CN103310668A - Method for realizing electric equipment maintenance multi-task multi-role collaborative interaction - Google Patents

Method for realizing electric equipment maintenance multi-task multi-role collaborative interaction Download PDF

Info

Publication number
CN103310668A
CN103310668A CN2013102314935A CN201310231493A CN103310668A CN 103310668 A CN103310668 A CN 103310668A CN 2013102314935 A CN2013102314935 A CN 2013102314935A CN 201310231493 A CN201310231493 A CN 201310231493A CN 103310668 A CN103310668 A CN 103310668A
Authority
CN
China
Prior art keywords
server
role
client
maintenance
multi
Prior art date
Application number
CN2013102314935A
Other languages
Chinese (zh)
Other versions
CN103310668B (en
Inventor
陈向光
赵凯峰
朱金花
席风沛
Original Assignee
国家电网公司
江苏省电力公司徐州供电公司
江苏省电力公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国家电网公司, 江苏省电力公司徐州供电公司, 江苏省电力公司 filed Critical 国家电网公司
Priority to CN201310231493.5A priority Critical patent/CN103310668B/en
Publication of CN103310668A publication Critical patent/CN103310668A/en
Application granted granted Critical
Publication of CN103310668B publication Critical patent/CN103310668B/en

Links

Abstract

The invention discloses a method for realizing electric equipment maintenance multi-task multi-role collaborative interaction and relates to the technical field of electric equipment maintenance three-dimension simulation interaction practical training. The method includes: an electric equipment maintenance three-dimension simulation interaction system is mounted on each client and a server, when one client modifies shared resources, the corresponding system sends a request to the server, when the server agrees the request, the server feeds back each client connected to the server, each server modifies the corresponding resources after receiving the instruction sent by the server, the server can customize maintenance tasks, the clients can used to select corresponding maintenance work types so as to complete the maintenance tasks appointed by teachers, and multiple students can participate in the same work type. The method has the advantages that under an uniform transformer substation, real-time interaction operations of students is achieved, and related shared resources and variable parameters can be updated in real time.

Description

The polygonal look cooperation interaction of power equipment simulation maintenance multitask implementation method

Technical field

The present invention relates to the mutual real training technical field of electric power apparatus examination operation three-dimensional artificial, specifically is a kind of electric power

The polygonal look cooperation interaction operation of equipment simulating maintenance multitask implementation method.

Background technology

Power industry plays a part very important in the National modern construction, is the artery of name of the country economic development.Cultivating high-grade, precision and advanced technician, is the pith that power industry is built.Transformer station's maintenance teaching is subjected to the restriction of place, appointed condition in kind, and teaching efficiency is limited, Repair of Transformer worker, isolating switch check man, mutual inductor check man, disconnector check man under unified substation, not enough real time interactive operation.

Summary of the invention

In order to overcome the shortcoming of above-mentioned prior art, the invention provides the polygonal look cooperation interaction of a kind of power equipment simulation maintenance multitask implementation method, realize that Repair of Transformer worker, isolating switch check man, mutual inductor check man, disconnector check man are under unified substation, can real time interactive operation, what relate to shares

Resource and variable parameter are upgraded in real time synchronously, and the user end to server end sends request, and server is agreed the unified client that sends in back.

The present invention realizes with following technical scheme: a kind of based on the polygonal look cooperation interaction of power equipment simulation maintenance multitask implementation method, when on the client shared resource having been carried out when operation change, system transmit a request on the server, after server is agreed, feeding back on each client that is connected to server, client after having received the instruction of server transmission is made amendment the resource of this machine correspondence, and concrete steps are as follows:

1) creates server end;

2) client is connected to server according to server address and user name password;

3) before the role does not put in place fully, whole team attendant exclusion;

4) user selects the role, sends role's request to server;

5) after server receives that the role asks, judge whether this role puts in place, if not then allow to add, otherwise refusal;

6) server judges whether the role is all on board, and then still is not in to wait for that the role adds state;

7) Team Member is in place finish after, server sends the message that cooperative surroundings has been set up to all clients, the beginning co-operating.

The beneficial effect of the invention is: realize Repair of Transformer worker, isolating switch check man, mutual inductor check man, disconnector check man under unified substation, can real time interactive operation, and what relate to shares

Resource and variable parameter are upgraded in real time synchronously; Significantly improve the quality of teaching and learning efficiency.

Description of drawings

The invention will be further described below in conjunction with drawings and Examples.

Fig. 1 is electric power apparatus examination operation three-dimension interaction analogue system block diagram;

Fig. 2 is principle of the invention synoptic diagram.

Embodiment

As shown in Figure 1, at client and server electric power apparatus examination operation three-dimension interaction analogue system is installed, simulated environment is built according to true 220KV substation.At first according to drawing or material object the power equipment model is carried out modeling, native system needs the equipment of modeling that transformer, isolating switch, disconnector, mutual inductor are arranged, and 220KV substation scene, each equipment all adopts the modeling of part level, and each parts can both be dismantled separately;

After building up, model imports in the d engine based on openGL shape library standard, transformer, isolating switch, disconnector, mutual inductor model are all put into 220KV substation model, according to true connected mode marshalling, write the mathematical logic relation, give model interactive operation basis;

By script engine and logic engine, the power equipment model is carried out cartoon making, cooperate the language of sound engine to play, have the teaching demonstration module that structure composition and the principle of power equipment are showed and overhaul module alternately.

The user can be by composition structure, principle of work, the several modules of maintenance flow process of systematic learning power equipment under the unified environment, and in the operating process, system can realize the interactive operation of the polygonal colour system system of multitask, shared resource.

In order to ensure the student in analogue simulation maintenance experience and reality in similar, the information such as on off state of residing environmental parameter, transformer substation voltage variation, current transformation, switch must be unified upgrading synchronously in real time.Such as, student A has done certain operation, has changed the on off state of certain switch of transformer station, and the student of all participation analogue simulation maintenance should receive this state so, and cashes out corresponding feedback effects.

In network cooperating operating system, resource (variable, program object) all is divided into local resource and shared resource.Local resource namely is the resource of using on this machine, can not move variable or the program object that exerts an influence to total system; Shared resource is that all users can both shared variable or program object in the system.Realizing the data sharing under the unified environment, in fact is exactly to realize the synchronous renewal of shared resource and trigger feedback response.

As shown in Figure 2, because all interactive operations are all finished at student's machine, so the behavior that shared resource changes event takes place, only may appear on student's machine.So when on student's machine shared resource having been carried out when operation change, system transmit a request on the server (teacher's machine), after server is agreed, feeding back on each client that is connected to server (student's machine), after client has received the instruction of server transmission, the resource of this machine correspondence is made amendment, and trigger the feedback action that to carry out.These feedback actions may be that the form of expression with animation also may be that in logic parameter changes.Concrete steps are as follows:

1) creates server end;

2) client is connected to server according to server address and user name password;

3) before the role does not put in place fully, whole team attendant exclusion;

4) user selects the role, sends role's request to server;

5) after server receives that the role asks, judge whether this role puts in place, if not then allow to add, otherwise refusal;

6) server judges whether the role is all on board, and then still is not in to wait for that the role adds state;

7) Team Member is in place finish after, server sends the message that cooperative surroundings has been set up to all clients, the beginning co-operating.

Claims (1)

1. one kind based on the polygonal look cooperation interaction of power equipment simulation maintenance multitask implementation method, it is characterized in that: at client and server electric power apparatus examination operation three-dimension interaction analogue system is installed, simulated environment is built according to true 220KV substation, when on the client shared resource having been carried out when operation change, system transmit a request on the server, after server is agreed, feeding back on each client that is connected to server, after client has received the instruction of server transmission, the resource of this machine correspondence is made amendment, server can customize the maintenance task, client can select the maintenance work post of correspondence oneself to finish the maintenance task that the teacher assigns from multiple maintenance work post, can be by a plurality of student's fellowships with a kind of work post; Concrete steps are as follows:
1) creates server end;
2) client is connected to server according to server address and user name password;
3) before the role does not put in place fully, whole team attendant exclusion;
4) user selects the role, sends role's request to server;
5) after server receives that the role asks, judge whether this role puts in place, if not then allow to add, otherwise refusal;
6) server judges whether the role is all on board, and then still is not in to wait for that the role adds state;
7) Team Member is in place finish after, server sends the message that cooperative surroundings has been set up to all clients, the beginning co-operating.
CN201310231493.5A 2013-06-09 2013-06-09 Electric equipment maintenance multi-task multi-role collaborative interaction implementation method CN103310668B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310231493.5A CN103310668B (en) 2013-06-09 2013-06-09 Electric equipment maintenance multi-task multi-role collaborative interaction implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310231493.5A CN103310668B (en) 2013-06-09 2013-06-09 Electric equipment maintenance multi-task multi-role collaborative interaction implementation method

Publications (2)

Publication Number Publication Date
CN103310668A true CN103310668A (en) 2013-09-18
CN103310668B CN103310668B (en) 2015-10-14

Family

ID=49135835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310231493.5A CN103310668B (en) 2013-06-09 2013-06-09 Electric equipment maintenance multi-task multi-role collaborative interaction implementation method

Country Status (1)

Country Link
CN (1) CN103310668B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system
CN106157723A (en) * 2016-08-23 2016-11-23 国网山东省电力公司济宁供电公司 A kind of power transformation O&M accident handling intelligent training analog systems
CN106296826A (en) * 2016-08-08 2017-01-04 国网江苏省电力公司徐州供电公司 Transformer station's Virtual Wandering System
CN108154772A (en) * 2018-01-09 2018-06-12 国网江苏省电力有限公司电力科学研究院 Substation's collaborative simulation training system construction method based on virtual reality

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101866462A (en) * 2010-07-08 2010-10-20 武汉理工大学 Supporting platform for product collaborative maintenance and maintenance method
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制系统有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN102136204A (en) * 2011-02-25 2011-07-27 中国人民解放军第二炮兵工程学院 Virtual maintenance distribution interactive simulation support platform of large equipment and collaborative maintenance method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制系统有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN101866462A (en) * 2010-07-08 2010-10-20 武汉理工大学 Supporting platform for product collaborative maintenance and maintenance method
CN102136204A (en) * 2011-02-25 2011-07-27 中国人民解放军第二炮兵工程学院 Virtual maintenance distribution interactive simulation support platform of large equipment and collaborative maintenance method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system
CN105869470B (en) * 2015-05-28 2018-11-09 国家电网公司 A kind of method and system of ultra-high voltage transformer station operation emulation
CN106296826A (en) * 2016-08-08 2017-01-04 国网江苏省电力公司徐州供电公司 Transformer station's Virtual Wandering System
CN106157723A (en) * 2016-08-23 2016-11-23 国网山东省电力公司济宁供电公司 A kind of power transformation O&M accident handling intelligent training analog systems
CN108154772A (en) * 2018-01-09 2018-06-12 国网江苏省电力有限公司电力科学研究院 Substation's collaborative simulation training system construction method based on virtual reality

Also Published As

Publication number Publication date
CN103310668B (en) 2015-10-14

Similar Documents

Publication Publication Date Title
Abdulwahed et al. Developing the TriLab, a triple access mode (hands‐on, virtual, remote) laboratory, of a process control rig using LabVIEW and Joomla
CN101894487B (en) Practice and simulation training system and method for power distribution live-wire work
CN101894488B (en) Distributed three-dimensional simulation training system for regional power system transformer station
CN104008454A (en) Practical training laboratory system
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN102955882B (en) Automatic detection simulation analog system of ultra-large intelligent electric energy meter
CN102930773B (en) Three-dimensional real-time training system for petrochemical device
CN103794109B (en) There is electric control system and the emulation training method thereof of emulation training function
CN106095105A (en) A kind of traction substation operator on duty's virtual immersive Training Simulation System and method
CN100590678C (en) Visual rapid design and verification control teaching experiment system
Wilson et al. The aggregate level simulation protocol: an evolving system
CN101154213A (en) Simulation platform of macrotype power station integrated automation system
Schnabel et al. The first virtual environment design studio
CN102881202B (en) Virtual reality based on-load tap switch maintenance training method
Hu et al. Web-based 3-D control laboratory for remote real-time experimentation
CN104462730B (en) Power plant's on-line simulation system and method
CN103632581A (en) Debugging, operation and maintenance simulation method of electric energy collection terminals
CN103593181B (en) A kind of configurable Distributed Three-dimensional vision emulation system
WO2019076234A1 (en) Transparent monitoring method and system for intelligent workshop
Galvão et al. Modeling reality with simulation games for a cooperative learning
Arendarski et al. Maintenance of complex machines in electric power systems using virtual reality techniques
CN102360535A (en) Three-dimensional visual simulation training system and method
CN102664399A (en) Establishment method of RTDS-EMS (real time digital simulator-energy management system) system-level closed-loop control experiment simulation platform
CN102262534B (en) System and method for developing computer online games based on Internet browser/server (B/S) structure
Barrero et al. eDSPLab: remote laboratory for experiments on DSP applications

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant