CN106836323B - 条形基础砖混建筑物的纠偏施工方法 - Google Patents

条形基础砖混建筑物的纠偏施工方法 Download PDF

Info

Publication number
CN106836323B
CN106836323B CN201710072383.7A CN201710072383A CN106836323B CN 106836323 B CN106836323 B CN 106836323B CN 201710072383 A CN201710072383 A CN 201710072383A CN 106836323 B CN106836323 B CN 106836323B
Authority
CN
China
Prior art keywords
cushion cap
jacking
concrete
building
bar shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710072383.7A
Other languages
English (en)
Other versions
CN106836323A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Qiannan
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810347651.6A priority Critical patent/CN108532655B/zh
Priority to CN201710072383.7A priority patent/CN106836323B/zh
Priority to CN201810347608.XA priority patent/CN108505553B/zh
Publication of CN106836323A publication Critical patent/CN106836323A/zh
Application granted granted Critical
Publication of CN106836323B publication Critical patent/CN106836323B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种条形基础砖混建筑物的纠偏施工方法,其特征是施工步骤包括:(1)确定迫降区和顶升区;根据荷载分布情况计算建筑物的重心,确定建筑物的重心后划分迫降区和顶升区;(2)对承力墙进行加固;(3)对混凝土条形承台进行加固;(4)对建筑物进行顶升;(5)对建筑物进行迫降;本发明结构性能好,安全可靠。

Description

条形基础砖混建筑物的纠偏施工方法
技术领域
本发明涉及一种纠偏施工方法,特别涉及一种条形基础砖混建筑物的纠偏施工方法。
背景技术
条形基础砖混建筑物倾斜后要进行纠偏,但是纠偏过程中施工风险较大。传统方法是采用单一的迫降或顶升施工方法,无论那种方法施工中产生的应力都很大,有必要对传统方法进行调整。由于砖混结构的承力墙刚度和强度相对于框架结构要差很多,在迫降或顶升施工过程中会产生较大的次生应力,如果不对其进行加固,有可能会造成结构破坏,产生安全问题。建筑物迫降或顶升施工过程中会对混凝土基础产生较大的次生应力,也对混凝土条形承台可能造成破坏。
发明内容
本发明是提供一种条形基础砖混建筑物的纠偏施工方法,解决纠偏施工安全的问题。
本发明施工步骤包括:
(1)确定迫降区和顶升区;
根据荷载分布情况计算建筑物的重心,确定建筑物的重心后划分迫降区和顶升区;迫降或顶升施工是以横向基础轴线作为操作单元,横向基础轴线是指短边基础轴线,在相同横向基础轴线的迫降量或顶升量是相同的,迫降量或顶升量是根据每条横向基础轴线的平均纠偏量来确定的;每条横向基础轴线设置8~10个沉降观测点,根据8-10个沉降观测点的平均值来确定平均纠偏量。
(2)对承力墙进行加固;
加固步骤采用如下:首先剥离承力墙的粉刷,然后再承力墙的砖表面挂设加固筋,加固筋直径为14~16mm,加固筋间距为350~400mm,加固筋每隔400~500mm焊接锚固筋,锚固筋直径为14~16mm,锚固筋伸入承力墙的砖灰缝进行锚固;锚固完毕后对加固筋进行预应力张拉;预应力张拉后的加固筋变成折线形;用固定筋将相邻的加固筋进行固定。
(3)对混凝土条形承台进行加固;
基础加固采用如下:混凝土条形承台侧边植入钢筋,植入钢筋直径为25~32mm,植入钢筋分布间距为400~450mm;植入钢筋具体步骤为:在混凝土条形承台侧边钻设预留孔,预留孔深度为300~350mm,预留孔直径为27~34mm,然后在预留孔插入钢筋,预留孔和钢筋之间空隙采用高强度环氧树脂胶进行封闭;植入钢筋施工完毕后对混凝土条形承台进行加固,混凝土条形承台加固结构采用方形承台,方形承台对混凝土条形承台进行加宽且加高,方形承台将混凝土条形承台包裹在里面,加宽量根据迫降量或顶升量确定,当迫降量或顶升量小于或等于30mm,混凝土条形承台每边加宽200mm,混凝土条形承台加高量为100mm;当迫降量或顶升量大于30mm且小于或等于50mm,混凝土条形承台每边加宽400mm,混凝土条形承台加高量为200mm;当迫降量或顶升量大于50mm且小于或等于70mm,混凝土条形承台每边加宽600mm,混凝土条形承台加高量为300mm;当迫降量或顶升量大于70mm,混凝土条形承台每边加宽800mm,混凝土条形承台加高量为400mm。方形承台混凝土强度采用C30以上。
(4)对建筑物进行顶升;
由于对建筑物进行迫降时会对建筑物地基土产生扰动从而影响顶升效果,故先对建筑物进行顶升,然后再对建筑物进行迫降。
最少顶升点数量根据下式来确定:n=kP/N,n为顶升点数量;k为安全系数,取值为1.5;P为上部总荷载;N为顶升支承点的荷载设计值,取0.8倍的千斤顶额定工作荷载。确定出最少顶升点数量后,再根据建筑物荷载布置情况进行设置顶升点,顶升点间距为0.8~1.5m,当最少顶升点数量不够布置时,增加顶升点数量。顶升点布置要避开门窗洞口,当门窗洞口宽度大于1.2m时,门窗洞口下面增加混凝土过梁进行加固。
(5)对建筑物进行迫降;
离混凝土条形承台边缘200mm处垂直钻孔,钻孔深度为20~30m,钻孔直径为150~200mm。将钻杆用高压胶管与高压泵相连,通过高压泵向孔内输送清水。清水从喷头体上的喷嘴中以高压水射流的形式喷出,对地基土形成切割破坏作用,高压水压力控制在1.5~2.5MPa,流量控制在40~45L/min。被切割的地基土与水一起搅和,形成泥浆后返回地面。经高压水射流切割后,基础之下便形成了一个泥浆柱。
本发明结构性能好,安全可靠。
附图说明
图1为承力墙加固示意图,图2为混凝土条形承台加固示意图。
各附图中:1、加固筋,2、预应力张拉后的加固筋,3、固定筋,4、植入钢筋,5、方形承台,6、混凝土条形承台。
具体实施方式
本实施例施工步骤包括:
(1)确定迫降区和顶升区;
根据荷载分布情况计算建筑物的重心,确定建筑物的重心后划分迫降区和顶升区;迫降或顶升施工是以横向基础轴线作为操作单元,横向基础轴线是指短边基础轴线,在相同横向基础轴线的迫降量或顶升量是相同的,迫降量或顶升量是根据每条横向基础轴线的平均纠偏量来确定的;每条横向基础轴线设置8~10个沉降观测点,根据8-10个沉降观测点的平均值来确定平均纠偏量。
(2)对承力墙进行加固;
加固步骤采用如下:首先剥离承力墙的粉刷,然后再承力墙的砖表面挂设加固筋,加固筋直径为14~16mm,加固筋间距为350~400mm,加固筋每隔400~500mm焊接锚固筋,锚固筋直径为14~16mm,锚固筋伸入承力墙的砖灰缝进行锚固;锚固完毕后对加固筋进行预应力张拉;预应力张拉后的加固筋变成折线形;用固定筋将相邻的加固筋进行固定。
(3)对混凝土条形承台进行加固;
基础加固采用如下:混凝土条形承台侧边植入钢筋,植入钢筋直径为25~32mm,植入钢筋分布间距为400~450mm;植入钢筋具体步骤为:在混凝土条形承台侧边钻设预留孔,预留孔深度为300~350mm,预留孔直径为27~34mm,然后在预留孔插入钢筋,预留孔和钢筋之间空隙采用高强度环氧树脂胶进行封闭;植入钢筋施工完毕后对混凝土条形承台进行加固,混凝土条形承台加固结构采用方形承台,方形承台对混凝土条形承台进行加宽且加高,方形承台将混凝土条形承台包裹在里面,加宽量根据迫降量或顶升量确定,当迫降量或顶升量小于或等于30mm,混凝土条形承台每边加宽200mm,混凝土条形承台加高量为100mm;当迫降量或顶升量大于30mm且小于或等于50mm,混凝土条形承台每边加宽400mm,混凝土条形承台加高量为200mm;当迫降量或顶升量大于50mm且小于或等于70mm,混凝土条形承台每边加宽600mm,混凝土条形承台加高量为300mm;当迫降量或顶升量大于70mm,混凝土条形承台每边加宽800mm,混凝土条形承台加高量为400mm。这里混凝土条形承台加高量就是附图中阴影部分高度。方形承台混凝土强度采用C30以上。
(4)对建筑物进行顶升;
最少顶升点数量根据下式来确定:n=kP/N,n为顶升点数量;k为安全系数,取值为1.5;P为上部总荷载;N为顶升支承点的荷载设计值,取0.8倍的千斤顶额定工作荷载。确定出最少顶升点数量后,再根据建筑物荷载布置情况进行设置顶升点,顶升点间距为0.8~1.5m,当最少顶升点数量不够布置时,增加顶升点数量。顶升点布置要避开门窗洞口,当门窗洞口宽度大于1.2m时,门窗洞口下面增加混凝土过梁进行加固。
(5)对建筑物进行迫降;
离混凝土条形承台边缘200mm处垂直钻孔,钻孔深度为20~30m,钻孔直径为150~200mm。将钻杆用高压胶管与高压泵相连,通过高压泵向孔内输送清水。清水从喷头体上的喷嘴中以高压水射流的形式喷出,对地基土形成切割破坏作用,高压水压力控制在1.5~2.5MPa,流量控制在40~45L/min。被切割的地基土与水一起搅和,形成泥浆后返回地面。经高压水射流切割后,基础之下便形成了一个泥浆柱。

Claims (1)

1.一种条形基础砖混建筑物的纠偏施工方法,其特征是施工步骤包括:
(1)确定迫降区和顶升区;
根据荷载分布情况计算建筑物的重心,确定建筑物的重心后划分迫降区和顶升区;迫降或顶升施工是以横向基础轴线作为操作单元,在相同横向基础轴线的迫降量或顶升量是相同的,迫降量或顶升量是根据每条横向基础轴线的平均纠偏量来确定的;每条横向基础轴线设置8~10个沉降观测点,根据8~10个沉降观测点的平均值来确定平均纠偏量;
(2)对承力墙进行加固;
承力墙加固步骤采用如下:首先剥离承力墙的粉刷,然后在承力墙的砖表面挂设加固筋,加固筋直径为14~16mm,加固筋间距为350~400mm,加固筋每隔400~500mm焊接锚固筋,锚固筋直径为14~16mm,锚固筋伸入承力墙的砖灰缝进行锚固;锚固完毕后对加固筋进行预应力张拉;预应力张拉后的加固筋变成折线形;用固定筋将相邻的加固筋进行固定;
(3)对混凝土条形承台进行加固;
基础加固采用如下:混凝土条形承台侧边植入钢筋,植入钢筋直径为25~32mm,植入钢筋分布间距为400~450mm;植入钢筋具体步骤为:在混凝土条形承台侧边钻设预留孔,预留孔深度为300~350mm,预留孔直径为27~34mm,然后在预留孔插入钢筋,预留孔和钢筋之间空隙采用高强度环氧树脂胶进行封闭;植入钢筋施工完毕后对混凝土条形承台进行加固,混凝土条形承台加固结构采用方形承台,方形承台对混凝土条形承台进行加宽且加高,方形承台将混凝土条形承台包裹在里面,方形承台混凝土强度采用C30以上;
(4)对建筑物进行顶升;
最少顶升点数量根据下式来确定:n=kP/N,n为顶升点数量;k为安全系数,取值为1.5;P为上部总荷载;N为顶升支承点的荷载设计值,取0.8倍的千斤顶额定工作荷载;确定出最少顶升点数量后,再根据建筑物荷载布置情况进行设置顶升点,顶升点间距为0.8~1.5m,当最少顶升点数量不够布置时,增加顶升点数量;
(5)对建筑物进行迫降;
离混凝土条形承台边缘200mm处垂直钻孔,钻孔深度为20~30m,钻孔直径为150~200mm;将钻杆用高压胶管与高压泵相连,通过高压泵向孔内输送清水;清水从喷头体上的喷嘴中以高压水射流的形式喷出,对地基土形成切割破坏作用,高压水压力控制在1.5~2.5MPa,流量控制在40~45L/min;被切割的地基土与水一起搅和,形成泥浆后返回地面;经高压水射流切割后,基础之下便形成了一个泥浆柱。
CN201710072383.7A 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏施工方法 Expired - Fee Related CN106836323B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810347651.6A CN108532655B (zh) 2017-01-21 2017-01-21 砖混建筑物的纠偏施工方法
CN201710072383.7A CN106836323B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏施工方法
CN201810347608.XA CN108505553B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072383.7A CN106836323B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏施工方法

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810347608.XA Division CN108505553B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏方法
CN201810347651.6A Division CN108532655B (zh) 2017-01-21 2017-01-21 砖混建筑物的纠偏施工方法

Publications (2)

Publication Number Publication Date
CN106836323A CN106836323A (zh) 2017-06-13
CN106836323B true CN106836323B (zh) 2018-09-18

Family

ID=59122296

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810347651.6A Active CN108532655B (zh) 2017-01-21 2017-01-21 砖混建筑物的纠偏施工方法
CN201710072383.7A Expired - Fee Related CN106836323B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏施工方法
CN201810347608.XA Active CN108505553B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810347651.6A Active CN108532655B (zh) 2017-01-21 2017-01-21 砖混建筑物的纠偏施工方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201810347608.XA Active CN108505553B (zh) 2017-01-21 2017-01-21 条形基础砖混建筑物的纠偏方法

Country Status (1)

Country Link
CN (3) CN108532655B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08239861A (ja) * 1995-03-03 1996-09-17 Shimizu Corp 基礎構造および基礎の構築方法
CN1208103A (zh) * 1998-07-16 1999-02-17 赵启 建筑物整体平移的装置和方法
CN101691765A (zh) * 2009-09-21 2010-04-07 唐业清 复杂地基双灰井柱应力解除协调纠倾法
CN106120811A (zh) * 2016-08-24 2016-11-16 中天建设集团有限公司天津分公司 一种基坑周边预防变形和纠偏施工方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913416A (ja) * 1995-06-27 1997-01-14 Daito Kogyo Kk 沈下した建物の修正方法
JP3804063B2 (ja) * 2001-10-15 2006-08-02 株式会社佐藤住建 建造物における基礎構造の補強構造及び補強工法
CN100386781C (zh) * 2005-07-12 2008-05-07 范晓征 具有身份码功能的对讲机遥控装置
CN101725258B (zh) * 2008-10-30 2012-09-19 上海天演建筑物移位工程有限公司 古建筑物整体顶升方法
CN101994325B (zh) * 2010-12-22 2012-11-28 建研地基基础工程有限责任公司 一种加固基础及提高既有建筑刚性基础抗弯剪能力的方法
CN107227860B (zh) * 2016-02-17 2019-06-11 朱奎 砖墙预应力加固结构
CN106320403A (zh) * 2016-09-20 2017-01-11 武汉理工大学 既有建筑纠倾加固方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08239861A (ja) * 1995-03-03 1996-09-17 Shimizu Corp 基礎構造および基礎の構築方法
CN1208103A (zh) * 1998-07-16 1999-02-17 赵启 建筑物整体平移的装置和方法
CN101691765A (zh) * 2009-09-21 2010-04-07 唐业清 复杂地基双灰井柱应力解除协调纠倾法
CN106120811A (zh) * 2016-08-24 2016-11-16 中天建设集团有限公司天津分公司 一种基坑周边预防变形和纠偏施工方法

Also Published As

Publication number Publication date
CN106836323A (zh) 2017-06-13
CN108505553A (zh) 2018-09-07
CN108532655A (zh) 2018-09-14
CN108505553B (zh) 2019-12-03
CN108532655B (zh) 2019-11-29

Similar Documents

Publication Publication Date Title
CN108343260B (zh) 倾斜建筑物纠偏加固结构及其施工方法
CN107435346A (zh) 一种适用于高层建筑结构的注浆加固纠偏方法
CN106013171B (zh) 一种深基坑侧壁的半刚性半柔性支护结构和方法
CN103603358B (zh) 一种多平台围护结构及施工方法
CN107366284B (zh) 降低回落土厚度的湿陷性黄土挤密桩施工装置及施工方法
CN103541352B (zh) 一种在砂土地层大直径高承台桩地下地上连续施工方法
CN203795446U (zh) 一种钢板混凝土沉井
CN101250878A (zh) 一种用无嵌固端桩锚结合锚板墙的深基坑支护方法
CN105040712A (zh) 一种软硬破碎互层式复合岩质边坡高压冲洗植锚回灌综合生态防护结构及其施工方法
CN205954638U (zh) 一种深基坑侧壁的半刚性半柔性支护结构
CN107100160B (zh) 一种用于下水库拦沙坝振冲碎石桩的施工工艺
CN112411610A (zh) 一种桩基托换施工方法
CN108797578A (zh) 带分级扩大头的碎石注浆桩及其施工方法
CN108239975A (zh) 一种组合式基坑支护桩和一种组合式基坑支护方式
CN109680737A (zh) 一种风力发电机组基础偏差修正施工方法
CN103603357B (zh) 一种多平台无内支撑自防水基坑围护结构及其施工方法
CN109056710B (zh) 一种硬质地层钢管桩及其施工方法
CN108797323B (zh) 一种适用于硬质地层的钢栈桥
CN101148888B (zh) 气压沉箱锚桩自主纠偏装置
CN110387886A (zh) 人防工程基坑支护结构及其施工方法
CN104153355B (zh) 混凝土桩的施工装置及其施工方法
CN106836323B (zh) 条形基础砖混建筑物的纠偏施工方法
CN107503355B (zh) 外排后插型钢式双排桩基坑支护体系及其施工方法
CN216339582U (zh) 一种用于基坑支护的组合斜向支撑
CN113266019B (zh) 一种基坑钢管支撑体系的施工工法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201230

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210430

Address after: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee after: Li Qiannan

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180918

CF01 Termination of patent right due to non-payment of annual fee