CN113722571B - Internet + based supplementary quota determination method and device - Google Patents

Internet + based supplementary quota determination method and device Download PDF

Info

Publication number
CN113722571B
CN113722571B CN202111081122.4A CN202111081122A CN113722571B CN 113722571 B CN113722571 B CN 113722571B CN 202111081122 A CN202111081122 A CN 202111081122A CN 113722571 B CN113722571 B CN 113722571B
Authority
CN
China
Prior art keywords
data
quota
new
unit price
basic unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111081122.4A
Other languages
Chinese (zh)
Other versions
CN113722571A (en
Inventor
李会静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing College of Electronic Engineering
Original Assignee
Chongqing College of Electronic Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing College of Electronic Engineering filed Critical Chongqing College of Electronic Engineering
Priority to CN202111081122.4A priority Critical patent/CN113722571B/en
Publication of CN113722571A publication Critical patent/CN113722571A/en
Application granted granted Critical
Publication of CN113722571B publication Critical patent/CN113722571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/951Indexing; Web crawling techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/953Querying, e.g. by the use of web search engines
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0278Product appraisal
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Finance (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of intelligent buildings, in particular to an Internet+ based supplementary quota determination method and device, wherein the method comprises the following steps: and a data updating step: acquiring updated iteration data of new and old building technologies; and a data storage step: acquiring quota data which is measured in the old building technology and storing the quota data in a data storage module; and a data acquisition step: when updated iteration data is acquired, basic unit price data required by finishing quota in a new construction technology is acquired; basic quantity data of the client corresponding to the basic unit price data is also acquired; and a data analysis step: and calculating a supplementary quota according to the basic unit price data and the basic quantity data, and storing the supplementary quota into a data storage module and storing the supplementary quota in association with a new building technology. The invention can efficiently and accurately complete engineering quota supplement, and overcomes the defect of artificial determination of engineering quota, thereby providing effective guidance for enterprise construction production and economic activities.

Description

Internet + based supplementary quota determination method and device
Technical Field
The invention relates to the technical field of intelligent buildings, in particular to a method and a device for measuring supplementary quota based on Internet+.
Background
Engineering quota refers to the number of labor, materials, tools, equipment, and related costs required to complete a qualified unit building installation product under specified operating conditions. According to the composition, the labor rate (working time rate or yield rate), the material consumption rate, the mechanical rate (construction equipment use rate, cost rate) and the like can be classified. In which it takes time to complete a qualified unit building installation product, and in which new processes, new equipment, new technology, new materials may occur, replace old processes, equipment, and technology, to improve work efficiency and reduce costs. Therefore, the original engineering quota may not be applicable any more, and a supplementary quota needs to be compiled. The compilation method of the supplementary quota is basically the same as the method of the traditional engineering quota determination.
Traditional engineering quota determinations are basically handled manually, since the calculation formulas involved in engineering quota are not computationally complex, and manual handling is possible. However, because the measuring personnel are uneven in level, the iterative technology and related data are difficult to update and search in time, and artificial subjective factors exist, the measured data have problems, so that the accuracy of calculation of labor quota, material consumption quota and mechanical quota is reduced, the construction quota of the enterprise cannot be accurately obtained, and effective guidance cannot be provided for the construction production and economic activities of the enterprise.
Disclosure of Invention
The invention aims to provide an Internet+ based supplementary quota measuring method, which can efficiently and accurately finish engineering supplementary quota and solve the defect of artificial measurement of engineering quota, thereby providing effective guidance for enterprise construction production and economic activities.
In order to achieve the above object, there is provided an internet+ based supplementary quota determination method comprising the steps of:
and a data updating step: acquiring updated iteration data of new and old building technologies;
and a data storage step: acquiring quota data which is measured in the old building technology and storing the quota data in a data storage module;
and a data acquisition step: when updated iteration data is acquired, basic unit price data required by finishing quota in a new construction technology is acquired; basic quantity data of the client corresponding to the basic unit price data is also acquired;
and a data analysis step: generating a data template according to the quota data of the old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to the new building technology in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into a data storage module, performing associated storage with a new building technology, filling the supplementary quota into an vacated position in a data template, obtaining new quota data, and pushing the new quota data to a client.
Principle and advantage:
1. the setting of the data updating step is convenient for acquiring the updating iteration data of the new and old building technologies in real time, and the technology and the data for updating iteration do not need to be known by people with time and effort, so that the working efficiency of supplementing the quota is improved.
2. The setting of the data storage step, the data acquisition step and the data analysis step is that the engineering quota has scientificity and stature, and the standard such as basic unit price data required by the corresponding quota in the new construction technology is disclosed, so that when the updated iteration data is acquired, the basic unit price data required by the quota in the new construction technology is acquired by the data storage step, and then the two key data for calculating the complementary quota can be obtained by acquiring the basic quantity data of the client corresponding to the basic unit price data, wherein the basic quantity data is directly input by the client (such as a smart phone, a tablet personal computer and the like), and the method is rapid and convenient, and has high input efficiency. The data analysis step can generate a data template according to the quota data of the old building technology, and fill unchanged parts in the quota data into the data template, and vacate parts corresponding to the new building technology in the data template, so that the previous quota data can be conveniently checked, new quota data can be obtained by combining with the supplementary quota in time, calculation is accurate and efficient, excessive time and effort are not required, the defect of manually measuring engineering quota is overcome, and effective guidance is conveniently provided for enterprise construction production and economic activities.
Further, the method also comprises the following steps:
and a data verification step: new basic unit price data required by finishing quota in new construction technology are collected again, the true reliability of the basic unit price data is verified according to the new basic unit price data, and when the verification result is true, the verification result is stored in the data storage module; when the verification result is false or an error exists, the data analysis step is adopted to recalculate the supplementary quota and the complete quota.
The setting of the data verification step can verify the true reliability of the basic unit price data in real time, and avoid error data obtained and error of the supplement quota, thereby avoiding the failure to provide effective guidance for the construction production and economic activities of enterprises.
Further, a history management step of: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data which adopt the new construction technology each time into a historical data record, and storing the historical data record into a data storage module.
The setting of the history record management step can be used for finishing the basic unit price data, the basic quantity data, the supplementary quota and the new quota data which adopt the new construction technology each time into a history data record, and storing the history data record into the data storage module so as to facilitate the subsequent direct retrieval and check, thereby further improving the calculation efficiency of the supplementary quota.
Further, a data searching step: and acquiring the demand information of the client for the new construction technology, decomposing keywords according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client.
The setting of the data searching step can decompose the keywords according to the requirement information, and search related historical data records from the data storage module according to the decomposed keywords, so that a user can conveniently and accurately find corresponding basic unit price data or supplement quota data through the historical data records, and the method is convenient to directly apply to other engineering construction projects, and the quota work efficiency is improved.
Another object of the present invention is to provide an internet + based supplementary quota measuring apparatus, including a client and a server, the client being connected to the server in a remote communication manner, the server comprising:
and a data updating module: the method comprises the steps of obtaining updated iteration data of new and old building technologies;
and a data storage module: the device is used for acquiring and storing quota data of measurement completed in the old building technology;
and a data acquisition module: when the updated iteration data is acquired, acquiring basic unit price data required by finishing quota in a new construction technology; the method is also used for acquiring basic quantity data of the client corresponding to the basic unit price data;
and a data analysis module: the method comprises the steps of generating a data template according to quota data of an old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module and storing the supplementary quota in association with a new building technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data and pushing the new quota data to the client.
Principle and advantage:
1. the data updating module is arranged, so that updating iteration data of new and old building technologies can be conveniently obtained in real time, and the time and effort are not needed to be intentionally spent on learning the updating iteration technology and data, thereby improving the working efficiency of supplementing the quota.
2. The data storage module, the data acquisition module and the data analysis module are arranged, and as engineering quota has scientificity and stature, basic unit price data and other standards required by corresponding quota in new construction technology are disclosed, when updated iteration data are acquired, the data storage module acquires basic unit price data required by finishing quota in new construction technology, and then two key data for calculating the supplemental quota can be obtained by acquiring basic quantity data of a client corresponding to the basic unit price data, wherein the basic quantity data are directly input by the client (such as a smart phone, a tablet personal computer and the like), and the method is rapid and convenient, and has high input efficiency. The data analysis module can generate a data template according to the quota data of the old building technology, fill unchanged parts in the quota data into the data template, and vacate parts corresponding to the new building technology in the data template, so that the former quota data can be conveniently checked, new quota data can be obtained by combining with the supplementary quota in time, calculation is accurate and efficient, excessive time and effort are not required, the defect of manually measuring engineering quota is overcome, and effective guidance is conveniently provided for enterprise construction production and economic activities. Further, the server further includes:
and a data verification module: the system comprises a data acquisition module, a data storage module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by finishing quota in a new construction technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into the data storage module when the verification result is true; and when the verification result is false or an error exists, sending the verification result to the data analysis module to recalculate the supplemental quota and the complete quota.
The data verification module is arranged, so that the true reliability of basic unit price data can be verified in real time, and errors in supplementing quota caused by obtaining error data are avoided, and therefore, the situation that effective guidance cannot be provided for enterprise construction production and economic activities is avoided.
Further, the server further includes:
history management module: the system is used for organizing the basic unit price data, the basic quantity data, the supplement quota and the new quota data which adopt the new construction technology each time into a historical data record and storing the historical data record into the data storage module.
The setting of the history management module can sort the basic unit price data, the basic quantity data, the supplementary quota and the new quota data which adopt the new construction technology each time into a history data record, and then the history data record is stored in the data storage module, so that the subsequent direct calling and checking are convenient, and the calculating efficiency of the supplementary quota is further improved.
Further, the data search module: the method is used for acquiring the demand information of the client for the new construction technology, carrying out keyword decomposition according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client.
The data searching module is arranged, so that keyword decomposition can be carried out according to the requirement information, related historical data records are searched from the data storage module according to the decomposed keywords, and users can conveniently and accurately find corresponding basic unit price data or supplement quota data through the historical data records, so that the data searching module is convenient to directly apply to other engineering construction projects, and the quota work efficiency is improved.
Drawings
FIG. 1 is a logic block diagram of an Internet+ based supplemental quota measuring device in accordance with an embodiment of the invention.
Detailed Description
The following is a further detailed description of the embodiments:
examples
An internet + based supplemental quota measuring device, substantially as shown in figure 1: the intelligent terminal comprises a client and a server, wherein the client is in remote communication connection with the server, the client is a smart phone or a tablet personal computer, and the intelligent terminal carries an APP to be in communication connection with the server and receives information fed back by the server. The server includes:
and a data updating module: the method comprises the steps of acquiring updated iteration data of new and old building technologies from the Internet through a web crawler technology;
and a data storage module: the device is used for acquiring and storing quota data of measurement completed in the old building technology;
and a data acquisition module: when the updated iteration data is acquired, basic unit price data required by finishing quota in a new construction technology is acquired, and in the embodiment, the acquisition mode is acquired from the Internet through a web crawler technology, and the acquired basic unit price data can be a public standard or an enterprise self-defined standard; the data acquisition module is also used for acquiring basic quantity data of the client corresponding to the basic unit price data; the basic unit price data includes labor unit price, material consumption unit price, mechanical unit price, etc., and the basic quantity data is consumption data corresponding to the labor unit price, the material consumption unit price, the mechanical unit price, etc.
And a data analysis module: the method comprises the steps of generating a data template according to quota data of an old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module and storing the supplementary quota in association with a new building technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data and pushing the new quota data to the client. In this embodiment, the data items of the data table template include a quota number, a quota name, a unit, a basic price, a single weight, a work fee, a material fee, a machine fee, a work content, and the like, and the portion for supplementing the quota can be marked by frame selection, so that the supplement quota can be conveniently and intuitively referred.
And a data verification module: the system comprises a data acquisition module, a data storage module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by finishing quota in a new construction technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into the data storage module when the verification result is true; and when the verification result is false or an error exists, sending the verification result to the data analysis module to recalculate the supplemental quota and the complete quota. The data verification module can verify the true reliability of the basic unit price data in real time, and avoid error data, which leads to error of the supplement quota, thereby avoiding the failure to provide effective guidance for the construction production and economic activities of enterprises.
History management module: the system is used for organizing the basic unit price data, the basic quantity data, the supplement quota and the new quota data which adopt the new construction technology each time into a historical data record and storing the historical data record into the data storage module. Through the arrangement of the historical data record, the subsequent direct calling and checking can be facilitated, and therefore the calculating efficiency of the supplement quota is further improved.
And a data searching module: the method is used for acquiring the demand information of the client for the new construction technology, carrying out keyword decomposition according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client. Through the historical data record, a user can conveniently and accurately find corresponding basic unit price data or supplement quota data, so that the user can conveniently and directly apply the basic unit price data or the supplemental quota data to other engineering building projects, and the quota work efficiency is improved.
An internet + based supplementary quota measuring method, which is applied to the above device, specifically comprises the following steps:
and a data updating step: acquiring updated iteration data of new and old building technologies;
and a data storage step: acquiring quota data which is measured in the old building technology and storing the quota data in a data storage module;
and a data acquisition step: when updated iteration data is acquired, basic unit price data required by finishing quota in a new construction technology is acquired; basic quantity data of the client corresponding to the basic unit price data is also acquired;
and a data analysis step: generating a data template according to the quota data of the old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to the new building technology in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into a data storage module, performing associated storage with a new building technology, filling the supplementary quota into an vacated position in a data template, obtaining new quota data, and pushing the new quota data to a client.
And a data verification step: new basic unit price data required by finishing quota in new construction technology are collected again, the true reliability of the basic unit price data is verified according to the new basic unit price data, and when the verification result is true, the verification result is stored in the data storage module; when the verification result is false or an error exists, the data analysis step is adopted to recalculate the supplementary quota and the complete quota.
History management step: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data which adopt the new construction technology each time into a historical data record, and storing the historical data record into a data storage module.
And a data searching step: and acquiring the demand information of the client for the new construction technology, decomposing keywords according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client.
The foregoing is merely exemplary of the present invention, and the specific structures and features well known in the art will be described in detail herein, so that those skilled in the art will be able to ascertain the general knowledge of the state of the art, including the application date or the priority date, and to ascertain the general knowledge of the state of the art, without the ability to apply the general experimental means before that date, so that those skilled in the art, with the benefit of this disclosure, may make various modifications of the present invention with the ability to work itself, without the ability to work out the present invention, as such typical structures or methods would be considered to be an obstacle for those skilled in the art to practice the present invention. It should be noted that modifications and improvements can be made by those skilled in the art without departing from the structure of the present invention, and these should also be considered as the scope of the present invention, which does not affect the effect of the implementation of the present invention and the utility of the patent. The protection scope of the present application shall be subject to the content of the claims, and the description of the specific embodiments and the like in the specification can be used for explaining the content of the claims.

Claims (8)

1. An internet + based supplemental quota determination method comprising the steps of:
and a data updating step: acquiring updated iteration data of new and old building technologies;
and a data storage step: acquiring quota data which is measured in the old building technology and storing the quota data in a data storage module;
and a data acquisition step: when updated iteration data is acquired, basic unit price data required by finishing quota in a new construction technology is acquired; basic quantity data of the client corresponding to the basic unit price data is also acquired;
and a data analysis step: generating a data template according to the quota data of the old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to the new building technology in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into a data storage module, performing associated storage with a new building technology, filling the supplementary quota into an vacated position in a data template, obtaining new quota data, and pushing the new quota data to a client.
2. An internet + based supplemental quota determination method in accordance with claim 1 wherein: the method also comprises the following steps:
and a data verification step: new basic unit price data required by finishing quota in new construction technology are collected again, the true reliability of the basic unit price data is verified according to the new basic unit price data, and when the verification result is true, the verification result is stored in the data storage module; when the verification result is false or an error exists, the data analysis step is adopted to recalculate the supplementary quota and the complete quota.
3. An internet + based supplemental quota determination method in accordance with claim 2 wherein: the method also comprises the following steps:
history management step: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data which adopt the new construction technology each time into a historical data record, and storing the historical data record into a data storage module.
4. An internet + based supplemental quota determination method in accordance with claim 3 wherein: the method also comprises the following steps:
and a data searching step: and acquiring the demand information of the client for the new construction technology, decomposing keywords according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client.
5. An internet + based supplemental quota measuring device, characterized by: the system comprises a client and a server, wherein the client is in remote communication connection with the server, and the server comprises:
and a data updating module: the method comprises the steps of obtaining updated iteration data of new and old building technologies;
and a data storage module: the device is used for acquiring and storing quota data of measurement completed in the old building technology;
and a data acquisition module: when the updated iteration data is acquired, acquiring basic unit price data required by finishing quota in a new construction technology; the method is also used for acquiring basic quantity data of the client corresponding to the basic unit price data;
and a data analysis module: the method comprises the steps of generating a data template according to quota data of an old building technology, filling unchanged parts in the quota data into the data template, and freeing parts corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module and storing the supplementary quota in association with a new building technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data and pushing the new quota data to the client.
6. An internet + based supplemental quota measuring device in accordance with claim 5, wherein: the server further includes:
and a data verification module: the system comprises a data acquisition module, a data storage module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by finishing quota in a new construction technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into the data storage module when the verification result is true; and when the verification result is false or an error exists, sending the verification result to the data analysis module to recalculate the supplemental quota and the complete quota.
7. An internet + based supplemental quota measuring device as in claim 6 wherein: the server further includes:
history management module: the system is used for organizing the basic unit price data, the basic quantity data, the supplement quota and the new quota data which adopt the new construction technology each time into a historical data record and storing the historical data record into the data storage module.
8. An internet + based supplemental quota measuring device as in claim 7 wherein: the server further includes:
and a data searching module: the method is used for acquiring the demand information of the client for the new construction technology, carrying out keyword decomposition according to the demand information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing the basic unit price data, the basic quantity data and the supplementary quota corresponding to the historical data records to the client.
CN202111081122.4A 2021-09-15 2021-09-15 Internet + based supplementary quota determination method and device Active CN113722571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111081122.4A CN113722571B (en) 2021-09-15 2021-09-15 Internet + based supplementary quota determination method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111081122.4A CN113722571B (en) 2021-09-15 2021-09-15 Internet + based supplementary quota determination method and device

Publications (2)

Publication Number Publication Date
CN113722571A CN113722571A (en) 2021-11-30
CN113722571B true CN113722571B (en) 2023-06-16

Family

ID=78684032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111081122.4A Active CN113722571B (en) 2021-09-15 2021-09-15 Internet + based supplementary quota determination method and device

Country Status (1)

Country Link
CN (1) CN113722571B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106934527A (en) * 2017-02-22 2017-07-07 广东华联软件科技有限公司 A kind of enterprise model system system and method
CN107480878A (en) * 2017-08-04 2017-12-15 中国电建集团成都勘测设计研究院有限公司 Hydroelectric project Norm Measure system architecture based on " internet+"
CN110888669A (en) * 2018-09-10 2020-03-17 福建天泉教育科技有限公司 Method and system for creating template engineering on IDE
CN110991982A (en) * 2019-10-28 2020-04-10 中船重工海鑫工程管理(北京)有限公司 Construction project building information management method and system
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer
CN111652640A (en) * 2020-05-28 2020-09-11 上海上咨工程造价咨询有限公司 Civil engineering auxiliary pricing method and system for electric power project and storage medium thereof
CN111950903A (en) * 2020-08-12 2020-11-17 中铁二院工程集团有限责任公司 Method and device for generating railway engineering quota and engineering quantity based on template

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106934527A (en) * 2017-02-22 2017-07-07 广东华联软件科技有限公司 A kind of enterprise model system system and method
CN107480878A (en) * 2017-08-04 2017-12-15 中国电建集团成都勘测设计研究院有限公司 Hydroelectric project Norm Measure system architecture based on " internet+"
CN110888669A (en) * 2018-09-10 2020-03-17 福建天泉教育科技有限公司 Method and system for creating template engineering on IDE
CN110991982A (en) * 2019-10-28 2020-04-10 中船重工海鑫工程管理(北京)有限公司 Construction project building information management method and system
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer
CN111652640A (en) * 2020-05-28 2020-09-11 上海上咨工程造价咨询有限公司 Civil engineering auxiliary pricing method and system for electric power project and storage medium thereof
CN111950903A (en) * 2020-08-12 2020-11-17 中铁二院工程集团有限责任公司 Method and device for generating railway engineering quota and engineering quantity based on template

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
新型施工工法的补充定额测定及编制研究——以泥水平衡机械顶管施工为例;刘谦等;《建筑经济》;第2021年卷(第4期);74-77 *

Also Published As

Publication number Publication date
CN113722571A (en) 2021-11-30

Similar Documents

Publication Publication Date Title
CN107341098B (en) Software performance testing method, platform, equipment and storage medium
CN111767247A (en) File specification and synchronous forming control platform for real-time supervision of engineering data
CN102999524B (en) A kind of document associations search method and system
CN110728422A (en) Building information model, method, device and settlement system for construction project
CN105868956A (en) Data processing method and device
CN111414410A (en) Data processing method, device, equipment and storage medium
CN108960758A (en) Architectural engineering process control management system
CN110196849A (en) It realizes that user draws a portrait based on big data Treatment process and constructs the system and method for processing
CN113722571B (en) Internet + based supplementary quota determination method and device
CN111046382B (en) Database auditing method, equipment, storage medium and device
CN109670728B (en) Ship design quality information management system based on database
CN116645044A (en) Full-flow management method and system for scientific research device construction
CN116796950A (en) Online review system and method for power distribution network project capable of being researched
CN112348454B (en) Intelligent management and control system and method for handover test of electrical equipment
CN115599679A (en) Test rule base updating method and device, electronic equipment and storage medium
CN110597899B (en) Project expense management method and system
CN110956693B (en) Three-dimensional geological modeling method
CN112016288B (en) Method for manufacturing power grid secondary equipment fixed inspection report based on template
CN113793098B (en) BIM (building information modeling) model management system for scanning two-dimensional code by mobile equipment
CN115660019B (en) Tool data supervision system and method based on cloud computing platform
CN115146604B (en) Method, device, equipment and storage medium for generating interface technical document
CN116781745B (en) Mobile APP system for on-site monitoring of offline environment-friendly industry
CN101211426A (en) Fixture detection report automatic generation system and method
CN115629978A (en) Automatic embedded point testing method and device, electronic equipment and storage medium
CN115330220A (en) Engineering quality evaluation method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant