CN106803162A - A kind of three-dimensional construction operation guidance method based on BIM technology - Google Patents

A kind of three-dimensional construction operation guidance method based on BIM technology Download PDF

Info

Publication number
CN106803162A
CN106803162A CN201611099624.9A CN201611099624A CN106803162A CN 106803162 A CN106803162 A CN 106803162A CN 201611099624 A CN201611099624 A CN 201611099624A CN 106803162 A CN106803162 A CN 106803162A
Authority
CN
China
Prior art keywords
bim
threedimensional models
construction
method based
bim threedimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611099624.9A
Other languages
Chinese (zh)
Inventor
任世朋
孙小猛
赵飞
王宁平
刘乐
张勇
朱元元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201611099624.9A priority Critical patent/CN106803162A/en
Publication of CN106803162A publication Critical patent/CN106803162A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/20Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computer Graphics (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Architecture (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of three-dimensional construction operation guidance method based on BIM technology, comprise the following steps:1 sets up BIM threedimensional models;2 pairs foundation BIM threedimensional models optimize, it is perfect;3 models are managed with relevant documentation, audio;Model is uploaded to network by 4, and generates the Quick Response Code of download address;The download model of Quick Response Code 6 of 5 distribution download address simultaneously checks simulation;The quality of engineering can be ensured by the method, efficiency of construction is improved, and reduce overall construction cost.

Description

A kind of three-dimensional construction operation guidance method based on BIM technology
Technical field
It is to be related to a kind of based on BIM technology three in particular the present invention relates to a kind of architecture information construction method Dimension construction operation guidance method.
Background technology
Housing industrialization is carried out energetically by country at this stage, and housing industrialization refers to just the mode produced of recruitment industry metaplasia to be built House, that is, be substantially carried out the construction of assembly concrete component system.Assembled architecture is constructed compared with conventional wet trade, is being applied Have in work efficiency rate and improve to a certain extent.Assembled architecture construction be substantially carried out production prefabricated components, prefabricated components transport with The operation that stacking, in-site installation hang.With the implementation of industrialization, planar figure can not meet building unit Need, especially complex component, while in work progress, it is difficult that building unit also faces prefabricated components fine-grained management The problems such as degree is big, big, the specialized construction ability culture difficulty of design and construction slitless connection difficulty is big, so as to cause to produce component When do over again or adjust temporarily, manufacturing schedule is influenceed, in addition, because housing industrialization is that country enters 2 years and just rises , also there is the phenomenon such as lack experience in many management or workmen, therefore cause the prefabricated components can not to enter according to normal procedure Row produces and exists when prefabricated components are produced many quality problems.
The content of the invention
The present invention seeks to:A kind of three-dimensional construction operation guidance method based on BIM technology is provided, so as to improve communication Efficiency and accuracy, it is ensured that construction quality, reduces cost.
The technical scheme is that:
A kind of three-dimensional construction operation guidance method based on BIM technologies, management or workmen for guiding construction scene are entered Row operation, comprises the following steps:
Step 1:Set up BIM threedimensional models;
Step 2:To set up BIM threedimensional models optimize, it is perfect;
Step 3:BIM threedimensional models are associated to related document, audio after improving;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address Dimension code;
Step 5:Distribute the Quick Response Code of download address;
Step 6:Management or workmen download BIM threedimensional models by barcode scanning, check and simulate BIM threedimensional models;
Step 7:When there is problem in BIM threedimensional models, management or workmen are fed back, and return to step 2, are otherwise tied Line journey.
Further, BIM threedimensional models can be according to construction procedure stage by stage after the step 1 sets up BIM threedimensional models Show or hide BIM threedimensional models.
Further, the stage include project verification, design, preparation of construction, construction, 5 stages of final acceptance of construction.
Further, the step 3 can carry out the association of relevant documentation, audio for different phase.
Further, the step 5 distributes the Quick Response Code of download address or by download address by way of short message, mail Quick Response Code print on paper after distribution.
Further, simulated in the step 6 BIM threedimensional models will BIM threedimensional models import in the middle of NAVISWORKS, Construction simulation is carried out, and generates the corresponding simulation animation for instructing prefabricated components to construct.
The present invention(Invention)Beneficial effect be:(1)Communication exchange visual pattern, information transmission precise and high efficiency, reduce Because information transmission is inaccurate or cognitive misreads the phenomenon of doing over again that causes, it is ensured that construction quality, efficiency of construction is improve, reduced Construction cost;(2)Information transmission is more authentic and valid, for the homogeneous structure of disparity items, only need to be to model, document or audio It is modified slightly being capable of achieving function reproduction, reduces the labour intensity of administrative staff;(3)Due to being a new technology, Ren Yuandou There is curiosity, while study application new communication mode, deepened the impression to construction quality standard and key points for operation, Construction quality is more secure.
Brief description of the drawings
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
Fig. 1 is process flow diagram of the invention.
Specific embodiment
Specific embodiment of the invention is described as follows with reference to shown in accompanying drawing:A kind of three-dimensional construction based on BIM technologies Task instruction method, management or workmen for guiding construction scene carry out operation, comprise the following steps:
Step 1:BIM threedimensional models are set up, model includes agent structure and auxiliary construction facility, and wherein agent structure includes steel Muscle, concrete, prestressing force and all kinds of built-in fittings, the auxiliary construction facility model such as including construction equipment, equipment, support, template;
Step 2:To set up BIM threedimensional models optimize, it is perfect, in step one set up BIM threedimensional models carry out power Learn, the test in space, until test passes, export perfect BIM threedimensional models;
Step 3:BIM threedimensional models are associated to related document, audio after improving, and associate related operation requirement, matter Amount standard, plant, key Quality Control and security civilization environmental protection points for attention, can also be aided with regarding for similar engineering construction Frequently, simulation animation, construction photo, design drawing, explain the means such as audio to be explained;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address Dimension code;
Step 5:Distribute the Quick Response Code of download address, the Quick Response Code of download address is distributed by way of short message, mail or by under The Quick Response Code of set address is distributed after printing on paper;
Step 6:Management or workmen pass through mobile end equipment(Mobile phone, panel computer etc.)Barcode scanning downloads BIM threedimensional models, leads to Cross and move end equipment(Mobile phone, panel computer etc.)Check threedimensional model and associated document, video, audio, drawing or figure Piece data, understands and grasps essentials for Construction Control, and simulates BIM threedimensional models, and simulation BIM threedimensional models will BIM three-dimensional moulds Type is imported in the middle of NAVISWORKS, carries out construction simulation, and generate the corresponding simulation animation for instructing prefabricated components to construct;
Step 7:When there is problem in BIM threedimensional models, management or workmen are fed back, and return to step 2, are otherwise tied Line journey.
In the present embodiment, BIM threedimensional models can be according to construction procedure point after the step 1 sets up BIM threedimensional models Stage show or hide BIM threedimensional model, the stage includes project verification, design, preparation of construction, construction, 5 ranks of final acceptance of construction Section, and step 3 can carry out the association of relevant documentation, audio for different phase.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and technique is familiar with its object is to allow People will appreciate that present disclosure and implement according to this that it is not intended to limit the scope of the present invention.It is all according to this hair The modification that the Spirit Essence of bright main technical schemes is done, should all be included within the scope of the present invention.

Claims (6)

1. a kind of three-dimensional construction operation guidance method based on BIM technology, management or workmen for guiding construction scene Operation is carried out, is comprised the following steps:
Step 1:Set up BIM threedimensional models;
Step 2:To set up BIM threedimensional models optimize, it is perfect;
Step 3:BIM threedimensional models are associated to related document, audio after improving;
Step 4:BIM threedimensional models after association are uploaded to network, and using the two of two-dimension code generator generation download address Dimension code;
Step 5:Distribute the Quick Response Code of download address;
Step 6:Management or workmen download BIM threedimensional models by barcode scanning, check and simulate BIM threedimensional models;
Step 7:When there is problem in BIM threedimensional models, management or workmen carry out feedback opinion, and return to step 2, no Then terminate flow.
2. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step Rapid 1 sets up after BIM threedimensional models BIM threedimensional models can be according to construction procedure show or hide BIM threedimensional models stage by stage.
3. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The rank Section includes project verification, design, preparation of construction, construction, 5 stages of final acceptance of construction.
4. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:Further , the step 3 can carry out the association of relevant documentation, audio for different phase.
5. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step Rapid 5 Quick Response Codes for being distributed download address by way of short message, mail are printed on rear point on paper the Quick Response Code of download address Hair.
6. the three-dimensional construction operation guidance method based on BIM technology according to claim 1, it is characterised in that:The step Simulated in rapid 6 BIM threedimensional models will BIM threedimensional models import in software, carry out construction simulation, and generate and corresponding instruct pre- The simulation animation of component construction processed.
CN201611099624.9A 2016-12-02 2016-12-02 A kind of three-dimensional construction operation guidance method based on BIM technology Pending CN106803162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611099624.9A CN106803162A (en) 2016-12-02 2016-12-02 A kind of three-dimensional construction operation guidance method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611099624.9A CN106803162A (en) 2016-12-02 2016-12-02 A kind of three-dimensional construction operation guidance method based on BIM technology

Publications (1)

Publication Number Publication Date
CN106803162A true CN106803162A (en) 2017-06-06

Family

ID=58984002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611099624.9A Pending CN106803162A (en) 2016-12-02 2016-12-02 A kind of three-dimensional construction operation guidance method based on BIM technology

Country Status (1)

Country Link
CN (1) CN106803162A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457504A (en) * 2018-03-27 2018-08-28 湘能楚天电力有限公司 A kind of building method of BIM assembly integrated intelligents substation
CN108665527A (en) * 2018-03-26 2018-10-16 中铁四局集团第二工程有限公司 A kind of technical annotation in construction method based on panoramic technique and BIM models
CN109376395A (en) * 2018-09-26 2019-02-22 中建五局第三建设有限公司 A kind of architectural design management method and system
CN109508493A (en) * 2018-11-12 2019-03-22 中国十七冶集团有限公司 A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance
CN109977486A (en) * 2019-03-05 2019-07-05 中国电力工程顾问集团西南电力设计院有限公司 A kind of transmission line of electricity ring water based on life cycle management protects the construction method of scheme
CN113408261A (en) * 2021-08-10 2021-09-17 广东新瑞智安科技有限公司 Method and system for generating job requisition

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463950A (en) * 2014-10-29 2015-03-25 中冶天工集团有限公司 Two-dimension code information identification method of furnace kiln refractory 3D model
CN104573254A (en) * 2015-01-21 2015-04-29 中国十七冶集团有限公司 Pre-construction technical disclosure method based on BIM

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463950A (en) * 2014-10-29 2015-03-25 中冶天工集团有限公司 Two-dimension code information identification method of furnace kiln refractory 3D model
CN104573254A (en) * 2015-01-21 2015-04-29 中国十七冶集团有限公司 Pre-construction technical disclosure method based on BIM

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108665527A (en) * 2018-03-26 2018-10-16 中铁四局集团第二工程有限公司 A kind of technical annotation in construction method based on panoramic technique and BIM models
CN108665527B (en) * 2018-03-26 2022-07-08 中铁四局集团第二工程有限公司 Construction technology bottom crossing method based on panoramic technology and BIM model
CN108457504A (en) * 2018-03-27 2018-08-28 湘能楚天电力有限公司 A kind of building method of BIM assembly integrated intelligents substation
CN109376395A (en) * 2018-09-26 2019-02-22 中建五局第三建设有限公司 A kind of architectural design management method and system
CN109508493A (en) * 2018-11-12 2019-03-22 中国十七冶集团有限公司 A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance
CN109977486A (en) * 2019-03-05 2019-07-05 中国电力工程顾问集团西南电力设计院有限公司 A kind of transmission line of electricity ring water based on life cycle management protects the construction method of scheme
CN113408261A (en) * 2021-08-10 2021-09-17 广东新瑞智安科技有限公司 Method and system for generating job requisition
CN113408261B (en) * 2021-08-10 2021-12-14 广东新瑞智安科技有限公司 Method and system for generating job requisition

Similar Documents

Publication Publication Date Title
CN106803162A (en) A kind of three-dimensional construction operation guidance method based on BIM technology
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106779476A (en) A kind of Construction Schedule management platform and method based on BIM IFC technologies
CN103903038A (en) System for dynamically displaying two-dimension codes and implementation method and application thereof
CN110287613A (en) The method and its system of BIM guiding construction operation
CN104575150A (en) Multi-user online cooperating method, device and system for power simulation training
CN105975655A (en) BIM-based parametric modeling method for imitated Tang and Song dynasty ancient building special-shaped roof tiles
CN108427802A (en) A kind of Deepen Design technique drawing generating method and device based on BIM
CN115374509A (en) BIM model drawing generation method, device, equipment and readable storage medium
CN108629057A (en) A method of generating BIM models
CN103310668A (en) Method for realizing electric equipment maintenance multi-task multi-role collaborative interaction
CN105242928A (en) Rapid development platform method based on module plant
CN106803163A (en) A kind of method of telling somebody what one's real intentions are based on AR technologies
CN114896677A (en) Construction simulation method and system based on BIM model
CN202650332U (en) Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks
CN114547761A (en) High-precision model-based prefabricated part steel bar optimization method and system
CN113205607A (en) Immersive virtual reality interactive teaching system for building assembly and using method
Chin et al. A QR-based materials building system to support outdoor teaching activities
Kazarinov et al. International experience and development trends of information modeling technology in relation to the life cycle of railway infrastructure facilities
Zhang et al. Construction of basic education cloud computing platform based on virtualization technology
CN111080771B (en) Information model construction method applied to three-dimensional intelligent aided design
You Analysis on Reformation of Digital Management Education of Prefabricated Construction Project Under the Background of Intelligent Construction
KR20040019437A (en) Generation system of a steel frame drawing
Leite et al. Additive manufacturing and the evolution of the construction industry: A systematic literature review 2015-2021
Esposito et al. Giocare seriamente per crescere digitali

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170606

RJ01 Rejection of invention patent application after publication