CN105069542A - Responsibility cost budget drafting method and system - Google Patents

Responsibility cost budget drafting method and system Download PDF

Info

Publication number
CN105069542A
CN105069542A CN201510361913.0A CN201510361913A CN105069542A CN 105069542 A CN105069542 A CN 105069542A CN 201510361913 A CN201510361913 A CN 201510361913A CN 105069542 A CN105069542 A CN 105069542A
Authority
CN
China
Prior art keywords
quantities
bill
gauge outfit
field name
advance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510361913.0A
Other languages
Chinese (zh)
Inventor
吴峰
王新民
李永顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201510361913.0A priority Critical patent/CN105069542A/en
Publication of CN105069542A publication Critical patent/CN105069542A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a responsibility cost budget drafting method and system. The method comprises guiding in a pre-decomposed engineering quantity list; and carrying out price combination on pending menus in the pre-decomposed engineering quantity list according to preset rules. With combination of a responsibility cost budget drafting idea and software, man-machine interaction is realized, site construction actual cost calculation is effectively solved, and actual requirements for cost management are met.

Description

A kind of responsibility cost budgetary technique and system
Technical field
The application relates to cost budgeting technical field, particularly relates to a kind of responsibility cost budgetary technique and system.
Background technology
At present, Construction Cost Software all adopts norm quota of consumption group valency pattern, calculate people, material, machine expense according to the work load evaluation specified in quota, unit price quota, then get enterprise administration expense, profit, set-fee and tax by the rate specified and service fee norm, gather and draw construction costs.But quota is whole nation construction average level consumption standard, cannot be completely corresponding with the actual consumption level in reality and construction technology, Extinction efficiency take part-to-item project as targetofthe plan, and the site check-up of integrated construction enterprise and the analytic target operation rank that to be granularity thinner, in addition construction enterprises do not have Extinction efficiency mostly, and along with construction technology, the continuous progress of engineering method and innovation, new technology, new material is progressively used widely, existing quota of budget cannot meet the actual management requirement of working-yard, every database resource of enterprises fails to play one's part to the full.
Summary of the invention
In view of this, this application provides a kind of method and system of responsibility cost budget compilation, to overcome the actual management requirement that construction costs of the prior art cannot meet working-yard, the problem that every database resource of enterprises can not play one's part to the full.
For achieving the above object, this application provides following scheme:
A kind of responsibility cost budgetary technique, the method comprises:
Import the bill of quantities decomposed in advance;
According to preset rules, group valency is carried out to the pending list in the described bill of quantities decomposed in advance.
Preferably, the decomposition method in advance of the described bill of quantities decomposed in advance comprises:
Import the bill of quantities built in advance;
The corresponding relation of projects level in the bill of quantities built in advance described in determining;
According to described corresponding relation, the inventory obtaining Demand levels is decomposed to the described bill of quantities built in advance.
Preferably, the method that described decomposition obtains the inventory of Demand levels comprises:
List item to be decomposed is selected in the described bill of quantities built in advance;
According to described corresponding relation by newly-increased for described list item at the same level or subordinate, until obtain the inventory of described demand levels.
Preferably, the construction method in advance of the described bill of quantities built in advance comprises:
Determine the bill of quantities that will import, and determined bill of quantities is imported;
The first gauge outfit field name is extracted from imported bill of quantities;
Described first gauge outfit field name mated with the second gauge outfit field name in criteria field name storehouse, wherein said second gauge outfit field name is the criteria field title in country or the bill of quantities that specifies of industry;
The data that each described first gauge outfit field name is corresponding are obtained from imported bill of quantities;
Under the described second gauge outfit field name that data corresponding for each described first gauge outfit field name are written to described first gauge outfit fields match, imported bill of quantities to be converted to the bill of quantities of standard, the bill of quantities of described standard is the bill of quantities write according to national regulation form.
Preferably, described construction method in advance also comprises:
List item title is extracted from the first gauge outfit field name of imported bill of quantities;
According to the list item title extracted, the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities;
According to described hierarchical relationship, determine the project code of imported bill of quantities, described project code is for determining the hierarchical relationship between bill of quantities.
A kind of responsibility cost budgeting system, this system comprises:
Resolving cell, for decomposing bill of quantities in advance;
Import unit, for importing the bill of quantities decomposed in advance;
Group valency unit, for carrying out group valency according to preset rules to the pending list in the described bill of quantities decomposed in advance.
Preferably, described resolving cell comprises:
Construction unit, for building bill of quantities in advance;
Import subelement, for importing the bill of quantities built in advance;
Determining unit, for the corresponding relation of projects level in the bill of quantities that builds in advance described in determining;
Decompose subelement, for decomposing to the described bill of quantities built in advance the inventory obtaining Demand levels according to described corresponding relation.
Preferably, described decomposition subelement comprises:
Selection unit, for selecting list item to be decomposed in the described bill of quantities built in advance;
Newly-increased bottom-ranked unit, for increasing described list item newly subordinate according to described corresponding relation, until obtain the list of described demand levels.
Preferably, described construction unit comprises:
First determines subelement, for determining the bill of quantities that will import, and is imported by determined bill of quantities;
Extraction unit, for extracting the first gauge outfit field name from imported bill of quantities;
Matching unit, for described first gauge outfit field name being mated with the second gauge outfit field name in criteria field name storehouse, wherein said second gauge outfit field name is the criteria field title in the bill of quantities of national regulation;
Acquiring unit, for obtaining data corresponding to each described first gauge outfit field name from imported bill of quantities;
Writing unit, under being written to described first gauge outfit fields match by data corresponding for each described first gauge outfit field name described second gauge outfit field name, imported bill of quantities to be converted to the bill of quantities of standard, the bill of quantities of described standard is the bill of quantities write according to national regulation form.
Preferably, described construction unit also comprises:
Title extraction unit, for extracting list item title from the first gauge outfit field name of imported bill of quantities;
Second determines subelement, for the list item title that foundation is extracted, and the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities;
3rd determines subelement, for according to described hierarchical relationship, determines the project code of imported bill of quantities, and described project code is for determining the hierarchical relationship between bill of quantities.
From above technical scheme, this application provides a kind of responsibility cost budgetary technique and system, the method comprises: import the bill of quantities decomposed in advance; According to preset rules, group valency is carried out to the pending list in the described bill of quantities decomposed in advance.The method adopts the thinking of responsibility cost establishment to combine with software, realizes human-computer interaction, solves site operation real cost efficiently and calculates and the actual needs meeting cost management.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The process flow diagram of a kind of responsibility cost budgetary technique that Fig. 1 provides for the embodiment of the present application one;
The interface schematic diagram of a kind of responsibility cost budget compilation that Fig. 2 provides for the embodiment of the present application one;
The process flow diagram of the decomposition method in advance of a kind of bill of quantities that Fig. 3 provides for the embodiment of the present application two;
The process flow diagram of the construction method of a kind of bill of quantities that Fig. 4 provides for the embodiment of the present application two;
The process flow diagram of the construction method of the another kind of bill of quantities that Fig. 5 provides for the embodiment of the present application two;
Fig. 6 for the embodiment of the present application two provide one in organize the interface schematic diagram of valency pattern;
The structural representation of a kind of responsibility cost budgeting system that Fig. 7 provides for the embodiment of the present application three;
The structural representation of a kind of resolving cell that Fig. 8 provides for the embodiment of the present application four;
The structural representation of a kind of construction unit that Fig. 9 provides for the embodiment of the present application four;
The structural representation of the another kind of construction unit that Figure 10 provides for the embodiment of the present application four.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
The present invention mainly solves that responsibility cost budget compilation under Client line is numerous and diverse, efficiency is not high, standard differs, the relevant data not problem such as good utilisation.The present invention is intended to specification and utilizes project WBS (WorkBreakdownStructure, work breakdown structure (WBS)) STRUCTURE DECOMPOSITION principle, in conjunction with feature and the actual conditions of enterprise's labor subcontracting, acceptance of the bid contract work amount inventory is rationally decomposed, increase the detailed specific item of classification, specification, reasonably calculate in corresponding specific item estimate need occur work, material, machine and other etc. cost, complete responsibility cost Budget making rapidly.
Embodiment one
The embodiment of the present application one provides a kind of responsibility cost budgetary technique, as shown in Figure 1, and the process flow diagram of a kind of responsibility cost budgetary technique that Fig. 1 provides for the embodiment of the present application one.This responsibility cost budgetary technique comprises:
S101: import the bill of quantities decomposed in advance.
In this application, in advance bill of quantities is decomposed, obtain the inventory of Demand levels.When needs carry out responsibility cost budget compilation, differentiate enters the bill of quantities decomposed in advance as required.
S102: group valency is carried out to the pending list in the bill of quantities decomposed in advance according to preset rules.
As shown in Figure 2, a kind of interface schematic diagram of responsibility cost budget compilation that provides for the embodiment of the present application one of Fig. 2.User selects certain inventory specific item in the bill of quantities decomposed in advance, if existing responsibility cost budget compilation achievement, then automatically can be loaded into existing group of valence mumber certificate in expense unit price and group valency detail; If the data such as the theoretical match ratio of current labor service subpackage guiding price, material price storehouse, mechanical price storehouse or concrete mortar no, then can be selected in group valency detail to carry out group valency.Wherein, the unit price in unit price row meeting automatic acquisition price storehouse, user can adjust according to the actual conditions of inventory specific item, after the amount is entered, automatically calculates the amount of money; The group valency content of user's also certain project reproducible pastes on sundry item, realizes the recycling of responsibility budget standard " modularization ", and then increases work efficiency.Solve the inner examine and value of program accountability cost, responsibility cost budget data obtains efficiently, Appropriate application, and then achieves the function problem such as " three ways of calculating contrast ", cost early warning of project cost control, improves project cost management and control actual effect simultaneously.
This responsibility cost budgetary technique that the application provides, project WBS STRUCTURE DECOMPOSITION principle is utilized by specification, in conjunction with feature and the actual conditions of enterprise's labor subcontracting, acceptance of the bid contract work amount inventory is rationally decomposed, according to the arrangement and method for construction to engineering project, the concrete analyses such as construction technology, calculate the work of corresponding inventory specific item, material, machine, measure, the costs such as other take, during to its group valency, must adopt unified, the labor service subpackage guide price storehouse of specification, material price storehouse, machinery price storehouse or the theoretical match ratio of concrete mortar, the company standard Pricedatas such as consumption standard carry out group valency, finally develop the projected cost that this in the detailed list completes the required expenditure of action used.By analysis and the measuring and calculating of contract anticipated revenue and responsibility cost budget, the target of prediction rate of profit of project can be drawn.By this software programming responsibility cost budget, open, transparent, standard unification; Historical relevance data can realize " modularization " of responsibility budget standard, can reuse, and then increase work efficiency.Solve the function such as " three ways of calculating contrast ", early warning of the inner examine and value of program accountability cost, project cost control simultaneously, improve the actual effect of project cost management and control.
Embodiment two
On the basis of embodiment one, the embodiment of the present application two provides another kind of responsibility cost budgetary technique.This responsibility cost budgetary technique comprises as shown in Figure 1:
S101: import the bill of quantities decomposed in advance.
In this application, in advance bill of quantities is decomposed, obtain the inventory of Demand levels.When needs carry out responsibility cost budget compilation, differentiate enters the bill of quantities decomposed in advance as required.
Concrete, as shown in Figure 3, the process flow diagram of the decomposition method in advance of a kind of bill of quantities that Fig. 3 provides for the embodiment of the present application two.This decomposition method comprises:
S201: import the bill of quantities built in advance.
Concrete, as shown in Figure 4, the process flow diagram of the construction method of a kind of bill of quantities that Fig. 4 provides for the embodiment of the present application two, this in advance construction method comprise:
S301: determine the bill of quantities that will import, and determined bill of quantities is imported.
Be understandable that: determine that the bill of quantities that will import is some bill of quantities of manually being specified by user, after user manually specifies this project amount inventory, electronic equipment obtains the link of the bill of quantities of specifying, obtain the bill of quantities carrying inventory recorded information from the memory location that link is pointed to, then the bill of quantities carrying inventory recorded information is imported.
S302: extract the first gauge outfit field name from imported bill of quantities.
Wherein the first gauge outfit field name is the parameter name of the header record of imported bill of quantities, and gauge outfit is then bill of quantities the first row, and what record under each first gauge outfit field name is the actual usage data of certain construction material.
S303: the first gauge outfit field name is mated with the second gauge outfit field name in criteria field name storehouse.
Wherein the second gauge outfit field name is the criteria field title in the bill of quantities of national regulation, by the first gauge outfit field name is mated with the second gauge outfit field name, the first gauge outfit field name of mating with the second gauge outfit field name can be carried out standardization, the bill of quantities standardization that can will import like this.
In embodiments of the present invention, determine whether the first gauge outfit field name and the second gauge outfit field name mate whether to point to same content by analysis first gauge outfit field name and the second gauge outfit field name and judge, when the first gauge outfit field name and the second gauge outfit field name point to same content, the first gauge outfit field name and the second gauge outfit field name coupling; When the first gauge outfit field name and the second gauge outfit field name point to different content, the first gauge outfit field name and the second gauge outfit field name are not mated.
Accordingly the first gauge outfit field name of mating with the second gauge outfit field name being carried out standardized a kind of feasible pattern is: the first gauge outfit field name is converted to the second gauge outfit field name of mating with it, namely adopts the word of description second gauge outfit field name to describe the first gauge outfit field name.
Be " specific item title " with the first gauge outfit field name, second gauge outfit field name is " project name " is example, point to same content by analysis specific item title and project name, then judging specific item title and project name coupling, is project name by specific item name translation.
In embodiments of the present invention, by a kind of feasible pattern that the first gauge outfit field name and the second gauge outfit field name in criteria field name storehouse carry out mating be: by the semantic analysis to the first gauge outfit field name and the second gauge outfit field name, determine the second gauge outfit field name of mating with the first gauge outfit field name, realize Auto-matching.
Another kind of feasible pattern is: be presented on interface by the second gauge outfit field name according to recording mode by column, the first gauge outfit field name extracted imported in drop-down menu.After certain second gauge outfit field name in elected median surface, from drop-down menu, choose the first gauge outfit field name of mating with the second gauge outfit field name chosen, namely mate the first gauge outfit field name and the second gauge outfit field name by manual mode of operation.Although artificial coupling gauge outfit field name can increase the importing time, reduce work efficiency, but artificial coupling gauge outfit field name can improve matching accuracy relative to semantic analysis Auto-matching, and then improves the accuracy making the bill of quantities of the standard finally obtained.
S304: obtain the data that each first gauge outfit field name is corresponding from imported bill of quantities.
S305: under the second gauge outfit field name that data corresponding for each first gauge outfit field name are written to the first gauge outfit fields match, imported bill of quantities to be converted to the bill of quantities of standard.
Wherein, the bill of quantities of standard is the bill of quantities write according to national regulation form.
As shown in Figure 5, Fig. 5 shows the process flow diagram of the construction method of the another kind of bill of quantities that the embodiment of the present application two provides.It has set forth on Fig. 4 basis, can also comprise the following steps:
S306: extract project name from the first gauge outfit field name of imported bill of quantities.
S307: according to the project name extracted, the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities.
Project code for railway inventory: " 03050301J02011101 ", wherein expense category and newly-built, reconstruct with alphabet code: construction work expense-J, installation work expense-A, other take-Q, newly-built-X, reconstruction-G.All the other codings adopt every 2 arabic numeral to be 1 group, and first 4 represent odd numbers, section number respectively, as: chapter 1 first segment is 0101, and chapter 3 Section 5 is 0305, and the rest may be inferred.Each bill of quantities is by main subordinate relation sequential organization below.As level-one item coding: 0305, secondary items is encoded: 030501, can see that secondary items coding inherits in level-one item coding 0305, can go out the secondary items coding that 030501 belongs to 0305 by automatic decision.
S308: according to hierarchical relationship, determine the project code of imported bill of quantities, project code is for determining the hierarchical relationship between bill of quantities.
For the general bill of quantities of GB, highway engineering amount inventory and quantities in railway projects inventory, extract the gauge outfit field name " description of sequence number, project code, project name, item characteristic, measurement unit, quantities, comprehensive unit price, conjunction valency, provisional estimate " of the general bill of quantities of GB; Extract the gauge outfit field name " specific item number, specific item title, unit, quantity, unit price, conjunction valency " of highway engineering amount inventory; Extract the gauge outfit field name " coding, section number, title, measurement unit, engineering quantity, comprehensive unit price, conjunction valency " of quantities in railway projects inventory.
The gauge outfit field name that the bill of quantities merging above-mentioned three like terms obtains is: " sequence number, project code, coding, specific item number, section number, project name, specific item title, item characteristic describes, measurement unit, unit, quantities, quantity, comprehensive unit price, unit price, conjunction valency, provisional estimate ", can see by analyzing, " project code, coding, specific item number " three all belong to same content, and be " project list coding " according to this content that national regulation is write, therefore by " project code, coding, specific item number " three merge into " project list coding ", " project name, specific item title " two all belong to same content, " project name " namely write according to national regulation merges, " measurement unit, unit " two all belong to same content, " unit " that namely write according to national regulation merges, " quantities, quantity " two all belong to same content, " engineering quantity " namely write according to national regulation merges, " comprehensive unit price, unit price " two all belong to same content, " unit price " namely write according to national regulation merges, and the second gauge outfit field name obtained after merging is: " project list is encoded, project name, item characteristic describes, unit, unit price, conjunction valency, provisional estimate ", the gauge outfit of the bill of quantities of type for this reason of being fixed, the bill of quantities of this type of follow-up like this importing has unique gauge head structure, on the one hand for the different industry situation of integrated construction enterprise engineering from inventory represent accomplish in form unified, the uniqueness of list on the other hand, facilitates the needs of subsequent statistical analysis data mining.
After obtaining above-mentioned second gauge outfit field name of writing according to national regulation, according to the bill of quantities form of national regulation, the second gauge outfit field name in criteria field name storehouse is sorted, the top-of-form of the bill of quantities be fixed.By the bill of quantities form of the second gauge outfit field name according to national regulation, obtain unique top-of-form meeting the bill of quantities form of national regulation, realize gauge outfit solidification.
Like this when imported bill of quantities is converted to the bill of quantities of standard, can according to top-of-form, under the second gauge outfit field name being written to the first gauge outfit fields match by data corresponding for each first gauge outfit field name successively, thus imported bill of quantities is converted to the bill of quantities of state specified standards.
S202: the corresponding relation determining each list in bill of quantities.
Concrete, corresponding relation is specifically by inventory coded representation, and in bill of quantities, the coding of each list item is unique.
S203: decompose bill of quantities according to corresponding relation, obtains the list of demand levels.
This decomposition method comprises: in the bill of quantities built in advance, select list item to be decomposed; List item is increased newly subordinate, until obtain the list of demand levels according to corresponding relation.
S102: group valency is carried out to the pending list in the bill of quantities decomposed in advance according to preset rules.
In this application, first the basic databases such as the labor service subcontracting price storehouse of Erecting and improving, material price storehouse, plant equipment price storehouse are needed, this is establishment responsibility cost budget element task, and the level of the productive forces of reaction enterprise self, rationally must determine according to the management level of enterprise self; Next is to contract quotation list specification, reasonably decomposes, and deeply will understand action and the price composition thereof of detailed catalogue simultaneously; Finally by have enrich on-site experience cost staff according to situations such as site operation scheme, technique, engineering methods, accurately the labor and materials machine cost of on-the-spot actual consumption is compiled into responsibility cost budget, can solve simultaneously early stage construction technology change or adjustment repair volume, the problems such as data correlation.
Responsibility cost Budget making needs a large amount of basic data library informations as support, the action after the decomposition of inventory specific item fully will be grasped in process, adopt the group valency pattern of the work of on-the-spot practice of construction scheme and technique, material, machine, the group valency content of preventing error or omission.Concrete, as shown in Figure 6, the interface schematic diagram of a kind of group of valency pattern that Fig. 6 provides for the embodiment of the present application two.In the detailed catalogue that purpose data classifying after work, material, machine establishment can decompose to bill of quantities by last responsibility cost budget compilation function fast and accurately, mount with bill of quantities specific item, finally realizing inventory and take in and the one_to_one corresponding of responsibility cost budget.
Under the specific item that the responsibility cost budget compilation function that the application provides is decomposed at inventory by responsibility cost budget compilation personnel, according to existing construction technology, arrangement and method for construction, the data of the database such as labor service subpackage guide price storehouse, material price storehouse, plant equipment price storehouse provided in software are provided, carry out the responsibility cost budget compilation of specific item, finally realize responsibility cost budget compilation content to mate completely with real arrangement and method for construction, technique, engineering method, achieve the establishment that responsibility cost budget is convenient, fast, efficient, real-time.This module solves the function problem such as " three ways of calculating contrast ", cost accounting, cost early warning of the inner examine and value of program accountability cost, project cost control simultaneously, improves the actual effect of project cost management and control.
The present invention is applicable to the bill of quantities of all projects in construction of Current Domestic, responsibility cost budget compilation under detailed catalogue after being decomposed by bill of quantities, realize the authentic and valid of the responsibility cost estimated cost of mating with on-the-spot practical construction process, scheme, there is applicability more widely, and data are more true and reliable.And the database source of responsibility cost budget compilation, in enterprises, more easily realizes real-time update and correction, simultaneously by setting up frequently-used data storehouse, improve the service efficiency of database, reach responsibility cost budget compilation quick, efficiently work out.The function that specific item work after the framework of responsibility cost budget can decompose inventory, material, machine data realize computing, gather, collect, stop site operation cost and inventory takes in the mistake or difference that collect and may exist in process and the revenue and costs caused analyzes unmatched situation, for later stage basic data of constructing in a large number collects and constructs detailed distribution platform with analyzing, realize collecting of data more fast and easily, improve the accuracy of data analysis, reduce the error rate of field personnel's statistics, comparative analysis simultaneously, increase work efficiency.
Embodiment three
Based on the responsibility cost budgetary technique described in embodiment one, the embodiment of the present application three provides a kind of responsibility cost budgeting system.As shown in Figure 7, a kind of structural representation of responsibility cost budgeting system that provides for the embodiment of the present application three of Fig. 7.This system comprises:
Resolving cell 501, for decomposing bill of quantities in advance;
Import unit 502, for importing the bill of quantities decomposed in advance;
Group valency unit 503, for carrying out group valency according to preset rules to the pending list in the described bill of quantities decomposed in advance.
Detailed content repeats no more in the present embodiment, can see embodiment one.
Embodiment four
On the basis of embodiment two and embodiment three, present embodiments provide one responsibility cost budgeting system more specifically.This system comprises: resolving cell, importing unit and group valency unit, wherein,
Resolving cell, for decomposing bill of quantities in advance.
Import unit, for importing the bill of quantities decomposed in advance.
Group valency unit, for carrying out group valency according to preset rules to the pending list in the described bill of quantities decomposed in advance.
Concrete, as shown in Figure 8, the structural representation of a kind of resolving cell that Fig. 8 provides for the embodiment of the present application four.Resolving cell comprises: construction unit 601, importing subelement 602, determining unit 603 Sum decomposition subelement 604, wherein,
Construction unit 601, for building bill of quantities in advance.
Concrete, as shown in Figure 9, the structural representation of a kind of construction unit that Fig. 9 provides for the embodiment of the present application four, this construction unit comprises:
First determines subelement 701, for determining the bill of quantities that will import, and is imported by determined bill of quantities.
Extraction unit 702, for extracting the first gauge outfit field name from imported bill of quantities.
Matching unit 703, for the first gauge outfit field name being mated with the second gauge outfit field name in criteria field name storehouse, wherein the second gauge outfit field name is the criteria field title in the bill of quantities of national regulation.
Acquiring unit 704, for obtaining data corresponding to each first gauge outfit field name from imported bill of quantities.
Writing unit 705, under being written to the first gauge outfit fields match by data corresponding for each first gauge outfit field name the second gauge outfit field name, imported bill of quantities to be converted to the bill of quantities of standard, the bill of quantities of standard is the bill of quantities write according to national regulation form.
As shown in Figure 10, Figure 10 shows the structural representation of the another kind of construction unit that the embodiment of the present application four provides.It has set forth on Fig. 9 basis, can also comprise: title extraction unit 706, second determines that subelement 708 determined by subelement 707, the 3rd, wherein,
Title extraction unit 706, for extracting list item title from the first gauge outfit field name of imported bill of quantities.
Second determines subelement 707, for the list item title that foundation is extracted, and the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities.
3rd determines subelement 708, for according to described hierarchical relationship, determines the project code of imported bill of quantities, and project code is for determining the hierarchical relationship between bill of quantities.
Import subelement 602, for importing the bill of quantities built in advance;
Determining unit 603, for the corresponding relation of projects level in the bill of quantities that builds in advance described in determining;
Decompose subelement 604, for decomposing to the described bill of quantities built in advance the inventory obtaining Demand levels according to described corresponding relation.
Concrete, decompose subelement and comprise:
Selection unit, for selecting list item to be decomposed in the bill of quantities built in advance;
Newly-increased bottom-ranked unit, for increasing described list item newly subordinate according to corresponding relation, until obtain the list of described demand levels.
The present invention is applicable to the bill of quantities of all projects in construction of Current Domestic, responsibility cost budget compilation under detailed catalogue after being decomposed by bill of quantities, realize the authentic and valid of the responsibility cost estimated cost of mating with on-the-spot practical construction process, scheme, there is applicability more widely, and data are more true and reliable.And the database source of responsibility cost budget compilation, in enterprises, more easily realizes real-time update and correction, simultaneously by setting up frequently-used data storehouse, improve the service efficiency of database, reach responsibility cost budget compilation quick, efficiently work out.The function that specific item work after the framework of responsibility cost budget can decompose inventory, material, machine data realize computing, gather, collect, stop site operation cost and inventory takes in the mistake or difference that collect and may exist in process and the revenue and costs caused analyzes unmatched situation, for later stage basic data of constructing in a large number collects and constructs detailed distribution platform with analyzing, realize collecting of data more fast and easily, improve the accuracy of data analysis, reduce the error rate of field personnel's statistics, comparative analysis simultaneously, increase work efficiency.
Finally, also it should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the application.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from the spirit or scope of the application, can realize in other embodiments.Therefore, the application can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a responsibility cost budgetary technique, is characterized in that, the method comprises:
Import the bill of quantities decomposed in advance;
According to preset rules, group valency is carried out to the pending list in the described bill of quantities decomposed in advance.
2. responsibility cost budgetary technique according to claim 1, is characterized in that, the decomposition method in advance of the described bill of quantities decomposed in advance comprises:
Import the bill of quantities built in advance;
The corresponding relation of projects level in the bill of quantities built in advance described in determining;
According to described corresponding relation, the inventory obtaining Demand levels is decomposed to the described bill of quantities built in advance.
3. responsibility cost budgetary technique according to claim 2, is characterized in that, the method that described decomposition obtains the inventory of Demand levels comprises:
List item to be decomposed is selected in the described bill of quantities built in advance;
According to described corresponding relation by newly-increased for described list item at the same level or subordinate, until obtain the inventory of described demand levels.
4. responsibility cost budgetary technique according to claim 2, is characterized in that, the construction method in advance of the described bill of quantities built in advance comprises:
Determine the bill of quantities that will import, and determined bill of quantities is imported;
The first gauge outfit field name is extracted from imported bill of quantities;
Described first gauge outfit field name mated with the second gauge outfit field name in criteria field name storehouse, wherein said second gauge outfit field name is the criteria field title in country or the bill of quantities that specifies of industry;
The data that each described first gauge outfit field name is corresponding are obtained from imported bill of quantities;
Under the described second gauge outfit field name that data corresponding for each described first gauge outfit field name are written to described first gauge outfit fields match, imported bill of quantities to be converted to the bill of quantities of standard, the bill of quantities of described standard is the bill of quantities write according to national regulation form.
5. responsibility cost budgetary technique according to claim 4, is characterized in that, described construction method in advance also comprises:
List item title is extracted from the first gauge outfit field name of imported bill of quantities;
According to the list item title extracted, the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities;
According to described hierarchical relationship, determine the project code of imported bill of quantities, described project code is for determining the hierarchical relationship between bill of quantities.
6. a responsibility cost budgeting system, is characterized in that, this system comprises:
Resolving cell, for decomposing bill of quantities in advance;
Import unit, for importing the bill of quantities decomposed in advance;
Group valency unit, for carrying out group valency according to preset rules to the pending list in the described bill of quantities decomposed in advance.
7. responsibility cost budgeting system according to claim 6, is characterized in that, described resolving cell comprises:
Construction unit, for building bill of quantities in advance;
Import subelement, for importing the bill of quantities built in advance;
Determining unit, for the corresponding relation of projects level in the bill of quantities that builds in advance described in determining;
Decompose subelement, for decomposing to the described bill of quantities built in advance the inventory obtaining Demand levels according to described corresponding relation.
8. responsibility cost budgeting system according to claim 7, is characterized in that, described decomposition subelement comprises:
Selection unit, for selecting list item to be decomposed in the described bill of quantities built in advance;
Newly-increased bottom-ranked unit, for increasing described list item newly subordinate according to described corresponding relation, until obtain the list of described demand levels.
9. responsibility cost budgeting system according to claim 7, is characterized in that, described construction unit comprises:
First determines subelement, for determining the bill of quantities that will import, and is imported by determined bill of quantities;
Extraction unit, for extracting the first gauge outfit field name from imported bill of quantities;
Matching unit, for described first gauge outfit field name being mated with the second gauge outfit field name in criteria field name storehouse, wherein said second gauge outfit field name is the criteria field title in the bill of quantities of national regulation;
Acquiring unit, for obtaining data corresponding to each described first gauge outfit field name from imported bill of quantities;
Writing unit, under being written to described first gauge outfit fields match by data corresponding for each described first gauge outfit field name described second gauge outfit field name, imported bill of quantities to be converted to the bill of quantities of standard, the bill of quantities of described standard is the bill of quantities write according to national regulation form.
10. responsibility cost budgeting system according to claim 9, is characterized in that, described construction unit also comprises:
Title extraction unit, for extracting list item title from the first gauge outfit field name of imported bill of quantities;
Second determines subelement, for the list item title that foundation is extracted, and the hierarchical relationship determined imported bill of quantities and imported before between bill of quantities;
3rd determines subelement, for according to described hierarchical relationship, determines the project code of imported bill of quantities, and described project code is for determining the hierarchical relationship between bill of quantities.
CN201510361913.0A 2015-06-25 2015-06-25 Responsibility cost budget drafting method and system Pending CN105069542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510361913.0A CN105069542A (en) 2015-06-25 2015-06-25 Responsibility cost budget drafting method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510361913.0A CN105069542A (en) 2015-06-25 2015-06-25 Responsibility cost budget drafting method and system

Publications (1)

Publication Number Publication Date
CN105069542A true CN105069542A (en) 2015-11-18

Family

ID=54498902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510361913.0A Pending CN105069542A (en) 2015-06-25 2015-06-25 Responsibility cost budget drafting method and system

Country Status (1)

Country Link
CN (1) CN105069542A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096997A (en) * 2016-06-01 2016-11-09 江苏国泰新点软件有限公司 Inventory composing exes, system and device
CN106934527A (en) * 2017-02-22 2017-07-07 广东华联软件科技有限公司 A kind of enterprise model system system and method
CN108830662A (en) * 2018-07-18 2018-11-16 贵州汇杰兴邦电力工程有限公司 A kind of power engineering budget device and method
CN109918401A (en) * 2019-01-25 2019-06-21 北京海数宝科技有限公司 Bill of quantities data processing method, device, storage medium and computer equipment
CN111415133A (en) * 2020-03-18 2020-07-14 成都智造天下科技有限公司 Shield project cost and benefit monitoring system
CN111489199A (en) * 2020-04-14 2020-08-04 国网甘肃省电力公司经济技术研究院 Cost method for three-dimensional design unmodeled part based on contribution inventory
CN111815015A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Engineering management optimization method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1677398A (en) * 2004-03-22 2005-10-05 微软公司 System and method for modeless data mapping with nested tables
CN1755689A (en) * 2004-09-30 2006-04-05 微软公司 Method, system, and computer-readable medium for merging data from multiple data sources for use in an electronic document
CN1940981A (en) * 2006-08-14 2007-04-04 北京金润方舟软件科技有限公司 Producer, production, applied system and method for electronic label
CN101064027A (en) * 2006-04-28 2007-10-31 施威 Architectural engineering construction technique normalizing knowledge base data structure
CN101241486A (en) * 2007-02-08 2008-08-13 佛山市顺德区顺达电脑厂有限公司 Data replication process
CN101809610A (en) * 2007-09-28 2010-08-18 微软公司 Auto-generation and syndication of tables as forms
CN103136595A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project budget generation by material and labor cost analysis

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1677398A (en) * 2004-03-22 2005-10-05 微软公司 System and method for modeless data mapping with nested tables
CN1755689A (en) * 2004-09-30 2006-04-05 微软公司 Method, system, and computer-readable medium for merging data from multiple data sources for use in an electronic document
CN101064027A (en) * 2006-04-28 2007-10-31 施威 Architectural engineering construction technique normalizing knowledge base data structure
CN1940981A (en) * 2006-08-14 2007-04-04 北京金润方舟软件科技有限公司 Producer, production, applied system and method for electronic label
CN101241486A (en) * 2007-02-08 2008-08-13 佛山市顺德区顺达电脑厂有限公司 Data replication process
CN101809610A (en) * 2007-09-28 2010-08-18 微软公司 Auto-generation and syndication of tables as forms
CN103136595A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project budget generation by material and labor cost analysis

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何银喜: "工程量清单编制中的几点体会", 《四川建材》 *
广联达: "《广联达计价软件GBQ4.0(学习版)(4.103.0.3688)》", 17 November 2010 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096997A (en) * 2016-06-01 2016-11-09 江苏国泰新点软件有限公司 Inventory composing exes, system and device
CN106934527A (en) * 2017-02-22 2017-07-07 广东华联软件科技有限公司 A kind of enterprise model system system and method
CN108830662A (en) * 2018-07-18 2018-11-16 贵州汇杰兴邦电力工程有限公司 A kind of power engineering budget device and method
CN109918401A (en) * 2019-01-25 2019-06-21 北京海数宝科技有限公司 Bill of quantities data processing method, device, storage medium and computer equipment
CN109918401B (en) * 2019-01-25 2021-10-19 北京海数宝科技有限公司 Building engineering list data processing method and device, storage medium and computer equipment
CN111415133A (en) * 2020-03-18 2020-07-14 成都智造天下科技有限公司 Shield project cost and benefit monitoring system
CN111489199A (en) * 2020-04-14 2020-08-04 国网甘肃省电力公司经济技术研究院 Cost method for three-dimensional design unmodeled part based on contribution inventory
CN111815015A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Engineering management optimization method and system

Similar Documents

Publication Publication Date Title
CN105069542A (en) Responsibility cost budget drafting method and system
Sun et al. Taxonomy for change causes and effects in construction projects
CN114511202B (en) BIM-based full-period engineering project management method and platform
CN103679373A (en) Full chain budget data processing system and method for production infrastructure standard cost system
CN104881762A (en) Engineering quantity list decomposition method and system
CN202948475U (en) Information management system of construction material
CN114049150A (en) Engineering cost accounting management system
CN107909280A (en) A kind of electricity power engineering managing and control system and its control method based on bill of quantities
CN107967522A (en) A kind of power grid technological transformation overhaul engineering Cost Management System and its control method
CN111210108A (en) Performance management and control model of electric power material supply chain
CN109064126B (en) Hydropower engineering metering information management method based on quality driving
Gil Capital budgeting and flexible manufacturing
CN113868753A (en) Intelligent metering method and device for building engineering, computing equipment and storage medium
CN111291498A (en) Steel rail section abrasion prediction system, method, computer device and storage medium
CN105069546A (en) Multi-service cost budget requirement data processing method for electric power enterprise
CN107093018A (en) Communication engineering project information method for visualizing and device based on health model
CN111507760A (en) Method and system for screening reasonableness of bidding documents
CN111105204A (en) Construction project progress reporting and managing method and information processing device
Li The application of BIM technology in the whole life cycle of construction project
Wang et al. ICCREM 2018: Innovative Technology and Intelligent Construction
Xiao et al. Study on Construction Engineering Management Based on BIM from the perspective of big data
Fini et al. Sustainable Procurement and Transport of Construction Materials
KR20210053564A (en) A method of construction information management system with using big data processing
CN111309736A (en) System, method, device and storage medium for managing rail section wear data
CN104915785A (en) Power grid enterprise renewable resource price evaluation method based on social fair value

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151118