CN106934527A - A kind of enterprise model system system and method - Google Patents
A kind of enterprise model system system and method Download PDFInfo
- Publication number
- CN106934527A CN106934527A CN201710095528.5A CN201710095528A CN106934527A CN 106934527 A CN106934527 A CN 106934527A CN 201710095528 A CN201710095528 A CN 201710095528A CN 106934527 A CN106934527 A CN 106934527A
- Authority
- CN
- China
- Prior art keywords
- enterprise
- storehouse
- inventory
- measuring
- price
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 239000000463 material Substances 0.000 claims abstract description 80
- 238000010276 construction Methods 0.000 claims description 15
- 238000007726 management method Methods 0.000 claims description 14
- 230000006870 function Effects 0.000 claims description 6
- 230000009885 systemic effect Effects 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 4
- 230000008676 import Effects 0.000 description 4
- 238000009825 accumulation Methods 0.000 description 3
- 238000009435 building construction Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method of enterprise model system, including step:S1:Enterprise model system cost element is obtained, enterprise model system Database Systems are set up;S2:Newly-built measuring and calculating project, by measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse, obtains the accounts summary of measuring and calculating project;S3:It is determined that measuring and calculating project mark before results of measuring and target responsibility cost accounting result;S4:Index analysis reliability is carried out to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system.The invention also discloses a kind of enterprise model system system, the system includes user's desk module and management backstage module, and user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.The present invention provide method and system, reduce undertaken needed for concentration of enterprises staffing quota manpower and materials, reduce input, reduce cost.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of enterprise model system system and method.
Background technology
Pushing Valuation with Bill Quantity of Works method is a concrete measure of construction cost account method reform, is also that China adds
Enter the inevitable requirement that WTO becomes compatible with internationally accepted practices.Pushing Valuation with Bill Quantity of Works pattern, with the market price and Enterprise Internal
It has been trend of the times that quota is set price, and enterprise model system is only set up as early as possible, can just keep up with market economy with keen competition
Trend.Overwhelming majority enterprise does not set up enterprise model system also at present, based on the quota that a small number of enterprises are promulgated by authorities,
Carry out specific aim adjustment to labor and materials consumption, administration fee to form Enterprise content by norm with reference to the managerial skills of enterprise.It is big at present
The technical bottleneck that most construction enterprises do not set up enterprise model system is:By existing Norm Measure, making mode, enterprise
There is no enough human and material resources complete independentlies, and difficulty has energy continuous updating.
Only a small number of construction enterprises are set up and have enterprise model system at present, and the mode of allotment arrangement is issued based on authorities
Based on the norm quota of consumption of cloth.This mode needs to put into great manpower and materials, and with the project of most construction enterprises
Management is not inconsistent actually, and this is also the reason for why most enterprises do not set up enterprise model system.
Existing enterprise model system form of presentation is on the basis of conventional ration, to be produced with reference to the work of enterprise itself
Rate level, redeterminates the labor and materials machine consumption of each quota specific item, to form enterprise model system.What current allotment arrangement was used
It is operation exhaustive, uses the technique way that regular (typically 5 years) will be commonly used in current engineering construction, determines disappear item by item
Water consumption is put down, and is assembled into quota.Time-consuming for this method, and need to put into great manpower and materials, and follow-up updating maintenance is also difficult,
The development of new material, new technology cannot be adapted to.It is serious to constrain the establishment that enterprise works out Internal Quota.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of enterprise model system system and method, can
The manpower and materials that construction enterprises concentrate establishment Internal Quota are reduced, input, reduces cost is reduced.
To achieve the above object, on the one hand, the invention provides a kind of method of enterprise model system, including as follows walk
Suddenly:
S1:Enterprise model system cost element is obtained, enterprise model system Database Systems, enterprise model system number are set up
Include entreprise cost factor price storehouse, typical list consumption storehouse according to storehouse system;
S2:Newly-built measuring and calculating project, measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse obtain
The accounts summary of measuring and calculating project, expense includes start-up costs, operation, main material, professional subpackage, whole audience machinery;
S3:According to measuring and calculating project actual conditions adjust accounts summary, it is determined that measuring and calculating project mark before results of measuring with
And target responsibility cost accounting result;
S4:Row index point is entered to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system
Analysis, it is determined that the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.
The present invention provide enterprise model system method, by measure, valency separation Model Establishment enterprise model system
Storehouse, the cost element price storehouse in enterprise model system storehouse realizes social resources with internal enterprise resources by data syn-chronization
Build together, improve the use value of enterprise model system storehouse system;Extract history budget and balance automatically by using XML technology
Listings data in file, realizes the new model that the accumulation based on enterprise's history list way forms enterprise model system.Keep away
The concentration input of a large amount of manpower and materials for undertaking needed for having exempted from concentration of enterprises staffing quota, substantially reduces Internal Quota establishment
Input.
According to another specific embodiment of the invention, enterprise model system Database Systems include user's desk module and pipe
Reason background module, user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
According to another specific embodiment of the invention, entreprise cost factor price storehouse includes that information valency, market price, enterprise open
Do expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price
Storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
According to another specific embodiment of the invention, step S1 comprises the following steps:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up.
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, obtain the main of bill of quantities and disappear
Consumption.
S13:According to the markup language expanded of business budgeting file, the main consumption of typical list is determined, obtain typical case
Inventory consumes storehouse.
According to another specific embodiment of the invention, step S11 comprises the following steps:
S111:Push information valency, the city of labor and materials for enterprise model system Database Systems automatically by cost information platform
Field valency.S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and according to operation keywords database
Coding inventory.
S113:Each subject expense of start-up costs of finished item is obtained, each intermediate item start-up costs are determined according to item types
Each subject fee forecast, obtains establishing and enterprise expense index storehouse.
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price
Storehouse, and project material buying, inquiry inventory are encoded according to material keywords database.
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and subpackage unit bid it is clear
It is single, set up enterprise's specialty subcontracting price storehouse.
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience
Mechanical price storehouse.
According to another specific embodiment of the invention, step S12 comprises the following steps:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC classification
Administrative standard, obtains main material summary sheet, and main material summary sheet includes centralized purchasing material mark, non-pooled buying material
Mark.
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, inventory management is extracted and take, entirely
Field machinery expenses, reject professional subpackage inventory, determine the main consumption of bill of quantities.
According to another specific embodiment of the invention, step S2 comprises the following steps:
S21:Obtain the essential information of measuring and calculating project, the start-up costs template according to enterprise model system systemic presupposition, by base
The corresponding start-up costs index of this information matches, the start-up costs inventory and start-up costs for obtaining measuring and calculating project adds up to.
S22:Highway bids amount inventory is obtained, according to the coding and characteristic key enterprise model system of highway bids amount inventory
Storehouse, obtains operation inventory, main material inventory, professional subpackage inventory.
S23:According to operation inventory, main material inventory, professional subpackage inventory retrieval enterprise model system storehouse, operation is obtained
Univalent summary sheet, main material summary sheet, professional subpackage summary sheet.
S24:According to measuring and calculating project construction on-site actual situations, determine the whole audience machinery and the whole audience machinery enter the time for competiton,
Obtain whole audience machinery summary sheet.
According to another specific embodiment of the invention, in step S21, essential information include classification of the items, project location,
Construction scope, duration.
On the other hand, the invention provides a kind of enterprise model system system, system includes user's desk module and management
Background module, user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
Compared with prior art, the enterprise model system system that the present embodiment is provided, it uses B/S structures to set up, supports
Our department of enterprise and branch, the data sharing of project management department, our department and branch, project management department can complete enterprises and determine by internet
The upload of volume database data and utilization, without concentrating company's ample resources, concentrating discussion, establishment Discourse of Enterprise's ration, save manpower, provide
Source.
According to another specific embodiment of the invention, entreprise cost factor price storehouse includes that information valency, market price, enterprise open
Do expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price
Storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Brief description of the drawings
Fig. 1 is the flow chart of the enterprise model system method that embodiment 1 is provided;
Fig. 2 is the flow chart of step S1 in Fig. 1;
Fig. 3 is the flow chart of step S11 in Fig. 2;
Fig. 4 is the flow chart of step S2 in Fig. 1;
Fig. 5 is the structured flowchart of the enterprise model system system that embodiment 2 is provided.
Specific embodiment
Embodiment 1
It is a kind of flow chart of enterprise model system method that the present embodiment is provided referring to Fig. 1.The method comprising the steps of S1
~S4:
S1:Enterprise model system cost element is obtained, enterprise model system Database Systems, enterprise model system number are set up
Include entreprise cost factor price storehouse, typical list consumption storehouse according to storehouse system.
The step is used to set up enterprise model system Database Systems.
In the present embodiment, enterprise model system Database Systems include user's desk module and management backstage module, user
Desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
Specifically, including step S11~S13 referring to Fig. 2 steps S1:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up.
The step is used to set up entreprise cost factor price storehouse.Specifically, entreprise cost factor price storehouse include information valency,
Market price, establishing and enterprise take index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise
Whole audience machinery price storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
In the present embodiment, information valency, market price derive from cost information platform, and the cost information platform is determined with enterprises
Volume database system relationship, the automatic information valency and market price that feed is pushed for enterprise model system Database Systems.
Specifically, referring to Fig. 3, step S11 includes step S111~S116:
S111:Push information valency, the city of labor and materials for enterprise model system Database Systems automatically by cost information platform
Field valency.
The step is used to determine information valency, the market price of labor and materials.In this step, it is preferred that cost information platform is to make
The information platform of valency 168, the platform can push information valency, the market price of work for enterprise model system Database Systems automatically.So that
Enterprise model system Database Systems are reached the standard grade and have data, it is possible to use, improve the enthusiasm of inside data of enterprise accumulation.
S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and labor is encoded according to operation keywords database
Business subcontract inventory.
The step is used to set up enterprise's operation price storehouse.Specifically, by importing known labor service subcontract
Excel, forms enterprise's operation price storehouse, and encode the excel according to operation keywords database.
S113:Each subject expense of start-up costs of finished item is obtained, each intermediate item start-up costs are determined according to item types
Each subject fee forecast, obtains establishing and enterprise expense index storehouse.
The step is used to set up establishing and enterprise expense index storehouse.Specifically, by obtaining construction enterprises, finished item is opened
Each subject expense of expense is done, by the item types of finished item, each each subject fee forecast of intermediate item start-up costs is formed, and import
Form establishing and enterprise and take index storehouse.
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price
Storehouse, and project material buying, inquiry inventory are encoded according to material keywords database.
The step is used to set up enterprise's material price storehouse.Specifically, import construction enterprises having completed or operational project
Material purchases, inquiry inventory Excel, form enterprise's material price storehouse.And the material key set up by cost information platform
Dictionary search engine encodes inventory Excel, realizes materials classification coding automation.
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and subpackage unit bid it is clear
It is single, set up enterprise's specialty subcontracting price storehouse.
The step is used to set up enterprise's specialty subcontracting price storehouse.Specifically, import enterprise having completed or operational project
Professional subpackage contract inventory Excel and the bid inventory Excel of subpackage unit,
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience
Mechanical price storehouse.
The step is used to set up enterprise's whole audience machinery price storehouse.Specifically, import enterprise having completed or operational project
Whole audience machinery lease, inquiry inventory Excel, form enterprise whole audience machinery price storehouse.
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, obtain the main of bill of quantities and disappear
Consumption.
The step is used to obtain the main consumption of quantities.Main consumption includes operation quantity and main material consumption number
Amount.Specifically, step S12 includes step S121~S122:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC classification
Administrative standard, obtains main material summary sheet, and main material summary sheet includes centralized purchasing material mark, non-pooled buying material
Mark.
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, inventory management is extracted and take, entirely
Field machinery expenses, reject professional subpackage inventory, determine the main consumption of bill of quantities.
S13:According to the markup language expanded of business budgeting file, the main consumption of typical list is determined, obtain typical case
Inventory consumes storehouse.
The step is used to determine that typical list consumes storehouse.Specifically, enterprise model system system is by extracting business budgeting
The XML of file, forms the enterprises consumption of typical list, and it includes operation classification, quantity;Concentrated collection material specification, number
Amount;Non-pooled capturing material is detailed, quantity;So as to set up typical list consumption storehouse.
S2:Newly-built measuring and calculating project, measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse obtain
The accounts summary of measuring and calculating project, expense includes start-up costs, operation, main material, professional subpackage, whole audience machinery.
The step is used to determine by enterprise model system system the accounts summary of measuring and calculating project.Specifically, by inciting somebody to action
Entreprise cost factor price storehouse and typical list consumption storehouse in measuring and calculating project matching enterprise model system system, so that it is determined that
The work of the measuring and calculating project, material, machine, the general expenses of start-up costs.
Specifically, referring to Fig. 4, the step includes step S21~S24:
S21:Obtain the essential information of measuring and calculating project, the start-up costs template according to enterprise model system systemic presupposition, by base
The corresponding start-up costs index of this information matches, the start-up costs inventory and start-up costs for obtaining measuring and calculating project adds up to.
Specifically, essential information includes but is not limited to classification of the items, project location, construction scope, duration.
S22:Highway bids amount inventory is obtained, according to the coding and characteristic key enterprise model system of highway bids amount inventory
Storehouse, obtains operation inventory, main material inventory, professional subpackage inventory.
Specifically, enterprise model system system is by importing highway bids amount inventory XML, enterprise model system system according to
The inventory with same characteristic features in the coding and feature automatically retrieval enterprise model system storehouse of the inventory, automatic classifying goes out operation
Inventory, main material inventory, professional subpackage inventory.
S23:According to operation inventory, main material inventory, professional subpackage inventory retrieval enterprise model system storehouse, operation is obtained
Univalent summary sheet, main material summary sheet, professional subpackage summary sheet.
Specifically, the operation inventory that will be obtained by step S22, main material inventory, professional subpackage inventory matching enterprise
Internal Quota storehouse, so that it is determined that operation inventory, main material inventory, the corresponding price of professional subpackage inventory, and it is next to indicate price
Source item and time.
S24:According to measuring and calculating project construction on-site actual situations, determine the whole audience machinery and the whole audience machinery enter the time for competiton,
Obtain whole audience machinery summary sheet.
Specifically, user combines measuring and calculating project construction on-site actual situations, appropriate whole audience machinery model combination is chosen, and
That plans enters the time for competiton, obtains whole audience machinery summary sheet.
S3:According to measuring and calculating project actual conditions adjust accounts summary, it is determined that measuring and calculating project mark before results of measuring with
And target responsibility cost accounting result.
The step is for results of measuring and target responsibility cost accounting result before the mark for determining measuring and calculating project.Specifically,
, it is necessary to according to actual conditions to the accounts summary of the measuring and calculating project after step S2 obtains the accounts summary of measuring and calculating project
It is adjusted, results of measuring and target responsibility cost accounting result before the mark of the measuring and calculating project can be obtained after adjustment confirmation.
S4:Row index point is entered to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system
Analysis, it is determined that the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.
The step is used to analyze the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.Specifically, passing through
Cost Index analysis system carries out index analysis to results of measuring before mark and target responsibility cost accounting result.
In the present embodiment, Cost Index analysis system is the index analysing system of cost 168.
The method of the enterprise model system that the present embodiment is provided, by measure, the separate Model Establishment enterprises of valency it is fixed
E Ku, the cost element price storehouse in enterprise model system storehouse realizes social resources and internal enterprise resources by data syn-chronization
The shared use value built together, improve enterprise model system storehouse system;History is extracted automatically by using XML technology to tie in advance
The listings data in file is calculated, the new model that the accumulation based on enterprise's history list way forms enterprise model system is realized.
The concentration input of a large amount of manpower and materials for undertaking needed for avoiding concentration of enterprises staffing quota, substantially reduces Internal Quota establishment
Input.
Embodiment 2
It is a kind of structured flowchart of enterprise model system system that the present embodiment is provided referring to Fig. 5.The system includes user
Desk module 1 and management backstage module 2, user's desk module 1 include that entreprise cost factor price storehouse 11, typical list consumes storehouse
12 and function application module 13.
Specifically, entreprise cost factor price storehouse 11 includes that information valency, market price, establishing and enterprise take index storehouse, enterprise's work
Sequence price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price storehouse;Typical list consumes storehouse
12 include operation quantity and main material quantity consumed.Function application module includes measuring and calculating, objective cost measuring and calculating before mark.
The enterprise model system system that the present embodiment is provided, it uses B/S structures to set up, support our department of enterprise and branch,
The data sharing of project management department, our department and branch, project management department can complete the upload of enterprise model system database data by internet
With utilization, without concentrating company's ample resources, concentrating discussion, establishment Discourse of Enterprise's ration, manpower, resource are saved.
Although the present invention is disclosed above with preferred embodiment, the scope of present invention implementation is not limited to.Any
The those of ordinary skill in field, is not departing from invention scope of the invention, when that can make a little improvement, i.e., every according to this hair
Bright done equal improvement, should be the scope of the present invention and is covered.
Claims (10)
1. a kind of method of enterprise model system, it is characterised in that comprise the following steps:
S1:Enterprise model system cost element is obtained, the enterprise model system Database Systems are set up, the enterprises are determined
Volume Database Systems include entreprise cost factor price storehouse, typical list consumption storehouse;
S2:Newly-built measuring and calculating project, the entreprise cost factor price storehouse, typical list consumption storehouse are matched by the measuring and calculating project,
The accounts summary of the measuring and calculating project is obtained, the expense includes start-up costs, operation, main material, professional subpackage, whole audience machine
Tool;
S3:Actual conditions according to the measuring and calculating project adjust the accounts summary, are surveyed before determining the mark of the measuring and calculating project
Calculate result and target responsibility cost accounting result;
S4:Row index point is entered to results of measuring before the mark and target responsibility cost accounting result according to Cost Index analysis system
Analysis, determines the reliability of results of measuring and target responsibility cost accounting result before the mark.
2. the method for claim 1, it is characterised in that the enterprise model system Database Systems include user foreground
Module and management backstage module, user's desk module include entreprise cost factor price storehouse, typical list consumption storehouse and work(
Can application module.
3. the method for claim 1, it is characterised in that the entreprise cost factor price storehouse includes information valency, market
Valency, establishing and enterprise take index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience
Mechanical price storehouse;The typical list consumption storehouse includes operation quantity and main material quantity consumed.
4. the method for claim 1, it is characterised in that the step S1 comprises the following steps:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up;
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, the main consumption of bill of quantities is obtained;
S13:According to the markup language expanded of business budgeting file, the described main consumption of typical list is determined, obtain typical case
Inventory consumes storehouse.
5. the method for claim 1, it is characterised in that the step S11 comprises the following steps:
S111:Push information valency, the city of labor and materials for the enterprise model system Database Systems automatically by cost information platform
Field valency;
S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and compile according to operation keywords database
The code inventory;
S113:Each subject expense of start-up costs of finished item is obtained, each each section of intermediate item start-up costs is determined according to item types
Mesh fee forecast, obtains establishing and enterprise expense index storehouse;
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price storehouse, and
The project material buying, inquiry inventory are encoded according to material keywords database;
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and the bid inventory of subpackage unit,
Set up enterprise's specialty subcontracting price storehouse;
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience machinery
Price storehouse.
6. method as claimed in claim 4, it is characterised in that the step S12 comprises the following steps:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC Classification Managements
Standard, obtains main material summary sheet, and the main material summary sheet includes centralized purchasing material mark, non-pooled buying material
Mark;
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, extraction inventory management is taken, whole audience machine
Tool expense, rejects professional subpackage inventory, determines the main consumption of bill of quantities.
7. the method for claim 1, it is characterised in that the step S2 comprises the following steps:
S21:The essential information of measuring and calculating project is obtained, according to the start-up costs template of the enterprise model system systemic presupposition, by institute
State essential information and match corresponding start-up costs index, the start-up costs inventory and start-up costs for obtaining the measuring and calculating project add up to;
S22:Obtain highway bids amount inventory, the enterprises according to the coding and characteristic key of the highway bids amount inventory
Quota store, obtains operation inventory, main material inventory, professional subpackage inventory;
S23:The enterprises are retrieved according to the operation inventory, the main material inventory, the professional subpackage inventory to determine
E Ku, obtains operation unit price summary sheet, main material summary sheet, professional subpackage summary sheet;
S24:According to the measuring and calculating project construction on-site actual situations, determine that the whole audience is mechanical and whole audience machinery when entering to appear on the scene
Between, obtain whole audience machinery summary sheet.
8. method as claimed in claim 7, it is characterised in that in step S21, the essential information includes classification of the items, item
Mesh location, construction scope, duration.
9. a kind of enterprise model system system, it is characterised in that the system includes user's desk module and management backstage module,
User's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
10. enterprise model system system as claimed in claim 9, it is characterised in that the entreprise cost factor price storehouse bag
Include information valency, market price, establishing and enterprise expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subpackage valency
Ge Ku, enterprise's whole audience machinery price storehouse;The typical list consumption storehouse includes operation quantity and main material quantity consumed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710095528.5A CN106934527A (en) | 2017-02-22 | 2017-02-22 | A kind of enterprise model system system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710095528.5A CN106934527A (en) | 2017-02-22 | 2017-02-22 | A kind of enterprise model system system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106934527A true CN106934527A (en) | 2017-07-07 |
Family
ID=59423452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710095528.5A Pending CN106934527A (en) | 2017-02-22 | 2017-02-22 | A kind of enterprise model system system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106934527A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108428030A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | Quota store based on BIM and the associated method and device of WBS base libraries |
CN108876301A (en) * | 2018-06-21 | 2018-11-23 | 平安科技(深圳)有限公司 | Data determination method, device, electronic equipment and computer readable storage medium |
CN109146422A (en) * | 2018-08-18 | 2019-01-04 | 深圳市江益达科技股份有限公司 | Project packet generation method, device and storage medium |
CN111127068A (en) * | 2019-02-27 | 2020-05-08 | 上海万亩电子科技有限公司 | Automatic pricing method and device for engineering quantity list |
CN113610408A (en) * | 2021-08-12 | 2021-11-05 | 上海土木信息科技有限公司 | Cost and budget management system based on enterprise cost element quota |
CN113722571A (en) * | 2021-09-15 | 2021-11-30 | 重庆电子工程职业学院 | Internet + -based supplementary quota determination method and device |
CN116205694A (en) * | 2023-05-04 | 2023-06-02 | 品茗科技股份有限公司 | Method, device, equipment and medium for automatic recommending mix proportion by cost quota |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102955982A (en) * | 2011-08-18 | 2013-03-06 | 大连博特软件科技有限公司 | System for managing construction project contracting |
CN103699963A (en) * | 2013-12-14 | 2014-04-02 | 中广核工程有限公司 | Mounting work amount calculation method and system for nuclear power project |
CN104899702A (en) * | 2015-06-26 | 2015-09-09 | 江苏易合大成网络科技有限公司 | Big data-based decoration budget quota management system and method |
CN105069542A (en) * | 2015-06-25 | 2015-11-18 | 中铁四局集团有限公司 | Responsibility cost budget drafting method and system |
CN106373036A (en) * | 2016-09-21 | 2017-02-01 | 广东中建普联科技股份有限公司 | Construction project data automatic recognition and analysis method and system |
-
2017
- 2017-02-22 CN CN201710095528.5A patent/CN106934527A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102955982A (en) * | 2011-08-18 | 2013-03-06 | 大连博特软件科技有限公司 | System for managing construction project contracting |
CN103699963A (en) * | 2013-12-14 | 2014-04-02 | 中广核工程有限公司 | Mounting work amount calculation method and system for nuclear power project |
CN105069542A (en) * | 2015-06-25 | 2015-11-18 | 中铁四局集团有限公司 | Responsibility cost budget drafting method and system |
CN104899702A (en) * | 2015-06-26 | 2015-09-09 | 江苏易合大成网络科技有限公司 | Big data-based decoration budget quota management system and method |
CN106373036A (en) * | 2016-09-21 | 2017-02-01 | 广东中建普联科技股份有限公司 | Construction project data automatic recognition and analysis method and system |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108428030A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | Quota store based on BIM and the associated method and device of WBS base libraries |
CN108876301A (en) * | 2018-06-21 | 2018-11-23 | 平安科技(深圳)有限公司 | Data determination method, device, electronic equipment and computer readable storage medium |
CN109146422A (en) * | 2018-08-18 | 2019-01-04 | 深圳市江益达科技股份有限公司 | Project packet generation method, device and storage medium |
CN111127068A (en) * | 2019-02-27 | 2020-05-08 | 上海万亩电子科技有限公司 | Automatic pricing method and device for engineering quantity list |
CN111127068B (en) * | 2019-02-27 | 2023-04-18 | 上海万亩电子科技有限公司 | Automatic pricing method and device for engineering quantity list |
CN113610408A (en) * | 2021-08-12 | 2021-11-05 | 上海土木信息科技有限公司 | Cost and budget management system based on enterprise cost element quota |
CN113722571A (en) * | 2021-09-15 | 2021-11-30 | 重庆电子工程职业学院 | Internet + -based supplementary quota determination method and device |
CN113722571B (en) * | 2021-09-15 | 2023-06-16 | 重庆电子工程职业学院 | Internet + based supplementary quota determination method and device |
CN116205694A (en) * | 2023-05-04 | 2023-06-02 | 品茗科技股份有限公司 | Method, device, equipment and medium for automatic recommending mix proportion by cost quota |
CN116205694B (en) * | 2023-05-04 | 2023-10-24 | 品茗科技股份有限公司 | Method, device, equipment and medium for automatic recommending mix proportion by cost quota |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106934527A (en) | A kind of enterprise model system system and method | |
CN109472642A (en) | The editing of electricity power engineering cost and inventory application system based on working drawing budget management | |
US5918219A (en) | System and method for estimating construction project costs and schedules based on historical data | |
CN108416701A (en) | A kind of processing method of the Engineering Project Construction real data based on BIM | |
CN106169152A (en) | The automatic accounting method of a kind of value-added tax and system | |
CN105631737A (en) | Account checking method and account checking system | |
CN113034190B (en) | Nuclear price management system for engineering project | |
CN109359868A (en) | A kind of construction method and system of power grid user portrait | |
CN107067170A (en) | A kind of cost accounting and quotation system based on assembling decomposition texture | |
CN114648400B (en) | Financial data intelligent acquisition analysis management system based on mobile internet | |
CN109785106A (en) | A kind of ERP system account checking method | |
CN105069542A (en) | Responsibility cost budget drafting method and system | |
CN110288451B (en) | Financial reimbursement method, system, equipment and storage medium | |
CN102819774A (en) | Project cost management system and architecture thereof | |
CN101706926A (en) | Method for investigating and processing cigarette consumption information | |
CN110378672A (en) | A kind of project cost system | |
CN115170090A (en) | Project management method and device, electronic equipment and readable storage medium | |
CN116361367A (en) | Content identification system and method for efficiently publishing recruitment information | |
CN104331779A (en) | Development area construction project management system and method | |
CN110942280A (en) | Interaction method for collaborative participation of designers | |
CN113887917A (en) | Smart city management platform based on service architecture | |
CN114154862A (en) | Engineering cost automatic allocation method and system based on engineering whole-process management | |
KR20090002218A (en) | On-line construction management method | |
CN111507760A (en) | Method and system for screening reasonableness of bidding documents | |
CN107790403B (en) | A kind of sorting system of Financial Billing and the method for sorting of Financial Billing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |
|
RJ01 | Rejection of invention patent application after publication |