CN106818264A - A kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope - Google Patents

A kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope Download PDF

Info

Publication number
CN106818264A
CN106818264A CN201710203769.7A CN201710203769A CN106818264A CN 106818264 A CN106818264 A CN 106818264A CN 201710203769 A CN201710203769 A CN 201710203769A CN 106818264 A CN106818264 A CN 106818264A
Authority
CN
China
Prior art keywords
arbor
circular steel
taproot
steel pile
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710203769.7A
Other languages
Chinese (zh)
Other versions
CN106818264B (en
Inventor
项鹏飞
马亚男
顾晨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201710203769.7A priority Critical patent/CN106818264B/en
Publication of CN106818264A publication Critical patent/CN106818264A/en
Application granted granted Critical
Publication of CN106818264B publication Critical patent/CN106818264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G7/00Botany in general
    • A01G7/06Treatment of growing trees or plants, e.g. for preventing decay of wood, for tingeing flowers or wood, for prolonging the life of plants
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C23/00Distributing devices specially adapted for liquid manure or other fertilising liquid, including ammonia, e.g. transport tanks or sprinkling wagons
    • A01C23/02Special arrangements for delivering the liquid directly into the soil
    • A01C23/023Special arrangements for delivering the liquid directly into the soil for liquid or gas fertilisers
    • A01C23/025Continuous injection tools
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Forests & Forestry (AREA)
  • Water Supply & Treatment (AREA)
  • Wood Science & Technology (AREA)
  • Botany (AREA)
  • Piles And Underground Anchors (AREA)
  • Hydroponics (AREA)

Abstract

The present invention relates to a kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope, circular steel pile tube 3~6m long and less than the length of main root after system of taproot arbor Cheng Shu used, wherein circular steel pile tube demifacet is uniformly drilled with fibrous root and portals, every circular steel pile tube matches somebody with somebody a plant nutrition liquid dispatch tube, plant nutrition liquid transmission bottom of the tube is portalled in cone with some nutrient solutions.It is used to coordinate the circular steel pile tube and its construction method of system of taproot arbor reinforcing side slope using this, under the induction of nutrient solution, along the oblique growth of circular steel pile tube, the later stage is under gravity for system of taproot arbor main root for early stage, system of taproot arbor main root longitudinal growth, gos deep into supporting course.Usefulness of the present invention:The phenomenon of early stage poor processing effect when can avoid tree planting reinforcing side slope;Effect compared to common tree planting reinforcing side slope is more excellent;Some Slope Treatment methods can be avoided simultaneously needs secondary greening construction after side slope has been processed.

Description

A kind of circular steel pile tube and its construction for coordinating system of taproot arbor reinforcing side slope Method
Technical field
The present invention relates to slope reinforcement field, more particularly to a kind of circular steel for coordinating system of taproot arbor reinforcing side slope Pile tube and its construction method.
Background technology
China since the reform and opening-up, sky way, the highway in mountain area just in carrying out like a raging fire, at these During the construction of highway, it may appear that substantial amounts of side slope needs to protect, reinforces.The processing method of current side slope is although numerous, but mostly Planting greening will be again carried out after side slope has been processed, repetition can be produced to construct, the construction period is often more long;If directly using Plant trees the mode reinforced, the very short consolidation effect of root of early stage trees is poor, and the root of plant is and vertically grows up, effect is not most It is good.Constantly invention, improvement, so as to further improve construction quality, creates bigger warp suitable for the reinforcement means of different side slopes Ji benefit is very necessary.
The content of the invention
Pointedly to solve the above problems, the present invention proposes a kind of circle for coordinating system of taproot arbor reinforcing side slope Steel-pipe pile and its construction method.Using a kind of circular steel pile tube for coordinating system of taproot arbor reinforcing side slope of the invention and its Construction method, the phenomenon of early stage poor processing effect when can avoid tree planting reinforcing side slope;Early stage arbor main root of the present invention is in plant In the presence of nutrient solution, grown along circular steel pile tube, later stage main root longitudinally gos deep into supporting course, compared to common tree planting reinforcing edge The effect on slope is more excellent;Some Slope Treatment methods can be avoided simultaneously needs secondary greening construction after side slope has been processed.
In order to realize above-mentioned technical purpose, present invention employs following technical scheme:
A kind of circular steel pile tube for coordinating system of taproot arbor reinforcing side slope, it is characterised in that:Circular steel pile tube is long by 3~ 6m and less than the length of main root after system of taproot arbor Cheng Shu used, thickness 5~20mm, wherein 60~80cm of diameter, round steel pipe Stake demifacet is equably drilled with fibrous root and portals, a diameter of 2~5cm that fibrous root portals, and every circular steel pile tube takes root in thing equipped with one Nutrient solution dispatch tube.
A kind of circular steel pile tube for coordinating system of taproot arbor reinforcing side slope, it is characterised in that:The plant nutrition liquid Transmission length of tube is suitable with circular steel pile tube, a diameter of 6~8cm;Plant nutrition liquid transmission bottom of the tube in cone, and if with Dry nutrient solution portals, and nutrient solution goes out bore dia less than 10mm;The plant nutrition liquid dispatch tube nutritious liquid inlet hole in top and use stopper Clog;Plant nutrition liquid dispatch tube is made up of highstrenghtpiston.
A kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope, it is characterised in that including Following steps:
1) material prepares:According to construction environment, suitable system of taproot arbor is chosen some;According to side slope actual conditions and institute With arbor, choose appropriate length, diameter, thickness circular steel pile tube it is some;According to selected system of taproot arbor, it is determined that properly Fibrous root go out bore dia, uniformly boring fibrous root to every circular steel pile tube demifacet portals;Diameter according to selected circular steel pile tube, Length, determines the length and diameter of plant nutrition liquid dispatch tube, makes plant nutrition liquid dispatch tube some.
2) prepare before constructing:Place is peaceful, and machine-walking track laying, machinery is marched into the arena.
3) circular steel pile tube implantation:By the implantation of circular steel pile tube, it is ensured that there is what fibrous root portalled partly to face up.
4) arbor is planted:System of taproot arbor is planted in every circular steel pile tube, has what fibrous root portalled in circular steel pile tube Demifacet is inserted into plant nutrition liquid dispatch tube, it is ensured that nutrient solution portals down, and plant nutrition liquid dispatch tube insertion depth compares taproot It is arbor main root depth 3cm or so.
5) construction is completed:After system of taproot arbor has been planted, plant nutrition liquid is filled in plant nutrition liquid dispatch tube, Demolition Construction equipment, place cleaning.
6) follow-up work:With the growth of plant, at regular intervals to adding plant in whole plant nutrition liquid dispatch tube Nutrient solution, adjusts plant nutrition liquid dispatch tube insertion depth at regular intervals, keeps plant nutrition liquid dispatch tube insertion depth Than system of taproot arbor main root depth 3cm or so, until after in the fully-inserted soil body of plant nutrition liquid dispatch tube, reclaiming plant nutrition liquid Dispatch tube.
The invention has the characteristics that and beneficial effect:
1. circular steel pile tube demifacet of the present invention is uniformly drilled with fibrous root and portals, and arbor fibrous root can go out toward fibrous root Grown at hole.
2. the present invention uses circular steel pile tube and the system of taproot arbor reinforcing side slope together, before can overcoming tree planting reinforcing side slope The shortcoming that phase, consolidation effect was poor because plant roots are short, can overcome some method for reinforcing side slope to be needed after side slope has been processed The shortcoming of secondary greening construction.
3. system of taproot arbor early stage of the present invention is under the induction of nutrition fluid catheter, arbor main root along the oblique growth of steel-pipe pile, Later stage, supporting course was goed deep into arbor main root longitudinal growth, and such slope reinforcement effect is reinforced better than common tree planting under gravity Side slope.
4. plant nutrition liquid dispatch tube of the present invention is made up of highstrenghtpiston, repeats and utilizes.
Brief description of the drawings
A kind of circular steel pile tube overall schematics for coordinating system of taproot arbor reinforcing side slope of Fig. 1.
Fig. 2 nutrient solution dispatch tube generalized sections.
Fig. 3 circular steel pile tube schematic diagrames.
Label declaration in figure:1- circular steel pile tubes, 2- fibrous roots, 3- system of taproot arbors, 4- main roots, the transmission of 5- plant nutrition liquids Pipe, 6- side slopes, 7- soft layers, 8- supporting courses, 9- stoppers, 10- nutrient solutions portal, and 11- fibrous roots portal.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that the present invention is realized are easy to understand, further Illustrate the present invention.
Reinforcing of the present invention for side slope.
Represented by Fig. 1 is a kind of circular steel pile tube overall schematic of cooperation system of taproot arbor reinforcing side slope, and early stage is straight Under the induction of nutrient solution, along the oblique growth of circular steel pile tube 1, fibrous root 2 gets out the palpus of circular steel pile tube 1 to the main root 4 of root system arbor 3 Root portals 11, the vertical growth under gravity of the main root 4 of later stage system of taproot arbor 3, gos deep into supporting course 8.Represented by Fig. 2 is battalion Nutrient solution dispatch tube generalized section, the nutritious liquid inlet hole in the upper end of nutrient solution dispatch tube 5, is clogged, nutrient solution dispatch tube 5 with stopper 9 The nutritious liquid in lower end portals 10.Represented by Fig. 3 is circular steel pile tube schematic diagram, and the demifacet of circular steel pile tube 1 is uniformly drilled with palpus Root portals 11.
A kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope, it is characterised in that including Following steps:
1) material prepares:According to construction environment, suitable system of taproot arbor 3 is chosen some;According to the actual conditions of side slope 6 and System of taproot arbor 3 used, choose appropriate length, diameter, thickness circular steel pile tube 1 it is some;It is tall according to the selected system of taproot Wood 3,11 diameters it is determined that suitable fibrous root portals uniformly bore fibrous root to the every demifacet of circular steel pile tube 1 and portal 11;According to selected The diameter of circular steel pile tube 1, length, determine the length and diameter of plant nutrition liquid dispatch tube 5, make plant nutrition liquid dispatch tube 5 is some.
2) prepare before constructing:Place is peaceful, and machine-walking track laying, machinery is marched into the arena.
3) circular steel pile tube implantation:Circular steel pile tube 1 is implanted into, it is ensured that there is fibrous root to portal and 11 partly face up.
4) arbor is planted:Plantation system of taproot arbor 3, has fibrous root to portal in circular steel pile tube 1 in every circular steel pile tube 1 11 demifacet is inserted into plant nutrition liquid dispatch tube 5, it is ensured that nutrient solution portals 10 down, and plant nutrition liquid dispatch tube 5 inserts depth Degree is than the depth of 3 main root of system of taproot arbor 4 3cm or so.
5) construction is completed:After system of taproot arbor 3 has been planted, plant nutrient is filled in plant nutrition liquid dispatch tube 5 Liquid, Demolition Construction equipment, place cleaning.
6) follow-up work:With the growth of plant, sought to addition plant in plant nutrition liquid dispatch tube 5 at regular intervals Nutrient solution, adjusts the insertion depth of plant nutrition liquid dispatch tube 5 at regular intervals, keeps the insertion depth of plant nutrition liquid dispatch tube 5 Than the depth of 3 main root of system of taproot arbor 4 3cm or so, until after in the fully-inserted soil body of plant nutrition liquid dispatch tube 5, reclaiming plant battalion Nutrient solution dispatch tube 5.

Claims (3)

1. a kind of circular steel pile tube for coordinating system of taproot arbor reinforcing side slope, it is characterised in that:Circular steel pile tube (1) long 3 ~6m and less than the length of main root (4) after system of taproot arbor (3) Cheng Shu used, thickness 5~20mm, 60~80cm of diameter, wherein Circular steel pile tube (1) demifacet is uniformly drilled with fibrous root and portals (11), and fibrous root portals a diameter of 2~5cm of (11), and every circle Steel-pipe pile (1) is equipped with a plant nutrition liquid dispatch tube (5).
2. a kind of circular steel pile tube for coordinating system of taproot arbor reinforcing side slope according to claims 1, its feature It is:Plant nutrition liquid dispatch tube (5) length is suitable with circular steel pile tube (1), a diameter of 6~8cm;Plant nutrition liquid is passed Pipe (5) bottom is sent in cone, and is portalled (10) with some nutrient solutions, nutrient solution portals (10) diameter less than 10mm;Plant Nutrient solution dispatch tube (5) the nutritious liquid inlet hole in top and clogged with stopper (9);Plant nutrition liquid dispatch tube (5) is by high intensity Plastics are made.
3. a kind of construction method for coordinating the circular steel pile tube of system of taproot arbor reinforcing side slope, it is characterised in that including following Step:
1) material prepares:According to construction environment, suitable system of taproot arbor (3) is chosen some;According to side slope (6) actual conditions and System of taproot arbor (3) used, choose appropriate length, diameter, thickness circular steel pile tube (1) it is some;According to selected taproot It is arbor (3), (11) diameter it is determined that suitable fibrous root portals uniformly bores fibrous root and portals to every circular steel pile tube (1) demifacet (11);According to diameter, the length of selected circular steel pile tube (1), the length and diameter of plant nutrition liquid dispatch tube (5) are determined, Make plant nutrition liquid dispatch tube (5) some.
2) prepare before constructing:Place is peaceful, and machine-walking track laying, machinery is marched into the arena.
3) circular steel pile tube implantation:By circular steel pile tube (1) implantation, it is ensured that there is fibrous root to portal partly the facing up of (11).
4) arbor is planted:Plantation system of taproot arbor (3), has fibrous root to go out in circular steel pile tube (1) in every circular steel pile tube (1) The demifacet in hole (11) is inserted into plant nutrition liquid dispatch tube (5), it is ensured that nutrient solution portals (10) down, plant nutrition liquid dispatch tube (5) insertion depth is than system of taproot arbor (3) main root (4) depth 3cm or so.
5) construction is completed:After system of taproot arbor (3) has been planted, plant nutrient is filled in plant nutrition liquid dispatch tube (5) Liquid, Demolition Construction equipment, place cleaning.
6) follow-up work:With the growth of plant, at regular intervals to addition plant nutrient in plant nutrition liquid dispatch tube (5) Liquid, adjusts plant nutrition liquid dispatch tube (5) insertion depth at regular intervals, keeps plant nutrition liquid dispatch tube (5) insertion deep Degree is than system of taproot arbor (3) main root (4) depth 3cm or so, until after in plant nutrition liquid dispatch tube (5) fully-inserted soil body, returning Receive plant nutrition liquid dispatch tube (5).
CN201710203769.7A 2017-03-30 2017-03-30 Construction method of circular steel pipe pile for reinforcing side slope by matching with straight root system arbor Active CN106818264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710203769.7A CN106818264B (en) 2017-03-30 2017-03-30 Construction method of circular steel pipe pile for reinforcing side slope by matching with straight root system arbor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710203769.7A CN106818264B (en) 2017-03-30 2017-03-30 Construction method of circular steel pipe pile for reinforcing side slope by matching with straight root system arbor

Publications (2)

Publication Number Publication Date
CN106818264A true CN106818264A (en) 2017-06-13
CN106818264B CN106818264B (en) 2023-05-05

Family

ID=59141643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710203769.7A Active CN106818264B (en) 2017-03-30 2017-03-30 Construction method of circular steel pipe pile for reinforcing side slope by matching with straight root system arbor

Country Status (1)

Country Link
CN (1) CN106818264B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109819815A (en) * 2019-02-26 2019-05-31 南京林业大学 Road surface is avoided to be encircleed bad plantation circle by Tree root system
CN110644508A (en) * 2019-10-10 2020-01-03 重庆科技学院 Slope reinforcement construction method of vegetation combined microorganisms and thin-wall steel pipe for construction
CN111887058A (en) * 2020-07-27 2020-11-06 宁波市天莱园林建设工程有限公司 Slope ecological reinforcement structure
CN112195954A (en) * 2020-09-08 2021-01-08 王生东 Reinforcing pile for wetland soft soil construction and installation method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1743387A1 (en) * 1990-08-29 1992-06-30 Научно-производственное объединение "Элита Поволжья" Ravine stabilization method
JPH06280266A (en) * 1993-03-26 1994-10-04 Hara Sogyo Kk Slope greening execution method by spraying concrete
JP2000273871A (en) * 1999-03-23 2000-10-03 Sankyo Engineering:Kk Slope stabilizing construction method
JP2001123451A (en) * 1999-10-25 2001-05-08 Nittoc Constr Co Ltd Vegetation block, and method of greening slope by vegetation block
CN2923823Y (en) * 2006-07-24 2007-07-18 浙江华东建设工程有限公司 Concrete edge slope recovering structure
CN101502223A (en) * 2009-03-31 2009-08-12 云南路桥股份有限公司 Slope soil-establishing greening apparatus and method
CN102964040A (en) * 2012-11-30 2013-03-13 南京大学 In-situ repair method for polluted sediment nitrogen nutritive salt and in-situ repairing pile applied to in-situ repair method
CN103931371A (en) * 2013-01-22 2014-07-23 黄璞 Stone side slope biological control method
CN104429535A (en) * 2014-12-06 2015-03-25 山东胜伟园林科技有限公司 Slope greening method
CN104770270A (en) * 2015-04-17 2015-07-15 三峡大学 Shrub planting method in slope protection and seedling protecting cover thereof
CN105200998A (en) * 2015-09-07 2015-12-30 北京林业大学 Planting structure and ecological slope protection structure
CN206743973U (en) * 2017-03-30 2017-12-15 安徽理工大学 A kind of circular steel pile tube for being used to coordinate system of taproot arbor reinforcing side slope

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1743387A1 (en) * 1990-08-29 1992-06-30 Научно-производственное объединение "Элита Поволжья" Ravine stabilization method
JPH06280266A (en) * 1993-03-26 1994-10-04 Hara Sogyo Kk Slope greening execution method by spraying concrete
JP2000273871A (en) * 1999-03-23 2000-10-03 Sankyo Engineering:Kk Slope stabilizing construction method
JP2001123451A (en) * 1999-10-25 2001-05-08 Nittoc Constr Co Ltd Vegetation block, and method of greening slope by vegetation block
CN2923823Y (en) * 2006-07-24 2007-07-18 浙江华东建设工程有限公司 Concrete edge slope recovering structure
CN101502223A (en) * 2009-03-31 2009-08-12 云南路桥股份有限公司 Slope soil-establishing greening apparatus and method
CN102964040A (en) * 2012-11-30 2013-03-13 南京大学 In-situ repair method for polluted sediment nitrogen nutritive salt and in-situ repairing pile applied to in-situ repair method
CN103931371A (en) * 2013-01-22 2014-07-23 黄璞 Stone side slope biological control method
CN104429535A (en) * 2014-12-06 2015-03-25 山东胜伟园林科技有限公司 Slope greening method
CN104770270A (en) * 2015-04-17 2015-07-15 三峡大学 Shrub planting method in slope protection and seedling protecting cover thereof
CN105200998A (en) * 2015-09-07 2015-12-30 北京林业大学 Planting structure and ecological slope protection structure
CN206743973U (en) * 2017-03-30 2017-12-15 安徽理工大学 A kind of circular steel pile tube for being used to coordinate system of taproot arbor reinforcing side slope

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109819815A (en) * 2019-02-26 2019-05-31 南京林业大学 Road surface is avoided to be encircleed bad plantation circle by Tree root system
CN109819815B (en) * 2019-02-26 2023-10-20 南京林业大学 Planting ring capable of avoiding road surface from being arched and damaged by arbor root system
CN110644508A (en) * 2019-10-10 2020-01-03 重庆科技学院 Slope reinforcement construction method of vegetation combined microorganisms and thin-wall steel pipe for construction
CN111887058A (en) * 2020-07-27 2020-11-06 宁波市天莱园林建设工程有限公司 Slope ecological reinforcement structure
CN111887058B (en) * 2020-07-27 2021-12-21 宁波市天莱园林建设工程有限公司 Slope ecological reinforcement structure
CN112195954A (en) * 2020-09-08 2021-01-08 王生东 Reinforcing pile for wetland soft soil construction and installation method
CN112195954B (en) * 2020-09-08 2021-12-10 上海民航新时代机场设计研究院有限公司 Reinforcing pile for wetland soft soil construction and installation method

Also Published As

Publication number Publication date
CN106818264B (en) 2023-05-05

Similar Documents

Publication Publication Date Title
CN106818264A (en) A kind of circular steel pile tube and its construction method for coordinating system of taproot arbor reinforcing side slope
CN104234667B (en) Bittern irrigation canals and ditches and its system and excavation method
CN204948911U (en) Can be used for seedling to plant and light section of thick bamboo of growing seedlings of transplanting
CN106376276A (en) Automatic hole digger for planting seedlings
CN206743973U (en) A kind of circular steel pile tube for being used to coordinate system of taproot arbor reinforcing side slope
CN107690884A (en) One kind is digged pit equipment
CN103125296B (en) Plant water retention pit and water retention method of Yunnan phosphorite refuse dumps
CN209314391U (en) A kind of container for plant growth
CN106305259A (en) Arbor planting moisture absorption root in bare rock area and use method thereof
CN206389838U (en) A kind of device of promotion saline cistanche development growth
CN209011085U (en) A kind of Ecotypic Stone Mesh-box planting pot
CN111657091A (en) Planting method for greening trees and supporting bracket used for method
CN206136618U (en) Pre -buried and seedling planting perforating device of hand -held type permeation irrigation ware
CN204851069U (en) Well equipment is beaten fast to sleeve pipe
CN206517862U (en) Cobble seepage well
CN105724202B (en) A kind of liquid manure device for supplying leading directly to big usage tree root
CN105200998A (en) Planting structure and ecological slope protection structure
CN202819192U (en) Rapid nutrient and water supplement device for large tree transplanting
CN204940307U (en) Pattern of farming and ecological slope protection structure
CN207075341U (en) A kind of underground drip irrigation pipe
CN108739258A (en) A kind of Arid desert region shrubbery sand drift collection rain method for recovering vegetation
CN205124492U (en) Cliff side slope pipe shape afforestation equipment
CN210695148U (en) Water and soil loss prevention structure for limestone mountain vegetation zone
CN202310559U (en) Yam cultivation guide device
CN203492489U (en) Planting mechanism for large-specification arbor in clayed soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant