CN106295022A - The simulation of a kind of arrangement and method for construction based on BIM and optimization method - Google Patents
The simulation of a kind of arrangement and method for construction based on BIM and optimization method Download PDFInfo
- Publication number
- CN106295022A CN106295022A CN201610670825.3A CN201610670825A CN106295022A CN 106295022 A CN106295022 A CN 106295022A CN 201610670825 A CN201610670825 A CN 201610670825A CN 106295022 A CN106295022 A CN 106295022A
- Authority
- CN
- China
- Prior art keywords
- construction
- arrangement
- simulation
- bim
- optimization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses the simulation of a kind of arrangement and method for construction based on BIM and optimization method, this optimization method comprises the following steps: utilize BIM model, in conjunction with on-the-spot construction environment and relevant construction technology process;By the perspective cut-away of model, wandering map and construction simulation, make high-quality arrangement and method for construction.The present invention is reached to provide the benefit that: be possible not only to be fully understood by the environment residing for every step process flow process and the working place of construction, simultaneously in compliant, standard, on the premise of ensureing arrangement and method for construction safe and feasible, constantly carry out the optimization of scheme, the most perfect.
Description
Technical field
The invention belongs to Construction Technology field, be specifically related to the simulation of a kind of arrangement and method for construction based on BIM and optimization side
Method.
Background technology
In Process of Engineering Construction, traditional arrangement and method for construction preparation method be Project Technical director according to construction drawing,
Specification and correlation experience are worked out, but the arrangement and method for construction worked out in this way, it is impossible to the concrete feasibility of scheme and
Whether scheme is that optimal case is verified, causes in work progress, and scheme is continually changing, it is impossible to play engineering construction very
Good directive function.
Summary of the invention
The present invention is directed to whether to be that optimal case is verified to the concrete feasibility of scheme and scheme, cause executing
During work, scheme is continually changing, it is impossible to engineering construction is played good directive function and provides a kind of construction based on BIM
Program simulation and optimization method.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
The simulation of a kind of arrangement and method for construction based on BIM of the present invention and optimization method, this optimization method comprises the following steps:
Utilize BIM model, in conjunction with on-the-spot construction environment and relevant construction technology process;
By the perspective cut-away of model, wandering map and construction simulation, make high-quality arrangement and method for construction.
The present invention is reached to provide the benefit that:
It is possible not only to be fully understood by the environment residing for every step process flow process and the working place of construction, meets rule simultaneously
Model, standard, it is ensured that on the premise of arrangement and method for construction safe and feasible, constantly carry out the optimization of scheme, the most perfect.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the invention will be further described, but protection scope of the present invention is not limited only to down
State the content of embodiment.
Embodiment 1
The simulation of a kind of arrangement and method for construction based on BIM of the present invention and optimization method, this optimization method comprises the following steps:
Utilize BIM model, in conjunction with on-the-spot construction environment and relevant construction technology process;
By the perspective cut-away of model, wandering map and construction simulation, make high-quality arrangement and method for construction.
The present invention is reached to provide the benefit that:
It is possible not only to be fully understood by the environment residing for every step process flow process and the working place of construction, meets rule simultaneously
Model, standard, it is ensured that on the premise of arrangement and method for construction safe and feasible, constantly carry out the optimization of scheme, the most perfect.
Finally it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention,
Although being described in detail the present invention with reference to previous embodiment, for a person skilled in the art, it still may be used
So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent.
All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in the present invention's
Within protection domain.
Claims (1)
1. arrangement and method for construction based on a BIM simulation and optimization method, it is characterised in that this optimization method comprises the following steps:
Utilize BIM model, in conjunction with on-the-spot construction environment and relevant construction technology process;By the perspective cut-away of model,
Wandering map and construction simulation, make high-quality arrangement and method for construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610670825.3A CN106295022A (en) | 2016-08-15 | 2016-08-15 | The simulation of a kind of arrangement and method for construction based on BIM and optimization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610670825.3A CN106295022A (en) | 2016-08-15 | 2016-08-15 | The simulation of a kind of arrangement and method for construction based on BIM and optimization method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106295022A true CN106295022A (en) | 2017-01-04 |
Family
ID=57671917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610670825.3A Pending CN106295022A (en) | 2016-08-15 | 2016-08-15 | The simulation of a kind of arrangement and method for construction based on BIM and optimization method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106295022A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102945570A (en) * | 2012-11-23 | 2013-02-27 | 华东师范大学 | Method for constructing full-space three-dimensional digital earth model |
CN104573254A (en) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | Pre-construction technical disclosure method based on BIM |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN105279609A (en) * | 2015-10-26 | 2016-01-27 | 中国十七冶集团有限公司 | Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control |
CN105631154A (en) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform |
-
2016
- 2016-08-15 CN CN201610670825.3A patent/CN106295022A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102945570A (en) * | 2012-11-23 | 2013-02-27 | 华东师范大学 | Method for constructing full-space three-dimensional digital earth model |
CN104573254A (en) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | Pre-construction technical disclosure method based on BIM |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN105279609A (en) * | 2015-10-26 | 2016-01-27 | 中国十七冶集团有限公司 | Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control |
CN105631154A (en) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform |
Non-Patent Citations (1)
Title |
---|
肖本林: "《土木工程与建筑教育改革理论及实践》", 31 December 2013 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105844017A (en) | Method for optimizing designs of underground pipe network and landscape plantation by using BIM technology | |
WO2007058946A3 (en) | Systems and methods for modifying network map attributes | |
WO2009105324A3 (en) | Sketch-based password authentication | |
WO2013103463A3 (en) | Methods and apparatus for high performance design of a project | |
CN107194112A (en) | The method being laid out based on BIM to garden landscape | |
CN106295022A (en) | The simulation of a kind of arrangement and method for construction based on BIM and optimization method | |
WO2006097926A3 (en) | Methods and systems for creating and altering cad models | |
ATE434165T1 (en) | METHOD AND TOOL FOR PRODUCING IMPROVED HEAT TRANSFER SURFACES | |
CN204370737U (en) | A kind of structure preventing architecture indoor from fitting up metope inner corner trim cracking | |
Mork et al. | Conceptual structural design of shell structures in virtual reality | |
Walden | Distant thunder | |
Tattara et al. | Communal Villa: Production and Reproduction in Artist's Housing | |
Fortunato Dal Sasso et al. | The impact of a multi-criteria calibration on the performances of the DREAM model | |
Jeong | A numerical study on propagation characteristics of dam-break wave through a porous structure | |
Vassilev | Establishment of Modern “Atrium” Buildings as a Model for Sustainable Energy Efficient Architecture | |
Paetzold et al. | Okapi+ QuEst: Translation Quality Estimation within Okapi. | |
CN204745652U (en) | Toy excavator's scraper bowl | |
WO2008086103A3 (en) | One pass modeling of data sets | |
CN204311641U (en) | Sound-proof hollow brick | |
Shin et al. | Selection of the Optimal Building Skin-System in Remodeling Projects | |
Kim et al. | A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures | |
Wang et al. | 3 D discrete element method based on direct method of joint network simulation. | |
Duc–IFMA | Product Manufacturing and Additive Manufacturing | |
SIMÕES et al. | Land use changes scenarios and future environmental services provision in the Brazilian Amazon. | |
方銘川 et al. | Applying the optimized PD controller to the towing system in waves |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |
|
RJ01 | Rejection of invention patent application after publication |