CN107023132A - Extruded sheet exterior-wall heat insulation construction technology - Google Patents

Extruded sheet exterior-wall heat insulation construction technology Download PDF

Info

Publication number
CN107023132A
CN107023132A CN201710218283.0A CN201710218283A CN107023132A CN 107023132 A CN107023132 A CN 107023132A CN 201710218283 A CN201710218283 A CN 201710218283A CN 107023132 A CN107023132 A CN 107023132A
Authority
CN
China
Prior art keywords
mortar
parts
extruded sheet
polymer mortar
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710218283.0A
Other languages
Chinese (zh)
Other versions
CN107023132B (en
Inventor
霍全乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huaao Jianke Group Co ltd
Original Assignee
Bazhou Rui Ying Surplus Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bazhou Rui Ying Surplus Decoration Engineering Co Ltd filed Critical Bazhou Rui Ying Surplus Decoration Engineering Co Ltd
Priority to CN201710218283.0A priority Critical patent/CN107023132B/en
Publication of CN107023132A publication Critical patent/CN107023132A/en
Application granted granted Critical
Publication of CN107023132B publication Critical patent/CN107023132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/06Aluminous cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0875Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00637Uses not provided for elsewhere in C04B2111/00 as glue or binder for uniting building or structural materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Finishing Walls (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a kind of extruded sheet exterior-wall heat insulation construction technology, comprise the following steps:Putty, cleaning and levelling base course wall are prepared, boundary mortar is prepared, smears boundary mortar, prepare adhesive mortar, smear on extruded sheet adhesive mortar, paste extruded sheet, mounting fixing parts, prepared polymer mortar, smear polymer mortar, press-in fiberglass gridding cloth, polymer mortar, the floating ash of polishing are smeared again, surface coating or ceramic tile construction is carried out.Extruded sheet exterior-wall heat insulation construction technology of the present invention, conventional construction technique is made improvements, it is preferred that the formula of adhesive mortar and polymer mortar, construction cost is saved, enhance the binding ability of extruded sheet and basic unit, heat-insulation system has good anti-crack ability and freezing tolerance, and high insulating effect has a wide range of application.

Description

Extruded sheet exterior-wall heat insulation construction technology
Technical field
The present invention relates to a kind of exterior-wall heat insulation construction technology, more particularly to a kind of extruded sheet exterior-wall heat insulation construction technology.
Background technology
External thermal insulation system is made up of heat-insulation layer, protective layer and fixed material, it is adaptable to be arranged on exterior wall outer surface Non-bearing heat-preserving construction general name.The insulation material used in present external wall outer insulation engineering mainly has three kinds:EPS sheet, XPS Plate and adhesive powder-polystyrene granule thermal insulation mortar.
XPS plate continuity extrusion type polystyrene foam plate is, using vinyl as raw material, continuously to be extruded through special process The hard plate material of foaming, it is independent closed bubble structure that it is internal, with compression strength it is high, do not absorb water, it is moistureproof, no Ventilative, lightweight, corrosion-resistant, service life length, the low feature of thermal conductivity factor, are a kind of environment protecting thermal insulating materials of excellent performance. XPS external thermal insulations structure generally can all be divided into basic unit, tack coat, heat-insulation layer, overcoat.The connection safety of heat-insulation layer and structure sheaf One of key technology of external wall heat insulation system, be mainly adhesively fixed method, mechanical Fixing Method and both be used in mixed way fixation Method.The normal produced problem of exterior wall heat-preserving system has:Because sunlight irradiation causes problem of aging;Round the clock, seasonal climate change is drawn The adhesive mortar risen loses intensity too early, causes warming plate to come off problem;In asking for cold district heat-insulation layer freeze thawing resistance effect difference Topic.
Adhesive mortar is to be equipped with multiple additives by cement, quartz sand, polymer latex ramming material uniformly to form through mechanical mixture A kind of mortar.The practicality and durability of the fine or not External Wall heat-insulation system of the performance of adhesive mortar play conclusive influence. In addition to adhesive mortar, anticracking grout and the decorative mortar also adhesion strength of different degrees of influence heat-insulation system, fold resistance, freeze proof Property etc..
Present invention optimizes exterior-wall heat insulation construction technology, the preferred formula of adhesive mortar and polymer mortar is improved Adhesion strength, fracture resistance and the frost resistance of exterior wall heat-preserving system.
The content of the invention
For above shortcomings in the prior art, the technical problems to be solved by the invention are to provide a kind of extruded sheet Exterior-wall heat insulation construction technology.
The present invention seeks to what is be achieved through the following technical solutions:
A kind of extruded sheet exterior-wall heat insulation construction technology, is comprised the steps of:
(1) putty is prepared;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling;
(3) boundary mortar is prepared;
(4) boundary mortar is smeared on the two sides of extruded sheet;
(5) adhesive mortar is prepared;
(6) adhesive mortar configured is applied to the one side of extruded sheet, is pasted using bar bonding, adhesive mortar will be wiped Extruded sheet be pasted onto immediately on base course wall;
(7) extruded sheet is pasted and placed 8-24 hours after base course wall, will then in extrusion molding plate surface mounting fixing parts Polished at extruded sheet seam injustice with coarse sandpaper, it is immediately that extruded sheet chip and floating grey brush cleaning is clean after polishing;
(8) prepared polymer mortar;
(9) polymer mortar configured is uniformly applied on extruded sheet, underlying polymer mortar is obtained, in bottom Polymer mortar surface is punched, and is then pressed into fiberglass gridding cloth in the underlying polymer mortar punched, is treated bottom sand Slurry solidification to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, the position that fixture is installed is gathered with bottom The hole of compound mortar surface is corresponding, installs after fixture and to smear one layer of polymeric sand again on fiberglass gridding cloth surface Slurry, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
A kind of extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirrings 7- 10min, stands 15-20min, and then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added and stirred Mix in machine, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:100-150 parts of binding sand starches are added in mixer, 20-30 is added into mixer Part water, 20-30rpm stirring 5-10min, stands 3-5min, 20-30rpm stirs 1-3min again, produces;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, between bar Away from 50-80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is stood It is pasted onto on base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted into placement 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often Square metre 3-10 fixture is installed, fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into The depth of base course wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet after polishing Chip and floating grey brush cleaning are clean;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 20-30 parts of water, 20- are added 30rpm stirs 3-5min, then stands 3-5min, produces;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom Polymer mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, hole depth For 30-50mm, then by fiberglass gridding cloth, exceptionally straight stretch tight is put down in the horizontal direction, and is pressed into the underlying polymer mortar punched In, when bedding mortar solidifies tack-free to surface, the position installed in fiberglass gridding cloth surface mounting fixing parts, fixture Put corresponding with the hole of underlying polymer mortar surface, install after fixture and to smear one layer again on fiberglass gridding cloth surface Polymer mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
A kind of extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirrings 7- 10min, stands 15-20min, and then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added and stirred Mix in machine, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:By 20-30 parts of alumina cements, 15-30 parts of portland cements, 0.5-2 parts of polymer latexs Powder, 30-40 part quartz sand, 5-10 parts of expanded vermiculites, 0.2-0.5 parts of organosilicon moisture repellents, 0.2-0.5 parts of hydroxypropyl methyl fibers Plain ether is added in mixer, 20-30rpm stirring 5-10min, adds 20-30 parts of water, 20-30rpm stirs 5-10min, i.e., ;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, between bar Away from 50-80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is stood It is pasted onto on base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted into placement 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often Square metre 3-10 fixture is installed, fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into The depth of base course wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet after polishing Chip and floating grey brush cleaning are clean;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 20-30 parts of water, 20- are added 30rpm stirs 3-5min, then stands 3-5min, produces;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom Polymer mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, hole depth For 30-50mm, then by fiberglass gridding cloth, exceptionally straight stretch tight is put down in the horizontal direction, and is pressed into the underlying polymer mortar punched In, when bedding mortar solidifies tack-free to surface, the position installed in fiberglass gridding cloth surface mounting fixing parts, fixture Put corresponding with the hole of underlying polymer mortar surface, install after fixture and to smear one layer again on fiberglass gridding cloth surface Polymer mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
A kind of extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirrings 7- 10min, stands 15-20min, and then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added and stirred Mix in machine, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:By 20-30 parts of alumina cements, 15-30 parts of portland cements, 0.5-2 parts of polymer latexs Powder, 30-40 part quartz sand, 5-10 parts of expanded vermiculites, 0.2-0.5 parts of organosilicon moisture repellents, 0.2-0.5 parts of hydroxypropyl methyl fibers Plain ether is added in mixer, 20-30rpm stirring 5-10min, adds 20-30 parts of water, 20-30rpm stirs 5-10min, i.e., ;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, between bar Away from 50-80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is stood It is pasted onto on base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted into placement 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often Square metre 3-10 fixture is installed, fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into The depth of base course wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet after polishing Chip and floating grey brush cleaning are clean;
(8) prepared polymer mortar:By 30-50 parts of portland cements, 40-60 parts of river sands, 12-15 parts of dicalcium powders, 0.1- 0.5 part of water reducer, 0.1-0.3 parts of hydroxypropyl methyl cellulose ethers, 0.05-0.1 parts of basalt fibres are added in mixer, 20- 30rpm stirs 5-8min, and 30-50 parts of water are then added into mixer, and then 20-30rpm stirring 2-3min add 0.2- 0.4 part of modified rubber powder, 20-30rpm stirring 3-5min, is produced;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom Polymer mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, hole depth For 30-50mm, then by fiberglass gridding cloth, exceptionally straight stretch tight is put down in the horizontal direction, and is pressed into the underlying polymer mortar punched In, when bedding mortar solidifies tack-free to surface, the position installed in fiberglass gridding cloth surface mounting fixing parts, fixture Put corresponding with the hole of underlying polymer mortar surface, install after fixture and to smear one layer again on fiberglass gridding cloth surface Polymer mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
Preferably, described fixture is self-tapping screw.
Preferably, described water reducer is poly carboxylic acid series water reducer.
Preferably, the preparation method of described modified rubber powder is as follows:By 1-4 parts of sodium aluminates, 1-2 parts of sodium metasilicate, 10-15 Part water is uniformly mixed in 300-600rpm, adds 1-2 parts of rubber powders, and 300-600rpm stirs 60-120min, then mistake 300 mesh sieves, discard filtrate, and filter residue is rinsed with 300-500 parts of water, 50-80 DEG C of dry 5-10h, and dry filter residue is added into 35- In 40 DEG C of 40-80 part organic solvents, 300-600rpm stirring 15-20min cross 300 mesh sieves, 50-80 DEG C of dry 5- while hot 10h, natural cooling obtains modified rubber powder.
Preferably, described organic solvent is ethanol and/or isopropanol.
A kind of extruded sheet exterior-wall heat insulation construction technology of the present invention, make improvements to conventional construction technique, preferably viscous The formula of mortar and polymer mortar is tied, construction cost has been saved, has enhanced the binding ability of extruded sheet and basic unit, heat-insulation system With good anti-crack ability and freezing tolerance, high insulating effect has a wide range of application.
Embodiment
The tension adhesion strength test of adhesive mortar:According to《External wall outer insulation engineering technology code》In JGJ144-2004 Tensile bond strength testing method carries out tension bonding strength test.Test specimen makes:Basic unit, water are simulated using cement mortar block The preparation method of cement mortar test block is as follows:20 parts of portland cements, 60 parts of river sands, 12 parts of water are added in mixer, with 30rpm Rotating speed stirs 10min, obtains cement mortar, cement mortar is fitted into die trial, and die trial size is 70mm × 70mm × 70mm, will Die trial equipped with cement mortar is put on a vibration table, and shake table is closed in vibration after one minute, and mortar face should be higher than die trial top surface, Pre-embedded bolt is inserted, notices that on same straight line, unnecessary cement mortar is struck off with scraper for pre-embedded bolt axis, is 20 in temperature DEG C, humidity for 96% fog room in maintenance 7 days, obtain cement mortar block.The floating ash on cement mortar block surface is removed, it is right Rejected in projection, hollowing, porous spot and use putty levelling, levelling flatness is 2mm/2m, and extruded sheet is cut into chi Very little is 50mm × 50mm, and boundary mortar, adhesive mortar are smeared successively according to the technique of embodiment in extruded sheet one side, viscous by wiping The extruded sheet of knot mortar is pasted onto cement mortar block surface immediately, in the fog room that temperature is 23 DEG C, relative humidity is 50% Interior maintenance 28 days.Experimental condition:Temperature be 23 DEG C, relative humidity be to be tested in the environment of 50%, use excellent great observing and controlling The model UH4000 of technology (Shanghai) Co., Ltd. production universal tensile testing machine is tested, and test specimen is loaded onto and stretches folder Tool, is then charged into tensile testing machine, and pulling force acts perpendicularly to test specimen, and adjustment draw speed is 5mm/min, starts testing machine to gluing Knot destruction, load during record destruction, in triplicate, averages.
The anti-folding of polymer mortar, compressive property test:The preparation method of polymer mortar is gathered according to described in each embodiment The preparation method of compound mortar specimen is as follows:The polymer mortar prepared is fitted into die trial, die trial size be 40mm × 40mm × 160mm, vibrates flat top surface is scraped after 60s on a vibration table, and test specimen is placed on parked 72h under 20 DEG C of environment after making, then Form removal is carried out, and is conserved respectively 28 days in the environment of 20 DEG C, relative humidity 92%, its anti-folding and compression strength, test side is surveyed Method in triplicate, is averaged with reference to GB/T17671-1999, every time test.
The anti-freezing property test of polymer mortar:By JGJ70-90《Building mortar basic performance tests method》Defined Forming method is molded, and is prepared into 70.7mm × 70.7mm × 70.7mm standard specimen, then the 24h under 20 DEG C of temperature environments, Then by test specimen form removal, tear open and continuing to conserve to 28 days under 20 DEG C, the environment of relative humidity 92% after taking off, in -15 to -20 DEG C of models In enclosing as defined in JGJ70-90 method, carry out freezing-thawing test, the mass loss rate of test block, is surveyed every time after test freeze thawing 200 times Test mass is multiple five times, averages.
Each raw material introduction in embodiment:
Extruded sheet, the XPS extruded sheets provided using Changshu City Sha Jiabang towns Qing Xin insulation materials factory, size 1800mm × 600mm, B1 grades.
Powder of lacquer putty for use on:Using the exterior wall leveling putty provided by Jiangsu hundred generations energy-saving building material Co., Ltd.
Portland cement, the Swan Portland cement produced using Harbin Ya Tai cement plants, model PO 42.5。
Alumina cement, by Yanshi earnings, prosperous Refractory Co., ltd provides, model PO 32.5.
Quartz sand, is provided, the mesh of particle diameter 325, density 2.6g/cm by mineral products processing factory of Lingshou County Asus3
Polymer glue powder, the extruded sheet specialty polymer rubber powder provided using the municipal day Chemical Co., Ltd. of Renqiu, model LT-025。
Expanded vermiculite, by Lingshou County, square mineral products processing factory provides, the mesh of particle diameter 50.
Organosilicon moisture repellent, is provided, model QS-H2020S by Shanghai Qi Shuo Industrial Co., Ltd.s.
Hydroxypropyl methyl cellulose ether, is provided, model 60RT, viscosity 60000 by Shanghai Zeng Ye Industrial Co., Ltd.s.
Dicalcium powder, is provided, the mesh of particle diameter 800 by Lingshou County Sheng Heng mineral products processings factory.
Basalt fibre, is provided, fibre length 6mm by the Cai Wang engineering materials Co., Ltd of Shenzhen one.Diameter 16um, compares table Area 2.6m2/g。
Stone perseverance is provided up to mineral products Co., Ltd in rubber powder, Shijiazhuang, the mesh of mesh number 80.
Interfacial agents:The high-strength surface conditioning agents of EC-1 provided using Beijing Hua Zhou architectural engineerings Co., Ltd.
Binding sand starch:The model MLJ-E16 provided using beautiful good building materials (Beijing) Co., Ltd polymer is glued Tie mortar.
Fiberglass gridding cloth:There is provided by Anping County Guan Bang silk screens Products Co., Ltd, specification:100m × 60m, 180g/ m2, mesh 5mm × 5mm.
Self-tapping screw, is provided by Shanghai from the east of metallic article Co., Ltd.
Tooth mouthful trowel, is provided by Shanghai from the east of metallic article Co., Ltd.
River sand, is provided by Lingshou County Sheng Heng mineral products processings factory.
Polymer mortar powder, the Crack-resistance Front Mortar provided using Wuxi City Yangze river and Huai river building materials Science and Technology Ltd..
High-efficiency water-reducing agent of poly-carboxylic acid, using German BASF F-10 water reducers.
Sodium aluminate, No. CAS:1302-42-7, is provided by Shandong rel New Chemical Material Co., Ltd.
Sodium metasilicate, No. CAS:1344-09-8, is provided by Shangyu Hua Bao Chemical Co., Ltd.s.
Ethanol, No. CAS:64-17-5, is provided, purity 98% by Zhengzhou Brian Jacks Chemical Co., Ltd..
Isopropanol, No. CAS:67-63-0, is provided, purity 98% by Zhengzhou Brian Jacks Chemical Co., Ltd..
Coarse sandpaper, is provided, 60 mesh by Shanghai Min Xin detecting instruments Co., Ltd.
Fine sandpaper, is provided, 2500 mesh by Yongkang City Jin Hu grinding tools Co., Ltd.
Mixer, using the multifunctional mixer of Zhengzhou east heavy-duty machinery Co., Ltd, model JW500.
Embodiment 1
Extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100 parts of powder of lacquer putty for use on and 50 parts of water are added in mixer, 30rpm stirring 7min are stood 15min, then 30rpm stirs 3min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 2mm/2m;
(3) boundary mortar is prepared:45 parts of interfacial agents, 45 parts of portland cements, 45 parts of quartz sands are added in mixer, 30rpm stirs 10min, produces;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.25kg/m is smeared per face2
(5) adhesive mortar is prepared:100 parts of binding sand starches are added in mixer, 25 parts of water are added into mixer, 30rpm stirs 7min, stands 5min, and 30rpm stirs 3min again, produces;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 10mm of bar, bar thickness 10mm, stripe pitch 50mm, the total application area of adhesive mortar accounts for the 40% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted onto immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 20 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often put down Fang meter An fills 4 fixtures, and fixture is 10mm through the aperture that extruded sheet enters base course wall, and fixture anchors into base course wall Depth be 50mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip and floating ash after polishing It is clean with brush cleaning;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 25 parts of water are added, 30rpm is stirred 5min is mixed, 3min is then stood, produced;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2mm, obtains bottom and gather Compound mortar, in the punching of underlying polymer mortar surface, 4 holes of every square metre of installation, aperture is 10mm, and hole depth is 50mm, Then it is fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat bottom Mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, position and bottom that fixture is installed The hole on polymer mortar surface is corresponding, installs after fixture and to smear one layer of polymeric sand again on fiberglass gridding cloth surface Slurry, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
Described fixture is self-tapping screw.
Comparative example 1
Extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100 parts of powder of lacquer putty for use on and 50 parts of water are added in mixer, 30rpm stirring 7min are stood 15min, then 30rpm stirs 3min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 2mm/2m;
(3) boundary mortar is prepared:45 parts of interfacial agents, 45 parts of portland cements, 45 parts of quartz sands are added in mixer, 30rpm stirs 10min, produces;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.25kg/m is smeared per face2
(5) adhesive mortar is prepared:100 parts of binding sand starches are added in mixer, 25 parts of water are added into mixer, 30rpm stirs 7min, stands 5min, and 30rpm stirs 3min again, produces;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 10mm of bar, bar thickness 10mm, stripe pitch 50mm, the total application area of adhesive mortar accounts for the 40% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted onto immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 20 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often put down Fang meter An fills 4 fixtures, and fixture is 10mm through the aperture that extruded sheet enters base course wall, and fixture anchors into base course wall Depth be 50mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip and floating ash after polishing It is clean with brush cleaning;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 25 parts of water are added, 30rpm is stirred 5min is mixed, 3min is then stood, produced;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2mm, obtains bottom and gather Compound mortar, it is then that fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and it is pressed into the underlying polymer mortar punched In, when bedding mortar solidifies tack-free to surface, smear one layer of polymeric mortar again on fiberglass gridding cloth surface, smear Thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
Described fixture is self-tapping screw.
Embodiment 1 is compared with comparative example 1, and embodiment 1 makes a call to a hole again on underlying polymer mortar, gathers in press-in bottom The fixture coordinated with hole is installed again on the grid cloth of compound mortar, coming off for polymer mortar layer is effectively prevent, improves The durability and service life of heat-insulation layer.
Embodiment 2
Extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100 parts of powder of lacquer putty for use on and 50 parts of water are added in mixer, 30rpm stirring 7min are stood 15min, then 30rpm stirs 3min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 2mm/2m;
(3) boundary mortar is prepared:45 parts of interfacial agents, 45 parts of portland cements, 45 parts of quartz sands are added in mixer, 30rpm stirs 10min, produces;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.25kg/m is smeared per face2
(5) adhesive mortar is prepared:By 30 parts of alumina cements, 30 parts of portland cements, 0.5 part of polymer glue powder, 30 parts of stones Sand, 10 parts of expanded vermiculites, 0.3 part of organosilicon moisture repellent, 0.4 part of hydroxypropyl methyl cellulose ether are added in mixer, 30rpm stirs 8min, adds 30 parts of water, and 30rpm stirring 5min are produced;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 10mm of bar, bar thickness 10mm, stripe pitch 50mm, the total application area of adhesive mortar accounts for the 40% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted onto immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 20 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often put down Fang meter An fills 4 fixtures, and fixture is 10mm through the aperture that extruded sheet enters base course wall, and fixture anchors into base course wall Depth be 50mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip and floating ash after polishing It is clean with brush cleaning;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 25 parts of water are added, 30rpm is stirred 5min is mixed, 3min is then stood, produced;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2mm, obtains bottom and gather Compound mortar, in the punching of underlying polymer mortar surface, 4 holes of every square metre of installation, aperture is 10mm, and hole depth is 50mm, Then it is fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat bottom Mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, position and bottom that fixture is installed The hole on polymer mortar surface is corresponding, installs after fixture and to smear one layer of polymeric sand again on fiberglass gridding cloth surface Slurry, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
Described fixture is self-tapping screw.
Embodiment 3
It is substantially the same manner as Example 2, differ only in:In the present embodiment 3, the step (5) is preparation adhesive mortar: 30 parts of alumina cements, 30 parts of portland cements, 0.5 part of polymer glue powder, 32 parts of quartz sand, 8 parts of expanded vermiculites, 0.3 part are had Machine silicon hydrophober, 0.4 part of hydroxypropyl methyl cellulose ether are added in mixer, 30rpm stirring 8min, add 30 parts of water, 30rpm stirs 5min, produces.
Embodiment 4
It is substantially the same manner as Example 2, differ only in:In the present embodiment 4, the step (5) is preparation adhesive mortar: 30 parts of alumina cements, 30 parts of portland cements, 0.5 part of polymer glue powder, 35 parts of quartz sand, 5 parts of expanded vermiculites, 0.3 part are had Machine silicon hydrophober, 0.4 part of hydroxypropyl methyl cellulose ether are added in mixer, 30rpm stirring 8min, add 30 parts of water, 30rpm stirs 5min, produces.
Embodiment 5
It is substantially the same manner as Example 2, differ only in:In the present embodiment 5, the step (5) is preparation adhesive mortar: 30 parts of alumina cements, 30 parts of portland cements, 0.5 part of polymer glue powder, 37 parts of quartz sand, 3 parts of expanded vermiculites, 0.3 part are had Machine silicon hydrophober, 0.4 part of hydroxypropyl methyl cellulose ether are added in mixer, 30rpm stirring 8min, add 30 parts of water, 30rpm stirs 5min, produces.
Embodiment 6
Extruded sheet exterior-wall heat insulation construction technology, comprises the steps of, described part is parts by weight:
(1) putty is prepared:100 parts of powder of lacquer putty for use on and 50 parts of water are added in mixer, 30rpm stirring 7min are stood 15min, then 30rpm stirs 3min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected and is used in combination for projection, hollowing, porous spot Putty is levelling, and levelling flatness is 2mm/2m;
(3) boundary mortar is prepared:45 parts of interfacial agents, 45 parts of portland cements, 45 parts of quartz sands are added in mixer, 30rpm stirs 10min, produces;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.25kg/m is smeared per face2
(5) adhesive mortar is prepared:By 30 parts of alumina cements, 30 parts of portland cements, 0.5 part of polymer glue powder, 35 parts of stones Sand, 5 parts of expanded vermiculites, 0.3 part of organosilicon moisture repellent, 0.4 part of hydroxypropyl methyl cellulose ether are added in mixer, 30rpm stirs 8min, adds 30 parts of water, and 30rpm stirring 5min are produced;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will with tooth mouthful trowel Adhesive mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 10mm of bar, bar thickness 10mm, stripe pitch 50mm, the total application area of adhesive mortar accounts for the 40% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted onto immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 20 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, often put down Fang meter An fills 4 fixtures, and fixture is 10mm through the aperture that extruded sheet enters base course wall, and fixture anchors into base course wall Depth be 50mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip and floating ash after polishing It is clean with brush cleaning;
(8) prepared polymer mortar:By 50 parts of portland cements, 45 parts of river sands, 12 parts of dicalcium powders, 0.2 part of water reducer, 0.3 part of hydroxypropyl methyl cellulose ether, 0.05 part of basalt fibre are added in mixer, 30rpm stirring 8min, then to stirring 40 parts of water are added in machine, then 30rpm stirring 3min add 0.3 part of modified rubber powder, and 30rpm stirring 5min are produced;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2mm, obtains bottom and gather Compound mortar, in the punching of underlying polymer mortar surface, 4 holes of every square metre of installation, aperture is 10mm, and hole depth is 50mm, Then it is fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat bottom Mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, position and bottom that fixture is installed The hole on polymer mortar surface is corresponding, installs after fixture and to smear one layer of polymeric sand again on fiberglass gridding cloth surface Slurry, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, Then routinely technique carries out surface coating or ceramic tile construction.
Described fixture is self-tapping screw.Described water reducer is German BASF F-10 water reducers.The modified rubber The preparation method of rubber powder is as follows:3 parts of sodium aluminates, 1 part of sodium metasilicate, 10 parts of water 300rpm are uniformly mixed, 2 parts of rubber are added Powder, 300rpm stirring 80min, then crosses 300 mesh sieves, discards filtrate, filter residue is rinsed with 300 parts of water, and 50 DEG C of dry 5h will be dry Dry filter residue is added in 35 DEG C of 40 parts of ethanol, 300rpm stirring 20min, 300 mesh sieves is crossed while hot, 50 DEG C of dry 5h are naturally cold But, modified rubber powder is obtained.
Embodiment 7
Substantially the same manner as Example 6, it, which is distinguished, is that the preparation method of modified rubber powder is different, modified in the present embodiment 7 The preparation method of rubber powder is as follows:3 parts of sodium aluminates, 1 part of sodium metasilicate, 10 parts of water 300rpm are uniformly mixed, 2 portions of rubbers are added Rubber powder, 300rpm stirring 80min, then crosses 300 mesh sieves, discards filtrate, filter residue is rinsed with 300 parts of water, and 50 DEG C of dry 5h will Dry filter residue is added in 35 DEG C of 40 parts of isopropanols, 300rpm stirring 20min, while hot 300 mesh sieves excessively, 50 DEG C of dry 5h, from So cooling, obtains modified rubber powder.
Comparative example 2
Substantially the same manner as Example 6, it, which is distinguished, is that the preparation method of modified rubber powder is different, modified in this comparative example 2 The preparation method of rubber powder is as follows:3 parts of sodium aluminates, 1 part of sodium metasilicate, 10 parts of water 300rpm are uniformly mixed, 2 portions of rubbers are added Rubber powder, 300rpm stirring 80min, then crosses 300 mesh sieves, discards filtrate, filter residue is rinsed with 300 parts of water, 50 DEG C of dry 5h, from So cooling, obtains modified rubber powder.
Embodiment 8
Substantially the same manner as Example 6, it, which is distinguished, is that the preparation method of modified rubber powder is different, modified in the present embodiment 8 The preparation method of rubber powder is as follows:3 parts of sodium aluminates, 1 part of sodium metasilicate, 10 parts of water 300rpm are uniformly mixed, 2 portions of rubbers are added Rubber powder, 300rpm stirring 80min, then crosses 300 mesh sieves, discards filtrate, filter residue is rinsed with 300 parts of water, and 50 DEG C of dry 5h will Dry filter residue is added in 35 DEG C of 10 parts of ethanol and the mixed liquor of 30 parts of isopropanols, 300rpm stirring 20min, and 300 are crossed while hot Mesh sieve, 50 DEG C of dry 5h, natural cooling obtains modified rubber powder.
Resistance to compression, rupture strength test result:Compression strength is that 19.51MPa, rupture strength are that 6.57MPa, backfin ratio are 2.96.200 freeze-thaw cycle test mass loss rates are 2.1%.
Test case 1
Tension adhesion strength test is carried out to the adhesive mortar used in embodiment, specific test result is shown in Table 1.
Table 1:The tension adhesion strength test result table of adhesive mortar
Tension adhesion strength/MPa
Embodiment 1 0.605
Embodiment 2 0.635
Embodiment 3 0.647
Embodiment 4 0.669
Embodiment 5 0.642
Compared with Example 1, the tension adhesion strength of embodiment 2-5 adhesive mortar is significantly improved, by screening quartz The ratio of sand and expanded vermiculite can adjust porosity, surface area and the workability of adhesive mortar, and the tension of enhancing adhesive mortar is glued Knotting strength, it is to avoid extruded sheet comes off.
Test case 2
Resistance to compression, rupture strength test are carried out to the polymer mortar used in embodiment, specific test result is shown in Table 2.
Table 2:The resistance to compression of polymer mortar, rupture strength test result table
Compression strength/MPa Rupture strength/MPa Backfin ratio
Embodiment 4 15.27 3.46 4.41
Embodiment 6 17.46 5.68 3.07
Embodiment 7 16.83 5.35 3.14
Comparative example 2 16.32 3.85 4.23
Modified rubber powder is with the addition of in embodiment 6-7 polymer mortar, the resistance to compression of mortar, rupture strength are all substantially carried Height, backfin is than reduction, and illustrating embodiment 6-7 polymer mortar has good cracking resistance, commercially available better than in embodiment 4 Crack-resistance Front Mortar.Comparative example 2 is using conventional alkali come modified rubber powder, and embodiment 6-7 is used at alkali process and organic solvent Two-step method modified rubber powder is managed, organic solvent can further remove the zinc stearate in rubber powder, moreover it is possible in dissolving rubber powder Low pole additive, the compatibility between enhancing rubber powder and cement-based material is improved between rubber powder and cement-based interface Adhesive property, therefore improve the crack resistance of polymer mortar.
Test case 3
Freeze-thaw cycle test is carried out to the polymer mortar used in embodiment, specific test result is shown in Table 3.
Table 3:The freeze-thaw cycle test result table of polymer mortar
Mass loss rate/%
Embodiment 4 3.7
Embodiment 6 2.6
Embodiment 7 2.9
Comparative example 2 4.4
Inventors be surprised to learn that, the freeze thawing resistance loop test of the polymer mortar of embodiment 6-7 use modified rubber powder Middle mass loss rate is lower, beneficial to the frost resistance for improving exterior-wall heat insulation, increases the service life.

Claims (8)

1. a kind of extruded sheet exterior-wall heat insulation construction technology, it is characterised in that comprise the steps of:
(1) putty is prepared;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected for projection, hollowing, porous spot and uses putty It is levelling;
(3) boundary mortar is prepared;
(4) boundary mortar is smeared on the two sides of extruded sheet;
(5) adhesive mortar is prepared;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, squeezing for adhesive mortar will be wiped Mould plate is pasted onto on base course wall immediately;
(7) extruded sheet is pasted and placed 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, by extrusion molding Polished at plate seam injustice with coarse sandpaper, it is immediately that extruded sheet chip and floating grey brush cleaning is clean after polishing;
(8) prepared polymer mortar;
(9) polymer mortar configured is uniformly applied on extruded sheet, obtains underlying polymer mortar, in bottom polymerization Thing mortar surface is punched, and is then pressed into fiberglass gridding cloth in the underlying polymer mortar punched, treats that bedding mortar coagulates Gu to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, position and underlying polymer that fixture is installed The hole of mortar surface is corresponding, installs after fixture and to smear one layer of polymeric mortar again on fiberglass gridding cloth surface, obtains To surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, then Routinely technique carries out surface coating or ceramic tile construction.
2. a kind of extruded sheet exterior-wall heat insulation construction technology, it is characterised in that comprise the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirring 7-10min, 15-20min is stood, then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected for projection, hollowing, porous spot and uses putty Levelling, levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added into mixer In, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:100-150 parts of binding sand starches are added in mixer, 20-30 parts are added into mixer Water, 20-30rpm stirring 5-10min, stands 3-5min, 20-30rpm stirs 1-3min again, produces;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will be bonded with tooth mouthful trowel Mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, stripe pitch 50- 80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, every square Meter ampere fills 3-10 fixture, and fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into basic unit The depth of wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip after polishing And float grey brush cleaning it is clean;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 20-30 parts of water, 20-30rpm are added 3-5min is stirred, 3-5min is then stood, produces;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom polymerization Thing mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, and hole depth is 30- 50mm, it is then that fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat Bedding mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, the position that fixture is installed with The hole of underlying polymer mortar surface is corresponding, installs after fixture and to smear a layers of polymer again on fiberglass gridding cloth surface Thing mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, then Routinely technique carries out surface coating or ceramic tile construction.
3. a kind of extruded sheet exterior-wall heat insulation construction technology, it is characterised in that comprise the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirring 7-10min, 15-20min is stood, then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected for projection, hollowing, porous spot and uses putty Levelling, levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added into mixer In, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:By 20-30 parts of alumina cements, 15-30 parts of portland cements, 0.5-2 parts of polymer glue powders, 30- 40 parts of quartz sands, 5-10 parts of expanded vermiculites, 0.2-0.5 parts of organosilicon moisture repellents, 0.2-0.5 parts of hydroxypropyl methyl cellulose ethers add Enter into mixer, 20-30rpm stirring 5-10min, add 20-30 parts of water, 20-30rpm stirring 5-10min are produced;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will be bonded with tooth mouthful trowel Mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, stripe pitch 50- 80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, every square Meter ampere fills 3-10 fixture, and fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into basic unit The depth of wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip after polishing And float grey brush cleaning it is clean;
(8) prepared polymer mortar:100 parts of polymer mortar powder are added in mixer, 20-30 parts of water, 20-30rpm are added 3-5min is stirred, 3-5min is then stood, produces;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom polymerization Thing mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, and hole depth is 30- 50mm, it is then that fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat Bedding mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, the position that fixture is installed with The hole of underlying polymer mortar surface is corresponding, installs after fixture and to smear a layers of polymer again on fiberglass gridding cloth surface Thing mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, then Routinely technique carries out surface coating or ceramic tile construction.
4. a kind of extruded sheet exterior-wall heat insulation construction technology, it is characterised in that comprise the steps of, described part is parts by weight:
(1) putty is prepared:100-200 parts of powder of lacquer putty for use on and 50-80 parts of water are added in mixer, 20-30rpm stirring 7-10min, 15-20min is stood, then 20-30rpm stirs 3-5min again, produces;
(2) floating ash, greasy dirt, the releasing agent of base course wall are removed, is rejected for projection, hollowing, porous spot and uses putty Levelling, levelling flatness is 0-3mm/2m;
(3) boundary mortar is prepared:30-50 parts of interfacial agents, 30-50 parts of portland cements, 30-50 parts of quartz sands are added into mixer In, 20-30rpm stirring 5-10min are produced;
(4) boundary mortar is smeared on the two sides of extruded sheet, consumption 0.2-0.3kg/m is smeared per face2
(5) adhesive mortar is prepared:By 20-30 parts of alumina cements, 15-30 parts of portland cements, 0.5-2 parts of polymer glue powders, 30- 40 parts of quartz sands, 5-10 parts of expanded vermiculites, 0.2-0.5 parts of organosilicon moisture repellents, 0.2-0.5 parts of hydroxypropyl methyl cellulose ethers add Enter into mixer, 20-30rpm stirring 5-10min, add 20-30 parts of water, 20-30rpm stirring 5-10min are produced;
(6) adhesive mortar configured is applied to the one side of extruded sheet, pasted using bar bonding, i.e., will be bonded with tooth mouthful trowel Mortar is uniformly put on extruded sheet in the horizontal direction, is smeared into strips, the wide 8-10mm of bar, bar thickness 6-10mm, stripe pitch 50- 80mm, the total application area of adhesive mortar accounts for the 30-50% of extrusion molding plate suqare, and the extruded sheet for wiping adhesive mortar is pasted immediately On base course wall, the one side for smearing adhesive mortar with extruded sheet is pasted with base course wall;
(7) extruded sheet is pasted and placed 8-24 hours after base course wall, then in extrusion molding plate surface mounting fixing parts, every square Meter ampere fills 3-10 fixture, and fixture is 8-15mm through the aperture that extruded sheet enters base course wall, and fixture anchors into basic unit The depth of wall is 48-52mm, then will be polished at extruded sheet seam injustice with coarse sandpaper, immediately by extruded sheet chip after polishing And float grey brush cleaning it is clean;
(8) prepared polymer mortar:By 30-50 parts of portland cements, 40-60 parts of river sands, 12-15 parts of dicalcium powders, 0.1-0.5 parts Water reducer, 0.1-0.3 part hydroxypropyl methyl cellulose ether, 0.05-0.1 parts of basalt fibres are added in mixer, 20-30rpm 5-8min is stirred, 30-50 parts of water are then added into mixer, then 20-30rpm stirring 2-3min add 0.2-0.4 parts and change Property rubber powder, 20-30rpm stirring 3-5min, produce;
(9) polymer mortar configured is uniformly applied on extruded sheet, smearing thickness is 2-5mm, obtains bottom polymerization Thing mortar, in the punching of underlying polymer mortar surface, 3-10 hole of every square metre of installation, aperture is 5-10mm, and hole depth is 30- 50mm, it is then that fiberglass gridding cloth is exceptionally straight taut flat in the horizontal direction, and be pressed into the underlying polymer mortar punched, treat Bedding mortar solidify to surface it is tack-free when, in fiberglass gridding cloth surface mounting fixing parts, the position that fixture is installed with The hole of underlying polymer mortar surface is corresponding, installs after fixture and to smear a layers of polymer again on fiberglass gridding cloth surface Thing mortar, smearing thickness is defined by covering fiberglass gridding cloth, obtains surface layer polymer mortar;
(10) it will be polished at surface layer polymer mortar injustice with fine sandpaper, remove the floating ash on surface layer polymer mortar surface, then Routinely technique carries out surface coating or ceramic tile construction.
5. the extruded sheet exterior-wall heat insulation construction technology as described in claim any one of 1-4, it is characterised in that described fixture For self-tapping screw.
6. extruded sheet exterior-wall heat insulation construction technology as claimed in claim 4, it is characterised in that described water reducer is polycarboxylic acids Based water reducer.
7. extruded sheet exterior-wall heat insulation construction technology as claimed in claim 4, it is characterised in that the system of described modified rubber powder Preparation Method is as follows:1-4 parts of sodium aluminates, 1-2 parts of sodium metasilicate, 10-15 parts of water are uniformly mixed in 300-600rpm, 1- is added 2 parts of rubber powders, 300-600rpm stirring 60-120min, then cross 300 mesh sieves, discard filtrate, by filter residue with 300-500 parts of water Rinse, 50-80 DEG C of dry 5-10h, in 40-80 part organic solvents that dry filter residue is added to 35-40 DEG C, 300-600rpm is stirred 15-20min is mixed, 300 mesh sieves are crossed while hot, 50-80 DEG C of dry 5-10h, natural cooling obtains modified rubber powder.
8. extruded sheet exterior-wall heat insulation construction technology as claimed in claim 7, it is characterised in that described organic solvent is ethanol And/or isopropanol.
CN201710218283.0A 2017-04-05 2017-04-05 Extruded sheet exterior-wall heat insulation construction technology Active CN107023132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710218283.0A CN107023132B (en) 2017-04-05 2017-04-05 Extruded sheet exterior-wall heat insulation construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710218283.0A CN107023132B (en) 2017-04-05 2017-04-05 Extruded sheet exterior-wall heat insulation construction technology

Publications (2)

Publication Number Publication Date
CN107023132A true CN107023132A (en) 2017-08-08
CN107023132B CN107023132B (en) 2019-01-11

Family

ID=59527519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710218283.0A Active CN107023132B (en) 2017-04-05 2017-04-05 Extruded sheet exterior-wall heat insulation construction technology

Country Status (1)

Country Link
CN (1) CN107023132B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107663053A (en) * 2017-10-24 2018-02-06 河北晨阳工贸集团有限公司 A kind of soft and graceful soft rock is attached to the construction technology in the decoration of flooring
CN108590085A (en) * 2018-03-20 2018-09-28 上海二十冶建设有限公司 The installation method of exterior-wall heat insulation extruded sheet
CN109025077A (en) * 2018-08-15 2018-12-18 徽都建设有限公司 A kind of construction method of building roofing waterproof layer
CN112142423A (en) * 2020-09-25 2020-12-29 赵开磊 Formula and construction process of putty-free plastering mortar for external wall heat insulation
CN114573285A (en) * 2022-02-22 2022-06-03 兴宁市龙江建材实业有限公司 Preparation method of polymer cement mortar with high crack resistance

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974621A (en) * 2006-12-07 2007-06-06 武汉工程大学 Modified rubber powder and its prepn and use
CN101343162A (en) * 2008-08-25 2009-01-14 武汉理工大学 High-ductility polymer-rubber powder-honey-combed cement concrete road covering material and construction process thereof
CN101654932A (en) * 2009-09-25 2010-02-24 河北省烟草公司唐山市公司 Extruded-sheet external-wall external heat insulation construction method
CN101839045A (en) * 2010-04-01 2010-09-22 李金诺 Fabricating method and construction method of seamless composite board integrating insulation, decoration and waterproofing
CN102225856A (en) * 2011-04-14 2011-10-26 中国新兴保信建设总公司 Crack-resisting mortar for insulation of modified rubber powder and preparation method thereof
CN102561685A (en) * 2010-12-13 2012-07-11 五冶集团上海有限公司 Construction method of extruded polystyrene foamed plastic insulation boards in house energy-saving materials
CN102690091A (en) * 2012-05-23 2012-09-26 湖北天泉新型建筑材料有限公司 A hollow microsphere masonry dedicated thermal insulation mortar and a dedicated surface mortar
CN102875101A (en) * 2012-10-15 2013-01-16 山东圣泉化工股份有限公司 Waterproof adhesive mortar for external thermal insulation of external wall
CN103553495A (en) * 2013-10-21 2014-02-05 苏州市姑苏新型建材有限公司 Rapid-hardened type veneer stone early-strength adhesive

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974621A (en) * 2006-12-07 2007-06-06 武汉工程大学 Modified rubber powder and its prepn and use
CN101343162A (en) * 2008-08-25 2009-01-14 武汉理工大学 High-ductility polymer-rubber powder-honey-combed cement concrete road covering material and construction process thereof
CN101654932A (en) * 2009-09-25 2010-02-24 河北省烟草公司唐山市公司 Extruded-sheet external-wall external heat insulation construction method
CN101839045A (en) * 2010-04-01 2010-09-22 李金诺 Fabricating method and construction method of seamless composite board integrating insulation, decoration and waterproofing
CN102561685A (en) * 2010-12-13 2012-07-11 五冶集团上海有限公司 Construction method of extruded polystyrene foamed plastic insulation boards in house energy-saving materials
CN102225856A (en) * 2011-04-14 2011-10-26 中国新兴保信建设总公司 Crack-resisting mortar for insulation of modified rubber powder and preparation method thereof
CN102690091A (en) * 2012-05-23 2012-09-26 湖北天泉新型建筑材料有限公司 A hollow microsphere masonry dedicated thermal insulation mortar and a dedicated surface mortar
CN102875101A (en) * 2012-10-15 2013-01-16 山东圣泉化工股份有限公司 Waterproof adhesive mortar for external thermal insulation of external wall
CN103553495A (en) * 2013-10-21 2014-02-05 苏州市姑苏新型建材有限公司 Rapid-hardened type veneer stone early-strength adhesive

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107663053A (en) * 2017-10-24 2018-02-06 河北晨阳工贸集团有限公司 A kind of soft and graceful soft rock is attached to the construction technology in the decoration of flooring
CN107663053B (en) * 2017-10-24 2020-07-31 河北晨阳工贸集团有限公司 Construction process for pasting soft and beautiful soft stone in indoor floor decoration
CN108590085A (en) * 2018-03-20 2018-09-28 上海二十冶建设有限公司 The installation method of exterior-wall heat insulation extruded sheet
CN109025077A (en) * 2018-08-15 2018-12-18 徽都建设有限公司 A kind of construction method of building roofing waterproof layer
CN112142423A (en) * 2020-09-25 2020-12-29 赵开磊 Formula and construction process of putty-free plastering mortar for external wall heat insulation
CN114573285A (en) * 2022-02-22 2022-06-03 兴宁市龙江建材实业有限公司 Preparation method of polymer cement mortar with high crack resistance

Also Published As

Publication number Publication date
CN107023132B (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN107023132B (en) Extruded sheet exterior-wall heat insulation construction technology
CN112341123B (en) Seawater corrosion resistant ceramic tile adhesive and production method thereof
CN100345791C (en) Heat insulating glue powder material for wall and its prepn and usage
CN109574567B (en) Anti-freezing recycled concrete and preparation method thereof
CN103253909B (en) The preparation method of glaze and glaze material plate
CN103255888B (en) Full-body dry hanging plate and manufacturing method thereof
CN101648798A (en) Cement-based floor self-leveling mortar and preparation method thereof
CN103410232A (en) Outer-wall external thermal-insulating system utilizing inorganic compound thermal-insulating board
CN107555911B (en) Exterior wall spraying putty and preparation method thereof
KR101617067B1 (en) Exterior insulation mortar for cold weather and construction method of exterior insulation system using the same
CN103319128A (en) Anti-crack plaster mortar for outer wall of building and method for preparing anti-crack plaster mortar
CN111620661B (en) Self-leveling mortar with waterproof and sound insulation functions and construction method
EP2718243A1 (en) Cellulose ether compounds for improved hot temperature performance in external insulation finishing systems (eifs) mortars
CN111302722A (en) Polymer anti-crack mortar
CN113719047A (en) Building outer wall protection and decoration structure and application and construction process
CN115010452A (en) Gypsum-based ground ceramic tile bonding mortar and preparation method thereof
CN106830826A (en) A kind of thin-coat plaster system Machine-blasting mortar
CN104230265A (en) Thin-layer plastering material and preparation method thereof
CN202731170U (en) Exterior wall insulation and facing system based on decorative bricks
CN101774224A (en) Method for producing energy-saving and environmentally-friendly concrete
CN101935185A (en) Additive for preparing mortar from fine sand
CN203878854U (en) Whitewashing-free heat insulating wall structure
CN110451916A (en) A kind of expanded perlite light thermal insulation decoration integrated board and preparation method thereof
CN111410462B (en) Through-hole bonding plastering mortar, preparation method thereof and thermal insulation structure integrated plate prepared from same
CN115215627A (en) Low-cost light plastering gypsum mortar and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180724

Address after: 409600 Chongqing Pengshui Miao and Tujia Autonomous County Pengshui Industrial Park Science and technology incubation building B area 3-419 room.

Applicant after: PENGSHUI LYUYI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Address before: 065799 Dongguan seven street, Bazhou Town, Bazhou City, Langfang, Hebei, China

Applicant before: BAZHOU RUISHUOYING DECORATION FINISHING ENGINEERING CO.,LTD.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181127

Address after: 518000 Shatou Street Cuiwan Community Fuqiang Road, Futian District, Shenzhen City, Guangdong Province

Applicant after: SHENZHEN AOJIAN DECORATION CO.,LTD.

Address before: 409600 Chongqing Pengshui Miao and Tujia Autonomous County Pengshui Industrial Park Science and technology incubation building B area 3-419 room.

Applicant before: PENGSHUI LYUYI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518048 Shatou Street Cuiwan Community Fuqiang Road 4001 Shawei Industrial Zone Cultural Creative Park A Five Stories 506A, Futian District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Aojian Decoration Group Co.,Ltd.

Address before: 518048 Shatou Street Cuiwan Community Fuqiang Road 4001 Shawei Industrial Zone Cultural Creative Park A Five Stories 506A, Futian District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Aojian Decoration Group Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518048 Shatou Street Cuiwan Community Fuqiang Road 4001 Shawei Industrial Zone Cultural Creative Park A Five Stories 506A, Futian District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Aojian Decoration Group Co.,Ltd.

Address before: 518000 Shatou Street Cuiwan Community Fuqiang Road, Futian District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN AOJIAN DECORATION CO.,LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518048 Shatou Street Cuiwan Community Fuqiang Road 4001 Shawei Industrial Zone Cultural Creative Park A Five Stories 506A, Futian District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Huaao Jianke Group Co.,Ltd.

Address before: 518048 Shatou Street Cuiwan Community Fuqiang Road 4001 Shawei Industrial Zone Cultural Creative Park A Five Stories 506A, Futian District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Aojian Decoration Group Co.,Ltd.