CN108629057A - A method of generating BIM models - Google Patents

A method of generating BIM models Download PDF

Info

Publication number
CN108629057A
CN108629057A CN201710159555.4A CN201710159555A CN108629057A CN 108629057 A CN108629057 A CN 108629057A CN 201710159555 A CN201710159555 A CN 201710159555A CN 108629057 A CN108629057 A CN 108629057A
Authority
CN
China
Prior art keywords
building
model
face
information
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710159555.4A
Other languages
Chinese (zh)
Inventor
崔波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710159555.4A priority Critical patent/CN108629057A/en
Publication of CN108629057A publication Critical patent/CN108629057A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of building element information model is generated using by the binding face or eigencenter line of building element(BIM)Modeling and Design method:Using the plan model of building or planning chart as design basis, unwrapping wire is drawn in the enterprising professional etiquette of plan model, building sides is split as to the binding face or eigencenter line of building element, the threedimensional model of component is generated according to the type information of binding face or center line and component, the model is a kind of three-dimensional building information model, construction diagrams, production figure and the bill of materials can be exported according to model.Design method of the present invention significantly reduces the labor intensity of designer, improves the efficiency and accuracy of design, so that the design cost of Building Information Model is substantially reduced, the design cycle also greatly shortens.

Description

A method of generating BIM models
Technical field
The invention belongs to architectural design industries, the more particularly to information model of construction(BIM)Design field, tool Body refers to the BIM Computer Aided Designs of building relevant industries, including but not limited to concrete structure BIM designs, concreting The BIM of template is designed, the BIM designs and building curtain wall system BIM designs of building scaffold system..
Background technology
Building Information Model (BIM) is the new tool of architecture, engineering science and civil engineering, compared to traditional CAD bis- Drawing Design mode is tieed up, BIM designs can reduce all kinds of mistakes caused by design team member in large quantities at design initial stage, simultaneously Also the follow-up mistake manufactured manufacturer and made can be reduced.It can thus reduce and build the required time, while also contribute to reduce The cost of engineering.Currently, in the reinforced concrete structure construction applications of building, BIM designing techniques have had been widely used, Also the more and more extensive every field for penetrating into building simultaneously.
On more complicated building element, if building concrete is poured with stencil design, connection system for guide rail is designed and is built In terms of building Curtain Wall Design, although at present there are also the trial of BIM designs, practical application is also fewer, a main cause It is that, for complicated building element, modeling is difficult, and the cost of BIM Modeling and Designs is very high, inefficiency, it is difficult to meet engineering It needs.
Conventional BIM design methods at present are to use first to establish building element model race library, then according to project It is required that get well and be put into design position by various building element model foundations, for conventional building beam column model, due to structure compared with To be simple, the method efficiency is fine, but for complicated building element, establishes that component race library is extremely difficult, and positioning is placed into sets Meter position is also usually not easy to accomplish, and significantly limits application of the BIM designs in these fields.
Invention content
In order to improve the efficiency of BIM modellings, design accuracy is promoted, the present invention provides one kind being based on building element Binding face or center line are aided with element type information and quickly generate construction part information model(BIM)Method, feature is as follows.
1. based on three-dimensional building plans model(Bai Mo)Or in-depth figure is designed, building plans model or in-depth is flat Face figure is imported into three-dimensional software, and secondary development, in particular to sketch great master are carried out in 3 d modeling software(Sketchup), Revit, Solidwork, 3Dmax, AutoCAD etc. but not limited to this 3 d modeling software.
2. method is embodied as the first progress unwrapping wire planning on building plans model, by building element in building plans Image Segmentation Methods Based on Features line in model is drawn, this process can be hand drawn, can also be computer according to certain algorithm plan It is slightly automatic to draw.
3. the face of buildings model is split by the line after planning, become various building elements(Such as aluminum alloy pattern plate, curtain wall member Deng)Binding face or eigencenter line(Such as scaffold rod piece), then these faces or line are enclosed into type information, information can be By applying material, the modes such as judgement carry out the specified or spatial positional information according to line face of message box automatically, last computer root Corresponding building element model is generated according to binding face or center line and type information.
4. the model generated is each an independent threedimensional model group or component, has necessary letter on model Breath, such as title, number, the model of material etc., completion is a kind of Building Information Model(BIM)Spelling can be derived automatically from by computer Dress figure, production figure and the bill of materials.
Present invention advantage compared with prior art:
(1) this method improves the accuracy of the efficiency and design of BIM model modelings design.
Specific implementation mode
The preferred implementation method of this method is:
(1)Using sketch great master(Sketchup)As three dimensional design platform, the three-dimensional plan model of building is imported into In Sketchup;
(2)Secondary development is carried out using Ruby in Sketchup, realizes that plotted line is drawn automatically according to layout strategy, and carry out The functions such as artificial inspection and modification;
(3)It is realized by face, by color face or by functions such as center line generation building element threedimensional models, is generated by secondary development Threedimensional model on have information, be a kind of information model(BIM);
(4)The editting function of component model is realized by secondary development, is realized and is gone out construction diagrams automatically, the work(such as production figure and the bill of materials Energy.
In order to make those skilled in the art be better understood from the present invention, With reference to embodiment to the present invention into One step explanation.
Embodiment 1
(1) the white mould of building plans is imported in Sketchup, using the automatic planning functions such as unwrapping wire and manual line drawing, opposite carries out It splits, different materials is coated in the face after fractionation, and different materials represents different component types, sees attached drawing 1;
(2) different formwork elements is automatically generated according to color face, sees attached drawing 2;
(3) it modifies to template model, adds various attachment components, such as through-wall bolt, support etc., and punched, patch Etc. various operations, finally template is numbered;
(4) according to the arrangement automatic map delivery and the bill of materials of template, drawing includes construction diagrams and production figure, can be CAD Formatted file can also be Layout files, and the bill of materials is Excel sheet formats, including the necessary information of template, such as: Subregion, title, code, number etc..
Embodiment 2
(1) building curtain wall is imported in Sketchup plan surface model, it is right using the automatic planning functions such as unwrapping wire and manual line drawing Face is split, and sees attached drawing 3;
(2) different curtain wall members is automatically generated according to fractionation face, sees attached drawing 4;
(3) various attachment components, such as square steel framework, reinforcing bar and fixing component are further added to curtain wall member;
(4) according to the arrangement automatic map delivery and the bill of materials of template, drawing includes construction diagrams and production figure, can be CAD Formatted file can also be Layout files, and the bill of materials is Excel sheet formats, including the necessary information of component, such as: Subregion, title, code, number etc..
Embodiment 3
(1) architectural appearance figure is imported in Sketchup, using the automatic planning functions such as unwrapping wire and manual line drawing, opposite is into professional etiquette Unwrapping wire is drawn, sees attached drawing 5;
(2) according to the line of fractionation, this line is the center line of scaffold pull rod, automatically generates different rod pieces, sees attached drawing 6;
(3) various attachment components are further added to connection system for guide rail, such as pedal, turnover panel, brace, protection network etc.;
(4) according to the arrangement automatic map delivery and the bill of materials of template, drawing includes construction diagrams and production figure, can be CAD Formatted file can also be Layout files, and the bill of materials is Excel sheet formats, including the necessary information of component, such as: Subregion, title, code, number etc..
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, and it is any Those familiar with the art according to the technique and scheme of the present invention and its invents in the technical scope of present disclosure Design is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Description of the drawings:
Fig. 1 aluminum alloy pattern plates plan fractionation face sectional drawing (effect after planning face is split)
Fig. 2 aluminum alloy pattern plates generate component sectional drawing (the aluminum dipping form board member of generation)
Fig. 3 building curtain walls plan fractionation face sectional drawing (curtain wall plans effect after the fractionation of face)
Fig. 4 building curtain walls generate curtain wall member sectional drawing (curtain wall member generated by planning face)
Fig. 5 scaffolds plan unwrapping wire sectional drawing (scaffold plotted line effect)
Fig. 6 scaffolds generate sectional drawing (scaffold member model) after component.

Claims (8)

1. a kind of method generating BIM models, it is characterised in that:1) three-dimensional building plans model or plan view are imported;2) Unwrapping wire is planned on plan model, and planning face is divided into the binding face or eigencenter line of various building elements;3)By being bonded The type information of face or center line and building element generates the threedimensional model of component, has template name, coding etc. on the model Information is a kind of Building Information Model(BIM).
2. BIM models according to claim 1, i.e. Building Information Model, application field is building trade, is such as built mixed Xtah Crude Clay structure, building are poured with template, building curtain wall, connection system for guide rail etc..
3. building plans model according to claim 1 or plan view, it can be sketch great master to design software used, The softwares such as AutoCAD, Revit, SolidWork.
Can also be to be opened by secondary 4. hand drawn may be used in unwrapping wire planing method according to claim 1, unwrapping wire Hair is drawn by computer according to layout strategy automatically.
5. unwrapping wire plans fractionation face method according to claim 1, the face of fractionation is characterized in that, the face after fractionation is building Line after the binding face of component and wall, or fractionation is the center line of building element.
6. the input mode of the type information of building element according to claim 1 can be to tint, dialog box input or root Judge automatically according to the spatial positional information in line face etc..
7. the method for generating the threedimensional model of building element by face and type information according to claim 1, generation is logical Programming is crossed to be realized automatically by computer.
8. building element model according to claim 1, which is characterized in that the building element model is a kind of information mould Type, has title on model, and the necessary information such as number can be used for figure, mark and derived materials inventory.
CN201710159555.4A 2017-03-20 2017-03-20 A method of generating BIM models Pending CN108629057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710159555.4A CN108629057A (en) 2017-03-20 2017-03-20 A method of generating BIM models

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710159555.4A CN108629057A (en) 2017-03-20 2017-03-20 A method of generating BIM models

Publications (1)

Publication Number Publication Date
CN108629057A true CN108629057A (en) 2018-10-09

Family

ID=63686792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710159555.4A Pending CN108629057A (en) 2017-03-20 2017-03-20 A method of generating BIM models

Country Status (1)

Country Link
CN (1) CN108629057A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933900A (en) * 2019-03-13 2019-06-25 上海理工大学 A kind of construction three dimensional field cloth modeling method based on BIM technology
CN110528881A (en) * 2019-08-12 2019-12-03 成都市新宏建筑工程有限公司 A kind of quick turnover method of assembled architecture support system based on BIM
CN111047696A (en) * 2019-12-09 2020-04-21 星际空间(天津)科技发展有限公司 Three-dimensional space planning paying-off method
CN113505424A (en) * 2021-07-12 2021-10-15 南昌大学 Interactive construction method for derived component of linear engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
US8843350B2 (en) * 2011-06-03 2014-09-23 Walter P. Moore and Associates, Inc. Facilities management system
US20150063707A1 (en) * 2010-06-10 2015-03-05 Autodesk, Inc. Outline approximation for point cloud of building
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150063707A1 (en) * 2010-06-10 2015-03-05 Autodesk, Inc. Outline approximation for point cloud of building
US8843350B2 (en) * 2011-06-03 2014-09-23 Walter P. Moore and Associates, Inc. Facilities management system
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933900A (en) * 2019-03-13 2019-06-25 上海理工大学 A kind of construction three dimensional field cloth modeling method based on BIM technology
CN110528881A (en) * 2019-08-12 2019-12-03 成都市新宏建筑工程有限公司 A kind of quick turnover method of assembled architecture support system based on BIM
CN111047696A (en) * 2019-12-09 2020-04-21 星际空间(天津)科技发展有限公司 Three-dimensional space planning paying-off method
CN111047696B (en) * 2019-12-09 2023-05-05 星际空间(天津)科技发展有限公司 Method for planning paying-off in three-dimensional space
CN113505424A (en) * 2021-07-12 2021-10-15 南昌大学 Interactive construction method for derived component of linear engineering
CN113505424B (en) * 2021-07-12 2022-06-07 南昌大学 Interactive construction method for derived component of linear engineering

Similar Documents

Publication Publication Date Title
WO2017219921A1 (en) Building co-construction system and method based on member classification and combination
CN108595891B (en) Two-dimensional BIM design method for temporary support structure for concrete bridge girder construction
Buswell et al. Freeform construction: mega-scale rapid manufacturing for construction
CN104281729B (en) A kind of BIM methods manufactured applied to steel building Digital manufacturing
CN112560134B (en) CAD and BIM-based batch deepening design method for assembled structure laminated plates
CN108629057A (en) A method of generating BIM models
CN111177831A (en) BIM technology-based steel bar three-dimensional modeling and automatic calculation method
Gaudillière et al. Building applications using lost formworks obtained through large-scale additive manufacturing of ultra-high-performance concrete
CN104200026A (en) Method and system for formwork matching of three-dimension space software
Sharma et al. Parametric modelling for designing offsite construction
CN114154206A (en) Revit platform-based automatic building structure beam reinforcement generation method
CN107516161A (en) A kind of project progress management-control method based on BIM
CN106469434A (en) The method that two-dimentional reinforcement drawing is generated based on three-dimensional rebar model
Firoz et al. Modelling concept of sustainable steel building by Tekla Software
CN106779476A (en) A kind of Construction Schedule management platform and method based on BIM IFC technologies
Luth VDC and the engineering continuum
CN109977481B (en) Method for creating concrete assembly template and member steel bar based on CATIA
CN104951632A (en) Three-dimensional reinforcement arrangement method for concrete structure on surface of circular truncated cone
CN103310042A (en) Three-dimensional angle rib distribution method
CN106446448A (en) Formwork system parametrization design method based on BIM technology
CN107066644B (en) Automatic modeling method for special-shaped suspended ceiling
Raspall A procedural framework for design to fabrication
CN111143921A (en) Method for automatically designing digital space derivative structure
CN114077765A (en) Dynamo project data management method and device and computer equipment
CN116861542A (en) Peripheral wall panel design method and system based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181009