CN106803162A - A kind of three-dimensional construction operation guidance method based on BIM technology - Google Patents
A kind of three-dimensional construction operation guidance method based on BIM technology Download PDFInfo
- Publication number
- CN106803162A CN106803162A CN201611099624.9A CN201611099624A CN106803162A CN 106803162 A CN106803162 A CN 106803162A CN 201611099624 A CN201611099624 A CN 201611099624A CN 106803162 A CN106803162 A CN 106803162A
- Authority
- CN
- China
- Prior art keywords
- bim
- threedimensional models
- construction
- method based
- bim threedimensional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/20—Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Software Systems (AREA)
- Entrepreneurship & Innovation (AREA)
- Computer Graphics (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- Architecture (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of three-dimensional construction operation guidance method based on BIM technology, comprise the following steps:1 sets up BIM threedimensional models;2 pairs foundation BIM threedimensional models optimize, it is perfect;3 models are managed with relevant documentation, audio;Model is uploaded to network by 4, and generates the Quick Response Code of download address;The download model of Quick Response Code 6 of 5 distribution download address simultaneously checks simulation;The quality of engineering can be ensured by the method, efficiency of construction is improved, and reduce overall construction cost.
Description
Technical field
It is to be related to a kind of based on BIM technology three in particular the present invention relates to a kind of architecture information construction method
Dimension construction operation guidance method.
Background technology
Housing industrialization is carried out energetically by country at this stage, and housing industrialization refers to just the mode produced of recruitment industry metaplasia to be built
House, that is, be substantially carried out the construction of assembly concrete component system.Assembled architecture is constructed compared with conventional wet trade, is being applied
Have in work efficiency rate and improve to a certain extent.Assembled architecture construction be substantially carried out production prefabricated components, prefabricated components transport with
The operation that stacking, in-site installation hang.With the implementation of industrialization, planar figure can not meet building unit
Need, especially complex component, while in work progress, it is difficult that building unit also faces prefabricated components fine-grained management
The problems such as degree is big, big, the specialized construction ability culture difficulty of design and construction slitless connection difficulty is big, so as to cause to produce component
When do over again or adjust temporarily, manufacturing schedule is influenceed, in addition, because housing industrialization is that country enters 2 years and just rises
, also there is the phenomenon such as lack experience in many management or workmen, therefore cause the prefabricated components can not to enter according to normal procedure
Row produces and exists when prefabricated components are produced many quality problems.
The content of the invention
The present invention seeks to:A kind of three-dimensional construction operation guidance method based on BIM technology is provided, so as to improve communication
Efficiency and accuracy, it is ensured that construction quality, reduces cost.
The technical scheme is that:
A kind of three-dimensional construction operation guidance method based on BIM technologies, management or workmen for guiding construction scene are entered
Row operation, comprises the following steps:
Step 1:Set up BIM threedimensional models;
Step 2:To set up BIM threedimensional models optimize, it is perfect;
Step 3:BIM threedimensional models are associated to related document, audio after improving;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address
Dimension code;
Step 5:Distribute the Quick Response Code of download address;
Step 6:Management or workmen download BIM threedimensional models by barcode scanning, check and simulate BIM threedimensional models;
Step 7:When there is problem in BIM threedimensional models, management or workmen are fed back, and return to step 2, are otherwise tied
Line journey.
Further, BIM threedimensional models can be according to construction procedure stage by stage after the step 1 sets up BIM threedimensional models
Show or hide BIM threedimensional models.
Further, the stage include project verification, design, preparation of construction, construction, 5 stages of final acceptance of construction.
Further, the step 3 can carry out the association of relevant documentation, audio for different phase.
Further, the step 5 distributes the Quick Response Code of download address or by download address by way of short message, mail
Quick Response Code print on paper after distribution.
Further, simulated in the step 6 BIM threedimensional models will BIM threedimensional models import in the middle of NAVISWORKS,
Construction simulation is carried out, and generates the corresponding simulation animation for instructing prefabricated components to construct.
The present invention(Invention)Beneficial effect be:(1)Communication exchange visual pattern, information transmission precise and high efficiency, reduce
Because information transmission is inaccurate or cognitive misreads the phenomenon of doing over again that causes, it is ensured that construction quality, efficiency of construction is improve, reduced
Construction cost;(2)Information transmission is more authentic and valid, for the homogeneous structure of disparity items, only need to be to model, document or audio
It is modified slightly being capable of achieving function reproduction, reduces the labour intensity of administrative staff;(3)Due to being a new technology, Ren Yuandou
There is curiosity, while study application new communication mode, deepened the impression to construction quality standard and key points for operation,
Construction quality is more secure.
Brief description of the drawings
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
Fig. 1 is process flow diagram of the invention.
Specific embodiment
Specific embodiment of the invention is described as follows with reference to shown in accompanying drawing:A kind of three-dimensional construction based on BIM technologies
Task instruction method, management or workmen for guiding construction scene carry out operation, comprise the following steps:
Step 1:BIM threedimensional models are set up, model includes agent structure and auxiliary construction facility, and wherein agent structure includes steel
Muscle, concrete, prestressing force and all kinds of built-in fittings, the auxiliary construction facility model such as including construction equipment, equipment, support, template;
Step 2:To set up BIM threedimensional models optimize, it is perfect, in step one set up BIM threedimensional models carry out power
Learn, the test in space, until test passes, export perfect BIM threedimensional models;
Step 3:BIM threedimensional models are associated to related document, audio after improving, and associate related operation requirement, matter
Amount standard, plant, key Quality Control and security civilization environmental protection points for attention, can also be aided with regarding for similar engineering construction
Frequently, simulation animation, construction photo, design drawing, explain the means such as audio to be explained;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address
Dimension code;
Step 5:Distribute the Quick Response Code of download address, the Quick Response Code of download address is distributed by way of short message, mail or by under
The Quick Response Code of set address is distributed after printing on paper;
Step 6:Management or workmen pass through mobile end equipment(Mobile phone, panel computer etc.)Barcode scanning downloads BIM threedimensional models, leads to
Cross and move end equipment(Mobile phone, panel computer etc.)Check threedimensional model and associated document, video, audio, drawing or figure
Piece data, understands and grasps essentials for Construction Control, and simulates BIM threedimensional models, and simulation BIM threedimensional models will BIM three-dimensional moulds
Type is imported in the middle of NAVISWORKS, carries out construction simulation, and generate the corresponding simulation animation for instructing prefabricated components to construct;
Step 7:When there is problem in BIM threedimensional models, management or workmen are fed back, and return to step 2, are otherwise tied
Line journey.
In the present embodiment, BIM threedimensional models can be according to construction procedure point after the step 1 sets up BIM threedimensional models
Stage show or hide BIM threedimensional model, the stage includes project verification, design, preparation of construction, construction, 5 ranks of final acceptance of construction
Section, and step 3 can carry out the association of relevant documentation, audio for different phase.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and technique is familiar with its object is to allow
People will appreciate that present disclosure and implement according to this that it is not intended to limit the scope of the present invention.It is all according to this hair
The modification that the Spirit Essence of bright main technical schemes is done, should all be included within the scope of the present invention.
Claims (6)
1. a kind of three-dimensional construction operation guidance method based on BIM technology, management or workmen for guiding construction scene
Operation is carried out, is comprised the following steps:
Step 1:Set up BIM threedimensional models;
Step 2:To set up BIM threedimensional models optimize, it is perfect;
Step 3:BIM threedimensional models are associated to related document, audio after improving;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address
Dimension code;
Step 5:Distribute the Quick Response Code of download address;
Step 6:Management or workmen download BIM threedimensional models by barcode scanning, check and simulate BIM threedimensional models;
Step 7:When there is problem in BIM threedimensional models, management or workmen carry out feedback opinion, and return to step 2, no
Then terminate flow.
2. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step
Rapid 1 sets up after BIM threedimensional models BIM threedimensional models can be according to construction procedure show or hide BIM threedimensional models stage by stage.
3. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The rank
Section includes project verification, design, preparation of construction, construction, 5 stages of final acceptance of construction.
4. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:Further
, the step 3 can carry out the association of relevant documentation, audio for different phase.
5. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step
Rapid 5 Quick Response Codes for being distributed download address by way of short message, mail are printed on rear point on paper the Quick Response Code of download address
Hair.
6. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step
Simulated in rapid 6 BIM threedimensional models will BIM threedimensional models import in software, carry out construction simulation, and generate and corresponding instruct pre-
The simulation animation of component construction processed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611099624.9A CN106803162A (en) | 2016-12-02 | 2016-12-02 | A kind of three-dimensional construction operation guidance method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611099624.9A CN106803162A (en) | 2016-12-02 | 2016-12-02 | A kind of three-dimensional construction operation guidance method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106803162A true CN106803162A (en) | 2017-06-06 |
Family
ID=58984002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611099624.9A Pending CN106803162A (en) | 2016-12-02 | 2016-12-02 | A kind of three-dimensional construction operation guidance method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106803162A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457504A (en) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | A kind of building method of BIM assembly integrated intelligents substation |
CN108665527A (en) * | 2018-03-26 | 2018-10-16 | 中铁四局集团第二工程有限公司 | A kind of technical annotation in construction method based on panoramic technique and BIM models |
CN109376395A (en) * | 2018-09-26 | 2019-02-22 | 中建五局第三建设有限公司 | A kind of architectural design management method and system |
CN109508493A (en) * | 2018-11-12 | 2019-03-22 | 中国十七冶集团有限公司 | A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance |
CN109977486A (en) * | 2019-03-05 | 2019-07-05 | 中国电力工程顾问集团西南电力设计院有限公司 | A kind of transmission line of electricity ring water based on life cycle management protects the construction method of scheme |
CN113408261A (en) * | 2021-08-10 | 2021-09-17 | 广东新瑞智安科技有限公司 | Method and system for generating job requisition |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463950A (en) * | 2014-10-29 | 2015-03-25 | 中冶天工集团有限公司 | Two-dimension code information identification method of furnace kiln refractory 3D model |
CN104573254A (en) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | Pre-construction technical disclosure method based on BIM |
-
2016
- 2016-12-02 CN CN201611099624.9A patent/CN106803162A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463950A (en) * | 2014-10-29 | 2015-03-25 | 中冶天工集团有限公司 | Two-dimension code information identification method of furnace kiln refractory 3D model |
CN104573254A (en) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | Pre-construction technical disclosure method based on BIM |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108665527A (en) * | 2018-03-26 | 2018-10-16 | 中铁四局集团第二工程有限公司 | A kind of technical annotation in construction method based on panoramic technique and BIM models |
CN108665527B (en) * | 2018-03-26 | 2022-07-08 | 中铁四局集团第二工程有限公司 | Construction technology bottom crossing method based on panoramic technology and BIM model |
CN108457504A (en) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | A kind of building method of BIM assembly integrated intelligents substation |
CN109376395A (en) * | 2018-09-26 | 2019-02-22 | 中建五局第三建设有限公司 | A kind of architectural design management method and system |
CN109508493A (en) * | 2018-11-12 | 2019-03-22 | 中国十七冶集团有限公司 | A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance |
CN109977486A (en) * | 2019-03-05 | 2019-07-05 | 中国电力工程顾问集团西南电力设计院有限公司 | A kind of transmission line of electricity ring water based on life cycle management protects the construction method of scheme |
CN113408261A (en) * | 2021-08-10 | 2021-09-17 | 广东新瑞智安科技有限公司 | Method and system for generating job requisition |
CN113408261B (en) * | 2021-08-10 | 2021-12-14 | 广东新瑞智安科技有限公司 | Method and system for generating job requisition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106803162A (en) | A kind of three-dimensional construction operation guidance method based on BIM technology | |
CN105888248A (en) | Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology | |
CN106779476A (en) | A kind of Construction Schedule management platform and method based on BIM IFC technologies | |
CN103903038A (en) | System for dynamically displaying two-dimension codes and implementation method and application thereof | |
CN110287613A (en) | The method and its system of BIM guiding construction operation | |
CN104575150A (en) | Multi-user online cooperating method, device and system for power simulation training | |
CN105975655A (en) | BIM-based parametric modeling method for imitated Tang and Song dynasty ancient building special-shaped roof tiles | |
CN108427802A (en) | A kind of Deepen Design technique drawing generating method and device based on BIM | |
CN115374509A (en) | BIM model drawing generation method, device, equipment and readable storage medium | |
CN108629057A (en) | A method of generating BIM models | |
CN103310668A (en) | Method for realizing electric equipment maintenance multi-task multi-role collaborative interaction | |
CN105242928A (en) | Rapid development platform method based on module plant | |
CN106803163A (en) | A kind of method of telling somebody what one's real intentions are based on AR technologies | |
CN114896677A (en) | Construction simulation method and system based on BIM model | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks | |
CN114547761A (en) | High-precision model-based prefabricated part steel bar optimization method and system | |
CN113205607A (en) | Immersive virtual reality interactive teaching system for building assembly and using method | |
Chin et al. | A QR-based materials building system to support outdoor teaching activities | |
Kazarinov et al. | International experience and development trends of information modeling technology in relation to the life cycle of railway infrastructure facilities | |
Zhang et al. | Construction of basic education cloud computing platform based on virtualization technology | |
CN111080771B (en) | Information model construction method applied to three-dimensional intelligent aided design | |
You | Analysis on Reformation of Digital Management Education of Prefabricated Construction Project Under the Background of Intelligent Construction | |
KR20040019437A (en) | Generation system of a steel frame drawing | |
Leite et al. | Additive manufacturing and the evolution of the construction industry: A systematic literature review 2015-2021 | |
Esposito et al. | Giocare seriamente per crescere digitali |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170606 |
|
RJ01 | Rejection of invention patent application after publication |