CN212642759U - Quick installation waterstop of tunnel structure seam and lining cutting end template for installation - Google Patents
Quick installation waterstop of tunnel structure seam and lining cutting end template for installation Download PDFInfo
- Publication number
- CN212642759U CN212642759U CN202021048974.4U CN202021048974U CN212642759U CN 212642759 U CN212642759 U CN 212642759U CN 202021048974 U CN202021048974 U CN 202021048974U CN 212642759 U CN212642759 U CN 212642759U
- Authority
- CN
- China
- Prior art keywords
- waterstop
- installation
- tunnel
- flange
- lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The waterstop is installed fast at the tunnel structural joint and the lining end template is used for installation, the difficult problems that the existing tunnel circumferential structural joint waterstop cannot effectively and quickly locate and cannot effectively discharge accumulated water behind the structural joint are effectively overcome, the installation quality and the protection function of the waterstop are improved, and the construction quality of the secondary lining circumferential structural joint is improved. This install waterstop fast, including the installation waterstop fast along tunnel structure seam hoop setting, have bury the back pour secondary lining mould build the left side edge of a wing in the concrete, bury the right side edge of a wing in pouring secondary lining mould build the concrete earlier. The intersection part of the left flange and the right flange is provided with an inner groove, and the right side wall of the inner groove is flush with the end surface of the primary casting secondary lining; the outside of inside groove has U type groove structure, sets up the anti-crystallization drain pipe of hoop extension in this U type groove structure, fixedly on the outer port of U type groove structure setting up the filter layer. The central lines of the U-shaped groove structure and the anti-crystallization drain pipe coincide with the structural joint.
Description
Technical Field
The utility model relates to a tunnel structure, in particular to a lining cutting end template is used in quick installation waterstop and installation for tunnel structure seam.
Background
In general waterproof design, in order to ensure the waterproof effect of a tunnel, a medium-buried water stop and an external rubber water stop are arranged at structural joints (construction joints, deformation joints and settlement joints) of the tunnel during lining construction of the tunnel. The purpose of the water stop belt is to prevent water leakage at the joint. However, in practical engineering, leakage water is often gathered near the structural joint due to the breakage of the waterproof board, and water is preferably bypassed around the water stop belt which is not installed in place along with the increase of the water pressure of the leakage water, so that the leakage water disease is generated at the joint of the tunnel. The construction and installation method of the buried water stop belt is a difficult problem in the engineering field, and the current common method is as follows: for the reinforced concrete lining, when a formwork is erected, the buried water stop is clamped and fixed by welding two steel bars on a secondary lining steel bar in the tunnel; however, for plain concrete lining, only end steel bars are additionally added to fix the waterstop clamp and the waterstop, and the method is relatively uneconomical. Although the method can fix the buried water stop, the fixing force points of the water stop are few, when the water stop is subjected to irregular and uneven force of flowing concrete during pouring of the concrete, the water stop is loosened or runs out of a mold, the water stop cannot achieve the installation and water stop effects required by the design, and the water stop is prone to damage in the later stage.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a tunnel structure seam installs waterstop fast is provided, effectively overcomes the difficult problem that current tunnel hoop structure seam waterstop can't be effective, fix a position and can't effectively discharge ponding behind the structure seam.
The utility model provides a technical scheme that its technical problem adopted as follows:
the utility model discloses a quick installation waterstop of tunnel structure seam, include the quick installation waterstop that sets up along tunnel structure seam hoop, characterized by: the quick installation water stop belt is provided with a left flange embedded in secondary lining cast concrete and a right flange embedded in primary lining cast concrete; the intersection part of the left flange and the right flange is provided with an inner groove, and the right side wall of the inner groove is flush with the end face of the primary casting secondary lining; the outer side of the inner groove is provided with a U-shaped groove structure, an annularly extending anti-crystallization drain pipe is arranged in the U-shaped groove structure, and a filter layer is fixedly arranged on an outer port of the U-shaped groove structure; the central lines of the U-shaped groove structure and the anti-crystallization drain pipe coincide with the structural joint.
The utility model aims to solve another technical problem that a lining cutting end template is used in installation that above-mentioned tunnel structure seam was installed the waterstop fast is provided to effectively improve waterstop installation quality and safeguard function, improve the construction quality of secondary lining hoop structure seam department, eliminate the structure seam department because of burying the quality defect problem that waterstop installation problem arouses in.
The utility model provides an above-mentioned technical problem adopted technical scheme as follows: the cross section of the lining end template is h-shaped, and the lining end template is provided with an inner limb and an outer limb which are parallel, and a slot cavity for accommodating and deflecting a left flange is formed between the inner limb and the outer limb; the thickness of the inner limb is matched with the width of the inner groove, and the front end of the inner limb is abutted against the bottom wall of the inner groove; the front end of the outer limb is abutted against the surface of the waterproof board.
The utility model has the advantages that the water stop belt is provided with the U-shaped groove structure and the anti-crystallization drain pipe, and the central line of the water stop belt is coincided with the structural joint, so that the water stop belt has good waterproof and drainage functions, breaks through the traditional mode of 'only preventing and not discharging, being difficult to install and position' for solving the problem of water prevention and drainage of the circumferential structural joint of the tunnel, and achieves the dual guarantee of preventing and discharging, so that the waterproof and drainage effects are better; the lining end template for installation can well meet the waterproof and drainage requirements of construction joints and settlement joints, improves the construction quality of the waterstop, eliminates potential safety hazards in operation, enables the construction quality of the waterstop to be better, and provides effective guarantee for operation safety.
Drawings
The specification includes the following five figures:
FIG. 1 is a reference diagram of the use state of the quick installation water stop for the tunnel construction seam of the invention;
FIG. 2 is a structural section view of the quick installation waterstop for tunnel structural joint of the present invention;
FIG. 3 is a cross-sectional view of the lining end form for installation of the present invention;
FIG. 4 is a schematic view of the fast installation waterstop for tunnel construction seams of the present invention in use;
FIG. 5 is a schematic view of the installation state of the quick installation water stop for the tunnel structural joint of the present invention;
the figures show the components and corresponding references: the figures show the components and corresponding references: the method comprises the following steps of constructing a tunnel seam A, quickly installing a water stop belt 10, a left side flange 11, a right side flange 12, an inner groove 13, a U-shaped groove structure 14, an anti-crystallization drain pipe 15, a filter layer 16, an anchoring ridge 17, a water stop ridge 18, a lining end template 20, an inner limb 21, an outer limb 22, a groove cavity 23, a positioning shoulder 24, a tunnel primary support 30, pouring a secondary lining 41 firstly, pouring a secondary lining 42 secondly, a waterproof board 50 and a tunnel side ditch 51.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Referring to fig. 1 and 4, the utility model discloses a quick installation waterstop of tunnel structure seam, include the quick installation waterstop 10 that sets up along tunnel structure seam A hoop. Referring to fig. 2, the quick install water stop 10 has a left side flange 11 embedded in poured-after secondary lining 42 molded concrete and a right side flange 12 embedded in poured-before secondary lining 41 molded concrete. The intersection of the left flange 11 and the right flange 12 has an inner groove 13, and the right side wall of the inner groove 13 is flush with the end surface of the primary casting of the secondary lining 41. The outer side of the inner groove 13 is provided with a U-shaped groove structure 14, a circumferentially extending anti-crystallization drain pipe 15 is arranged in the U-shaped groove structure 14, and a filter layer 16 is fixedly arranged at the outer end opening of the U-shaped groove structure 14. The central lines of the U-shaped groove structure 14 and the anti-crystallization drain pipe 15 are coincident with the structural seam A. The waterproof and drainage device has good waterproof and drainage functions, breaks through the mode of 'preventing and not discharging, being difficult to install and position' of the traditional method for solving the problem of preventing and draining water at the structural joint of the tunnel, achieves the dual guarantee of preventing and draining, and enables the waterproof and drainage effects to be better.
Referring to fig. 1, both ends of the crystallization-preventing drain pipe 15 are introduced into the same-side tunnel-side trench 51. The mode that the anti-crystallization drain pipe 15 is bent into the tunnel side ditch 51 is that the anti-crystallization drain pipe 15 is bent and extends along the longitudinal direction at the arch foot for no less than 30cm, and then is bent and connected into the tunnel side ditch 51, so that the blocking of a lining end pouring template on the drain pipe is avoided.
Referring to fig. 2, the front and back panel surfaces of the left side flange 11 and the right side flange 12 are respectively provided with water stop ribs 18 protruding outwards at intervals along the width direction, and the water stop ribs 18 are arranged along the length direction. The outer ends of the left side flange 11 and the right side flange 12 are provided with an anchoring ridge 17 which is arranged along the length direction, and the cross section of the anchoring ridge 17 is triangular.
Referring to fig. 3 and 5, the lining end form for installation of the present invention has a cross section of h-shape, parallel inner limbs 21 and outer limbs 22, and a slot cavity 23 for accommodating the deflection left flange 11 is formed between the two. The inner limb 21 has a thickness adapted to the width of the inner groove 13 and a front end abutting against the bottom wall of the inner groove 13. The front end of the outer limb 22 rests against the surface of the flashing 50. The front end of the outer limb 22 has a locating shoulder 24. The use of lining cutting end template 20 can be fine satisfies the waterstop installation requirement of structure seam, improves waterstop construction quality, eliminates the operation potential safety hazard, makes waterstop construction quality more excellent, provides effective guarantee for operation safety.
Referring to fig. 5, when the quick-mounting water stop 10 is positioned, the left flange 11 is clamped by the cavity 23 of the lining end template 20, the inner limb 21 is clamped in the inner groove 13, and the positioning shoulder 24 at the front end of the outer limb 22 abuts against the side wall of the U-shaped groove structure 14 to position the anti-crystallization drain pipe 15. Meanwhile, the front end of the outer limb 22 abuts against the surface of the waterproof plate 50, so that the functions of fixing and rapidly installing the water stop 10 and increasing the rigidity of the water stop are achieved. And after the right flange 12 is embedded into the cast secondary lining 41. And after the formwork concrete reaches the formwork removal strength, taking down the lining end template 20, resetting the left flange 11 by virtue of elasticity, pouring concrete of the secondary lining 42 after the formwork is built, and pouring the left flange 11.
The above is only used for illustration the utility model discloses some principles of quick installation waterstop of tunnel structure seam and installation are with lining cutting end template are not intended to be will the utility model discloses the limitation show with concrete structure and application scope in, all corresponding revisions and equivalents that all probably are utilized belong to the utility model discloses the patent range who applies for.
Claims (5)
1. Quick installation waterstop of tunnel structure seam includes quick installation waterstop (10) that set up along tunnel structure seam (A) hoop, characterized by: the quick installation water stop (10) is provided with a left flange (11) embedded in the cast concrete of the secondary lining (42) poured after the quick installation water stop and a right flange (12) embedded in the cast concrete of the secondary lining (41) poured before; the intersection part of the left flange (11) and the right flange (12) is provided with an inner groove (13), and the right side wall of the inner groove (13) is flush with the end surface of the secondary lining (41) poured in advance; a U-shaped groove structure (14) is arranged on the outer side of the inner groove (13), a circumferentially extending anti-crystallization drain pipe (15) is arranged in the U-shaped groove structure (14), and a filter layer (16) is fixedly arranged on an outer port of the U-shaped groove structure (14); the central lines of the U-shaped groove structure (14) and the anti-crystallization drain pipe (15) are coincided with the structural seam (A).
2. The quick-installation water stop for tunnel construction joints according to claim 1, which is characterized in that: the front and back plate surfaces of the left flange (11) and the right flange (12) are respectively provided with water stopping ribs (18) protruding outwards at intervals along the width direction, and the water stopping ribs (18) are arranged along the length direction; the horizontal outer end of left side flange (11), right side flange (12) has along length direction full length setting's anchor arris (17), and the section of anchor arris (17) is triangle-shaped.
3. The quick-installation water stop for tunnel construction joints according to claim 1, which is characterized in that: two ends of the anti-crystallization drain pipe (15) are led into the tunnel side grooves (51) on the same side.
4. A lining end form for installing a quick installation waterstop for a tunnel construction joint according to any one of claims 1 to 3, wherein: the cross section of the lining end template (20) is h-shaped, an inner limb (21) and an outer limb (22) which are parallel are arranged, and a slot cavity (23) for accommodating and deflecting the left flange (11) is formed between the inner limb and the outer limb; the thickness of the inner limb (21) is matched with the width of the inner groove (13), and the front end of the inner limb abuts against the bottom wall of the inner groove (13); the front end of the outer limb (22) is abutted against the surface of the waterproof plate (50).
5. A lining end form for installation according to claim 4 wherein: the front end of the outer limb (22) has a positioning shoulder (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021048974.4U CN212642759U (en) | 2020-06-09 | 2020-06-09 | Quick installation waterstop of tunnel structure seam and lining cutting end template for installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021048974.4U CN212642759U (en) | 2020-06-09 | 2020-06-09 | Quick installation waterstop of tunnel structure seam and lining cutting end template for installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212642759U true CN212642759U (en) | 2021-03-02 |
Family
ID=74789847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021048974.4U Active CN212642759U (en) | 2020-06-09 | 2020-06-09 | Quick installation waterstop of tunnel structure seam and lining cutting end template for installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212642759U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113217019A (en) * | 2021-04-01 | 2021-08-06 | 中铁二院贵阳勘察设计研究院有限责任公司 | Test method for testing effectiveness of quickly-installed waterstop drain pipe |
-
2020
- 2020-06-09 CN CN202021048974.4U patent/CN212642759U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113217019A (en) * | 2021-04-01 | 2021-08-06 | 中铁二院贵阳勘察设计研究院有限责任公司 | Test method for testing effectiveness of quickly-installed waterstop drain pipe |
CN113217019B (en) * | 2021-04-01 | 2023-11-17 | 中铁二院贵阳勘察设计研究院有限责任公司 | Test method for testing effectiveness of drain pipe of quick-installation water stop |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201650310U (en) | Medium-bury type water stop mounting structure used in tunnel | |
CN109826239B (en) | Basement outer wall post-pouring strip structure and construction method thereof | |
CN212642759U (en) | Quick installation waterstop of tunnel structure seam and lining cutting end template for installation | |
KR101732669B1 (en) | Reinforcement member, concrete box reinforced with the same and the construction method thereof | |
CN210975898U (en) | Prefabricated template system of basement outer wall post-cast strip | |
CN206319893U (en) | A kind of middle buried water stop positioning chassis steel end mould | |
CN217710879U (en) | Basement post-cast strip protective structure | |
CN112982694B (en) | Waterproof structure and construction method for basement extension building junction structure | |
KR101774865B1 (en) | A double wall | |
CN212506439U (en) | Waterproof structure adopting combined steel-edge rubber waterstop | |
JPH11241314A (en) | Reinforcing construction method of underwater structure | |
CN103726514A (en) | Anti-leakage structure and anti-leakage construction method for underground continuous wall | |
CN212223970U (en) | Prefabricated apron post-cast strip stagnant water temporary enclosed construction | |
CN114045880A (en) | Basement post-cast strip treatment process | |
CN106761829A (en) | A kind of middle buried water stop positioning chassis steel end mould and Second Lining Construction method | |
CN208441115U (en) | A kind of diaphram wall piping plugging structure | |
CN105863125A (en) | Mounting joint for external wall panel | |
KR20050017815A (en) | Construction and design method about center wall of two arch tunnel excavation method | |
CN105863130A (en) | External wall panel mounting joint | |
CN105888055A (en) | External wall panel installation node | |
CN209760271U (en) | Precipitation well head shaping protection plugging device | |
KR102593946B1 (en) | A two-arch tunnel having a dedicate drainage case inside the upper girder of the central wall and its construction method | |
CN107304566B (en) | A kind of detachable soil nailing wall board structure | |
CN220768458U (en) | Post-pouring belt structure connected with existing concrete structure | |
CN219281760U (en) | Waterproof board and tunnel support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |