CN106934527A - A kind of enterprise model system system and method - Google Patents

A kind of enterprise model system system and method Download PDF

Info

Publication number
CN106934527A
CN106934527A CN201710095528.5A CN201710095528A CN106934527A CN 106934527 A CN106934527 A CN 106934527A CN 201710095528 A CN201710095528 A CN 201710095528A CN 106934527 A CN106934527 A CN 106934527A
Authority
CN
China
Prior art keywords
enterprise
storehouse
inventory
measuring
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710095528.5A
Other languages
Chinese (zh)
Inventor
陈宁
王云祥
李淑红
钟贞庆
陈付军
吴倩
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hualian Software Technology Co Ltd
Original Assignee
Guangdong Hualian Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hualian Software Technology Co Ltd filed Critical Guangdong Hualian Software Technology Co Ltd
Priority to CN201710095528.5A priority Critical patent/CN106934527A/en
Publication of CN106934527A publication Critical patent/CN106934527A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method of enterprise model system, including step:S1:Enterprise model system cost element is obtained, enterprise model system Database Systems are set up;S2:Newly-built measuring and calculating project, by measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse, obtains the accounts summary of measuring and calculating project;S3:It is determined that measuring and calculating project mark before results of measuring and target responsibility cost accounting result;S4:Index analysis reliability is carried out to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system.The invention also discloses a kind of enterprise model system system, the system includes user's desk module and management backstage module, and user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.The present invention provide method and system, reduce undertaken needed for concentration of enterprises staffing quota manpower and materials, reduce input, reduce cost.

Description

A kind of enterprise model system system and method
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of enterprise model system system and method.
Background technology
Pushing Valuation with Bill Quantity of Works method is a concrete measure of construction cost account method reform, is also that China adds Enter the inevitable requirement that WTO becomes compatible with internationally accepted practices.Pushing Valuation with Bill Quantity of Works pattern, with the market price and Enterprise Internal It has been trend of the times that quota is set price, and enterprise model system is only set up as early as possible, can just keep up with market economy with keen competition Trend.Overwhelming majority enterprise does not set up enterprise model system also at present, based on the quota that a small number of enterprises are promulgated by authorities, Carry out specific aim adjustment to labor and materials consumption, administration fee to form Enterprise content by norm with reference to the managerial skills of enterprise.It is big at present The technical bottleneck that most construction enterprises do not set up enterprise model system is:By existing Norm Measure, making mode, enterprise There is no enough human and material resources complete independentlies, and difficulty has energy continuous updating.
Only a small number of construction enterprises are set up and have enterprise model system at present, and the mode of allotment arrangement is issued based on authorities Based on the norm quota of consumption of cloth.This mode needs to put into great manpower and materials, and with the project of most construction enterprises Management is not inconsistent actually, and this is also the reason for why most enterprises do not set up enterprise model system.
Existing enterprise model system form of presentation is on the basis of conventional ration, to be produced with reference to the work of enterprise itself Rate level, redeterminates the labor and materials machine consumption of each quota specific item, to form enterprise model system.What current allotment arrangement was used It is operation exhaustive, uses the technique way that regular (typically 5 years) will be commonly used in current engineering construction, determines disappear item by item Water consumption is put down, and is assembled into quota.Time-consuming for this method, and need to put into great manpower and materials, and follow-up updating maintenance is also difficult, The development of new material, new technology cannot be adapted to.It is serious to constrain the establishment that enterprise works out Internal Quota.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of enterprise model system system and method, can The manpower and materials that construction enterprises concentrate establishment Internal Quota are reduced, input, reduces cost is reduced.
To achieve the above object, on the one hand, the invention provides a kind of method of enterprise model system, including as follows walk Suddenly:
S1:Enterprise model system cost element is obtained, enterprise model system Database Systems, enterprise model system number are set up Include entreprise cost factor price storehouse, typical list consumption storehouse according to storehouse system;
S2:Newly-built measuring and calculating project, measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse obtain The accounts summary of measuring and calculating project, expense includes start-up costs, operation, main material, professional subpackage, whole audience machinery;
S3:According to measuring and calculating project actual conditions adjust accounts summary, it is determined that measuring and calculating project mark before results of measuring with And target responsibility cost accounting result;
S4:Row index point is entered to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system Analysis, it is determined that the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.
The present invention provide enterprise model system method, by measure, valency separation Model Establishment enterprise model system Storehouse, the cost element price storehouse in enterprise model system storehouse realizes social resources with internal enterprise resources by data syn-chronization Build together, improve the use value of enterprise model system storehouse system;Extract history budget and balance automatically by using XML technology Listings data in file, realizes the new model that the accumulation based on enterprise's history list way forms enterprise model system.Keep away The concentration input of a large amount of manpower and materials for undertaking needed for having exempted from concentration of enterprises staffing quota, substantially reduces Internal Quota establishment Input.
According to another specific embodiment of the invention, enterprise model system Database Systems include user's desk module and pipe Reason background module, user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
According to another specific embodiment of the invention, entreprise cost factor price storehouse includes that information valency, market price, enterprise open Do expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price Storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
According to another specific embodiment of the invention, step S1 comprises the following steps:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up.
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, obtain the main of bill of quantities and disappear Consumption.
S13:According to the markup language expanded of business budgeting file, the main consumption of typical list is determined, obtain typical case Inventory consumes storehouse.
According to another specific embodiment of the invention, step S11 comprises the following steps:
S111:Push information valency, the city of labor and materials for enterprise model system Database Systems automatically by cost information platform Field valency.S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and according to operation keywords database Coding inventory.
S113:Each subject expense of start-up costs of finished item is obtained, each intermediate item start-up costs are determined according to item types Each subject fee forecast, obtains establishing and enterprise expense index storehouse.
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price Storehouse, and project material buying, inquiry inventory are encoded according to material keywords database.
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and subpackage unit bid it is clear It is single, set up enterprise's specialty subcontracting price storehouse.
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience Mechanical price storehouse.
According to another specific embodiment of the invention, step S12 comprises the following steps:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC classification Administrative standard, obtains main material summary sheet, and main material summary sheet includes centralized purchasing material mark, non-pooled buying material Mark.
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, inventory management is extracted and take, entirely Field machinery expenses, reject professional subpackage inventory, determine the main consumption of bill of quantities.
According to another specific embodiment of the invention, step S2 comprises the following steps:
S21:Obtain the essential information of measuring and calculating project, the start-up costs template according to enterprise model system systemic presupposition, by base The corresponding start-up costs index of this information matches, the start-up costs inventory and start-up costs for obtaining measuring and calculating project adds up to.
S22:Highway bids amount inventory is obtained, according to the coding and characteristic key enterprise model system of highway bids amount inventory Storehouse, obtains operation inventory, main material inventory, professional subpackage inventory.
S23:According to operation inventory, main material inventory, professional subpackage inventory retrieval enterprise model system storehouse, operation is obtained Univalent summary sheet, main material summary sheet, professional subpackage summary sheet.
S24:According to measuring and calculating project construction on-site actual situations, determine the whole audience machinery and the whole audience machinery enter the time for competiton, Obtain whole audience machinery summary sheet.
According to another specific embodiment of the invention, in step S21, essential information include classification of the items, project location, Construction scope, duration.
On the other hand, the invention provides a kind of enterprise model system system, system includes user's desk module and management Background module, user's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
Compared with prior art, the enterprise model system system that the present embodiment is provided, it uses B/S structures to set up, supports Our department of enterprise and branch, the data sharing of project management department, our department and branch, project management department can complete enterprises and determine by internet The upload of volume database data and utilization, without concentrating company's ample resources, concentrating discussion, establishment Discourse of Enterprise's ration, save manpower, provide Source.
According to another specific embodiment of the invention, entreprise cost factor price storehouse includes that information valency, market price, enterprise open Do expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price Storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Brief description of the drawings
Fig. 1 is the flow chart of the enterprise model system method that embodiment 1 is provided;
Fig. 2 is the flow chart of step S1 in Fig. 1;
Fig. 3 is the flow chart of step S11 in Fig. 2;
Fig. 4 is the flow chart of step S2 in Fig. 1;
Fig. 5 is the structured flowchart of the enterprise model system system that embodiment 2 is provided.
Specific embodiment
Embodiment 1
It is a kind of flow chart of enterprise model system method that the present embodiment is provided referring to Fig. 1.The method comprising the steps of S1 ~S4:
S1:Enterprise model system cost element is obtained, enterprise model system Database Systems, enterprise model system number are set up Include entreprise cost factor price storehouse, typical list consumption storehouse according to storehouse system.
The step is used to set up enterprise model system Database Systems.
In the present embodiment, enterprise model system Database Systems include user's desk module and management backstage module, user Desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
Specifically, including step S11~S13 referring to Fig. 2 steps S1:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up.
The step is used to set up entreprise cost factor price storehouse.Specifically, entreprise cost factor price storehouse include information valency, Market price, establishing and enterprise take index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise Whole audience machinery price storehouse;Typical list consumption storehouse includes operation quantity and main material quantity consumed.
In the present embodiment, information valency, market price derive from cost information platform, and the cost information platform is determined with enterprises Volume database system relationship, the automatic information valency and market price that feed is pushed for enterprise model system Database Systems.
Specifically, referring to Fig. 3, step S11 includes step S111~S116:
S111:Push information valency, the city of labor and materials for enterprise model system Database Systems automatically by cost information platform Field valency.
The step is used to determine information valency, the market price of labor and materials.In this step, it is preferred that cost information platform is to make The information platform of valency 168, the platform can push information valency, the market price of work for enterprise model system Database Systems automatically.So that Enterprise model system Database Systems are reached the standard grade and have data, it is possible to use, improve the enthusiasm of inside data of enterprise accumulation. S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and labor is encoded according to operation keywords database Business subcontract inventory.
The step is used to set up enterprise's operation price storehouse.Specifically, by importing known labor service subcontract Excel, forms enterprise's operation price storehouse, and encode the excel according to operation keywords database.
S113:Each subject expense of start-up costs of finished item is obtained, each intermediate item start-up costs are determined according to item types Each subject fee forecast, obtains establishing and enterprise expense index storehouse.
The step is used to set up establishing and enterprise expense index storehouse.Specifically, by obtaining construction enterprises, finished item is opened Each subject expense of expense is done, by the item types of finished item, each each subject fee forecast of intermediate item start-up costs is formed, and import Form establishing and enterprise and take index storehouse.
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price Storehouse, and project material buying, inquiry inventory are encoded according to material keywords database.
The step is used to set up enterprise's material price storehouse.Specifically, import construction enterprises having completed or operational project Material purchases, inquiry inventory Excel, form enterprise's material price storehouse.And the material key set up by cost information platform Dictionary search engine encodes inventory Excel, realizes materials classification coding automation.
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and subpackage unit bid it is clear It is single, set up enterprise's specialty subcontracting price storehouse.
The step is used to set up enterprise's specialty subcontracting price storehouse.Specifically, import enterprise having completed or operational project Professional subpackage contract inventory Excel and the bid inventory Excel of subpackage unit,
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience Mechanical price storehouse.
The step is used to set up enterprise's whole audience machinery price storehouse.Specifically, import enterprise having completed or operational project Whole audience machinery lease, inquiry inventory Excel, form enterprise whole audience machinery price storehouse.
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, obtain the main of bill of quantities and disappear Consumption.
The step is used to obtain the main consumption of quantities.Main consumption includes operation quantity and main material consumption number Amount.Specifically, step S12 includes step S121~S122:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC classification Administrative standard, obtains main material summary sheet, and main material summary sheet includes centralized purchasing material mark, non-pooled buying material Mark.
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, inventory management is extracted and take, entirely Field machinery expenses, reject professional subpackage inventory, determine the main consumption of bill of quantities.
S13:According to the markup language expanded of business budgeting file, the main consumption of typical list is determined, obtain typical case Inventory consumes storehouse.
The step is used to determine that typical list consumes storehouse.Specifically, enterprise model system system is by extracting business budgeting The XML of file, forms the enterprises consumption of typical list, and it includes operation classification, quantity;Concentrated collection material specification, number Amount;Non-pooled capturing material is detailed, quantity;So as to set up typical list consumption storehouse.
S2:Newly-built measuring and calculating project, measuring and calculating project matching entreprise cost factor price storehouse, typical list consumption storehouse obtain The accounts summary of measuring and calculating project, expense includes start-up costs, operation, main material, professional subpackage, whole audience machinery.
The step is used to determine by enterprise model system system the accounts summary of measuring and calculating project.Specifically, by inciting somebody to action Entreprise cost factor price storehouse and typical list consumption storehouse in measuring and calculating project matching enterprise model system system, so that it is determined that The work of the measuring and calculating project, material, machine, the general expenses of start-up costs.
Specifically, referring to Fig. 4, the step includes step S21~S24:
S21:Obtain the essential information of measuring and calculating project, the start-up costs template according to enterprise model system systemic presupposition, by base The corresponding start-up costs index of this information matches, the start-up costs inventory and start-up costs for obtaining measuring and calculating project adds up to.
Specifically, essential information includes but is not limited to classification of the items, project location, construction scope, duration.
S22:Highway bids amount inventory is obtained, according to the coding and characteristic key enterprise model system of highway bids amount inventory Storehouse, obtains operation inventory, main material inventory, professional subpackage inventory.
Specifically, enterprise model system system is by importing highway bids amount inventory XML, enterprise model system system according to The inventory with same characteristic features in the coding and feature automatically retrieval enterprise model system storehouse of the inventory, automatic classifying goes out operation Inventory, main material inventory, professional subpackage inventory.
S23:According to operation inventory, main material inventory, professional subpackage inventory retrieval enterprise model system storehouse, operation is obtained Univalent summary sheet, main material summary sheet, professional subpackage summary sheet.
Specifically, the operation inventory that will be obtained by step S22, main material inventory, professional subpackage inventory matching enterprise Internal Quota storehouse, so that it is determined that operation inventory, main material inventory, the corresponding price of professional subpackage inventory, and it is next to indicate price Source item and time.
S24:According to measuring and calculating project construction on-site actual situations, determine the whole audience machinery and the whole audience machinery enter the time for competiton, Obtain whole audience machinery summary sheet.
Specifically, user combines measuring and calculating project construction on-site actual situations, appropriate whole audience machinery model combination is chosen, and That plans enters the time for competiton, obtains whole audience machinery summary sheet.
S3:According to measuring and calculating project actual conditions adjust accounts summary, it is determined that measuring and calculating project mark before results of measuring with And target responsibility cost accounting result.
The step is for results of measuring and target responsibility cost accounting result before the mark for determining measuring and calculating project.Specifically, , it is necessary to according to actual conditions to the accounts summary of the measuring and calculating project after step S2 obtains the accounts summary of measuring and calculating project It is adjusted, results of measuring and target responsibility cost accounting result before the mark of the measuring and calculating project can be obtained after adjustment confirmation.
S4:Row index point is entered to results of measuring before mark and target responsibility cost accounting result according to Cost Index analysis system Analysis, it is determined that the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.
The step is used to analyze the reliability of the preceding results of measuring of mark and target responsibility cost accounting result.Specifically, passing through Cost Index analysis system carries out index analysis to results of measuring before mark and target responsibility cost accounting result.
In the present embodiment, Cost Index analysis system is the index analysing system of cost 168.
The method of the enterprise model system that the present embodiment is provided, by measure, the separate Model Establishment enterprises of valency it is fixed E Ku, the cost element price storehouse in enterprise model system storehouse realizes social resources and internal enterprise resources by data syn-chronization The shared use value built together, improve enterprise model system storehouse system;History is extracted automatically by using XML technology to tie in advance The listings data in file is calculated, the new model that the accumulation based on enterprise's history list way forms enterprise model system is realized. The concentration input of a large amount of manpower and materials for undertaking needed for avoiding concentration of enterprises staffing quota, substantially reduces Internal Quota establishment Input.
Embodiment 2
It is a kind of structured flowchart of enterprise model system system that the present embodiment is provided referring to Fig. 5.The system includes user Desk module 1 and management backstage module 2, user's desk module 1 include that entreprise cost factor price storehouse 11, typical list consumes storehouse 12 and function application module 13.
Specifically, entreprise cost factor price storehouse 11 includes that information valency, market price, establishing and enterprise take index storehouse, enterprise's work Sequence price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience machinery price storehouse;Typical list consumes storehouse 12 include operation quantity and main material quantity consumed.Function application module includes measuring and calculating, objective cost measuring and calculating before mark.
The enterprise model system system that the present embodiment is provided, it uses B/S structures to set up, support our department of enterprise and branch, The data sharing of project management department, our department and branch, project management department can complete the upload of enterprise model system database data by internet With utilization, without concentrating company's ample resources, concentrating discussion, establishment Discourse of Enterprise's ration, manpower, resource are saved.
Although the present invention is disclosed above with preferred embodiment, the scope of present invention implementation is not limited to.Any The those of ordinary skill in field, is not departing from invention scope of the invention, when that can make a little improvement, i.e., every according to this hair Bright done equal improvement, should be the scope of the present invention and is covered.

Claims (10)

1. a kind of method of enterprise model system, it is characterised in that comprise the following steps:
S1:Enterprise model system cost element is obtained, the enterprise model system Database Systems are set up, the enterprises are determined Volume Database Systems include entreprise cost factor price storehouse, typical list consumption storehouse;
S2:Newly-built measuring and calculating project, the entreprise cost factor price storehouse, typical list consumption storehouse are matched by the measuring and calculating project, The accounts summary of the measuring and calculating project is obtained, the expense includes start-up costs, operation, main material, professional subpackage, whole audience machine Tool;
S3:Actual conditions according to the measuring and calculating project adjust the accounts summary, are surveyed before determining the mark of the measuring and calculating project Calculate result and target responsibility cost accounting result;
S4:Row index point is entered to results of measuring before the mark and target responsibility cost accounting result according to Cost Index analysis system Analysis, determines the reliability of results of measuring and target responsibility cost accounting result before the mark.
2. the method for claim 1, it is characterised in that the enterprise model system Database Systems include user foreground Module and management backstage module, user's desk module include entreprise cost factor price storehouse, typical list consumption storehouse and work( Can application module.
3. the method for claim 1, it is characterised in that the entreprise cost factor price storehouse includes information valency, market Valency, establishing and enterprise take index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subcontracting price storehouse, enterprise's whole audience Mechanical price storehouse;The typical list consumption storehouse includes operation quantity and main material quantity consumed.
4. the method for claim 1, it is characterised in that the step S1 comprises the following steps:
S11:According to the related data of project in having completed or implemented of enterprise, entreprise cost factor price storehouse is set up;
S12:According to acceptance of the bid, the markup language expanded of bid project documents of estimate, the main consumption of bill of quantities is obtained;
S13:According to the markup language expanded of business budgeting file, the described main consumption of typical list is determined, obtain typical case Inventory consumes storehouse.
5. the method for claim 1, it is characterised in that the step S11 comprises the following steps:
S111:Push information valency, the city of labor and materials for the enterprise model system Database Systems automatically by cost information platform Field valency;
S112:By the inventory of known labor service subcontract, enterprise's operation price storehouse is set up, and compile according to operation keywords database The code inventory;
S113:Each subject expense of start-up costs of finished item is obtained, each each section of intermediate item start-up costs is determined according to item types Mesh fee forecast, obtains establishing and enterprise expense index storehouse;
S114:Obtain enterprise to have completed or operational project material purchases, inquiry inventory, set up enterprise's material price storehouse, and The project material buying, inquiry inventory are encoded according to material keywords database;
S115:Obtain enterprise completed or operational project specialty subpackage contract inventory and the bid inventory of subpackage unit, Set up enterprise's specialty subcontracting price storehouse;
S116:Obtain enterprise to have completed or the mechanical lease of the operational project whole audience, inquiry inventory, set up enterprise's whole audience machinery Price storehouse.
6. method as claimed in claim 4, it is characterised in that the step S12 comprises the following steps:
S121:Acceptance of the bid, the markup language expanded of bid project documents of estimate are obtained, and according to enterprise's materials A BC Classification Managements Standard, obtains main material summary sheet, and the main material summary sheet includes centralized purchasing material mark, non-pooled buying material Mark;
S122:Workman in bill of quantities, auxiliary material, Work tool are merged into operation inventory, extraction inventory management is taken, whole audience machine Tool expense, rejects professional subpackage inventory, determines the main consumption of bill of quantities.
7. the method for claim 1, it is characterised in that the step S2 comprises the following steps:
S21:The essential information of measuring and calculating project is obtained, according to the start-up costs template of the enterprise model system systemic presupposition, by institute State essential information and match corresponding start-up costs index, the start-up costs inventory and start-up costs for obtaining the measuring and calculating project add up to;
S22:Obtain highway bids amount inventory, the enterprises according to the coding and characteristic key of the highway bids amount inventory Quota store, obtains operation inventory, main material inventory, professional subpackage inventory;
S23:The enterprises are retrieved according to the operation inventory, the main material inventory, the professional subpackage inventory to determine E Ku, obtains operation unit price summary sheet, main material summary sheet, professional subpackage summary sheet;
S24:According to the measuring and calculating project construction on-site actual situations, determine that the whole audience is mechanical and whole audience machinery when entering to appear on the scene Between, obtain whole audience machinery summary sheet.
8. method as claimed in claim 7, it is characterised in that in step S21, the essential information includes classification of the items, item Mesh location, construction scope, duration.
9. a kind of enterprise model system system, it is characterised in that the system includes user's desk module and management backstage module, User's desk module includes entreprise cost factor price storehouse, typical list consumption storehouse and function application module.
10. enterprise model system system as claimed in claim 9, it is characterised in that the entreprise cost factor price storehouse bag Include information valency, market price, establishing and enterprise expense index storehouse, enterprise's operation price storehouse, enterprise's material price storehouse, enterprise's specialty subpackage valency Ge Ku, enterprise's whole audience machinery price storehouse;The typical list consumption storehouse includes operation quantity and main material quantity consumed.
CN201710095528.5A 2017-02-22 2017-02-22 A kind of enterprise model system system and method Pending CN106934527A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710095528.5A CN106934527A (en) 2017-02-22 2017-02-22 A kind of enterprise model system system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710095528.5A CN106934527A (en) 2017-02-22 2017-02-22 A kind of enterprise model system system and method

Publications (1)

Publication Number Publication Date
CN106934527A true CN106934527A (en) 2017-07-07

Family

ID=59423452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710095528.5A Pending CN106934527A (en) 2017-02-22 2017-02-22 A kind of enterprise model system system and method

Country Status (1)

Country Link
CN (1) CN106934527A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108428030A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 Quota store based on BIM and the associated method and device of WBS base libraries
CN108876301A (en) * 2018-06-21 2018-11-23 平安科技(深圳)有限公司 Data determination method, device, electronic equipment and computer readable storage medium
CN109146422A (en) * 2018-08-18 2019-01-04 深圳市江益达科技股份有限公司 Project packet generation method, device and storage medium
CN111127068A (en) * 2019-02-27 2020-05-08 上海万亩电子科技有限公司 Automatic pricing method and device for engineering quantity list
CN113610408A (en) * 2021-08-12 2021-11-05 上海土木信息科技有限公司 Cost and budget management system based on enterprise cost element quota
CN113722571A (en) * 2021-09-15 2021-11-30 重庆电子工程职业学院 Internet + -based supplementary quota determination method and device
CN116205694A (en) * 2023-05-04 2023-06-02 品茗科技股份有限公司 Method, device, equipment and medium for automatic recommending mix proportion by cost quota

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN103699963A (en) * 2013-12-14 2014-04-02 中广核工程有限公司 Mounting work amount calculation method and system for nuclear power project
CN104899702A (en) * 2015-06-26 2015-09-09 江苏易合大成网络科技有限公司 Big data-based decoration budget quota management system and method
CN105069542A (en) * 2015-06-25 2015-11-18 中铁四局集团有限公司 Responsibility cost budget drafting method and system
CN106373036A (en) * 2016-09-21 2017-02-01 广东中建普联科技股份有限公司 Construction project data automatic recognition and analysis method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN103699963A (en) * 2013-12-14 2014-04-02 中广核工程有限公司 Mounting work amount calculation method and system for nuclear power project
CN105069542A (en) * 2015-06-25 2015-11-18 中铁四局集团有限公司 Responsibility cost budget drafting method and system
CN104899702A (en) * 2015-06-26 2015-09-09 江苏易合大成网络科技有限公司 Big data-based decoration budget quota management system and method
CN106373036A (en) * 2016-09-21 2017-02-01 广东中建普联科技股份有限公司 Construction project data automatic recognition and analysis method and system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108428030A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 Quota store based on BIM and the associated method and device of WBS base libraries
CN108876301A (en) * 2018-06-21 2018-11-23 平安科技(深圳)有限公司 Data determination method, device, electronic equipment and computer readable storage medium
CN109146422A (en) * 2018-08-18 2019-01-04 深圳市江益达科技股份有限公司 Project packet generation method, device and storage medium
CN111127068A (en) * 2019-02-27 2020-05-08 上海万亩电子科技有限公司 Automatic pricing method and device for engineering quantity list
CN111127068B (en) * 2019-02-27 2023-04-18 上海万亩电子科技有限公司 Automatic pricing method and device for engineering quantity list
CN113610408A (en) * 2021-08-12 2021-11-05 上海土木信息科技有限公司 Cost and budget management system based on enterprise cost element quota
CN113722571A (en) * 2021-09-15 2021-11-30 重庆电子工程职业学院 Internet + -based supplementary quota determination method and device
CN113722571B (en) * 2021-09-15 2023-06-16 重庆电子工程职业学院 Internet + based supplementary quota determination method and device
CN116205694A (en) * 2023-05-04 2023-06-02 品茗科技股份有限公司 Method, device, equipment and medium for automatic recommending mix proportion by cost quota
CN116205694B (en) * 2023-05-04 2023-10-24 品茗科技股份有限公司 Method, device, equipment and medium for automatic recommending mix proportion by cost quota

Similar Documents

Publication Publication Date Title
CN106934527A (en) A kind of enterprise model system system and method
CN109472642A (en) The editing of electricity power engineering cost and inventory application system based on working drawing budget management
US5918219A (en) System and method for estimating construction project costs and schedules based on historical data
CN108416701A (en) A kind of processing method of the Engineering Project Construction real data based on BIM
CN106169152A (en) The automatic accounting method of a kind of value-added tax and system
CN105631737A (en) Account checking method and account checking system
CN113034190B (en) Nuclear price management system for engineering project
CN109359868A (en) A kind of construction method and system of power grid user portrait
CN107067170A (en) A kind of cost accounting and quotation system based on assembling decomposition texture
CN114648400B (en) Financial data intelligent acquisition analysis management system based on mobile internet
CN109785106A (en) A kind of ERP system account checking method
CN105069542A (en) Responsibility cost budget drafting method and system
CN110288451B (en) Financial reimbursement method, system, equipment and storage medium
CN102819774A (en) Project cost management system and architecture thereof
CN101706926A (en) Method for investigating and processing cigarette consumption information
CN110378672A (en) A kind of project cost system
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
CN116361367A (en) Content identification system and method for efficiently publishing recruitment information
CN104331779A (en) Development area construction project management system and method
CN110942280A (en) Interaction method for collaborative participation of designers
CN113887917A (en) Smart city management platform based on service architecture
CN114154862A (en) Engineering cost automatic allocation method and system based on engineering whole-process management
KR20090002218A (en) On-line construction management method
CN111507760A (en) Method and system for screening reasonableness of bidding documents
CN107790403B (en) A kind of sorting system of Financial Billing and the method for sorting of Financial Billing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707

RJ01 Rejection of invention patent application after publication