CN106979769B CN201710072566.9A CN201710072566A CN106979769B CN 106979769 B CN106979769 B CN 106979769B CN 201710072566 A CN201710072566 A CN 201710072566A CN 106979769 B CN106979769 B CN 106979769B
Authority
CN
China
Prior art keywords
cultellation
shaft
laser
point
total station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710072566.9A
Other languages
Chinese (zh)
Other versions
CN106979769A (en
Inventor
靳炳强
王普
张俊彪
魏先斌
武金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Original Assignee
China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd filed Critical China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Priority to CN201710072566.9A priority Critical patent/CN106979769B/en
Publication of CN106979769A publication Critical patent/CN106979769A/en
Application granted granted Critical
Publication of CN106979769B publication Critical patent/CN106979769B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Abstract

The invention discloses the reverse coordinates of tunnel shaft to transmit cultellation construction survey method, belong to deep shaft coordinate transmitting cultellation technical field of construction, the measurement method is convenient for burying point in shaft bottom, occupy the well hole time is short, precision is high, easy to operate, measuring speed is fast, it is practical, be easy to pile anchoring, be easy to carry out the transmitting of deep shaft plane and elevation transmitting measurement, be not easily susceptible in vertical shaft be influenced by air-flow and dripping.Include the following steps: the apparatus selection before (1) carries out cultellation and instrument verification;(2) setting laser plummet apparatus inversely transmits cultellation;(3) inversely transmitting is handled total station vertical shaft elevation.

Description

The reverse coordinate of tunnel shaft transmits cultellation construction survey method
Technical field
The present invention relates to deep shaft coordinates to transmit cultellation technical field of construction, and in particular to the reverse coordinate transmitting of tunnel shaft Cultellation construction survey method.
Background technique
In constructing tunnel, in order to accelerate construction progress and divulge information, major long tunnel especially urban subway tunnel is often adopted With increase vertical shaft method come increase construction face to accelerate construction progress, in order to guarantee that opposite excavation face can be penetrated through correctly, Just coordinate, direction and the elevation in terrestrial net underground be must be transmitted to via vertical shaft, underground control net and ground made On control net coordinate system it is unified.Therefore, vertical shaft transmitting connection survey just becomes the primary problem of construction.
The method of vertical shaft plane connection survey mainly uses vertical shaft to bury point in shaft bottom by the downward cultellation of well head at present It carries out.Its specific practice is that two steel wires of extension, the upper end of steel wire are hauled with puffer on the ground in pit shaft, and lower end steel wire is outstanding The geometric orientation measurement method of weight is hung, this method occurs plumb bob line inclined due to being influenced by vertical shaft by air-flow and dripping Move and ceaselessly swing may be only available for vertical shaft it is shallower, to the lower shaft plumbing of penetrating accuracy requirement, and vertical shaft is by well head Downward cultellation buries point inconvenience in shaft bottom, therefore, it is easy to use to design one kind, and be not easily susceptible in vertical shaft by air-flow and drop The reverse coordinate transmitting cultellation construction survey method of the tunnel shaft that water influences is very necessary.
Summary of the invention
The present invention is that it is perpendicular to provide a kind of tunnel in order to solve existing vertical shaft plane connection survey above shortcomings The reverse coordinate of well transmits cultellation construction survey method, which is convenient for burying point in shaft bottom, and it is short, smart to occupy the well hole time Spend it is high, easy to operate, measuring speed is fast, it is practical, be easy to pile anchoring, be easy to carry out the transmitting of deep shaft plane and elevation transmitting survey Amount is not easily susceptible in vertical shaft be influenced by air-flow and dripping, user be easy to know well head whether run-off the straight, underground operators are easy In knowing that laser plummet apparatus buries point.
The above technical problem is solved through the following technical scheme:
The reverse coordinate of tunnel shaft transmits cultellation construction survey method, buries the vertical shaft inverted arch at control point in vertical shaft shaft bottom Bottom surface is equipped with inverted arch vertical holes, and bracket is equipped in inverted arch vertical holes, and the ball for having opening up and down is equipped on bracket Face groove, universal rotational is equipped with spin in spherical groove, and laser plummet apparatus is fixed in the spin of spherical groove upper open end, It is fixed with sunpender straight down in the spin of spherical groove lower open end, is fixed with gravitation ball in downrod lower end, and The centre of sphere of the laser center line of laser plummet apparatus, the centre of sphere of Roll and gravitation ball all falls in the extended line of the axial line of sunpender On;The voice prompting device for being equipped with microcontroller on the operational platform and being connect with microcontroller, preformed hole on the operational platform It is interior vertical equipped with the light passing pipe that the laser of laser plummet apparatus can be allowed to pass through, it is equipped on the inner tubal wall of light passing pipe and microcontroller connects The photoelectric sensor connect;It is also equipped with telescopic rod straight up on bracket, level shadow plate is equipped in telescopic rod top end, in level Rotation is equipped with warning lamp on telescopic rod below barn door;Measurement method includes the following steps: the instrument choosing before (1) progress cultellation It selects and is verified with instrument;(2) setting laser plummet apparatus inversely transmits cultellation;(3) inversely transmitting is handled total station vertical shaft elevation.
This measurement method uses the reverse cultellation method of laser plummet apparatus of upward cultellation, solves vertical shaft by the downward cultellation of well head The problem of point inconvenience is buried in shaft bottom.It is convenient that the measurement method in shaft bottom buries point, occupies that the well hole time is short, precision It is high, easy to operate, measuring speed is fast, it is practical, be easy to pile anchoring, be easy to carry out the transmitting of deep shaft plane and elevation transmitting survey Amount is not easily susceptible in vertical shaft be influenced by air-flow and dripping.When the well head of vertical shaft tilts, the laser of laser plummet apparatus will It is irradiated on the photoelectric sensor, after microcontroller receives the photosignal that photoelectric sensor transmits, microcontroller gives language immediately The instruction of sound prompting device allows voice prompting device to issue voice prompting, and user may know that well head run-off the straight, and underground operators are easy In knowing that laser plummet apparatus buries point.
Preferably, the apparatus selection and instrument checking procedure before progress cultellation include:
(1.1) laser plummet apparatus of choice accuracy 1/200000 comes card TS30 robot measurement as cultellation instrument and use Calibration is carried out as the reverse transfer device of elevation, and to laser plummet apparatus;
(1.2) laser plummet apparatus alidade is carried out to diameter measurement in different orientation, eliminates the water of laser plummet apparatus The influence of fiducial axis and instrument rotary shaft, collimation axis and rotation axle misalignment;
(1.3) on calibration platform or an elevation building is looked for, centering leveling first is carried out to laser plummet apparatus, is then rotated Laser plummet apparatus checks whether laser plummet apparatus circular bubble and bubble tube are placed in the middle, makes axis of levelling bubble parallel or perpendicular to sharp Then level alidade is respectively aligned to 0 ° of instrument scale, 90 °, 180 °, 270 ° of four scale sides by the rotary shaft of light plumb aligner Position simultaneously rotates laser plummet apparatus alidade, and the center of graticle crosshair is observed by eyepiece, sees that 4 point centers of reading are No coincidence, if, the center of the graticle crosshair of laser plummet apparatus is overlapped with tester center of reticule, illustrates laser plumb The collimation axis of instrument be it is vertical, illustrate that accuracy of instrument is met the requirements, do not need adjustment;Otherwise, eyepiece protection cap, adjustment ten are opened Word silk, until the center of reticule of laser plummet apparatus is directed toward the same point always.
Preferably, setting laser plummet apparatus inversely transmits cultellation and includes the following steps:
(2.1) vertical shaft shaft bottom control point is embedded;
(2.2) Shaft bank operation rack is set up;
(2.3) the reverse cultellation of laser plummet apparatus;
(2.4) the reverse cultellation of well head is the same as ground control point connection survey.
Preferably, the embedded process in vertical shaft shaft bottom control point is: 3 control points are buried in the suitable position in vertical shaft shaft bottom, And the point depth of burying at control point will be lower than vertical shaft inverted arch bottom surface about 10cm;The mutual distance in 3 control points according to The width dimensions of vertical shaft want to the greatest extent possible maximum, to improve vertically and horizontally precision when total station pilot measurement;It should be infused in embedded point Meaning avoiding shelter.
Preferably, Shaft bank operation rack sets up process and is: laser plummet apparatus being erected on the control point of shaft bottom, is beaten It opens laser and looks for the position that operating platform is set up in wherein position convenient for the worker on the pit mouth of ground, it be in operating platform laser 150mm × 150mm and preformed hole corresponding with shaft bottom control point vertical are reserved in the position that beam passes through, and guarantee vertical in laser beam Preformed hole can be passed through when irradiation upwards;If being provided with wall around vertical shaft, operating platform is allowed to be significantly larger than wall.
Preferably, the reverse cultellation setting up procedure of laser plummet apparatus is:
(2.3.1) disposes laser plumb instrument: three control points D0, D1 and D2 is arranged in shaft bottom, then in D0, D1, D2 Laser plummet apparatus is set up on these three control points respectively, and laser plummet apparatus centering is flattened;
(2.3.2) is placed in reserved opening and is received target: D0 ', D1 ', D2 ' on well head gantry crane crossbeam operating platform this three The transparent glass of 200mm × 200mm is placed on the preformed hole of a control point 150mm × 150mm respectively as reception target;
(2.3.3) diameter cultellation: opening laser plummet apparatus Laser Power Devices, have beam of laser and project from telephotolens, It projects on the gantry crane crossbeam of well head top on the reception target of 150mm × 150mm preformed hole, using diameter method of reading, operation instrument In 0 degree, 90 degree, 180 degree and 270 degree, this four disk position cultellations position device respectively, survey crew's marking pen on operating platform Determine 4 LASER SPECKLE positions respectively on glass receiver board;The point that 4 directions are thrown constitutes approximation on glass receiver board In square, and require the side length of square within 5mm;
(2.3.4) diameter intersects punctum: 0 degree of point and 180 degree point and 90 degree of points and 270 degree of point interconnections are handed over Point is the vertical control point in the shaft bottom;
(2.3.5) forms triangular closed ring: laser plummet apparatus is on well and D0 ' and D0, D1 ' and D1, D2 ' are cast in underground And D2, and D0 ' and D0 are spatially 2 points, but while projecting to same plane just becomes 1 point;Similarly, D1 ' and D1 is thrown Also become 1 point when shadow is to same plane, D2 ' and D2 also become 1 point when projecting to same plane;Conducting wire passes through cultellation on well It is linked to be a triangular closed ring, underground conducting wire is also linked to be a triangular closed ring by cultellation;
Other 2 control points D0, D2 (2.3.6) are communicated up cultellation using same method;
The detection of (2.3.7) close ring: three control point groups of D0 ', D1 ', D2 ' on well head top operating platform are inversely thrown into At triangle, mutual angle and distance relationship is checked using total station TS30, is confirmed the interior of thrown control point and is met essence Degree;
(2.3.1)~(2.3.7) step is repeated several times in (2.3.8), takes its cultellation position mean value.
Preferably, the reverse cultellation of well head is with ground control point connection survey process: shaft bottom is inversely transmitted to operation Control point D0 ', D1 ', D2 ' on platform utilize total station with the control point WH1 and WH2 near well head according in total station hole two The measurement method of equal conducting wires carries out translocation, and total station is no less than 6 survey time.
Preferably, total station vertical shaft elevation inversely transmits treatment process is:
(3.1) basic point pilot measurement: using the electronic level of assay approval by ground elevation according to the side of second-order levelling D0 ' in method and precision pilot measurement to shaft mouth operating bench, D1 ', on three control points D2 ';
(3.2) instrumental constant is arranged: before measurement, first total station is placed in vertical shaft and adapts to domestic environment about 20 minutes, And total station is searched for horizontal extent automatically and increases 180 degree, vertical search range is reduced to 3 degree;
(3.3) it elevation reverse sourcing: is searched for automatically using robot measurement, sights, automatic measurement, automatically records automatically Function places 1 spherical prism above the plumb line at Shaft bank Yu shaft bottom control point, and total station centering leveling is erected at On the control point D0 of shaft bottom, and measures height of instrument and be recorded in the reverse cultellation specific record table of elevation;Prism is inputted before measurement Constant;Total station carrying handle is laid down, total station is manually substantially concentrated one's gaze on to the zenith prismosphere above well head, this is only to need to see whole station The zenith angle of instrument display screen is shown as 0 degree, open total station search for, sight automatically automatically, automatic measurement function, total station Automatically it searches for and sights the prismosphere on well head zenith direction automatically and start to measure, at this point, shown by total station display screen Distance plus height of instrument be vertical shaft elevation;
(3.4) D1 is as the method that the reverse transmission method of elevation at two shaft bottoms D2 control point is transmitted with D0 elevation;
(3.5) elevation imports accuracy detection: after all importing to shaft bottom D0, D1 and D2 elevation, in shaft bottom whole station Whether instrument triangulated height or level meter detection close ring meet third measurement of the level required precision;If precision transfinites, find out Reason simultaneously returns to the repetition benefit survey of (3.2) step;
(3.6) after tested, total station does not need additional purchase installation diagonal eyepiece can sight zenith direction automatically Prism.
The above technical problem is solved through the following technical scheme:
The present invention can reach following effect:
Measurement method of the invention use upward cultellation the reverse cultellation method of laser plummet apparatus, solve vertical shaft from well head to Lower cultellation buries the problem of point inconvenience in shaft bottom.It is convenient that the measurement method in shaft bottom buries point, occupy the well hole time it is short, Precision is high, easy to operate, measuring speed is fast, it is practical, be easy to pile anchoring, be easy to carry out the transmitting of deep shaft plane and elevation transmitting Measurement is not easily susceptible in vertical shaft be influenced by air-flow and dripping, user be easy to know well head whether run-off the straight, underground operators It is easy to know that laser plummet apparatus buries point.
Detailed description of the invention
Fig. 1 is a kind of reverse cultellation schematic diagram of laser plummet apparatus of the embodiment of the present invention.
Fig. 2 is a kind of reverse coordinate transmitting cultellation construction survey method flow diagram of deep shaft of invention the present embodiment.
Fig. 3 is that the laser of laser plummet apparatus of the embodiment of the present invention passes through a kind of use state diagram of light passing pipe.
Fig. 4 is a kind of circuit theory connection structure schematic block diagram of the embodiment of the present invention.
Specific embodiment
The present invention will be further described below with reference to the accompanying drawings and embodiments.
Embodiment, the reverse coordinate of tunnel shaft transmits cultellation construction survey method, shown referring to figures 1-4, in vertical shaft well Bottom buries the vertical shaft inverted arch bottom surface at control point and is equipped with inverted arch vertical holes, and bracket S1 is equipped in inverted arch vertical holes, Bracket is equipped with the spherical groove S4 for having opening up and down, and universal rotational is equipped with spin S3, laser plummet apparatus in spherical groove S2 is fixed in the spin of spherical groove upper open end, is fixed with and is hung straight down in the spin of spherical groove lower open end Bar S5 is fixed with gravitation ball S6 in downrod lower end, and the laser center line of laser plummet apparatus, the centre of sphere of Roll and again The centre of sphere of power ball is all fallen on the extended line of the axial line of sunpender.It is equipped with microcontroller S12 and and microcontroller on the operational platform The voice prompting S11 device of device connection, the laser S7 of laser plummet apparatus can be allowed by being equipped in preformed hole S9 on the operational platform vertically By light passing pipe S8, the photoelectric sensor S10 that connect with microcontroller is equipped on the inner tubal wall of light passing pipe.On bracket also It is equipped with telescopic rod S13 straight up, is equipped with level shadow plate S15 in telescopic rod top end, the telescopic rod below level shadow plate Upper rotation is equipped with warning lamp S14;Measurement includes the following steps:
(1) apparatus selection and instrument verification before carrying out cultellation;
(2) setting laser plummet apparatus inversely transmits cultellation;
(3) inversely transmitting is handled total station vertical shaft elevation.
Apparatus selection and instrument checking procedure before carrying out cultellation include:
(1.1) laser plummet apparatus of choice accuracy 1/200000 comes card TS30 robot measurement as cultellation instrument and use Calibration is carried out as the reverse transfer device of elevation, and to laser plummet apparatus;
(1.2) laser plummet apparatus alidade is carried out to diameter measurement in different orientation, eliminates the water of laser plummet apparatus The influence of fiducial axis and instrument rotary shaft, collimation axis and rotation axle misalignment;
(1.3) on calibration platform or an elevation building is looked for, centering leveling first is carried out to laser plummet apparatus, is then rotated Laser plummet apparatus checks whether laser plummet apparatus circular bubble and bubble tube are placed in the middle, makes axis of levelling bubble parallel or perpendicular to sharp Then level alidade is respectively aligned to 0 ° of instrument scale, 90 °, 180 °, 270 ° of four scale sides by the rotary shaft of light plumb aligner Position simultaneously rotates laser plummet apparatus alidade, and the center of graticle crosshair is observed by eyepiece, sees that 4 point centers of reading are No coincidence, if, the center of the graticle crosshair of laser plummet apparatus is overlapped with tester center of reticule, illustrates laser plumb The collimation axis of instrument be it is vertical, illustrate that accuracy of instrument is met the requirements, do not need adjustment;Otherwise, eyepiece protection cap, adjustment ten are opened Word silk, until the center of reticule of laser plummet apparatus is directed toward the same point always.
Setting laser plummet apparatus inversely transmits cultellation and includes the following steps:
(2.1) vertical shaft shaft bottom control point is embedded;
(2.2) Shaft bank operation rack is set up;
(2.3) the reverse cultellation of laser plummet apparatus;
(2.4) the reverse cultellation of well head is the same as ground control point connection survey.
It buries process in vertical shaft shaft bottom control point: burying 3 control points, and control point in the suitable position in vertical shaft shaft bottom The point depth of burying to be lower than vertical shaft inverted arch bottom surface about 10cm;The mutual distance in 3 control points is according to the width of vertical shaft Size wants to the greatest extent possible maximum, to improve vertically and horizontally precision when total station pilot measurement;It should be noted that in embedded point and avoid blocking Object.
Shaft bank operation rack, which sets up process, is: laser plummet apparatus being erected on the control point of shaft bottom, opens laser just The position that operating platform is set up in wherein position is looked in the worker on the pit mouth of ground, to be passed through in operating platform laser beam 150mm × 150mm and preformed hole corresponding with shaft bottom control point vertical are reserved in position, guarantee to irradiate vertically upward in laser beam When can pass through preformed hole;If being provided with wall around vertical shaft, operating platform is allowed to be significantly larger than wall.
The reverse cultellation setting up procedure of laser plummet apparatus is:
(2.3.1) disposes laser plumb instrument: three control points D0, D1 and D2 is arranged in shaft bottom, then in D0, D1, D2 Laser plummet apparatus is set up on these three control points respectively, and laser plummet apparatus centering is flattened;
(2.3.2) is placed in reserved opening and is received target: D0 ', D1 ', D2 ' on well head gantry crane crossbeam operating platform this three The transparent glass of 200mm × 200mm is placed on the preformed hole of a control point 150mm × 150mm respectively as reception target;
(2.3.3) diameter cultellation: opening laser plummet apparatus Laser Power Devices, have beam of laser and project from telephotolens, It projects on the gantry crane crossbeam of well head top on the reception target of 150mm × 150mm preformed hole, using diameter method of reading, operation instrument In 0 degree, 90 degree, 180 degree and 270 degree, this four disk position cultellations position device respectively, survey crew's marking pen on operating platform Determine 4 LASER SPECKLE positions respectively on glass receiver board;The point that 4 directions are thrown constitutes approximation on glass receiver board In square, and require the side length of square within 5mm;
(2.3.4) diameter intersects punctum: 0 degree of point and 180 degree point and 90 degree of points and 270 degree of point interconnections are handed over Point is the vertical control point in the shaft bottom;
(2.3.5) forms triangular closed ring: laser plummet apparatus is on well and D0 ' and D0, D1 ' and D1, D2 ' are cast in underground And D2, and D0 ' and D0 are spatially 2 points, but while projecting to same plane just becomes 1 point;Similarly, D1 ' and D1 is thrown Also become 1 point when shadow is to same plane, D2 ' and D2 also become 1 point when projecting to same plane;Conducting wire passes through cultellation on well It is linked to be a triangular closed ring, underground conducting wire is also linked to be a triangular closed ring by cultellation;
Other 2 control points D0, D2 (2.3.6) are communicated up cultellation using same method;
The detection of (2.3.7) close ring: three control point groups of D0 ', D1 ', D2 ' on well head top operating platform are inversely thrown into At triangle, mutual angle and distance relationship is checked using total station TS30, is confirmed the interior of thrown control point and is met essence Degree;
(2.3.1)~(2.3.7) step is repeated several times in (2.3.8), takes its cultellation position mean value.
The reverse cultellation of well head is with ground control point connection survey process: control shaft bottom being inversely transmitted on operating platform Making point D0 ', D1 ', D2 ' utilizes total station with the control point WH1 and WH2 near well head according to the survey of second-class conducting wire in total station hole Amount method carries out translocation, and total station is no less than 6 survey time.
Total station vertical shaft elevation inversely transmits treatment process:
(3.1) basic point pilot measurement: using the electronic level of assay approval by ground elevation according to the side of second-order levelling D0 ' in method and precision pilot measurement to shaft mouth operating bench, D1 ', on three control points D2 ';
(3.2) instrumental constant is arranged: before measurement, first total station is placed in vertical shaft and adapts to domestic environment about 20 minutes, And total station is searched for horizontal extent automatically and increases 180 degree, vertical search range is reduced to 3 degree;
(3.3) it elevation reverse sourcing: is searched for automatically using robot measurement, sights, automatic measurement, automatically records automatically Function places 1 spherical prism above the plumb line at Shaft bank Yu shaft bottom control point, and total station centering leveling is erected at On the control point D0 of shaft bottom, and measures height of instrument and be recorded in the reverse cultellation specific record table of elevation;Prism is inputted before measurement Constant;Total station carrying handle is laid down, total station is manually substantially concentrated one's gaze on to the zenith prismosphere above well head, this is only to need to see whole station The zenith angle of instrument display screen is shown as 0 degree, open total station search for, sight automatically automatically, automatic measurement function, total station Automatically it searches for and sights the prismosphere on well head zenith direction automatically and start to measure, at this point, shown by total station display screen Distance plus height of instrument be vertical shaft elevation;
(3.4) D1 is as the method that the reverse transmission method of elevation at two shaft bottoms D2 control point is transmitted with D0 elevation;
(3.5) elevation imports accuracy detection: after all importing to shaft bottom D0, D1 and D2 elevation, in shaft bottom whole station Whether instrument triangulated height or level meter detection close ring meet third measurement of the level required precision;If precision transfinites, find out Reason simultaneously returns to the repetition benefit survey of (3.2) step;
(3.6) after tested, total station does not need additional purchase installation diagonal eyepiece can sight zenith direction automatically Prism.
The apparatus selection of the present embodiment include 1 for traverse survey high-precision intelligent total station, 1 for upslide The optics zenith instrument of point, 1 set for downward cultellation laser plummet apparatus, 4 be used for the prism of conducting wire ranging angle measurement, 1 use Import that the mini micro-lens used, 4 centering pedestals for disposing prism, 5 for disposing the foot prop of instrument in elevation The steel tape for comparing test and using is imported for elevation with 2.D3, D4, D5, D6 and D7 in Fig. 1 are that underground control net is sat Control point on mark system, d1, d2, d3, d4, d5 and d6 are the line controlled between net control point for underground.
The measurement method of the present embodiment uses the reverse cultellation method of laser plummet apparatus of upward cultellation, solves vertical shaft by well head Downward cultellation buries the problem of point inconvenience in shaft bottom.The measurement method buries point conveniently in shaft bottom, occupies the well hole time It is short, precision is high, easy to operate, measuring speed is fast, it is practical, be easy to pile anchoring, be easy to carry out the transmitting of deep shaft plane and elevation Transmitting measurement is not easily susceptible in vertical shaft be influenced by air-flow and dripping.When the well head of vertical shaft tilts, laser plummet apparatus swashs Light will be irradiated on the photoelectric sensor, and after microcontroller receives the photosignal that photoelectric sensor transmits, microcontroller is vertical It is instructed to voice prompting device, voice prompting device is allowed to issue voice prompting, user may know that well head run-off the straight, underground work Personnel are easy to know that laser plummet apparatus buries point.
One, with laser plummet apparatus, cultellation compares test to the reverse cultellation of laser plummet apparatus downward
It is met the requirements to verify the precision of the reverse cultellation of laser plummet apparatus, this measurement method is conventionally grasped by well head Make the downward cultellation of platform.To reduce because laser plummet apparatus precision bring influences, use precision for 1/200000 Dalian La Tesheng The ZL zenith instrument that the EN-20 laser plummet apparatus of production and the precision of Witter company production are 1/200000 compares test with precision. On March 8th, 2014 is compared test in No. 2 vertical shafts of Borland Line for Passenger Transportation.No. 2 vertical shaft well depth 56.78m, shaft bottom inverted arch elevation 1064.000m well head gantry crane crossbeam elevation 1129.85m.Respectively by the instrument of two different operating methods of nadir instrument and zenith instrument Device is erected on the traveling gantry crane above shaft bottom and well head.Nadir instrument, gantry crane are set up above the well head on gantry crane crossbeam Crossbeam is apart from ground about 9m;At this point, height 66m of the laser plummet apparatus apart from shaft bottom control point, passes through live actual measurement cultellation Obtain that EN-20 nadir instrument is consistent with ZL zenith instrument result, throw the error in point measurement of 3 control points D0, D1 and D2 all 1mm with It is interior, penetrating accuracy requirement required for shaft plumbing is fully met, illustrates the feasible, precision using the reverse cultellation method of ZL zenith instrument Reliably, easy to operate practical.Compare test result and is shown in Table 1 in detail.
The reverse cultellation of table 1ZL zenith instrument compares test result table with the vertical cultellation of EN-20 nadir instrument
Two, total station vertical shaft elevation, which is inversely transmitted, compares test with vertical ruler introductory technique
The vertical ruler introductory technique of tradition: elevation transmitting measurement is carried out using the method for suspending 100m steel ruler in midair in vertical shaft.On well and Underground respectively disposes level to read the B Sopwith staff b2 on well head benchmark A Sopwith staff a1 and shaft bottom D0 respectively;Then it will identify 100m steel tape is suspended in well;And the weight that phase homogenous quantities are examined and determine with steel ruler should be suspended in midair on steel ruler.Stablize to steel tape Shi Jing is upper and underground level passes through intercom while reading a2 and b2;Three survey time of independent observation is answered every time, per survey time will change Height of instrument, three survey time measure on the ground, the height difference of underground bench mark is poor should be less than 3.0mm, the height difference of three survey time measurement carries out Temperature, ruler are long and self weight tension corrects, and measure the reading of steel ruler three times obtained and are averaged.The elevation H of shaft bottom D0 pointD0=HA+ (a1-b1)+(a2-b2)。
D1 with D2 steel tape introductory technique with D0 as, after D0, D1, D2 all import after with shaft bottom level measurement closure Ring checks the precision of importing.
The total station same step of elevation reverse sourcing method (3).
After tested, it is imported using 3 points of gained elevations of total station elevation vertical shaft reverse sourcing D0, D1, D2 with traditional vertical ruler Method result is consistent.It the results are shown in Table 2 than surveying in detail.
The reverse elevation introductory technique of 2 total station of table compares test result with vertical ruler introductory technique
Introductory technique D0(m) D1(m) D2 Required precision
Total station reverse sourcing method 1063.8622 1063.8151 1063.9858 ±3.1
Hang down ruler introductory technique 1063.8613 1063.8143 1063.9871 ±3.1
Difference (mm) +0.9 +0.8 -1.3 ±3.1
Conclusion Meet required precision Meet required precision Meet required precision Meet required precision
Embodiments of the present invention are described above in conjunction with attached drawing, however, the implementation is not limited to the above embodiments, this field Those of ordinary skill can be with various changes and modifications may be made within the scope of the appended claims.

Claims (6)

1. the reverse coordinate of tunnel shaft transmits cultellation construction survey method, which is characterized in that buried at control point in vertical shaft shaft bottom Vertical shaft inverted arch bottom surface be equipped with inverted arch vertical holes, in inverted arch vertical holes be equipped be equipped with bracket, on bracket be equipped with up and down There is the spherical groove of opening, universal rotational is equipped with spin in spherical groove, and laser plummet apparatus is fixed on spherical groove upper opening In the spin at end, it is fixed with sunpender straight down in the spin of spherical groove lower open end, is fixed in downrod lower end Gravitation ball, and the centre of sphere of the laser center line of laser plummet apparatus, the centre of sphere of Roll and gravitation ball all falls in the axis of sunpender On the extended line of heart line;The voice prompting device for being equipped with microcontroller on the operational platform and connecting with microcontroller is flat in operation The light passing pipe that the laser of laser plummet apparatus can be allowed to pass through is equipped in preformed hole on platform vertically, is equipped on the inner tubal wall of light passing pipe The photoelectric sensor being connect with microcontroller;It is also equipped with telescopic rod straight up on bracket, is equipped with level in telescopic rod top end Barn door, rotation is equipped with warning lamp on the telescopic rod below level shadow plate;Measurement method includes the following steps: that (1) carries out Apparatus selection and instrument verification before cultellation;(2) setting laser plummet apparatus inversely transmits cultellation;(3) total station vertical shaft elevation is inverse It is handled to transmitting;
Wherein, setting laser plummet apparatus inversely transmits cultellation and includes the following steps:
(2.1) vertical shaft shaft bottom control point is embedded;
(2.2) Shaft bank operation rack is set up;
(2.3) the reverse cultellation of laser plummet apparatus;
(2.4) the reverse cultellation of well head is the same as ground control point connection survey;
Wherein, the reverse cultellation setting up procedure of laser plummet apparatus is:
(2.3.1) dispose laser plumb instrument: shaft bottom be arranged three control points D0, D1 and D2, then D0, D1, D2 this three Laser plummet apparatus is set up on a control point respectively, and laser plummet apparatus centering is flattened;
(2.3.2) is placed in reserved opening and is received target: these three controls of D0 ', D1 ', D2 ' on well head gantry crane crossbeam operating platform The transparent glass for placing 200mm × 200mm on the preformed hole of point 150mm × 150mm respectively is made as reception target;
(2.3.3) diameter cultellation: opening laser plummet apparatus Laser Power Devices, have beam of laser and project from telephotolens, throws It is mapped at the top of well head on gantry crane crossbeam on the reception target of 150mm × 150mm preformed hole, using diameter method of reading, operates instrument The survey crew in this four disk position cultellation positioning of 0 degree, 90 degree, 180 degree and 270 degree, operating platform is existed with marking pen respectively 4 LASER SPECKLE positions are determined on glass receiver board respectively;The point that 4 directions are thrown is constituted on glass receiver board to be similar to Square, and require the side length of square within 5mm;
(2.3.4) diameter intersects punctum: by 0 degree of point and 180 degree point and 90 degree of points and 270 degree of point interconnections, intersection point The as vertical control point in the shaft bottom;
(2.3.5) forms triangular closed ring: laser plummet apparatus on well and underground cast D0 ' and D0, D1 ' and D1, D2 ' and D2, and D0 ' and D0 are spatially 2 points, but while projecting to same plane, just becomes 1 point;Similarly, D1 ' and D1 is projected Also become 1 point when to same plane, D2 ' and D2 also become 1 point when projecting to same plane;Conducting wire is connected by cultellation on well At a triangular closed ring, underground conducting wire is also linked to be a triangular closed ring by cultellation;
Other 2 control points D0, D2 (2.3.6) are communicated up cultellation using same method;
The detection of (2.3.7) close ring: three control point compositions three of D0 ', D1 ', D2 ' on well head top operating platform are inversely thrown into It is angular, mutual angle and distance relationship is checked using total station TS30, confirms the precision of inner coincidence at thrown control point;
(2.3.1)~(2.3.7) step is repeated several times in (2.3.8), takes its cultellation position mean value.
2. the reverse coordinate of tunnel shaft according to claim 1 transmits cultellation construction survey method, which is characterized in that carry out Apparatus selection and instrument checking procedure before cultellation include: the laser plummet apparatus of (1.1) choice accuracy 1/200000 as cultellation Instrument and use come card TS30 robot measurement as the reverse transfer device of elevation, and carry out calibration to laser plummet apparatus;
(1.2) laser plummet apparatus alidade is carried out to diameter measurement in different orientation, eliminates the axis of levelling bubble of laser plummet apparatus With the influence of instrument rotary shaft, collimation axis and rotation axle misalignment;
(1.3) on calibration platform or an elevation building is looked for, centering leveling first is carried out to laser plummet apparatus, then rotates laser Plumb aligner checks whether laser plummet apparatus circular bubble and bubble tube are placed in the middle, make axis of levelling bubble parallel or perpendicular to laser lead Hang down instrument rotary shaft, then by level alidade be respectively aligned to 0 ° of instrument scale, 90 °, 180 °, 270 ° of four scale orientation simultaneously Laser plummet apparatus alidade is rotated, the center of graticle crosshair is observed by eyepiece, sees whether 4 point centers of reading weigh It closes, if, the center of the graticle crosshair of laser plummet apparatus is overlapped with tester center of reticule, illustrates laser plummet apparatus Collimation axis be it is vertical, illustrate that accuracy of instrument is met the requirements, do not need adjustment;Otherwise, eyepiece protection cap, adjustment cross are opened Silk, until the center of reticule of laser plummet apparatus is directed toward the same point always.
3. the reverse coordinate of tunnel shaft according to claim 1 transmits cultellation construction survey method, which is characterized in that vertical shaft It buries process in shaft bottom control point: burying 3 control points in the suitable position in vertical shaft shaft bottom, and the point at control point is embedded deep Degree will be lower than vertical shaft inverted arch bottom surface about 10cm;The mutual distance in 3 control points wants to the greatest extent possible according to the width dimensions of vertical shaft Maximum, to improve vertically and horizontally precision when total station pilot measurement;It should be noted that avoiding shelter in embedded point.
4. the reverse coordinate of tunnel shaft according to claim 1 transmits cultellation construction survey method, which is characterized in that vertical shaft Well-mouth operating floor frame sets up process: laser plummet apparatus being erected on the control point of shaft bottom, laser is opened and is convenient for ground pit mouth On worker look for the position that operating platform is set up in wherein position, it is reserved in the position that operating platform laser beam passes through
150mm × 150mm and preformed hole corresponding with shaft bottom control point vertical, guarantee the energy when laser beam irradiates vertically upward Across preformed hole;If being provided with wall around vertical shaft, operating platform is allowed to be significantly larger than wall.
5. the reverse coordinate of tunnel shaft according to claim 1 transmits cultellation construction survey method, which is characterized in that well head Reverse cultellation is with ground control point connection survey process: shaft bottom is inversely transmitted to control point D0 ' on operating platform, D1 ', D2 ' is joined with the control point WH1 and WH2 near well head according to the measurement method of second-class conducting wire in total station hole using total station It surveys, total station is no less than 6 survey time.
6. the reverse coordinate of tunnel shaft according to claim 1 transmits cultellation construction survey method, which is characterized in that whole station Instrument vertical shaft elevation inversely transmits treatment process: (3.1) basic point pilot measurement: using the electronic level of assay approval by ground elevation According on D0 ' in the method and precision pilot measurement to shaft mouth operating bench of second-order levelling, D1 ', three control points D2 ';
(3.2) instrumental constant is arranged: before measurement, first total station being placed in vertical shaft and adapts to domestic environment about 20 minutes, and will Total station searches for horizontal extent automatically and increases 180 degree, and vertical search range is reduced to 3 degree;
(3.3) it elevation reverse sourcing: searched for using robot measurement, sighted automatically automatically, automatic measurement, the function such as automatically recording Can, 1 spherical prism is placed above the plumb line at Shaft bank Yu shaft bottom control point, and total station centering leveling is erected at well On the control point D0 of bottom, and measures height of instrument and be recorded in the reverse cultellation specific record table of elevation;Input prism is normal before measurement Number;Total station carrying handle is laid down, total station is manually substantially concentrated one's gaze on to the zenith prismosphere above well head, this is only to need to see total station The zenith angle of display screen is shown as 0 degree, open total station search for, sight automatically automatically, automatic measurement function, total station oneself It moves to search for and sight the prismosphere on well head zenith direction automatically and starts to measure, at this point, shown by total station display screen Distance is vertical shaft elevation plus height of instrument;
(3.4) D1 is as the method that the reverse transmission method of elevation at two shaft bottoms D2 control point is transmitted with D0 elevation;
(3.5) elevation imports accuracy detection: after all importing to shaft bottom D0, D1 and D2 elevation, in shaft bottom total station three Whether angle elevation or level meter detection close ring meet third measurement of the level required precision;If precision transfinites, reason is found out And it returns to (3.2) step and repeats to mend survey;
(3.6) after tested, total station does not need additional purchase installation diagonal eyepiece can sight the prism of zenith direction automatically.
CN201710072566.9A 2017-02-09 2017-02-09 The reverse coordinate of tunnel shaft transmits cultellation construction survey method Active CN106979769B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710072566.9A CN106979769B (en) 2017-02-09 2017-02-09 The reverse coordinate of tunnel shaft transmits cultellation construction survey method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072566.9A CN106979769B (en) 2017-02-09 2017-02-09 The reverse coordinate of tunnel shaft transmits cultellation construction survey method

Publications (2)

Publication Number Publication Date
CN106979769A CN106979769A (en) 2017-07-25
CN106979769B true CN106979769B (en) 2019-04-23

Family

ID=59339413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710072566.9A Active CN106979769B (en) 2017-02-09 2017-02-09 The reverse coordinate of tunnel shaft transmits cultellation construction survey method

Country Status (1)

Country Link
CN (1) CN106979769B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343448B (en) * 2018-01-31 2020-11-13 湖南联智科技股份有限公司 Method for determining attitude of arbitrary section of tunnel
CN110966007B (en) * 2019-12-18 2020-12-25 中国水利水电第五工程局有限公司 Curved arc excavation method for downward bending section of vertical shaft
CN114485584B (en) * 2021-12-30 2023-05-05 中铁第六勘察设计院集团有限公司 Subway interval joint measurement method based on reverse connection measurement
CN114320305A (en) * 2022-01-05 2022-04-12 浙江宁海抽水蓄能有限公司 Optical vision shaft excavation guiding system and guiding method
CN114396915B (en) * 2022-01-23 2023-11-17 中国电建集团河北省电力勘测设计研究院有限公司 Underground electric power tunnel engineering elevation measurement method
CN114577188A (en) * 2022-01-25 2022-06-03 武汉理工大学 Laser alignment guide device and system for tunnel construction
CN114413870B (en) * 2022-03-28 2022-06-07 中交第一航务工程局有限公司 Tunnel multi-line lead penetration measuring method
CN114543772B (en) * 2022-04-25 2022-07-08 中交第一航务工程局有限公司 In-tunnel and out-tunnel contact measurement method of immersed tunnel and double-tunnel point-throwing contact measurement method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2356318Y (en) * 1999-01-12 1999-12-29 游坤隆 Vertical level gauge
CN201858974U (en) * 2010-09-13 2011-06-08 上海水务建设工程有限公司 System for measuring axes of long-distance jacking pipe
CN102418515A (en) * 2011-09-08 2012-04-18 中铁上海工程局市政工程有限公司 Method for performing shaft orientation survey by using optical plummet
CN103644900A (en) * 2013-12-24 2014-03-19 中铁上海工程局有限公司 Pipe jacking work well plane connection survey method
CN205023775U (en) * 2015-10-14 2016-02-10 江苏聚业机械装备股份有限公司 Alarm device that inclines is wholly prevented to crane barge

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06213665A (en) * 1993-01-20 1994-08-05 Hideo Teruuchi Laser measuring device and laser plumb
GB2399376B (en) * 2003-03-14 2005-11-02 Cementation Found Skanska Ltd Placing elements in piles

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2356318Y (en) * 1999-01-12 1999-12-29 游坤隆 Vertical level gauge
CN201858974U (en) * 2010-09-13 2011-06-08 上海水务建设工程有限公司 System for measuring axes of long-distance jacking pipe
CN102418515A (en) * 2011-09-08 2012-04-18 中铁上海工程局市政工程有限公司 Method for performing shaft orientation survey by using optical plummet
CN103644900A (en) * 2013-12-24 2014-03-19 中铁上海工程局有限公司 Pipe jacking work well plane connection survey method
CN205023775U (en) * 2015-10-14 2016-02-10 江苏聚业机械装备股份有限公司 Alarm device that inclines is wholly prevented to crane barge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
深竖井及洞内控制测量中多种测量仪器联合定向的应用研究;张沛杰;《科技创新与应用》;20160808(第22期);第42-43页

Also Published As

Publication number Publication date
CN106979769A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN106979769B (en) The reverse coordinate of tunnel shaft transmits cultellation construction survey method
CN106895820B (en) The reverse coordinate of tunnel shaft transmits cultellation measurement method
CN106908048B (en) The reverse coordinate of deep shaft transmits cultellation measurement method
CN104328799B (en) A kind of sheltered reverse excavation subway station steel pipe column accurate positioning method
CN108253946A (en) Multi-functional vertical measurement connection survey integrated three-dimensional coordinate transfer device and method
US7987605B2 (en) Reflector target tripod for survey system with light emitter and pivoting bracket for enhanced ground marking accuracy
CN106979768B (en) The reverse coordinate of deep shaft transmits cultellation construction survey method
CN103884316B (en) A kind of self-alignment double laser level altimeter
CN102890281A (en) High-accuracy GPS (global position system) positioning measurement method for high-rise buildings
CN207379492U (en) A kind of wind-driven generator tower verticality measurement device
CN108680103A (en) A kind of cable-stayed bridge superelevation bridge tower pier anchor structure Rapid precision locating measurement method
CN105021171B (en) Floor axial line control point Vertical system and throwing survey method
CN105927213A (en) Accurate measuring device and method for pore-forming verticality of bored pile
CN106705947B (en) Based on trigone Based On The Conic Model and the united shaft connection survey method of gyroscope total station
CN108426564A (en) It builds bricklayer and is mostly used level meter with calibration-free portable
CN109238254A (en) A kind of hole stake cultellation method
CN101464146B (en) Measuring method and apparatus for accurately transmitting ground bench level to overhead viaduct
CN109682354B (en) Contact measurement system and measurement method
CN103344215B (en) Double-channel balance level
CN107339583A (en) It is a kind of from centering type laser tripod
CN110243355A (en) A kind of method of short distance calibration laser plummet apparatus
CN207963844U (en) Mining influence lower room basic slope settles stretcher strain measuring device
CN201795791U (en) Antenna azimuth angle measuring device
CN106441249A (en) Beacon bracket for instrument height measurement and application thereof
CN102853815A (en) Automatic smoothening leveling ruler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant