CN106761829A - A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method - Google Patents

A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method Download PDF

Info

Publication number
CN106761829A
CN106761829A CN201611245264.9A CN201611245264A CN106761829A CN 106761829 A CN106761829 A CN 106761829A CN 201611245264 A CN201611245264 A CN 201611245264A CN 106761829 A CN106761829 A CN 106761829A
Authority
CN
China
Prior art keywords
chassis
water stop
buried water
steel
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611245264.9A
Other languages
Chinese (zh)
Inventor
韦兴童
席辉
胡俊茂
曹强
龚润之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201611245264.9A priority Critical patent/CN106761829A/en
Publication of CN106761829A publication Critical patent/CN106761829A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices

Abstract

The invention discloses a kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method, the chassis steel end mould includes multigroup arc steel form, multigroup arc steel form is formed and institute's construction tunnel section configuration identical chassis steel end mould, the sealant for sealing is provided between chassis steel end mould and preliminary bracing structure, the thickness of sealant is not less than the distance between steel end mould outward flange and preliminary bracing structure;The construction method is comprised the following steps:First, chassis is in place;2nd, the installation of middle buried water stop and positioning;3rd, the installation of sealant;4th, casting concrete;5th, form removal.Simple structure of the present invention and easy to operate, input cost is few;Construction procedure is simple;Using effect is good and practical value is high;The middle buried water stop of required positioning is fixed in the card holding trough that the inner arc plate of arc steel form and outer arc plate are formed, it is ensured that the installation quality of middle buried water stop, while shortening the duration, is easy to promote the use of.

Description

A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method
Technical field
The invention belongs to tunnel arch wall lining cutting end head formwork technical field of construction, more particularly, to a kind of middle buried water stop Positioning chassis steel end mould and Second Lining Construction method.
Background technology
Current Tunnel Second Lining is built method and is constructed using chassis mould mostly, in order to improve the water-proof function of lining cutting, substantially Arch wall splash guard (EVA etc.) and seepage-resistant grade concrete high are employed, in order to prevent at every plate Second Lining Construction seam Seepage, the middle buried water stop in the design and installation of secondary lining termination.The end head formwork of general secondary chassis is all using wood Plate processing is assembled, and middle buried water stop is fixed using the curved card of reinforcing bar, and the installation of middle buried water stop is difficult to ensure that in construction Quality.
Wooden model does the processing of stopper template and installs very difficult, first has to the instrument fortune by plank sheathing raw material and processing template To scene, the batten of the contour machining appropriate length according to preliminary bracing structure, from one piece of chassis bottom both sides, one piece of assembly, together When middle buried water stop is first fixed in 90 ° with reinforcing bar card, be then subsequently secured in fritter template, middle buried water stop itself matter Amount is larger, and fixation rear rigidity in 90 ° increases, and operation is inconvenient, and supporting and retaining system is also wanted in outside after wooden model assembly, and whole model sheetinstallat is extremely 4 people being wanted less and 6h is needed, seriously being wasted time and energy, while wasting circulation material, the installation quality of main middle buried water stop is difficult To ensure.Therefore all inside template, if workman is careless or lacks a sense of responsibility, technology is poor, tears open for buried water stop in Middle buried water stop often occurs out of alignment after mould, and buried depth is exceeded, and middle buried water stop strikes the beam no Transducers Embedded in Concrete Middle the problems such as, the waterproof action of middle buried water stop is had a strong impact on, larger construction hidden danger is left to tunnel
The content of the invention
The technical problems to be solved by the invention are for above-mentioned deficiency of the prior art, there is provided buried in a kind of Formula waterstop positioning tunnel trolley steel end mould, its simple structure, reasonable in design, use value are high, arc steel form and chassis Connect as one, and inner arc plate and outer arc plate that the required middle buried water stop for exposing is fixed on arc steel form are formed In card holding trough, it is ensured that the installation quality of middle buried water stop, while shortening the duration.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of middle buried water stop positioning chassis Steel end mould, it is characterised in that:The chassis steel end mould includes multigroup arc steel form, and multigroup arc steel form is along chassis top To chassis both sides successively laying bonded to each other, multigroup arc steel form is formed and institute's construction tunnel section configuration identical platform The sealant for sealing is provided between the preliminary bracing structure of Che Gangduan moulds, the chassis steel end mould and institute's construction tunnel, The thickness of the sealant is not less than the distance between the steel end mould outward flange and described preliminary bracing structure;
Arc steel form described in every group includes arc steel form and outer arcuate steel form, and the arc steel form includes The wainscot being connected in chassis web edge and the inner arc plate for being vertically fixed on the wainscot outer ledge, the outer arcuate Steel form includes the outer arc plate being connected with inner arc plate and the outer panels for being vertically fixed on the outer arc plate exterior bottom, the inner face Plate is in the same plane with outer panels, and the wainscot is articulated and connected with chassis web, the inner arc plate and outer arc plate along One end of the chassis front end is articulated and connected, and the inner arc plate forms a card for being used for buried water stop in clamping with outer arc plate Tankage.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The sealant is multiple along tunnel Section radially lay wood lath successively from top to both sides, described wood lath one end is fixed in the outer panels, the other end Fitted with the preliminary bracing structure.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The chassis steel end mould is close with described Sealing is more than the thickness of institute's construction tunnel secondary lining along the gross thickness of the section radial direction in tunnel.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The wainscot and the inner arc plate Between be disposed with inner reinforced plate along the length direction of the arc steel form, along institute between the outer panels and the outer arc plate The length direction for stating arc steel form is disposed with outer gusset.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The wood lath and the outer panels It is fixedly connected by angle steel.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The width of the card holding trough is not more than The thickness of the middle buried water stop.
A kind of above-mentioned middle buried water stop positioning chassis steel end mould, it is characterized in that:The length of the card holding trough is more than institute State the 1/2 of middle buried water stop width.
Present invention also offers a kind of based on the above-mentioned middle buried water stop positioning Second Lining Construction of chassis steel end mould Method, it is characterised in that comprise the following steps:
Step one, chassis are in place:The rail of trolley traveling is laid according to surveying setting-out result, after steel rail laying is good, is opened Dynamic chassis motor, makes chassis be located in the position for needing to carry out Second Lining Construction, locks chassis, according to design and construction drawing branch If the ring template of chassis;
Step 2, the installation of middle buried water stop and positioning:When middle buried water stop is installed, first from the tip position in tunnel Start to install, then be installed separately from the abutment wall in tunnel, the inner arc plate and described is fixed on by the 1/2 of middle buried water stop width In the card holding trough that outer arc plate is formed;
The installation of step 3, sealant:After the completion of middle buried water stop positioning, at the beginning of the outward flange and tunnel according to outer panels The distance between phase supporting construction size determines the thickness of sealant, and the inward flange of sealant is fixedly connected in outer panels, The outward flange of sealant is fitted with Tunnel structure, secondary in ring template and steel end mould the formation constructing tunnel of chassis The forming panel of lining cutting;
Step 4, casting concrete:Concrete using mould is pumped into, make firm by ramming by symmetrical, laminated pouring, layering;
Step 5, form removal.
Above-mentioned Second Lining Construction method, it is characterized in that:Before step one construction, the installation of arc steel form is carried out: Outside tunnel by multigroup arc steel form along the chassis both sides segmented installation successively from top to chassis, respectively will The wainscot of the arc steel form is fixedly connected with inner arc plate, outer panels and the outer arc plate connection of outer arcuate steel form, so The inner arc plate is connected with the outer arc plate afterwards, mark is carried out at the edge of chassis web, by the arc steel form Panel is connected on the chassis web;It is fixedly connected between the arc steel form of two adjacent sections section.
Above-mentioned Second Lining Construction method, it is characterized in that:Before step 2 chassis is in place, in the chassis arc steel form With the ring template surface brushing releasing agent of the chassis.
The present invention has advantages below compared with prior art:
1. simple structure and easy to operate, input cost is few.It is to be fixedly connected as one with chassis in arc steel form first Body, it is not necessary to which secondary operation is assembled, time-consuming.
2. reasonable in design, is easily installed.Middle buried water stop need not curve 90 with reinforcing bar card, required to expose Middle buried water stop is fixed in the card holding trough that the inner arc plate of arc steel form and outer arc plate are formed, it is ensured that middle buried water stop Installation quality, while shorten the duration.
3. using effect is good and practical value is high.The steel end mould is reduced to wood in the installation of middle buried water stop The waste of material, while easy installation and removal, improves operating efficiency.
4. construction procedure is simple, and the use of steel end mould overcomes the common fault of traditional wooden model completely, and arc steel form first is Connected as one with chassis, it is not necessary to which secondary operation is assembled, time-consuming, and technical requirements to workman can be reduced, as long as pressing According to step of the invention construction, middle buried water stop only needs 4 people 3h~4h can just to install, and in ensure that it is buried only The installation quality of water band, buried water stop installs poor common fault in overcoming tunnel ring.
In sum, simple structure of the present invention and easy to operate, input cost is few;Reasonable in design, is easily installed, and applies Work step is suddenly simple;Using effect is good and practical value is high;The required middle buried water stop for exposing is fixed on arc steel form In the card holding trough of the formation of inner arc plate and outer arc plate, it is ensured that the installation quality of middle buried water stop, while shortening the duration, overcome Buried water stop installs the common fault of difference in tunnel ring, is easy to promote the use of.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the structural representation of chassis steel end mould of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the use state figure of chassis steel end mould of the present invention.
Fig. 4 is the method flow block diagram of Second Lining Construction method of the present invention.
Description of reference numerals:
1-1-wainscot;1-2-inner arc plate;1-3-inner reinforced plate;
2-1-outer panels;2-2-outer arc plate;2-3-outer gusset;
3-wood lath;4-1-otic placode;4-2-connecting plate;
4-3-bearing pin;5-middle buried water stop;6-angle steel;
7-the first bolt;8-the second bolt;9-chassis web;
10-preliminary bracing structure.
Specific embodiment
A kind of middle buried water stop positioning chassis steel end mould as shown in Figure 1, Figure 2, Figure 3 shows, the chassis steel end mould includes Multigroup arc steel form, multigroup arc steel form is along chassis top to chassis both sides successively laying bonded to each other, Duo Zusuo Arc steel form is stated to be formed and institute's construction tunnel section configuration identical chassis steel end mould, the chassis steel end mould and tunnel of constructing The sealant for sealing is provided between the preliminary bracing structure 10 in road, the thickness of the sealant is not less than steel end mould The distance between outward flange and described preliminary bracing structure 10;
Arc steel form described in every group includes arc steel form and outer arcuate steel form, and the arc steel form includes The wainscot 1-1 being connected on the edge of the chassis web 9 and inner arc plate 1-2 for being vertically fixed on the wainscot 1-1 outer ledges, The outer arcuate steel form includes the outer arc plate 2-2 being connected with inner arc plate 1-2 and is vertically fixed on bottom on the outside of the outer arc plate 2-2 The outer panels 2-1, the wainscot 1-1 in portion are in the same plane with outer panels 2-1, the wainscot 1-1 and chassis web 9 It is articulated and connected, the inner arc plate 1-2 and outer arc plate 2-2 is articulated and connected along one end of the chassis front end, the inner arc plate 1-2 A card holding trough for being used for buried water stop 5 in clamping is formed with outer arc plate 2-2.
When actually used, chassis steel end mould is multigroup arc steel form, and timber, economic ring are saved compared to traditional plank sheathing Protect.
When actually used, the thickness of the sealant is not less than the steel end mould outward flange and the preliminary bracing structure 10 The distance between, sealant is fixedly connected with the outer panels 2-1 in the mould of steel end, it is ensured that the reliability of connection, both preferred Between to have certain lap of splice, the lap of splice is 20mm~40mm.
When actually used, between two adjacent groups arc steel form by position hole position and through be connected to positioning hole position between Connecting bolt be bolted together, by connecting bolt by each group arc-shaped steel template assembly together, easy to operate, labour intensity Low, speed of application is fast, the installation procedure of traditional middle buried water stop is simplified, while ensure that adjacent in concreting Being fixedly connected between two groups of arc steel forms and seal, it is therefore prevented that during concreting, concrete is along two adjacent groups arc-shaped steel Gap between template is overflowed, so as to cause the waste of concrete and the problem of Tunnel Second Lining quality.
When actually used, arc steel form lower edge is installed with the justified margin of the chassis web 9, it is preferred that arc The steel form lower edge lap of splice is 230mm, it is ensured that the globality and stability connected between arc steel form and chassis.
When actually used, wainscot 1-1 is articulated and connected with chassis web 9 and be connected by the first articulated elements, inner arc plate 1-2 with Outer arc plate 2-2 is along one end of the chassis front end by joining the connection of the second articulated elements, the first articulated elements and the second articulated elements Include otic placode 4-1, connecting plate 4-2 and bearing pin 4-3.
When actually used, the direction that chassis front end is advanced for chassis along institute's construction tunnel.
When actually used, the otic placode 4-1 of the first articulated elements connection is welded on the edge of the chassis web 9, hinge ear 4-1's Connecting plate 4-2 is welded on the edge of the wainscot 1-1, and otic placode 4-1 is connected with connecting plate 4-2 by bearing pin 4-3, arc steel When template is rotated, the bearing pin 4-3 plays a part of bearing, the operation of the convenient buried water stop in positioning.
When actually used, after arc steel form rotate in place, wainscot 1-1 and chassis are fixedly connected with the first bolt 7 Web 9, it is ensured that during later stage concreting, the stability of arc steel form.
When actually used, the otic placode 4-1 of the second articulated elements connection is welded on the edge of inner arc plate 1-2, the hinge ear The connecting plate 4-2 of 4-1 is welded on the edge of outer arc plate 2-2, and otic placode 4-1 is connected with connecting plate 4-2 by bearing pin 4-3, outer arcuate When steel form is rotated, bearing pin 4-3 plays a part of bearing.
In the present embodiment, the sealant is that multiple sections along tunnel radially lay wood lath successively from top to both sides 3, the one end of the wood lath 3 is fixed on the outer panels 2-1, and the other end is fitted with the preliminary bracing structure 10.
During practice of construction, by outline excavation and the design profile line of institute's construction tunnel have deviation, outer panels 2-1's is outer Edge can not be arrived in preliminary bracing structure 10, the distance between the outward flange according to outer panels 2-1 and preliminary bracing structure 10 Processing is fitted between wood lath 3, and two neighboring wood lath 3 and is laid, it is ensured that the sealing of chassis steel end mould.
In the present embodiment, the chassis steel end mould is more than with the sealant along the gross thickness of the section radial direction in tunnel to be applied The thickness of work Tunnel Second Lining.
When actually used, chassis steel end mould is along the disconnected of tunnel along the gross thickness of the section radial direction in tunnel with the sealant Face diameter to the thickness of wainscot 1-1, the thickness of outer panels 2-1, the groove width of card holding trough and wood lath 3 thickness sum.
During practice of construction, because arc steel form lower edge is installed with the justified margin of the chassis web 9, it is preferred that It is certain that the arc steel form lower edge lap of splice is that outer panels 2-1 in 230mm, and sealant and steel end mould is fixedly connected with The lap of splice, therefore to ensure having wood lath 3 to be fitted with preliminary bracing structure 10, chassis steel end mould is with the sealant along tunnel When the gross thickness of the section radial direction in road is more than the thickness of institute's construction tunnel secondary lining, can ensure to form institute's construction tunnel two The Sealing formboard of secondary lining cutting, prevents spilling during concreting.
In the present embodiment, along the length direction of the arc steel form between the wainscot 1-1 and the inner arc plate 1-2 Inner reinforced plate 1-3 is disposed with, along the length side of the arc steel form between the outer panels 2-1 and the outer arc plate 2-2 To being disposed with outer gusset 2-3, it is therefore an objective to strengthen the integral rigidity of the arc steel form.
In the present embodiment, the wood lath 3 is fixedly connected with the outer panels 2-1 by angle steel 6.
During practice of construction, one end and the outer panels 2-1 of angle steel 6 are welded to connect, the other end of angle steel 6 and the wood lath 3 It is fixedly connected by the second bolt 8.
In the present embodiment, the width of the card holding trough is not more than the thickness of the middle buried water stop 5, buried sealing in making Precision with 5 positioning, so as to ensure that the installation quality of middle buried water stop 5, it is ensured that the anti-row of institute's construction tunnel arch wall Water effect;If thickness of the width of card holding trough more than middle buried water stop 5, in concreting, concrete can enter interior In interval between arc plate 1-2 and outer arc plate 2-2, it is unfavorable for the form removal in later stage, and cause the waste of concrete.
In the present embodiment, middle buried water stop 5 be preferably in buried rubber fastening band.
In the present embodiment, 1/2 of the length of the card holding trough more than the width of middle buried water stop 5, it is ensured that in it is buried The accurate positioning of waterstop 5, makes the depth of burying of the middle buried water stop 5 in the middle of construction joint two segment concrete be guaranteed, and prevents Only Tunnel Second Lining is due to the deviation of the installation site of middle buried water stop 5, the total quality of influence institute construction tunnel.
During practice of construction, the width of the middle buried water stop 5 is 350mm, and the length of the card holding trough is 230mm.
During practice of construction, middle buried water stop 5 is arranged on and exceeds chassis ring template edge along institute's construction tunnel section 200mm and it is be arranged in parallel with chassis ring template.
As shown in Figure 4 is a kind of based on the middle buried water stop positioning Second Lining Construction method of chassis steel end mould, wraps Include following steps:
Step one, chassis are in place:The rail of trolley traveling is laid according to surveying setting-out result, after steel rail laying is good, is opened Dynamic chassis motor, makes chassis be located in the position for needing to carry out Second Lining Construction, locks chassis, according to design and construction drawing branch If the ring template of chassis;
During practice of construction, spacing top iron is both provided with before and after chassis, for the position of spacing chassis, prevented in secondary lining Cause the movement of chassis steel end mould due to the movement of chassis in block work progress, also result in the change of the position of middle buried water stop 5 It is dynamic.
Step 2, the installation of middle buried water stop and positioning:When middle buried water stop 5 is installed, first from the top position in tunnel Put and start to install, then be installed separately from the abutment wall in tunnel, the inner arc plate 1-2 is fixed on by the 1/2 of the width of middle buried water stop 5 In the card holding trough formed with the outer arc plate 2-2;
During practice of construction, middle buried water stop 5 passes through solid by bolt between bolt and inner arc plate 1-2 and outer arc plate 2-2 Fixed connection, prevents in concreting, the quick-fried mould of middle buried water stop 5.
The installation of step 3, sealant:After the completion of middle buried water stop 5 is positioned, outward flange and tunnel according to outer panels 2-1 The distance between road preliminary bracing structure 10 size determines the thickness of sealant, and the inward flange of sealant is fixedly connected outside On plate 2-1, the outward flange of sealant is fitted with Tunnel structure 10, and the ring template and steel end mould of chassis form tunnel The forming panel of secondary lining in construction;
During practice of construction, arc steel form is in installation process it should be noted that adjusting, being accurately positioned, installation deviation most very much not surpasses Cross 30mm.
Step 4, casting concrete:Concrete using mould is pumped into, make firm by ramming by symmetrical, laminated pouring, layering;
Step 5, form removal.
During practice of construction, start to unscrew middle buried water stop 5 and inner arc plate 1-2 and the outer arc plate after concreting 4h Fixed bolt between 2-2, when concrete strength is more than more than 8.0Mpa, removes small plank 3, pull up wainscot 1-1 with it is outer The bearing pin 4-3 of the setting between panel 2-1.
In the present embodiment, before step one construction, the installation of arc steel form is carried out:By multigroup arc outside tunnel Steel form along the chassis both sides segmented installation successively from top to chassis, respectively by the inner face of the arc steel form Plate 1-1 is fixedly connected with inner arc plate 1-2, outer panels 2-1 and outer arc plate the 2-2 connection of outer arcuate steel form, then will be described interior Arc plate 1-2 is connected with the outer arc plate 2-2, and the edge of chassis web 9 is carried out into mark, by the wainscot of the arc steel form 1-1 is connected on the chassis web 9;It is fixedly connected between the arc steel form of two adjacent sections section.
During practice of construction, the arc-shaped steel model sheetinstallat is made into arc steel form on chassis web before chassis is in place Space during installation is unrestricted, convenient to install, while being conducive to adjusting the gap of arc formwork and chassis ring template, it is ensured that Sealing between the two.
In the present embodiment, before step 2 chassis is in place, in the chassis arc steel form and the ring template of the chassis External coating releasing agent, is easy to form removal.
The above, is only presently preferred embodiments of the present invention, and not the present invention is imposed any restrictions, every according to the present invention Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a kind of middle buried water stop is positioned with chassis steel end mould, it is characterised in that:The chassis steel end mould includes multigroup arc-shaped steel Template, multigroup arc steel form along chassis top to chassis both sides successively laying bonded to each other, multigroup arc punching block Plate shape into institute's construction tunnel section configuration identical chassis steel end mould, the initial stage branch of the chassis steel end mould and institute's construction tunnel Be provided with the sealant for sealing between protection structure (10), the thickness of the sealant not less than the steel end mould outward flange with The distance between described preliminary bracing structure (10);
Arc steel form described in every group includes arc steel form and outer arcuate steel form, and the arc steel form includes connection Wainscot (1-1) on chassis web (9) edge and it is vertically fixed on the inner arc plate of the wainscot (1-1) outer ledge (1-2), the outer arcuate steel form includes the outer arc plate (2-2) being connected with inner arc plate (1-2) and is vertically fixed on the outer arc The outer panels (2-1) of plate (2-2) exterior bottom, the wainscot (1-1) is in the same plane with outer panels (2-1), described Wainscot (1-1) is articulated and connected with chassis web (9), and the inner arc plate (1-2) is with outer arc plate (2-2) along the chassis front end One end be articulated and connected, the inner arc plate (1-2) and outer arc plate (2-2) formed one be used to clamping in buried water stop (5) Card holding trough.
2. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 1, it is characterised in that:The sealing Layer radially lays wood lath (3) from top to both sides successively for multiple sections along tunnel, and described wood lath (3) one end is fixed on On the outer panels (2-1), the other end is fitted with the preliminary bracing structure (10).
3. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 1, it is characterised in that:The chassis Steel end mould is more than the thickness of institute's construction tunnel secondary lining with the sealant along the gross thickness of the section radial direction in tunnel.
4. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 1, it is characterised in that:The inner face Inner reinforced plate (1-3) is disposed with along the length direction of the arc steel form between plate (1-1) and the inner arc plate (1-2), Between the outer panels (2-1) and the outer arc plate (2-2) outer muscle is disposed with along the length direction of the arc steel form Plate (2-3).
5. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 2, it is characterised in that:The plank Bar (3) is fixedly connected with the outer panels (2-1) by angle steel (6).
6. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 1, it is characterised in that:The clamp The width of groove is not more than the thickness of the middle buried water stop (5).
7. according to the chassis steel end mould of a kind of middle buried water stop positioning described in claim 1 or 6, it is characterised in that:It is described 1/2 of the length of card holding trough more than middle buried water stop (5) width.
8. a kind of based on the Second Lining Construction side of chassis steel end mould of buried water stop positioning in as claimed in claim 7 Method, it is characterised in that comprise the following steps:
Step one, chassis are in place:The rail of trolley traveling is laid according to surveying setting-out result, after steel rail laying is good, platform is started Vehicle and horse are reached, and chassis is located in the position for needing to carry out Second Lining Construction, lock chassis, and platform is installed according to design and construction drawing The ring template of car;
Step 2, the installation of middle buried water stop and positioning:When middle buried water stop (5) is installed, first from the tip position in tunnel Start to install, then be installed separately from the abutment wall in tunnel, the inner arc plate (1- is fixed on by the 1/2 of middle buried water stop (5) width 2) and in the card holding trough of the outer arc plate (2-2) formation;
The installation of step 3, sealant:After the completion of middle buried water stop (5) positioning, outward flange and tunnel according to outer panels (2-1) The distance between road preliminary bracing structure (10) size determines the thickness of sealant, and the inward flange of sealant is fixedly connected outside On panel (2-1), the outward flange of sealant is fitted with Tunnel structure (10), the ring template and steel end mould shape of chassis The forming panel of secondary lining into constructing tunnel;
Step 4, casting concrete:Concrete using mould is pumped into, make firm by ramming by symmetrical, laminated pouring, layering;
Step 5, form removal.
9. according to the Second Lining Construction method described in claim 8, it is characterised in that:Before step one construction, arc is carried out The installation of steel form:Outside tunnel by multigroup arc steel form along the chassis both sides merogenesis successively from top to chassis Section is installed, and the wainscot (1-1) of the arc steel form is fixedly connected with inner arc plate (1-2) respectively, outer arcuate steel form Outer panels (2-1) and outer arc plate (2-2) connection, then the inner arc plate (1-2) be connected with the outer arc plate (2-2), general Mark is carried out at the edge of chassis web (9), and the wainscot (1-1) of the arc steel form is connected into the chassis web (9) On;It is fixedly connected between the arc steel form of two adjacent sections section.
10. according to the Second Lining Construction method described in claim 8, it is characterised in that:Before step 2 chassis is in place, described The ring template surface brushing releasing agent of chassis arc steel form and the chassis.
CN201611245264.9A 2016-12-29 2016-12-29 A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method Pending CN106761829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611245264.9A CN106761829A (en) 2016-12-29 2016-12-29 A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611245264.9A CN106761829A (en) 2016-12-29 2016-12-29 A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method

Publications (1)

Publication Number Publication Date
CN106761829A true CN106761829A (en) 2017-05-31

Family

ID=58928868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611245264.9A Pending CN106761829A (en) 2016-12-29 2016-12-29 A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method

Country Status (1)

Country Link
CN (1) CN106761829A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533292A (en) * 2018-06-21 2018-09-14 中铁第四勘察设计院集团有限公司 A kind of tunnel double-lining armored concrete location end mode structure and installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2946492A1 (en) * 1979-11-17 1981-05-27 Günter 4630 Bochum Marzi Mine gallery support frame mat bolting system - has end screw holes in bolt mats gripping adjacent frames segments
JPH07197792A (en) * 1993-12-29 1995-08-01 Tekken Constr Co Ltd Tunnel lining structure, lining device and construction method
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103437791A (en) * 2013-09-13 2013-12-11 中铁隧道集团二处有限公司 Installation method of buried waterstop at tip of tunnel lining trolley
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
CN203685208U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 End-shaping steel template for double-lining trolley for tunnel
CN204920984U (en) * 2015-08-12 2015-12-30 中交第二航务工程局有限公司 Mounting structure of two bayonet lined steel end moulds convenient to dismantle
CN204960950U (en) * 2015-09-23 2016-01-13 中交第二航务工程局有限公司 Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to
CN206319893U (en) * 2016-12-29 2017-07-11 中铁二十一局集团第四工程有限公司 A kind of middle buried water stop positioning chassis steel end mould

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2946492A1 (en) * 1979-11-17 1981-05-27 Günter 4630 Bochum Marzi Mine gallery support frame mat bolting system - has end screw holes in bolt mats gripping adjacent frames segments
JPH07197792A (en) * 1993-12-29 1995-08-01 Tekken Constr Co Ltd Tunnel lining structure, lining device and construction method
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103437791A (en) * 2013-09-13 2013-12-11 中铁隧道集团二处有限公司 Installation method of buried waterstop at tip of tunnel lining trolley
CN203685208U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 End-shaping steel template for double-lining trolley for tunnel
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
CN204920984U (en) * 2015-08-12 2015-12-30 中交第二航务工程局有限公司 Mounting structure of two bayonet lined steel end moulds convenient to dismantle
CN204960950U (en) * 2015-09-23 2016-01-13 中交第二航务工程局有限公司 Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to
CN206319893U (en) * 2016-12-29 2017-07-11 中铁二十一局集团第四工程有限公司 A kind of middle buried water stop positioning chassis steel end mould

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533292A (en) * 2018-06-21 2018-09-14 中铁第四勘察设计院集团有限公司 A kind of tunnel double-lining armored concrete location end mode structure and installation method
CN108533292B (en) * 2018-06-21 2024-03-15 中铁第四勘察设计院集团有限公司 Tunnel secondary lining reinforced concrete section end mould structure and installation method

Similar Documents

Publication Publication Date Title
CN101818645B (en) Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN105625298B (en) Using the continuous underground wall structure and its construction method of glass fiber-reinforced polymer lap joint sleeve milling
CN107023160A (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN109751080A (en) The supporting construction and construction method with guarded drainage function suitable for water rich strata
CN106245526A (en) The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
CN109356183B (en) Open caisson reserved hole plugging structure and construction method thereof
CN107806349A (en) A kind of steel FRP complex waves card tunnel secondary liner structure and its apply method
CN107905814A (en) Large span loess tunnel top bar CD construction methods
CN107939415A (en) Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN206319893U (en) A kind of middle buried water stop positioning chassis steel end mould
CN205116713U (en) Concrete wall post mould with water and electricity pipeline provided groove fetal membrane
CN112227404B (en) Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN106761829A (en) A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method
CN203685208U (en) End-shaping steel template for double-lining trolley for tunnel
CN207111108U (en) A kind of rapid-maintenance structure damaged for Tunnel Second Lining
CN111335926A (en) Tunnel waterproof layer, template trolley and construction method
CN106930778B (en) water delivery tunnel concrete lining induced joint structure and setting method
CN100429354C (en) Concrete combined cushion wedge for supporting waist beam for pile anchoring system, and its constrection method
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN113217034A (en) Combined primary supporting structure and construction method thereof
CN114319454A (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN212642759U (en) Quick installation waterstop of tunnel structure seam and lining cutting end template for installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531