钢构件的装配式加固方法,包括以下步骤:
步骤一,制作夹具:将上钢板4压扎呈马鞍状,并在上钢板4和下钢板5两端对应的位置设有开孔,并分别配置对应的第一紧固螺栓7、第二紧固螺栓8;在新增角钢3的一侧翼上也设有配合所述第二紧固螺栓8的开孔;
步骤二,安装夹具:将待加固钢构件1两侧的横梁2置于上钢板4和下钢板5形成的梯形空间内,位置处于待加固钢构件1与横梁2连接部的左右两侧;加劲板6垂直且外形吻合于上钢板4和下钢板5的内侧壁设置,用第一紧固螺栓7紧固上钢板4和下钢板5;
步骤三,新增角钢:新增角钢3的两端分别紧固在待加固钢构件1两侧的横梁2上的夹具的上钢板4上,且新增角钢3两端都采用第二紧固螺栓8固定,即可完成弯曲构件的加固。
本发明中由于原有的待加固钢构件1呈弯曲状,不适合直接在其上加固,因此采用在待加固钢构件1的两端的横梁2上固定本加固装置。通过将待加固钢构件1两端的横梁2置于上钢板4和下钢板5形成的梯形空间内,并采用若干加劲板6垂直且外形吻合于上钢板4和下钢板5的内侧壁设置,保证上、下钢板与横梁2的稳定性。同时在两侧不同的横梁上的对应位置的加固装置上在通过第二紧固螺栓8固定新增角钢3,对待加固钢构件1两侧新构件两根新增角钢实现加固,实现替代加固的目的。
同时本方案中,针对横梁2的位置的不同,其新增角钢的固定数量也不同。如图2中,适应于横梁2处于钢结构的边缘,只需要一根新增角钢3即可,其加固的效果如图1中图示;针对横梁2处于整个钢结构的中部位置时,横梁2两侧的角钢都需要待加固,此时需要在一个加固装置的两侧分别通过第二紧固螺栓8固定新增角钢,如图3中所示。
本方案中整个加固过程中,加固现场无需焊接、打孔,不会产生零星火焰,保证了现场的安全。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (1)

1.一种弯曲变形钢构件的装配式加固方法,其特征在于,包括以下步骤:
步骤一,制作夹具:将上钢板(4)压扎呈马鞍状,并在上钢板(4)和下钢板(5)两端对应的位置设有开孔,并分别配置对应的第一紧固螺栓(7)、第二紧固螺栓(8);在新增角钢(3)的一侧翼上也设有配合所述第二紧固螺栓(8)的开孔;
步骤二,安装夹具:将待加固钢构件(1)两侧的横梁(2)置于上钢板(4)和下钢板(5)形成的梯形空间内,位置处于待加固钢构件(1)与横梁(2)连接部的左右两侧;加劲板(6)垂直且外形吻合于上钢板(4)和下钢板(5)的内侧壁设置,用第一紧固螺栓(7)紧固上钢板(4)和下钢板(5);
步骤三,新增角钢:新增角钢(3)的两端分别紧固在待加固钢构件(1)两侧的横梁(2)上的夹具的上钢板(4)上,且新增角钢(3)两端都采用第二紧固螺栓(8)固定,即可完成弯曲构件的加固。
CN201710457219.8A 2017-06-16 2017-06-16 一种弯曲变形钢构件的装配式加固装置及方法 Active CN107035160B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710457219.8A CN107035160B (zh) 2017-06-16 2017-06-16 一种弯曲变形钢构件的装配式加固装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710457219.8A CN107035160B (zh) 2017-06-16 2017-06-16 一种弯曲变形钢构件的装配式加固装置及方法

Publications (2)

Publication Number Publication Date
CN107035160A CN107035160A (zh) 2017-08-11
CN107035160B true CN107035160B (zh) 2022-06-14

Family

ID=59542420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710457219.8A Active CN107035160B (zh) 2017-06-16 2017-06-16 一种弯曲变形钢构件的装配式加固装置及方法

Country Status (1)

Country Link
CN (1) CN107035160B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695620A (zh) * 2017-09-11 2018-02-16 江西峰辉钢结构有限公司 一种钢构件的加工方法
CN107687266A (zh) * 2017-09-30 2018-02-13 广东电网有限责任公司电力科学研究院 一种输电塔角钢斜材加固装置
CN112983041A (zh) * 2021-03-16 2021-06-18 贵州电网有限责任公司 一种提升输电线路铁塔防冰能力的方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007077643A (ja) * 2005-09-13 2007-03-29 Kumagai Gumi Co Ltd 鉄骨建造物の既設鉄骨部材の補強方法及び補強構造
JP2007262716A (ja) * 2006-03-28 2007-10-11 Takenaka Komuten Co Ltd トラス用t字形断面部材又は十字形断面部材の座屈補剛構造
JP2007315056A (ja) * 2006-05-26 2007-12-06 Fujita Corp 鋼構造の補強構造
JP2008019576A (ja) * 2006-07-11 2008-01-31 Fujita Corp 鋼構造物の補強工法
JP2009215824A (ja) * 2008-03-12 2009-09-24 Fujita Corp 鋼構造の補強構造
CN101644107A (zh) * 2009-07-24 2010-02-10 天地金草田(北京)科技有限公司 一种钢结构建筑物加固结构及其加固方法
CN201695704U (zh) * 2010-05-26 2011-01-05 河南杭萧钢构有限公司 一种钢结构建筑物加固结构
CN204040513U (zh) * 2014-09-04 2014-12-24 武汉武大巨成结构股份有限公司 一种局部粘钢以加固的受压钢杆件
CN204983722U (zh) * 2015-06-30 2016-01-20 甘肃第四建设集团有限责任公司 钢结构构件加固临时组拼定位装置
CN105545005A (zh) * 2016-02-03 2016-05-04 北京堡瑞思减震科技有限公司 角钢支撑加固装置及其安装方法
CN105952239A (zh) * 2016-06-21 2016-09-21 山东大学 铁塔角钢防弯扭失稳加固装置
CN207092587U (zh) * 2017-06-16 2018-03-13 武大巨成结构股份有限公司 一种弯曲变形钢构件的装配式加固装置

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007077643A (ja) * 2005-09-13 2007-03-29 Kumagai Gumi Co Ltd 鉄骨建造物の既設鉄骨部材の補強方法及び補強構造
JP2007262716A (ja) * 2006-03-28 2007-10-11 Takenaka Komuten Co Ltd トラス用t字形断面部材又は十字形断面部材の座屈補剛構造
JP2007315056A (ja) * 2006-05-26 2007-12-06 Fujita Corp 鋼構造の補強構造
JP2008019576A (ja) * 2006-07-11 2008-01-31 Fujita Corp 鋼構造物の補強工法
JP2009215824A (ja) * 2008-03-12 2009-09-24 Fujita Corp 鋼構造の補強構造
CN101644107A (zh) * 2009-07-24 2010-02-10 天地金草田(北京)科技有限公司 一种钢结构建筑物加固结构及其加固方法
CN201695704U (zh) * 2010-05-26 2011-01-05 河南杭萧钢构有限公司 一种钢结构建筑物加固结构
CN204040513U (zh) * 2014-09-04 2014-12-24 武汉武大巨成结构股份有限公司 一种局部粘钢以加固的受压钢杆件
CN204983722U (zh) * 2015-06-30 2016-01-20 甘肃第四建设集团有限责任公司 钢结构构件加固临时组拼定位装置
CN105545005A (zh) * 2016-02-03 2016-05-04 北京堡瑞思减震科技有限公司 角钢支撑加固装置及其安装方法
CN105952239A (zh) * 2016-06-21 2016-09-21 山东大学 铁塔角钢防弯扭失稳加固装置
CN207092587U (zh) * 2017-06-16 2018-03-13 武大巨成结构股份有限公司 一种弯曲变形钢构件的装配式加固装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朔黄铁路64m双线栓焊钢桁梁强化改造技术研究;罗慧刚;《铁道建筑》;20150920(第09期);6-8 *

Also Published As

Publication number Publication date
CN107035160A (zh) 2017-08-11

Similar Documents

Publication Publication Date Title
CN107035160B (zh) 一种弯曲变形钢构件的装配式加固装置及方法
CN204609000U (zh) 一种用于建筑结构的装配式节点及其装配式框架
KR101548114B1 (ko) 단면 변화구간에서 연결부의 합성효과가 증대된 철골 콘크리트 복합보
CN110067186A (zh) 一种钢管加劲腹板钢混组合箱梁
KR100947340B1 (ko) 슬래브와 기둥 접합부의 전단보강체 및 그 제조방법
KR102031223B1 (ko) 부분프리플렉션 거더 및 그 제작방법
JP5283404B2 (ja) 鋼構造の補強構造
JP5428382B2 (ja) 柱梁接合構造、柱梁接合方法
CN207092587U (zh) 一种弯曲变形钢构件的装配式加固装置
CN103437499A (zh) 一种带有加劲肋的腹板开洞压型钢板组合梁及安装方法
JP5428363B2 (ja) 柱梁接合構造、柱梁接合方法
CN106825337A (zh) 一种用于预制楼梯钢筋笼生产的加工工艺
CN215053871U (zh) 新增夹层钢梁与混凝土柱的连接节点
CN205444990U (zh) 大跨度全预制站台雨棚架
JP2010013898A (ja) 鉄骨鉄筋柱の組立方法
US20220195685A1 (en) CLT Structure
CN211948924U (zh) 一种钢结构建筑的连接组件
CN210798013U (zh) 钢次梁与桁架交叉布置而成的井字梁楼盖系统
CN109881790B (zh) 钢筋模板一体化墙体附加可动钢筋连接构造与安装方法
JP2016142063A (ja) 鉄筋コンクリート柱と鉄骨梁の接合方法
JP2010255227A (ja) 柱梁接合構造、及び、鉄筋コンクリート部材
JP7032051B2 (ja) 床構造施工方法および床構造再利用方法
JP5458393B2 (ja) 梁構造
KR20170082391A (ko) 철골-프리캐스트 콘크리트 합성보
CN104251011A (zh) 纵向桁架

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Gao Zuoping

Inventor after: Zhang Chang

Inventor after: Li Wencheng

Inventor after: Zhou Jianbo

Inventor after: Zhou Zhiyong

Inventor after: Zhou Zhou

Inventor before: Gao Zuoping

Inventor before: Zhou Jianbo

Inventor before: Zhang Chang

Inventor before: Zhou Zhiyong

Inventor before: Zhou Zhou

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20220622

Address after: Jucheng scientific research building, No.4, wudayuan Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000

Patentee after: WUDA JUCHENG STRUCTURE Co.,Ltd.

Address before: 430000 production workshop of Jucheng company, Wuda Science Park, Donghu Development Zone, Wuhan City, Hubei Province

Patentee before: HUBEI WUDA LUOJIA INSPECTION AND CONSULTATION OF ENGINEERING STRUCTURE Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Jucheng scientific research building, No.4, wudayuan Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000

Patentee after: Wuhan Jucheng Structure Group Co.,Ltd.

Address before: Jucheng scientific research building, No.4, wudayuan Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000

Patentee before: WUDA JUCHENG STRUCTURE Co.,Ltd.

CP01 Change in the name or title of a patent holder