CN106758823A - 大跨度刚构连续梁0号段现浇支架支承托架结构 - Google Patents

大跨度刚构连续梁0号段现浇支架支承托架结构 Download PDF

Info

Publication number
CN106758823A
CN106758823A CN201611037138.4A CN201611037138A CN106758823A CN 106758823 A CN106758823 A CN 106758823A CN 201611037138 A CN201611037138 A CN 201611037138A CN 106758823 A CN106758823 A CN 106758823A
Authority
CN
China
Prior art keywords
bracket
number section
support
large span
rigid frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611037138.4A
Other languages
English (en)
Inventor
宋作栋
陈俊龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201611037138.4A priority Critical patent/CN106758823A/zh
Publication of CN106758823A publication Critical patent/CN106758823A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

本发明公开了一种大跨度刚构连续梁0号段现浇支架支撑托架结构,采用预制三角托架(2)、预埋墩身内钢板牛腿(1)及连接件(3)相结合的组合托架结构,组合托架上面采用贝雷梁(4),贝雷梁(4)上分别设置箱梁底板承重的桁架(5)及箱梁翼板承重的工字钢分配梁(6);工字钢分配梁(6)上面采用碗扣式满堂支架(7),即形成整体结构。本发明根据连续梁0号段的受力特点设计现浇支架支承托架,分节段施工顺序搭设支架,支架的安装与拆除方便、解决了跨江河及高速公路等地域限制,需要的支架材料数量较少,施工快速、成本低。

Description

大跨度刚构连续梁0号段现浇支架支承托架结构
技术领域
本发明涉及一种大跨度连续梁现浇支架支承托架结构。
背景技术
目前,铁路施工一般大跨度的连续梁设计均采用挂篮悬灌的方法进行施工,随着跨江河及高速公路连续梁的日益增多,限制了采用落地式支架进行0号段施工。传统的落地式支架对地基承载力的要求较高,且受地形限制,因此连续梁桥在跨江河及高速公路时施工0号段采用落地式支架是受限制的,往往无法满足施工要求。即使在条件允许的情况下采用落地式支架施工,其存在工期长,材料耗费大,经济效益较差的缺点。
发明内容
本发明要解决的技术问题是,提供一种大跨度连续梁0号段施工现浇支架支承托架结构,以克服由于受地形限制无法采用落地支架,往往会增加材料投入及影响施工工期等不足。
本发明解决其技术问题所采用的技术方案是:采用预制三角托架、预埋墩身内钢板牛腿及连接件相结合的组合托架结构,组合托架上面采用贝雷梁,贝雷梁上分别设置箱梁底板承重的桁架及箱梁翼板承重的工字钢分配梁;工字钢分配梁上面采用碗扣式满堂支架,即形成整体结构。
三角托架与预埋墩身内钢板牛腿焊接刚接。
墩身两侧三角托架之间采用连接件连接。
连接件采用直径φ32mm精轧螺纹钢,并施加预应力。
贝雷梁采用2榀一组在现场预拼装后汽车吊整体吊装并形成整体。
托架结构顶部采用挂篮的底模系,侧模系作为0号段箱梁的底模及侧模板进行0号段施工。
本发明的有益效果是,根据连续梁0号段的受力特点合理设计支架,支架的安装与拆除方便、解决了跨江河及高速公路等地域限制,需要的支架材料数量较少,施工快速、成本低。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1 是本发明的结构示意图;
图2 是图1中的侧面图;
图3 是图1中的俯视图。
具体实施方式
本发明的实施例:跨高速公路及江河段连续梁0号段,采用预制三角托架2、预埋墩身内钢板牛腿1及连接件3相结合的组合托架结构,组合托架上面采用贝雷梁4,贝雷梁4上分别设置箱梁底板承重的桁架5及箱梁翼板承重的工字钢分配梁6;工字钢分配梁6上面采用碗扣式满堂支架7,即形成整体结构。
三角托架2与预埋墩身内钢板牛腿1焊接刚接。
墩身两侧三角托架2之间采用连接件3连接。
连接件3采用直径32mm精轧螺纹钢对拉联接并施加预应力。
贝雷梁4采用2榀一组在现场预拼装后汽车吊整体吊装并形成整体。
托架结构顶部采用挂篮的底模系,侧模系作为0号段箱梁的底模及侧模板进行0号段施工。
下面介绍施工方法。
首先,墩身预埋钢板牛腿的施工及三角托架的预制。
如图1、图2所示意,墩身施工时将钢板牛腿1预埋至设计位置,并保证预埋准确在竖直钢板牛腿上焊接水平钢板;在预制场进行三角托架2的焊接制作,出场前进行各部位的探伤检查保证焊接质量。
其次,三角托架的安装施工。
将预制好的三角托架2运至现场进行吊装,将吊装到位的三角托架2与墩身预埋钢板牛腿1的水平钢板进行焊接刚接。在墩顶附近预埋φ50 mmPVC管,墩前后安装牛腿托架后采用4根φ32mm精轧螺纹钢筋连接件3对拉,并进行预应力施加,形成托架的主要承重结构。
依次对三角托架2的联接精轧螺纹钢连接件3进行张拉施加预应力。
最后,三角托架以上部分的贝雷梁安装施工。
贝雷梁4采用两榀组合吊装,吊装保证其下部与三角托架3顶面密贴,贝雷梁安装到位后可进行底板承重桁架5及翼板分配工字钢6的吊装,底板承重桁架5及翼板分配工字钢6均需要采用工字钢进行横向联接,以保证横向稳定。
工字钢6以上是碗扣式满堂支架7。

Claims (5)

1.一种大跨度刚构连续梁0号段现浇支架支撑托架结构,其特征是:采用预制三角托架(2)、预埋墩身内钢板牛腿(1)及连接件(3)相结合的组合托架结构,组合托架上面采用贝雷梁(4),贝雷梁(4)上分别设置箱梁底板承重的桁架(5)及箱梁翼板承重的工字钢分配梁(6);工字钢分配梁(6)上面采用碗扣式满堂支架(7),即形成整体结构。
2.根据权利要求1所述的大跨度刚构连续梁0号段现浇支架支撑托架结构,其特征在于:三角托架(2)与预埋墩身内钢板牛腿(1)焊接刚接。
3.根据权利要求1所述的大跨度刚构连续梁0号段现浇支架支撑托架结构,其特征在于:墩身两侧三角托架(2)之间采用连接件(3)连接。
4.根据权利要求1或3所述的大跨度刚构连续梁0号段现浇支架支撑托架结构,其特征在于:连接件(3)采用直径φ32mm精轧螺纹钢,并施加预应力。
5.根据权利要求1所述的大跨度刚构连续梁0号段现浇支架支撑托架结构,其特征在于:贝雷梁(4)采用2榀一组在现场预拼装后汽车吊整体吊装并形成整体。
CN201611037138.4A 2016-11-23 2016-11-23 大跨度刚构连续梁0号段现浇支架支承托架结构 Pending CN106758823A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611037138.4A CN106758823A (zh) 2016-11-23 2016-11-23 大跨度刚构连续梁0号段现浇支架支承托架结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611037138.4A CN106758823A (zh) 2016-11-23 2016-11-23 大跨度刚构连续梁0号段现浇支架支承托架结构

Publications (1)

Publication Number Publication Date
CN106758823A true CN106758823A (zh) 2017-05-31

Family

ID=58973710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611037138.4A Pending CN106758823A (zh) 2016-11-23 2016-11-23 大跨度刚构连续梁0号段现浇支架支承托架结构

Country Status (1)

Country Link
CN (1) CN106758823A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356040A (zh) * 2018-09-29 2019-02-19 中铁二局集团有限公司 一种高墩群小半径曲线现浇梁贝雷梁支架施工体系
CN110409306A (zh) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 一种连续刚构桥边跨合拢的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202830785U (zh) * 2012-09-02 2013-03-27 中铁十二局集团第二工程有限公司 高墩桥梁悬臂浇筑混凝土0#块墩顶托架
CN203904852U (zh) * 2014-06-14 2014-10-29 中铁三局集团有限公司 一种用于梁柱斜交体系现浇0号段施工的托架装置
US20160032543A1 (en) * 2013-03-06 2016-02-04 Western Mechanical Electrical Millwright Services Ltd. Bridge span replacement system
CN205242268U (zh) * 2015-12-18 2016-05-18 广东冠粤路桥有限公司 一种锚固三角托架
CN206279453U (zh) * 2016-11-23 2017-06-27 中铁五局集团有限公司 大跨度刚构连续梁0号段现浇支架支承托架结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202830785U (zh) * 2012-09-02 2013-03-27 中铁十二局集团第二工程有限公司 高墩桥梁悬臂浇筑混凝土0#块墩顶托架
US20160032543A1 (en) * 2013-03-06 2016-02-04 Western Mechanical Electrical Millwright Services Ltd. Bridge span replacement system
CN203904852U (zh) * 2014-06-14 2014-10-29 中铁三局集团有限公司 一种用于梁柱斜交体系现浇0号段施工的托架装置
CN205242268U (zh) * 2015-12-18 2016-05-18 广东冠粤路桥有限公司 一种锚固三角托架
CN206279453U (zh) * 2016-11-23 2017-06-27 中铁五局集团有限公司 大跨度刚构连续梁0号段现浇支架支承托架结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356040A (zh) * 2018-09-29 2019-02-19 中铁二局集团有限公司 一种高墩群小半径曲线现浇梁贝雷梁支架施工体系
CN110409306A (zh) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 一种连续刚构桥边跨合拢的施工方法

Similar Documents

Publication Publication Date Title
CN104631343B (zh) 自走行菱形销结桁架式挂篮结构及挂篮走行和施工方法
CN105780660B (zh) 一种节段拼装箱梁施工工艺
CN206279453U (zh) 大跨度刚构连续梁0号段现浇支架支承托架结构
CN107905114A (zh) 一种特大跨径连续刚构拱桥的施工方法
CN105648924A (zh) 多跨简支钢桁梁桥的施工方法
CN106854941B (zh) 一种大截面看台斜梁及斜柱的施工方法
CN102364012A (zh) 一种既有大跨度桁架扩建方法
CN108004929A (zh) 一种h型公铁两用桥梁桥面板吊装装置及吊装方法
CN102134832B (zh) 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架
CN110453613A (zh) 一种大跨径梁桥箱梁全断面一次悬浇施工方法
CN110700113B (zh) 一种无预应力束桥梁的预应力施加装置的施工方法
CN106758872A (zh) 波形钢腹板scc工法随车回旋吊移动挂篮及利用其施工的方法
CN106758823A (zh) 大跨度刚构连续梁0号段现浇支架支承托架结构
CN105019357B (zh) 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法
CN205257790U (zh) 固定高低腿提梁龙门吊
CN110700119A (zh) 一种组装式贝雷梁挂篮上走行系统及其设计工法
CN207498835U (zh) 小横梁组合钢板梁桥面板现浇施工滑动模架系统
CN206887771U (zh) 一种小跨径板梁施工平台结构
CN102926330B (zh) 一种适用于桥梁施工用挂蓝的安装方法
CN112878171A (zh) 一种大跨径钢结构拱桥及施工方法
CN104179123A (zh) 一种两孔连做节段拼装造桥机
JP4880374B2 (ja) 橋梁の架設方法
CN106284088A (zh) 预制拱板吊装临时固定方法
CN102322024A (zh) 连续梁悬臂施工挂篮交错安装施工方法
CN102251477B (zh) 系杆拱横移施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531

WD01 Invention patent application deemed withdrawn after publication