CN113722571A - Internet + -based supplementary quota determination method and device - Google Patents
Internet + -based supplementary quota determination method and device Download PDFInfo
- Publication number
- CN113722571A CN113722571A CN202111081122.4A CN202111081122A CN113722571A CN 113722571 A CN113722571 A CN 113722571A CN 202111081122 A CN202111081122 A CN 202111081122A CN 113722571 A CN113722571 A CN 113722571A
- Authority
- CN
- China
- Prior art keywords
- data
- quota
- new
- unit price
- basic unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005516 engineering process Methods 0.000 claims abstract description 79
- 238000013500 data storage Methods 0.000 claims abstract description 56
- 238000010276 construction Methods 0.000 claims abstract description 29
- 238000007405 data analysis Methods 0.000 claims abstract description 17
- 238000012795 verification Methods 0.000 claims description 21
- 238000012545 processing Methods 0.000 claims description 19
- 239000013589 supplement Substances 0.000 claims description 14
- 238000013524 data verification Methods 0.000 claims description 9
- 238000007726 management method Methods 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 4
- 238000000354 decomposition reaction Methods 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 9
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 230000007547 defect Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 description 7
- 238000004364 calculation method Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 230000001502 supplementing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/95—Retrieval from the web
- G06F16/951—Indexing; Web crawling techniques
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/95—Retrieval from the web
- G06F16/953—Querying, e.g. by the use of web search engines
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0278—Product appraisal
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Finance (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Accounting & Taxation (AREA)
- Economics (AREA)
- General Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of intelligent buildings, in particular to a method and a device for determining a supplementary quota based on the Internet +, wherein the method comprises the following steps: and a data updating step: acquiring updating iteration data of new and old building technologies; a data storage step: acquiring quota data which is determined in the old building technology and storing the quota data in a data storage module; a data acquisition step: acquiring basic unit price data required for completing quota in a new construction technology when updated iteration data is acquired; basic quantity data of the client corresponding to the basic unit price data are also obtained; and (3) data analysis step: and calculating the supplementary quota according to the basic unit price data and the basic quantity data, and storing the supplementary quota into the data storage module and storing the supplementary quota in association with the new construction technology. The invention can efficiently and accurately complete the project replenishment quota and overcome the defect of artificially measuring the project quota, thereby providing effective guidance for construction production and economic activities of enterprises.
Description
Technical Field
The invention relates to the technical field of intelligent buildings, in particular to a method and a device for determining a supplementary quota based on the Internet +.
Background
The project rating is the amount of labor, materials, equipment and related costs required to complete a qualified unit of building installation product under specified operating conditions. According to the composition, the method can be divided into labor quota (working hour quota or yield ration), material consumption quota, mechanical quota (construction equipment use quota, cost quota) and the like. Wherein it takes time to complete a qualified unit building installation product, and during this time period, new processes, new equipment, new technologies, new materials may appear to replace the old processes, equipment, and technologies to improve work efficiency and reduce costs. Therefore, the original project quota may no longer be applicable, and a supplementary quota needs to be compiled. The compiling method of the supplementary quota is basically the same as the traditional method for determining the engineering quota.
The traditional engineering quota determination is basically processed by manual work, because the involved calculation formula of the engineering quota is not complicated, and the manual processing is feasible. However, due to the fact that the self levels of the measuring personnel are uneven, the updating iterative technology and related data are difficult to update and search in time, and artificial subjective factors exist, the measured data have problems, the accuracy of calculation of labor quota, material consumption quota and mechanical quota is reduced, the construction quota of the enterprise cannot be accurately obtained, and effective guidance cannot be provided for construction production and economic activities of the enterprise.
Disclosure of Invention
One of the purposes of the invention is to provide a method for determining the supplementary quota based on the Internet +, which can efficiently and accurately complete the supplementary quota of the project and overcome the defect of artificially determining the quota of the project, thereby providing effective guidance for the construction production and economic activities of enterprises.
In order to achieve the above object, there is provided an internet + -based supplementary rating method, comprising the steps of:
and a data updating step: acquiring updating iteration data of new and old building technologies;
a data storage step: acquiring quota data which is determined in the old building technology and storing the quota data in a data storage module;
a data acquisition step: acquiring basic unit price data required for completing quota in a new construction technology when updated iteration data is acquired; basic quantity data of the client corresponding to the basic unit price data are also obtained;
and (3) data analysis step: generating a data template according to the quota data of the old building technology, filling the unchanged part in the quota data into the data template, and vacating the part, corresponding to the new building technology, in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, performing associated storage with the new construction technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data, and pushing the new quota data to the client.
The principle and the advantages are as follows:
1. the data updating step is arranged, so that the updating iteration data of the new building technology and the old building technology can be conveniently acquired in real time, and the technology and the data of updating iteration do not need to be known by people with time and energy, so that the quota supplementing working efficiency is improved.
2. The data storage step, the data acquisition step and the data analysis step are arranged, and the engineering quota has scientificity and legislation, and the standards such as basic unit price data and the like required by the corresponding quota in the new building technology are disclosed, so when the updated iteration data are obtained, the data storage step is used for collecting the basic unit price data required by the quota in the new building technology, and then two key data for calculating the supplement quota can be obtained by obtaining the basic quantity data of the client corresponding to the basic unit price data, wherein the basic quantity data can be directly input by the client (such as a smart phone, a tablet computer and the like), the operation is rapid and convenient, and the input efficiency is high. And in the data analysis step, a data template is generated according to the quota data of the old building technology, the unchanged part in the quota data is filled into the data template, and the part, corresponding to the new building technology, in the data template is vacated, so that the previous quota data can be conveniently checked, meanwhile, the new quota data can be obtained by combining with the supplementary quota in time, the calculation is accurate and efficient, excessive time and energy do not need to be artificially spent, the defect of artificially measuring the engineering quota is overcome, and therefore, the effective guidance is conveniently provided for the construction production and economic activities of enterprises.
Further, the method also comprises the following steps:
data verification step: newly collecting new basic unit price data required by quota completion in a new building technology, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into a data storage module when the verification result is true; when the verification result is false or error exists, the data analysis step is used for recalculating the supplementary quota and the complete quota.
The data verification step is set, so that the real reliability of the basic unit price data can be verified in real time, the condition that the supplement quota is wrong due to the fact that wrong data are obtained is avoided, and the condition that effective guidance cannot be provided for construction production and economic activities of enterprises is avoided.
Further, the history management step: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data of the new building technology into historical data records, and storing the historical data records into a data storage module.
The setting of the historical record management step can arrange basic unit price data, basic quantity data, supplementary quota and new quota data of new building technology adopted each time into historical data records, and then store the historical data records into the data storage module, so that the subsequent direct calling and checking are facilitated, and the efficiency of calculating the supplementary quota is further improved.
Further, the data searching step: acquiring demand information of a client for a new building technology, performing keyword decomposition according to the demand information, searching related historical data records from a data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client.
The data searching step is arranged, keyword decomposition can be carried out according to the requirement information, relevant historical data records are searched from the data storage module according to the decomposed keywords, and through the historical data records, a user can conveniently and accurately find corresponding basic unit price data or supplement quota data, so that the data searching step can be conveniently and directly applied to other engineering construction projects, and the quota working efficiency is improved.
Another object of the present invention is to provide an internet + -based supplementary quota measuring apparatus, including a client and a server, wherein the client is connected to the server in a remote communication manner, and the server includes:
a data updating module: the system comprises a data acquisition module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring update iteration data of new and old building technologies;
a data storage module: for acquiring and storing quota data on the completed measurements in the old construction technology;
a data acquisition module: the system is used for acquiring basic unit price data required by quota completion in the new construction technology when the updated iteration data is acquired; the system is also used for acquiring basic quantity data of the client corresponding to the basic unit price data;
a data analysis module: the system comprises a data template, a data storage module, a data processing module and a data processing module, wherein the data template is used for generating a data template according to quota data of an old building technology, filling an unchanged part in the quota data into the data template, and vacating a part corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, storing the supplementary quota in association with the new construction technology, filling the supplementary quota into the vacant position in the data template, obtaining the new quota data and pushing the new quota data to the client.
The principle and the advantages are as follows:
1. due to the arrangement of the data updating module, the updating iteration data of the new building technology and the old building technology can be conveniently acquired in real time, and the technology and the data of updating iteration do not need to be known by people with time and energy, so that the working efficiency of supplementing quota is improved.
2. The data storage module, the data acquisition module and the data analysis module are arranged, the engineering quota has scientificity and legislation, and standards such as basic unit price data and the like required by the corresponding quota in the new building technology are disclosed, so when the updated iteration data are acquired, the data storage module acquires the basic unit price data required by the quota in the new building technology, two key data for calculating the supplement quota can be obtained by acquiring the basic quantity data of the client corresponding to the basic unit price data, wherein the basic quantity data can be directly input by the client (such as a smart phone, a tablet computer and the like), the operation is rapid and convenient, and the input efficiency is high. The data analysis module can generate a data template according to the quota data of the old building technology, the unchanged part of the quota data is filled into the data template, and the part of the data template corresponding to the new building technology is vacated, so that the previous quota data can be conveniently checked, meanwhile, the new quota data can be obtained by combining the supplementary quota in time, the calculation is accurate and efficient, excessive time and energy are not needed to be manually spent, the defect of manually determining the engineering quota is overcome, and effective guidance is conveniently provided for enterprise construction production and economic activities. Further, the server further includes:
a data verification module: the system comprises a data acquisition module, a data storage module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by quota completion in a new building technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing a verification result into the data storage module when the verification result is true; and when the verification result is false or has an error, sending the verification result to a data analysis module to recalculate the supplementary quota and the complete quota.
The data verification module can verify the real reliability of the basic unit price data in real time, and avoids the situation that the supplement quota is wrong due to the fact that wrong data are obtained, so that the situation that effective guidance cannot be provided for construction production and economic activities of enterprises is avoided.
Further, the server further includes:
a history management module: the system is used for arranging basic unit price data, basic quantity data, supplementary quota and new quota data of each new building technology into historical data records and storing the historical data records into a data storage module.
The setting of historical record management module can arrange basic unit price data, basic quantity data, supplementary quota and the new quota data that adopt new construction technology at every turn into historical data record, and the prestore is in the data storage module to make things convenient for subsequent direct retrieval to look over, thereby further improve the efficiency of the calculation of supplementary quota.
Further, the data search module: the system comprises a data storage module, a client side and a data processing module, wherein the data storage module is used for storing the data of the client side, acquiring the requirement information of the client side for the new building technology, decomposing keywords according to the requirement information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client side.
The data search module is arranged to decompose the keywords according to the demand information, search related historical data records from the data storage module according to the decomposed keywords, and facilitate a user to accurately find corresponding basic unit price data or supplement quota data through the historical data records, so that the data search module can be directly applied to other engineering construction projects conveniently, and the quota working efficiency is improved.
Drawings
Fig. 1 is a logic block diagram of an internet + -based supplementary quota determining apparatus according to an embodiment of the present invention.
Detailed Description
The following is further detailed by way of specific embodiments:
examples
An internet + -based replenishment rating device substantially as shown in figure 1: the client is in remote communication connection with the server, the client is a smart phone or a tablet computer, carries the APP to be in communication connection with the server, and receives information fed back by the server. The server includes:
a data updating module: the system comprises a data acquisition module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring updated iteration data of new and old building technologies from the Internet through a web crawler technology;
a data storage module: for acquiring and storing quota data on the completed measurements in the old construction technology;
a data acquisition module: the system is used for acquiring basic unit price data required by quota completion in a new building technology when acquiring updated iteration data, and the acquisition mode of the basic unit price data is acquired from the Internet through a web crawler technology in the embodiment, and the basic unit price data can be a public standard or an enterprise self-defined standard; the data acquisition module is also used for acquiring basic quantity data of the client corresponding to the basic unit price data; the basic unit price data includes labor rate unit price, material consumption rate unit price, mechanical rate unit price, and the like, and the basic quantity data is consumption data corresponding to the labor rate unit price, the material consumption rate unit price, and the mechanical rate unit price.
A data analysis module: the system comprises a data template, a data storage module, a data processing module and a data processing module, wherein the data template is used for generating a data template according to quota data of an old building technology, filling an unchanged part in the quota data into the data template, and vacating a part corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, storing the supplementary quota in association with the new construction technology, filling the supplementary quota into the vacant position in the data template, obtaining the new quota data and pushing the new quota data to the client. In the data template, in the data table template in this embodiment, the data items of the data table template specifically include quota numbers, quota names, units, base price, unit weight, labor cost, material cost, machine cost, work content, and the like, and the positions of the supplementary quota can be marked by frame selection so as to facilitate the more intuitive lookup of the supplementary quota.
A data verification module: the system comprises a data acquisition module, a data storage module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by quota completion in a new building technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing a verification result into the data storage module when the verification result is true; and when the verification result is false or has an error, sending the verification result to a data analysis module to recalculate the supplementary quota and the complete quota. The data verification module can verify the real reliability of the basic unit price data in real time, and avoids the situation that the supplement quota is wrong due to the fact that wrong data are obtained, so that the situation that effective guidance cannot be provided for construction production and economic activities of enterprises is avoided.
A history management module: the system is used for arranging basic unit price data, basic quantity data, supplementary quota and new quota data of each new building technology into historical data records and storing the historical data records into a data storage module. Through arrangement of historical data records, subsequent direct calling and checking can be facilitated, and therefore the efficiency of calculation of the supplementary quota is further improved.
A data search module: the system comprises a data storage module, a client side and a data processing module, wherein the data storage module is used for storing the data of the client side, acquiring the requirement information of the client side for the new building technology, decomposing keywords according to the requirement information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client side. Through historical data records, a user can conveniently and accurately find corresponding basic unit price data or supplement quota data, and therefore the user can conveniently and directly apply the quota data to other engineering and building projects, and quota working efficiency is improved.
A method for determining a supplementary quota based on the Internet + is applied to the device and specifically comprises the following steps:
and a data updating step: acquiring updating iteration data of new and old building technologies;
a data storage step: acquiring quota data which is determined in the old building technology and storing the quota data in a data storage module;
a data acquisition step: acquiring basic unit price data required for completing quota in a new construction technology when updated iteration data is acquired; basic quantity data of the client corresponding to the basic unit price data are also obtained;
and (3) data analysis step: generating a data template according to the quota data of the old building technology, filling the unchanged part in the quota data into the data template, and vacating the part, corresponding to the new building technology, in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, performing associated storage with the new construction technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data, and pushing the new quota data to the client.
Data verification step: newly collecting new basic unit price data required by quota completion in a new building technology, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into a data storage module when the verification result is true; when the verification result is false or error exists, the data analysis step is used for recalculating the supplementary quota and the complete quota.
History management step: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data of the new building technology into historical data records, and storing the historical data records into a data storage module.
And a data searching step: acquiring demand information of a client for a new building technology, performing keyword decomposition according to the demand information, searching related historical data records from a data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client.
The foregoing is merely an example of the present invention, and common general knowledge in the field of known specific structures and characteristics is described herein in more detail, so that a person of ordinary skill in the art can understand all the prior art in the field and have the ability to apply routine experimentation before the present date, after knowing that all the common general knowledge in the field of the invention before the application date or the priority date of the invention, and the person of ordinary skill in the art can, in light of the teaching provided herein, combine his or her own abilities to complete and implement the present invention, and some typical known structures or known methods should not become an obstacle to the implementation of the present invention. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several changes and modifications can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.
Claims (8)
1. An internet + -based supplementary quota measuring method is characterized by comprising the following steps:
and a data updating step: acquiring updating iteration data of new and old building technologies;
a data storage step: acquiring quota data which is determined in the old building technology and storing the quota data in a data storage module;
a data acquisition step: acquiring basic unit price data required for completing quota in a new construction technology when updated iteration data is acquired; basic quantity data of the client corresponding to the basic unit price data are also obtained;
and (3) data analysis step: generating a data template according to the quota data of the old building technology, filling the unchanged part in the quota data into the data template, and vacating the part, corresponding to the new building technology, in the data template; and calculating a supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, performing associated storage with the new construction technology, filling the supplementary quota into an vacated position in the data template, obtaining new quota data, and pushing the new quota data to the client.
2. The internet + -based supplementary quota determining method as claimed in claim 1, wherein: further comprising the steps of:
data verification step: newly collecting new basic unit price data required by quota completion in a new building technology, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing the verification result into a data storage module when the verification result is true; when the verification result is false or error exists, the data analysis step is used for recalculating the supplementary quota and the complete quota.
3. The internet + -based supplementary quota determining method as claimed in claim 2, wherein: further comprising the steps of:
history management step: and arranging the basic unit price data, the basic quantity data, the supplementary quota and the new quota data of the new building technology into historical data records, and storing the historical data records into a data storage module.
4. The internet + -based supplementary quota determining method as claimed in claim 3, wherein: further comprising the steps of:
and a data searching step: acquiring demand information of a client for a new building technology, performing keyword decomposition according to the demand information, searching related historical data records from a data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client.
5. An internet + -based replenishment quota measuring apparatus, characterized in that: the system comprises a client and a server, wherein the client is in remote communication connection with the server, and the server comprises:
a data updating module: the system comprises a data acquisition module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring update iteration data of new and old building technologies;
a data storage module: for acquiring and storing quota data on the completed measurements in the old construction technology;
a data acquisition module: the system is used for acquiring basic unit price data required by quota completion in the new construction technology when the updated iteration data is acquired; the system is also used for acquiring basic quantity data of the client corresponding to the basic unit price data;
a data analysis module: the system comprises a data template, a data storage module, a data processing module and a data processing module, wherein the data template is used for generating a data template according to quota data of an old building technology, filling an unchanged part in the quota data into the data template, and vacating a part corresponding to a new building technology in the data template; the system is also used for calculating the supplementary quota according to the basic unit price data and the basic quantity data, storing the supplementary quota into the data storage module, storing the supplementary quota in association with the new construction technology, filling the supplementary quota into the vacant position in the data template, obtaining the new quota data and pushing the new quota data to the client.
6. An internet + -based supplementary quota device according to claim 5, further comprising: the server further comprises:
a data verification module: the system comprises a data acquisition module, a data storage module and a data processing module, wherein the data acquisition module is used for acquiring new basic unit price data required by quota completion in a new building technology again, verifying the real reliability of the basic unit price data according to the new basic unit price data, and storing a verification result into the data storage module when the verification result is true; and when the verification result is false or has an error, sending the verification result to a data analysis module to recalculate the supplementary quota and the complete quota.
7. An internet + -based supplementary quota device according to claim 6, further comprising: the server further comprises:
a history management module: the system is used for arranging basic unit price data, basic quantity data, supplementary quota and new quota data of each new building technology into historical data records and storing the historical data records into a data storage module.
8. An internet + -based supplementary quota device according to claim 7, further comprising: the server further comprises:
a data search module: the system comprises a data storage module, a client side and a data processing module, wherein the data storage module is used for storing the data of the client side, acquiring the requirement information of the client side for the new building technology, decomposing keywords according to the requirement information, searching related historical data records from the data storage module according to the decomposed keywords, and pushing basic unit price data, basic quantity data and supplement quota corresponding to the historical data records to the client side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111081122.4A CN113722571B (en) | 2021-09-15 | 2021-09-15 | Internet + based supplementary quota determination method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111081122.4A CN113722571B (en) | 2021-09-15 | 2021-09-15 | Internet + based supplementary quota determination method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113722571A true CN113722571A (en) | 2021-11-30 |
CN113722571B CN113722571B (en) | 2023-06-16 |
Family
ID=78684032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111081122.4A Active CN113722571B (en) | 2021-09-15 | 2021-09-15 | Internet + based supplementary quota determination method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113722571B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934527A (en) * | 2017-02-22 | 2017-07-07 | 广东华联软件科技有限公司 | A kind of enterprise model system system and method |
CN107480878A (en) * | 2017-08-04 | 2017-12-15 | 中国电建集团成都勘测设计研究院有限公司 | Hydroelectric project Norm Measure system architecture based on " internet+" |
CN110888669A (en) * | 2018-09-10 | 2020-03-17 | 福建天泉教育科技有限公司 | Method and system for creating template engineering on IDE |
CN110991982A (en) * | 2019-10-28 | 2020-04-10 | 中船重工海鑫工程管理(北京)有限公司 | Construction project building information management method and system |
CN111367939A (en) * | 2020-03-04 | 2020-07-03 | 昆明海巍科技有限公司 | System and method for compiling and managing highway engineering project account and computer |
CN111652640A (en) * | 2020-05-28 | 2020-09-11 | 上海上咨工程造价咨询有限公司 | Civil engineering auxiliary pricing method and system for electric power project and storage medium thereof |
CN111950903A (en) * | 2020-08-12 | 2020-11-17 | 中铁二院工程集团有限责任公司 | Method and device for generating railway engineering quota and engineering quantity based on template |
-
2021
- 2021-09-15 CN CN202111081122.4A patent/CN113722571B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934527A (en) * | 2017-02-22 | 2017-07-07 | 广东华联软件科技有限公司 | A kind of enterprise model system system and method |
CN107480878A (en) * | 2017-08-04 | 2017-12-15 | 中国电建集团成都勘测设计研究院有限公司 | Hydroelectric project Norm Measure system architecture based on " internet+" |
CN110888669A (en) * | 2018-09-10 | 2020-03-17 | 福建天泉教育科技有限公司 | Method and system for creating template engineering on IDE |
CN110991982A (en) * | 2019-10-28 | 2020-04-10 | 中船重工海鑫工程管理(北京)有限公司 | Construction project building information management method and system |
CN111367939A (en) * | 2020-03-04 | 2020-07-03 | 昆明海巍科技有限公司 | System and method for compiling and managing highway engineering project account and computer |
CN111652640A (en) * | 2020-05-28 | 2020-09-11 | 上海上咨工程造价咨询有限公司 | Civil engineering auxiliary pricing method and system for electric power project and storage medium thereof |
CN111950903A (en) * | 2020-08-12 | 2020-11-17 | 中铁二院工程集团有限责任公司 | Method and device for generating railway engineering quota and engineering quantity based on template |
Non-Patent Citations (1)
Title |
---|
刘谦等: "新型施工工法的补充定额测定及编制研究——以泥水平衡机械顶管施工为例", 《建筑经济》, vol. 2021, no. 4, pages 74 - 77 * |
Also Published As
Publication number | Publication date |
---|---|
CN113722571B (en) | 2023-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bailey et al. | A meta-model for software development resource expenditures | |
CA2707916C (en) | Intelligent timesheet assistance | |
CN108959059B (en) | Test method and test platform | |
CN107423214A (en) | Software regression testing use-case acquisition methods, device and storage medium and electronic equipment | |
CN113626914A (en) | Engineering project management method, device and system based on digital twins | |
US8548954B2 (en) | Archiving system for massive databases using pre-computed data lifecycles | |
WO2011145116A2 (en) | System and method for sql performance assurance services | |
CN110728422A (en) | Building information model, method, device and settlement system for construction project | |
CN101650800A (en) | Method and device for updating task content in project task plan system | |
CN109493158B (en) | Product quotation measuring and calculating method, device, computer equipment and storage medium | |
CN111414410A (en) | Data processing method, device, equipment and storage medium | |
CN112036759A (en) | Power grid engineering material list compiling and reporting method and system | |
CN115730900A (en) | Project data processing method and device, computer equipment and storage medium | |
CN114971693A (en) | Engineering cost consultation management system based on BIM | |
CN113722571A (en) | Internet + -based supplementary quota determination method and device | |
CN112861500A (en) | Engineering pricing table generation method and device based on engineering quantity list | |
CN110389944B (en) | Metadata management system and method based on model | |
CN110837530A (en) | Fault information processing method and device based on rail transit integrated equipment monitoring | |
CN110705853A (en) | Transformer substation cost dynamic management and control system and method based on BIM model | |
CN114742430A (en) | User retention early warning visualization method, device, equipment and storage medium | |
CN110597899A (en) | Project expense management method and system | |
TW200939140A (en) | System and method for maintaining and managing facility and equipment using radio frequency identification | |
CN112348454A (en) | Intelligent management and control system and method for electrical equipment handover test | |
CN115760012B (en) | Processing method and device for homeland change data | |
US8103633B2 (en) | Method and system for generic display and use of an object |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |