CN109025077A - A kind of construction method of building roofing waterproof layer - Google Patents
A kind of construction method of building roofing waterproof layer Download PDFInfo
- Publication number
- CN109025077A CN109025077A CN201810926163.0A CN201810926163A CN109025077A CN 109025077 A CN109025077 A CN 109025077A CN 201810926163 A CN201810926163 A CN 201810926163A CN 109025077 A CN109025077 A CN 109025077A
- Authority
- CN
- China
- Prior art keywords
- mortar
- base course
- waterproof layer
- course wall
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D7/00—Roof covering exclusively consisting of sealing masses applied in situ; Gravelling of flat roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/16—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
Abstract
The invention discloses a kind of construction methods of building roofing waterproof layer, comprising the following steps: prepares putty;Remove base course wall floating ash, greasy dirt, release agent, for protrusion, hollowing, porous spot carry out rejecting and with putty it is levelling;Prepare boundary mortar;Boundary mortar is smeared on the two sides of base course wall;Configured boundary mortar is uniformly applied on base course wall, underlying polymer mortar is obtained, after base course wall is tentatively constructed, in the surface paving macromolecule water-proof sheet material of the boundary mortar layer.The present invention makes improvements conventional construction technique, it is preferred that the formula of adhesive mortar and polymer mortar, construction cost is saved, the rapid hardening rubber asphalt waterproof coating used simultaneously is mixed by emulsified asphalt, polymer rubber modifying agent and additive, has more excellent waterproof quality compared to general water-repellent paint.
Description
Technical field
The present invention relates to building waterproofing technique field, the construction method of specifically a kind of building roofing waterproof layer.
Background technique
In building field, to prevent water to the infiltration at the certain positions of building and from construction material and structurally taking
Waterproof measure.Currently, the measure that people generally take is that coating water-repellent paint or waterproof roll, coiled material advantage are on base's table
Thickness is uniform, and thickness is easy to grasp by requirement of setting up defences, and it is accurate to be calculated with material, the disadvantage is that being needed in the construction process according to waterproof matrix
Shape and cut the garment according to the figure, need muti-piece to splice the base of complex contour, the bonding difficulty of mutual lap-joint is larger, difficult
To be absolutely sealed completely, leakage hidden trouble is big.The bonding of waterproof roll and base either Man Pu, Dian Pu, item paving, empty paving, coiled material
All easily become channeling water layer between base, once there is penetrability damaged, degumming, leak adhesive, the water-proof function of entire waterproof layer is all
By whole forfeitures, repair very difficult.
The advantages of water-repellent paint be it is easy for construction simple, waterproof layer is there is no overlap joint, the region that coiled material can not construct, especially
It is complicated position, coating can be solved perfectly, and water tight integrity is good, but the disadvantage is that the flatness requirement to basal plane is higher,
It is influenced by basal plane injustice, is easy became uneven, coating pass when thickness is according to construction determines.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods of building roofing waterproof layer, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction method of building roofing waterproof layer, comprising the following steps:
S1: it preparing putty: 50-100 parts of powder of lacquer putty for use on and 30-50 parts of water is added in blender, 20-30rpm stirs 5-10min,
Stand 20-30min, then again 20-30rpm stir 5-10min to get;
S2: floating ash, the greasy dirt, release agent of base course wall are removed, protrusion, hollowing, porous spot are rejected and use putty
It is levelling;
S3: it prepares boundary mortar: blender is added in 20-50 parts of interfacial agents, 20-50 parts of portland cements, 20-50 parts of quartz sands
In, 10-20rpm stir 10-20min to get;
S4: boundary mortar is smeared on the two sides of base course wall;
S5: configured boundary mortar is uniformly applied on base course wall, underlying polymer mortar is obtained, in floor interface
Mortar surface punching, 5-10 hole of every square metre of installation, aperture 3-5mm, hole depth 20-40mm, then by glass fibre
Grid cloth is exceptionally straight taut flat in the horizontal direction, and is pressed into the floor interface mortar punched, solidifies to surface not to bedding mortar
When viscous hand, in fiberglass gridding cloth surface mounting fixing parts, the position of fixing piece installation and the hole of floor interface mortar surface
It is corresponding, it installs and smears a bed boundary mortar again on fiberglass gridding cloth surface after fixing piece, smearing thickness is to cover glass
Subject to glass fibrous mesh cloth, boundary mortar layer is obtained
S6: after base course wall is tentatively constructed, in the surface paving macromolecule water-proof sheet material of the boundary mortar layer, and
Overlapping the slot processing is carried out by welding or gluing or overlap joint between adjacent high-molecular waterproof sheet, in the macromolecule water-proof sheet material
Surface sprays rapid hardening rubber asphalt waterproof coating.
In as a further solution of the present invention: step S2), levelling flatness is 0-3mm/2m.
As further scheme of the invention: step S4) in, the applying amount of the base course wall boundary mortar is 0.2-
0.3kg/m2。
As further scheme of the invention: step S5) in, the smearing thickness of the boundary mortar is 1-3mm.
As further scheme of the invention: step S6) in, the rapid hardening rubber asphalt waterproof coating and the high score
Sub- waterproof sheet bonding constitutes complex waterproof layer.
As further scheme of the invention: step S6) in, the rapid hardening rubber asphalt waterproof coating is dripped by emulsification
Green, polymer rubber modifying agent and additive pass through the quick setting polymeric emulsion form water-repellent paint that emulsification and cross linked is formed.
As further scheme of the invention: the assembling reinforcement on the complex waterproof layer, casting concrete structure sheaf.
Compared with prior art, the beneficial effects of the present invention are: the present invention makes improvements conventional construction technique, preferably
The formula of adhesive mortar and polymer mortar, has saved construction cost, at the same the rapid hardening rubber asphalt waterproof coating used be by
Emulsified asphalt, polymer rubber modifying agent and additive mix, and have compared to general water-repellent paint more excellent anti-
Water quality.
Specific embodiment
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field
Art personnel every other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
In the embodiment of the present invention, a kind of construction method of building roofing waterproof layer, comprising the following steps:
S1: it preparing putty: 50-100 parts of powder of lacquer putty for use on and 30-50 parts of water is added in blender, 20-30rpm stirs 5-10min,
Stand 20-30min, then again 20-30rpm stir 5-10min to get;
S2: floating ash, the greasy dirt, release agent of base course wall are removed, protrusion, hollowing, porous spot are rejected and use putty
It is levelling;
S3: it prepares boundary mortar: blender is added in 20-50 parts of interfacial agents, 20-50 parts of portland cements, 20-50 parts of quartz sands
In, 10-20rpm stir 10-20min to get;
S4: boundary mortar is smeared on the two sides of base course wall;
S5: configured boundary mortar is uniformly applied on base course wall, underlying polymer mortar is obtained, in floor interface
Mortar surface punching, 5-10 hole of every square metre of installation, aperture 3-5mm, hole depth 20-40mm, then by glass fibre
Grid cloth is exceptionally straight taut flat in the horizontal direction, and is pressed into the floor interface mortar punched, solidifies to surface not to bedding mortar
When viscous hand, in fiberglass gridding cloth surface mounting fixing parts, the position of fixing piece installation and the hole of floor interface mortar surface
It is corresponding, it installs and smears a bed boundary mortar again on fiberglass gridding cloth surface after fixing piece, smearing thickness is to cover glass
Subject to glass fibrous mesh cloth, boundary mortar layer is obtained;
S6: after base course wall is tentatively constructed, in the surface paving macromolecule water-proof sheet material of the boundary mortar layer, and
Overlapping the slot processing is carried out by welding or gluing or overlap joint between adjacent high-molecular waterproof sheet, in the macromolecule water-proof sheet material
Surface sprays rapid hardening rubber asphalt waterproof coating.
Preferably, the present embodiment step S2) in, levelling flatness is 0-3mm/2m.
Preferably, the present embodiment step S4) in, the applying amount of the base course wall boundary mortar is 0.2-0.3kg/m2.
Preferably, the present embodiment step S5) in, the smearing thickness of the boundary mortar is 1-3mm.
Preferably, the present embodiment step S6) in, the rapid hardening rubber asphalt waterproof coating and the macromolecule water-proof sheet material
Bonding constitutes complex waterproof layer.
Preferably, the present embodiment step S6) in, the rapid hardening rubber asphalt waterproof coating is by emulsified asphalt, macromolecule
Rubber modifier and additive pass through the quick setting polymeric emulsion form water-repellent paint that emulsification and cross linked is formed.
Preferably, in the present embodiment, the assembling reinforcement on the complex waterproof layer, casting concrete structure sheaf.
The present invention makes improvements conventional construction technique, preferably the formula of adhesive mortar and polymer mortar, saves
Construction cost, while the rapid hardening rubber asphalt waterproof coating used is by emulsified asphalt, polymer rubber modifying agent and additive
It mixes, has more excellent waterproof quality compared to general water-repellent paint.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (7)
1. a kind of construction method of building roofing waterproof layer, which comprises the following steps:
S1: it preparing putty: 50-100 parts of powder of lacquer putty for use on and 30-50 parts of water is added in blender, 20-30rpm stirs 5-10min,
Stand 20-30min, then again 20-30rpm stir 5-10min to get;
S2: floating ash, the greasy dirt, release agent of base course wall are removed, protrusion, hollowing, porous spot are rejected and use putty
It is levelling;
S3: it prepares boundary mortar: blender is added in 20-50 parts of interfacial agents, 20-50 parts of portland cements, 20-50 parts of quartz sands
In, 10-20rpm stir 10-20min to get;
S4: boundary mortar is smeared on the two sides of base course wall;
S5: configured boundary mortar is uniformly applied on base course wall, underlying polymer mortar is obtained, in floor interface
Mortar surface punching, 5-10 hole of every square metre of installation, aperture 3-5mm, hole depth 20-40mm, then by glass fibre
Grid cloth is exceptionally straight taut flat in the horizontal direction, and is pressed into the floor interface mortar punched, solidifies to surface not to bedding mortar
When viscous hand, in fiberglass gridding cloth surface mounting fixing parts, the position of fixing piece installation and the hole of floor interface mortar surface
It is corresponding, it installs and smears a bed boundary mortar again on fiberglass gridding cloth surface after fixing piece, smearing thickness is to cover glass
Subject to glass fibrous mesh cloth, boundary mortar layer is obtained
S6: after base course wall is tentatively constructed, in the surface paving macromolecule water-proof sheet material of the boundary mortar layer, and
Overlapping the slot processing is carried out by welding or gluing or overlap joint between adjacent high-molecular waterproof sheet, in the macromolecule water-proof sheet material
Surface sprays rapid hardening rubber asphalt waterproof coating.
2. the construction method of building roofing waterproof layer according to claim 1, which is characterized in that step S2) in, it is levelling
Flatness is 0-3mm/2m.
3. the construction method of building roofing waterproof layer according to claim 1, which is characterized in that step S4) in, it is described
The applying amount of base course wall boundary mortar is 0.2-0.3kg/m2.
4. the construction method of building roofing waterproof layer according to claim 1, which is characterized in that step S5) in, it is described
The smearing thickness of boundary mortar is 1-3mm.
5. the construction method of building roofing waterproof layer according to claim 1, which is characterized in that step S6) in, it is described
Rapid hardening rubber asphalt waterproof coating composition complex waterproof layer Nian Jie with the macromolecule water-proof sheet material.
6. the construction method of building roofing waterproof layer according to claim 1, which is characterized in that step S6) in, it is described
Rapid hardening rubber asphalt waterproof coating is to pass through the speed that emulsification and cross linked is formed by emulsified asphalt, polymer rubber modifying agent and additive
Solidifying macromolecule latex liquid water-repellent paint.
7. the construction method of building roofing waterproof layer according to claim 5, which is characterized in that in the composite water-proof
Assembling reinforcement on layer, casting concrete structure sheaf.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810926163.0A CN109025077A (en) | 2018-08-15 | 2018-08-15 | A kind of construction method of building roofing waterproof layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810926163.0A CN109025077A (en) | 2018-08-15 | 2018-08-15 | A kind of construction method of building roofing waterproof layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025077A true CN109025077A (en) | 2018-12-18 |
Family
ID=64630299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810926163.0A Pending CN109025077A (en) | 2018-08-15 | 2018-08-15 | A kind of construction method of building roofing waterproof layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025077A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114439158A (en) * | 2021-12-21 | 2022-05-06 | 河北三棵树涂料有限公司 | Waterproof construction method for rubber asphalt waterproof coating roof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104251140A (en) * | 2014-09-03 | 2014-12-31 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for underground construction and manufacturing and construction method thereof |
CN104264715A (en) * | 2014-09-03 | 2015-01-07 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for environmental engineering and preparing and constructing method thereof |
CN105623508A (en) * | 2014-11-05 | 2016-06-01 | 大禹伟业(北京)国际科技有限公司 | Aqueous flame-retardant rubber asphalt coating film waterproof material and preparation and construction method thereof |
CN107023132A (en) * | 2017-04-05 | 2017-08-08 | 霸州市瑞硕盈装饰装修工程有限公司 | Extruded sheet exterior-wall heat insulation construction technology |
CN107964362A (en) * | 2017-11-23 | 2018-04-27 | 大禹伟业(北京)国际科技有限公司 | One kind spraying rapid hardening rubber asphalt waterproof coating and its preparation and construction method |
-
2018
- 2018-08-15 CN CN201810926163.0A patent/CN109025077A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104251140A (en) * | 2014-09-03 | 2014-12-31 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for underground construction and manufacturing and construction method thereof |
CN104264715A (en) * | 2014-09-03 | 2015-01-07 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for environmental engineering and preparing and constructing method thereof |
CN105623508A (en) * | 2014-11-05 | 2016-06-01 | 大禹伟业(北京)国际科技有限公司 | Aqueous flame-retardant rubber asphalt coating film waterproof material and preparation and construction method thereof |
CN107023132A (en) * | 2017-04-05 | 2017-08-08 | 霸州市瑞硕盈装饰装修工程有限公司 | Extruded sheet exterior-wall heat insulation construction technology |
CN107964362A (en) * | 2017-11-23 | 2018-04-27 | 大禹伟业(北京)国际科技有限公司 | One kind spraying rapid hardening rubber asphalt waterproof coating and its preparation and construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114439158A (en) * | 2021-12-21 | 2022-05-06 | 河北三棵树涂料有限公司 | Waterproof construction method for rubber asphalt waterproof coating roof |
CN114439158B (en) * | 2021-12-21 | 2023-11-28 | 河北三棵树涂料有限公司 | Waterproof construction method for rubber asphalt waterproof coating roof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103343655B (en) | Wall window construction method | |
CN104251140B (en) | Composite waterproof layer for underground construction and manufacturing and construction method thereof | |
CN102762678B (en) | Polymer-based film waterproofing agent mixed with cement, and preparation method thereof | |
KR100992952B1 (en) | Complex waterproofing structure and construction method which use Low melting point polymer modified asphalt Waterproof material and silica sheet | |
CN108252530A (en) | A kind of parapet percolating water repairs technique | |
CN103669417B (en) | Prefabricated outer wall of basement seam crossing epoxy resin cement concrete and construction method thereof | |
CN106836529A (en) | A kind of construction technology for being applied to exterior-wall heat insulation | |
KR101241940B1 (en) | Aliphatic epoxy modified tarurethane waterproofing material and manufacturing method thereof, construction method and structure for complex waterproofing using aliphatic epoxy modified tarurethane waterproofing material and complex sheet with hole | |
CN112144581B (en) | Large integral underground space waterproof construction structure and construction method thereof | |
KR100315181B1 (en) | Two-Package Type Inorganic Membranous Waterproof Stuff Having Excellent Elasticity, Hybrid Membranous Waterproof Sheet and Construction Method therefor | |
CN112252462A (en) | Construction method of concrete roof layer waterproof structure | |
CN106499066A (en) | A kind of method that utilization FS101 mortar waterproof agents carry out building waterproof layer construction | |
CN108374566A (en) | A kind of back side percolating water repairerment technique | |
CN108951893B (en) | Shear wall horizontal construction joint rough surface reserved forming construction process | |
CN111608280A (en) | External wall heat insulation construction method | |
CN109025077A (en) | A kind of construction method of building roofing waterproof layer | |
KR101998820B1 (en) | Complex waterproof structure for concrete slab and construction method thereof | |
DE10261076A1 (en) | A process for coating a cement containing shaped part useful for covering concrete building components, cold rooms, sauna units, controlled tips, sewage treatment plants, tunnels, reactor construction, gas stations, flat roof coatings | |
CN112408851A (en) | Anti-radiation semi-permanent nano-penetration crystallization sealing compacting agent and use method thereof | |
CN108343164A (en) | A kind of expansion joint percolating water repairerment technique | |
CN107574936A (en) | A kind of heat preserving exterior wall construction technology | |
CN109837894A (en) | Anti-float anchor rod end multilayer flashing material mating steel plate for sealing water composite water-proof construction technology | |
CN105133855A (en) | Energy-saving and environment-friendly waterproof warming construction method for existing roof surface | |
CN108560608A (en) | Garbage power plant structures pond body engineering level construction joint construction | |
KR101212288B1 (en) | Primer composition and construction method for waterproof structure using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |