CN104573254A - Pre-construction technical disclosure method based on BIM - Google Patents

Pre-construction technical disclosure method based on BIM Download PDF

Info

Publication number
CN104573254A
CN104573254A CN201510029192.3A CN201510029192A CN104573254A CN 104573254 A CN104573254 A CN 104573254A CN 201510029192 A CN201510029192 A CN 201510029192A CN 104573254 A CN104573254 A CN 104573254A
Authority
CN
China
Prior art keywords
construction
bim
confiding
dimensional model
technological secret
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510029192.3A
Other languages
Chinese (zh)
Inventor
卜华琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510029192.3A priority Critical patent/CN104573254A/en
Publication of CN104573254A publication Critical patent/CN104573254A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a pre-construction technical disclosure method based on BIM. The method includes the following steps: building a construction BIM three-dimensional model according to construction design and marking relevant technical parameters in the model; manufacturing a construction scheme disclosure written card; placing the construction BIM three-dimensional model on a communication screen through a visual device. The method further includes that a designer breaks down the BIM three-dimensional model through the communication screen and explain technical parameters to constructors to conduct technical disclosure, and the constructors feed back opinions through the technical disclosure. The method has the advantages of being visual, quick and capable of improving construction efficiency, enabling the constructors to learn construction steps and various construction requirements and ensuring construction quality.

Description

A kind of based on method of confiding a technological secret before the construction of BIM
Technical field
The present invention relates to a kind of architecture information construction method, in particular, relate to a kind of based on method of confiding a technological secret before the construction of BIM.
Background technology
In engineering construction process, before each operation starts construction, all needing to confide a technological secret to construction crewmember. first the mode of confiding a technological secret adopted at present for working out technical annotation in construction form, then carry out at the bottom of an casual acquaintance to construction crewmember, finally Signature Confirmation on written record of telling somebody what one's real intentions are.Existing application number 201410362565.4; the patented technology of denomination of invention " a kind of joint examination of the drawing based on BIM technology system and method "; only to BIM three-dimensional model examination & verification construction drawing; workmen is not confided a technological secret; this can cause workmen can not understand completely construction content of telling somebody what one's real intentions are; in construction process, often there will be mistake and cause and do over again, harmful effect is produced to construction quality, progress, cost control.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and a kind of operating efficiency that improves is provided, reduce a kind of based on method of confiding a technological secret before the construction of BIM of construction cost.
Of the present invention a kind of based on method of confiding a technological secret before the construction of BIM, comprise the following steps:
Step 1: set up construction BIM three-dimensional model according to job design, and mark relevant technical parameter in a model;
Step 2: make arrangement and method for construction and to tell somebody what one's real intentions are written card;
Step 3: construction BIM three-dimensional model is placed on by visualization device and exchanges on screen;
Step 4: designer decomposes construction BIM three-dimensional model by exchanging screen, confides a technological secret to workmen by explaining every technical parameter;
Step 5: workmen is by feedback opinion of confiding a technological secret.
Job design in described step 1 is working drawing or arrangement and method for construction.
Described working drawing is reinforced bar engineering, masonry project and whitewashes engineering working drawing.
Described arrangement and method for construction is scaffolding work, template is set up and propping works arrangement and method for construction.
In described step 2 arrangement and method for construction tell somebody what one's real intentions are that written card is that construction BIM three-dimensional model is put down, stood, the decomposing schematic representation of section and construction process figure.
The invention has the beneficial effects as follows: (1) is directly perceived, quick, improves operating efficiency; (2) make workmen understand construction procedure and every construction requirement, guarantee construction quality.
Accompanying drawing explanation
Fig. 1 is process flow diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
In the drawings, of the present invention a kind of based on method of confiding a technological secret before the construction of BIM, comprise the following steps:
Step 1: set up construction BIM three-dimensional model according to working drawing or arrangement and method for construction, and mark relevant technical parameter in a model; Working drawing is reinforced bar engineering, masonry project and whitewashes engineering working drawing, and arrangement and method for construction is scaffolding work, template is set up and propping works arrangement and method for construction;
Step 2: make that construction BIM three-dimensional model is put down, stood, the decomposing schematic representation of section and construction process figure to tell somebody what one's real intentions are written card as arrangement and method for construction;
Step 3: construction BIM three-dimensional model is placed on by visualization device and exchanges on screen;
Step 4: designer decomposes construction BIM three-dimensional model by exchanging screen, confides a technological secret to workmen by explaining every technical parameter;
Step 5: workmen is by feedback opinion of confiding a technological secret.
Making workmen fully understand construction procedure and every construction requirement by above-mentioned steps, avoiding, because workmen causes because of not understanding work progress construction speed slow, guaranteeing construction quality.

Claims (5)

1., based on a method of confiding a technological secret before the construction of BIM, it is characterized in that, comprise the following steps:
Step 1: set up construction BIM three-dimensional model according to job design, and mark relevant technical parameter in a model;
Step 2: make arrangement and method for construction and to tell somebody what one's real intentions are written card;
Step 3: construction BIM three-dimensional model is placed on by visualization device and exchanges on screen;
Step 4: designer decomposes construction BIM three-dimensional model by exchanging screen, confides a technological secret to workmen by explaining every technical parameter;
Step 5: workmen is by feedback opinion of confiding a technological secret.
2. according to claim 1ly a kind ofly to it is characterized in that based on method of confiding a technological secret before the construction of BIM, the job design in described step 1 is working drawing or arrangement and method for construction.
3. according to claim 2ly a kind ofly to it is characterized in that based on method of confiding a technological secret before the construction of BIM, described working drawing is reinforced bar engineering, masonry project and whitewashes engineering working drawing.
4. according to claim 2ly a kind ofly to it is characterized in that based on method of confiding a technological secret before the construction of BIM, described arrangement and method for construction is scaffolding work, template is set up and propping works arrangement and method for construction.
5. according to claim 1ly a kind ofly to it is characterized in that based on method of confiding a technological secret before the construction of BIM, in described step 2 arrangement and method for construction tell somebody what one's real intentions are that written card is that construction BIM three-dimensional model is put down, stood, the decomposing schematic representation of section and construction process figure.
CN201510029192.3A 2015-01-21 2015-01-21 Pre-construction technical disclosure method based on BIM Pending CN104573254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510029192.3A CN104573254A (en) 2015-01-21 2015-01-21 Pre-construction technical disclosure method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510029192.3A CN104573254A (en) 2015-01-21 2015-01-21 Pre-construction technical disclosure method based on BIM

Publications (1)

Publication Number Publication Date
CN104573254A true CN104573254A (en) 2015-04-29

Family

ID=53089308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510029192.3A Pending CN104573254A (en) 2015-01-21 2015-01-21 Pre-construction technical disclosure method based on BIM

Country Status (1)

Country Link
CN (1) CN104573254A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850709A (en) * 2015-05-25 2015-08-19 苏州金螳螂建筑装饰股份有限公司 Three-dimensional simulation method for construction of architectural decoration project
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN106295022A (en) * 2016-08-15 2017-01-04 中国十七冶集团有限公司 The simulation of a kind of arrangement and method for construction based on BIM and optimization method
CN106412515A (en) * 2016-10-14 2017-02-15 中建三局安装工程有限公司 Visual disclosure device for technical disclosure on construction site
CN106803163A (en) * 2016-12-08 2017-06-06 中铁四局集团第二工程有限公司 A kind of method of telling somebody what one's real intentions are based on AR technologies
CN106803162A (en) * 2016-12-02 2017-06-06 中铁四局集团第二工程有限公司 A kind of three-dimensional construction operation guidance method based on BIM technology
CN107563662A (en) * 2017-09-15 2018-01-09 中建海峡建设发展有限公司 A kind of method and computing device of PC components production curves
CN107729609A (en) * 2017-09-14 2018-02-23 北京致臻智造科技有限公司 The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are
CN108507357A (en) * 2018-03-28 2018-09-07 中国冶集团有限公司 Industrial furnace branch pipe tee connection liner brick setting out method
CN108589725A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of built-in fitting construction method based on BIM technology
CN112434362A (en) * 2020-11-23 2021-03-02 上海燃气工程设计研究有限公司 BIM technology-based overground gas pipeline visual construction bottom crossing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247004A (en) * 2013-04-28 2013-08-14 中建安装工程有限公司 Information management method and system based on electromechanical integrated BIM (building information model)
CN104217065A (en) * 2014-07-28 2014-12-17 成都市第四建筑工程公司 BIM technology-based drawing reviewing system and method
CN104281729A (en) * 2014-07-02 2015-01-14 哈尔滨工业大学 BIM (building information model) method for digital processing and manufacturing of steel structure buildings

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247004A (en) * 2013-04-28 2013-08-14 中建安装工程有限公司 Information management method and system based on electromechanical integrated BIM (building information model)
CN104281729A (en) * 2014-07-02 2015-01-14 哈尔滨工业大学 BIM (building information model) method for digital processing and manufacturing of steel structure buildings
CN104217065A (en) * 2014-07-28 2014-12-17 成都市第四建筑工程公司 BIM technology-based drawing reviewing system and method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
曹乐等: "BIM技术在云南科技馆新馆项目中钢结构吊装方案应用", 《第十六届中国科协年会论文集》 *
王显斌等: "BIM技术在某医院工程中的应用", 《建筑》 *
王永义: "BIM协同平台在铁路工程建造阶段的应用研究", 《铁路技术创新》 *
赵军等: "BIM技术在贵阳金阳会展城某项目平面布置和可视化交底应用", 《城市建筑》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850709A (en) * 2015-05-25 2015-08-19 苏州金螳螂建筑装饰股份有限公司 Three-dimensional simulation method for construction of architectural decoration project
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN106295022A (en) * 2016-08-15 2017-01-04 中国十七冶集团有限公司 The simulation of a kind of arrangement and method for construction based on BIM and optimization method
CN106412515A (en) * 2016-10-14 2017-02-15 中建三局安装工程有限公司 Visual disclosure device for technical disclosure on construction site
CN106803162A (en) * 2016-12-02 2017-06-06 中铁四局集团第二工程有限公司 A kind of three-dimensional construction operation guidance method based on BIM technology
CN106803163A (en) * 2016-12-08 2017-06-06 中铁四局集团第二工程有限公司 A kind of method of telling somebody what one's real intentions are based on AR technologies
CN107729609A (en) * 2017-09-14 2018-02-23 北京致臻智造科技有限公司 The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are
CN107563662A (en) * 2017-09-15 2018-01-09 中建海峡建设发展有限公司 A kind of method and computing device of PC components production curves
CN108507357A (en) * 2018-03-28 2018-09-07 中国冶集团有限公司 Industrial furnace branch pipe tee connection liner brick setting out method
CN108507357B (en) * 2018-03-28 2020-01-31 中国一冶集团有限公司 Laying-out method for bricks lined in three-way pipeline of industrial furnace
CN108589725A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of built-in fitting construction method based on BIM technology
CN112434362A (en) * 2020-11-23 2021-03-02 上海燃气工程设计研究有限公司 BIM technology-based overground gas pipeline visual construction bottom crossing method

Similar Documents

Publication Publication Date Title
CN104573254A (en) Pre-construction technical disclosure method based on BIM
CN105204793A (en) Method for applying BIM and 3D printing technology to construction
CN107256005A (en) A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology
CN106652049A (en) Full-professional design delivery method for building based on augmented reality technology of mobile terminal
CN106202831A (en) A kind of pipeline layout optimization method based on BIM
CN106055829A (en) Water supply and drainage pipeline assembly prefabrication system construction method based on BIM
CN105117514B (en) Modularization automatic map delivery method and system
CN105913334A (en) Visualized detection method for online abnormal movements of power distribution automation graph and model
CN107330970A (en) A kind of threedimensional model processing method, server and computer read/write memory medium
CN106296473A (en) A kind of construction project progress real-time control method based on BIM technology
CN103369836A (en) Method and device for drilling band expansion/contraction
KR20140127038A (en) Automatic creating method for 2D file from 3D file
CN107299762A (en) A kind of concrete pouring procedure based on BIM
CN110795789A (en) Application method in scaffold engineering based on BIM (building information modeling) cooperation technology
CN107451358A (en) A kind of building method of the curved wall based on BIM
CN110929309B (en) Automatic verification method for protection section list document in urban rail signal system
CN107895065A (en) A kind of plant design method based on 3-D technology
CN106873437A (en) Nuclear power station real-time information monitoring system picture is detected and automatic configuration system and method
CN104281727A (en) Method for designing tire die on basis of Excel and CAD (computer aided design) platform
CN106777641B (en) Rapid modeling method for reinforcing plate with inverted right angle
CN105260569A (en) Method of automatically punching ground holes based on CadenceAllegro
CN112765711A (en) BIM modeling method for green building simulation calculation
CN103745075A (en) Method for automatically generating lamination information on PCB (Printed Circuit Board) drilling layer
JP4803447B2 (en) CAD system and program implemented in this system
CN105446883A (en) Model verification analysis method based on data configuration tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429

WD01 Invention patent application deemed withdrawn after publication