CN106758818A - 一种贝雷梁拆卸装置 - Google Patents

一种贝雷梁拆卸装置 Download PDF

Info

Publication number
CN106758818A
CN106758818A CN201611010566.8A CN201611010566A CN106758818A CN 106758818 A CN106758818 A CN 106758818A CN 201611010566 A CN201611010566 A CN 201611010566A CN 106758818 A CN106758818 A CN 106758818A
Authority
CN
China
Prior art keywords
bailey beam
cross girders
strand wires
shoulder pole
steel strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611010566.8A
Other languages
English (en)
Inventor
康卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201611010566.8A priority Critical patent/CN106758818A/zh
Publication of CN106758818A publication Critical patent/CN106758818A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种贝雷梁拆卸装置,包括钢支撑架,所述钢支撑架的上端设置有沙箱,且沙箱之间设置有横托梁,所述横托梁的上端设置有贝雷梁,所述横托梁的后端设置有翼缘板,且翼缘板的上端设置有扁担梁,所述扁担梁的上端设置有限位板,且限位板的上端设置有油压穿心式千斤顶,所述油压穿心式千斤顶的内部设置有钢绞线,本发明能很好的解决跨公路、跨河道等特殊施工环境的现浇连续梁施工所采用的贝雷梁支撑拆卸的技术问题,本发明结构简单、易操作、安全可靠、成本低廉、实用价值高。

Description

一种贝雷梁拆卸装置
技术领域
本发明涉及贝雷梁拆卸技术领域,具体为一种贝雷梁拆卸装置。
背景技术
随着我国经济的飞速发展,基础建设之一的交通建设也发展迅速,贝雷梁作为一种十分便捷且高效的支撑工具广泛存在于跨公路、跨河道的连续现浇梁等施工过程中。
传统拆卸方式主要有两种:1.采用2台25t吊车配合2台15t手拉倒链进行拆卸,拆卸器械笨重,作业过程缺乏可控性及拆卸过程中的安全性、稳定性较差,对作业场地也有一定要求;2.将单组贝雷梁拆卸成单元构件,采用手拉葫芦逐个拆除,此方式手拉葫芦不易固定,拆卸效率低下,操作难度大,易耽误工期。以上两种均非最优方案,故有必要开发一种简单、易操作、安全可靠、实用价值高,适用于跨公路、跨河道等特殊施工环境的贝雷梁拆卸装置。
发明内容
本发明的目的在于提供一种贝雷梁拆卸装置,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种贝雷梁拆卸装置,包括钢支撑架,所述钢支撑架的上端设置有沙箱,且沙箱之间设置有横托梁,所述横托梁的上端设置有贝雷梁,所述横托梁的后端设置有翼缘板,且翼缘板的上端设置有扁担梁,所述扁担梁的上端设置有限位板,且限位板的上端设置有油压穿心式千斤顶,所述油压穿心式千斤顶的内部设置有钢绞线,且钢绞线在油压穿心式千斤顶的上端处设置有第一工具锚,所述翼缘板上设置有安装钢绞线的预留孔,且钢绞线在对应预留孔上端处设置有第二工具锚,所述横托梁的下端设置有用于固定钢绞线末端的固定锚。
优选的,所述预留孔的内部设置有距离翼缘板的离腹板50cm距离的PVC管。
优选的,所述横托梁采用三拼12米长145B工字钢焊接形成。
优选的,所述扁担梁采用两拼1米长40B型工字钢中间预留3cm缝隙由两端面焊接形成。
优选的,所述第二工具锚焊接在扁担梁中间下T面上。
与现有技术相比,本发明的有益效果是:本发明能很好的解决跨公路、跨河道等特殊施工环境的现浇连续梁施工所采用的贝雷梁支撑拆卸的技术问题,本发明结构简单、易操作、安全可靠、成本低廉、实用价值高。
附图说明
图1为本发明结构示意图;
图2为图1中A区域的局部放大图。
图中:1第一工具锚、2贝雷梁、3固定锚、4钢支撑架、5沙箱、6横托梁、7钢绞线、8油压穿心式千斤顶、9扁担梁、10翼缘板、11预留孔、12第二工具锚、13限位板。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-2,本发明提供一种技术方案:
一种贝雷梁拆卸装置,包括钢支撑架4,钢支撑架4的上端设置有沙箱5,且沙箱5之间设置有横托梁6,横托梁6的上端设置有贝雷梁2,横托梁6的后端设置有翼缘板10,且翼缘板10的上端设置有扁担梁9,扁担梁9的上端设置有限位板13,且限位板13的上端设置有油压穿心式千斤顶8,油压穿心式千斤顶8的内部设置有钢绞线7,且钢绞线7在油压穿心式千斤顶8的上端处设置有第一工具锚1,翼缘板10上设置有安装钢绞线7的预留孔11,且钢绞线7在对应预留孔11上端处设置有第二工具锚12,横托梁6的下端设置有用于固定钢绞线7末端的固定锚3。
预留孔11的内部设置有距离翼缘板10的离腹板50cm距离的PVC管,横托梁6采用三拼12米长145B工字钢焊接形成,扁担梁9采用两拼1米长40B型工字钢中间预留3cm缝隙由两端面焊接形成,第二工具锚12焊接在扁担梁9中间下T面上。
本装置工作时,首先拆除钢支撑架4和沙箱5,随后将钢绞线7拉直,利用油压穿心式千斤顶8同步回顶至距最小行程5cm处,用第二工具锚12锁死钢绞线7,随后同步回顶至最小行程,此时第一工具锚1自动脱落,再利用油压穿心式千斤顶8同步升顶至距最大行程5cm处,用第一工具锚1锁死钢绞线7,继续升顶至最大行程,此时第二工具锚12脱落,循环上述步骤即可将贝雷梁2降至地面,因此很好的解决跨公路、跨河道等特殊施工环境的现浇连续梁施工所采用的贝雷梁支撑拆卸的技术问题,本发明结构简单、易操作、安全可靠、成本低廉、实用价值高。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (5)

1.一种贝雷梁拆卸装置,包括钢支撑架(4),所述钢支撑架(4)的上端设置有沙箱(5),且沙箱(5)之间设置有横托梁(6),所述横托梁(6)的上端设置有贝雷梁(2),其特征在于:所述横托梁(6)的后端设置有翼缘板(10),且翼缘板(10)的上端设置有扁担梁(9),所述扁担梁(9)的上端设置有限位板(13),且限位板(13)的上端设置有油压穿心式千斤顶(8),所述油压穿心式千斤顶(8)的内部设置有钢绞线(7),且钢绞线(7)在油压穿心式千斤顶(8)的上端处设置有第一工具锚(1),所述翼缘板(10)上设置有安装钢绞线(7)的预留孔(11),且钢绞线(7)在对应预留孔(11)上端处设置有第二工具锚(12),所述横托梁(6)的下端设置有用于固定钢绞线(7)末端的固定锚(3)。
2.根据权利要求1所述的一种贝雷梁拆卸装置,其特征在于:所述预留孔(11)的内部设置有距离翼缘板(10)的离腹板50cm距离的PVC管。
3.根据权利要求1所述的一种贝雷梁拆卸装置,其特征在于:所述横托梁(6)采用三拼12米长145B工字钢焊接形成。
4.根据权利要求1所述的一种贝雷梁拆卸装置,其特征在于:所述扁担梁(9)采用两拼1米长40B型工字钢中间预留3cm缝隙由两端面焊接形成。
5.根据权利要求1所述的一种贝雷梁拆卸装置,其特征在于:所述第二工具锚(12)焊接在扁担梁(9)中间下T面上。
CN201611010566.8A 2016-11-17 2016-11-17 一种贝雷梁拆卸装置 Pending CN106758818A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611010566.8A CN106758818A (zh) 2016-11-17 2016-11-17 一种贝雷梁拆卸装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611010566.8A CN106758818A (zh) 2016-11-17 2016-11-17 一种贝雷梁拆卸装置

Publications (1)

Publication Number Publication Date
CN106758818A true CN106758818A (zh) 2017-05-31

Family

ID=58968514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611010566.8A Pending CN106758818A (zh) 2016-11-17 2016-11-17 一种贝雷梁拆卸装置

Country Status (1)

Country Link
CN (1) CN106758818A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858927A (zh) * 2017-11-01 2018-03-30 中铁二十局集团第六工程有限公司 一种上行式移动模架模板整体拆除用吊挂体系
CN107892238A (zh) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 一种用于贝雷梁的吊放装置及方法
CN109468937A (zh) * 2018-12-28 2019-03-15 中铁十局集团第二工程有限公司 具有临时支架的桥梁及其拆除方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2145054B (en) * 1983-08-12 1986-12-31 Mabey Bridge Company Limited A method of lifting a bridge end, and a jacking frame therefor
CN101186273A (zh) * 2007-11-22 2008-05-28 广西壮族自治区公路桥梁工程总公司 两台千斤顶串联下放超重结构的方法
CN102080357A (zh) * 2011-01-06 2011-06-01 中铁二十四局集团浙江工程有限公司 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN103771292A (zh) * 2014-02-26 2014-05-07 北京市建筑工程研究院有限责任公司 一种自爬升式千斤顶以及自爬升式施工装置和施工方法
CN204000631U (zh) * 2014-08-08 2014-12-10 葛洲坝集团第六工程有限公司 一种贝雷架安装拆卸装置
CN104652297A (zh) * 2013-11-19 2015-05-27 葛洲坝集团第五工程有限公司 一种贝雷梁卸载装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2145054B (en) * 1983-08-12 1986-12-31 Mabey Bridge Company Limited A method of lifting a bridge end, and a jacking frame therefor
CN101186273A (zh) * 2007-11-22 2008-05-28 广西壮族自治区公路桥梁工程总公司 两台千斤顶串联下放超重结构的方法
CN102080357A (zh) * 2011-01-06 2011-06-01 中铁二十四局集团浙江工程有限公司 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN104652297A (zh) * 2013-11-19 2015-05-27 葛洲坝集团第五工程有限公司 一种贝雷梁卸载装置
CN103771292A (zh) * 2014-02-26 2014-05-07 北京市建筑工程研究院有限责任公司 一种自爬升式千斤顶以及自爬升式施工装置和施工方法
CN204000631U (zh) * 2014-08-08 2014-12-10 葛洲坝集团第六工程有限公司 一种贝雷架安装拆卸装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858927A (zh) * 2017-11-01 2018-03-30 中铁二十局集团第六工程有限公司 一种上行式移动模架模板整体拆除用吊挂体系
CN107858927B (zh) * 2017-11-01 2023-11-03 中铁二十局集团第六工程有限公司 一种上行式移动模架模板整体拆除用吊挂体系
CN107892238A (zh) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 一种用于贝雷梁的吊放装置及方法
CN107892238B (zh) * 2017-11-11 2019-10-22 中铁三局集团华东建设有限公司 一种用于贝雷梁的吊放装置及方法
CN109468937A (zh) * 2018-12-28 2019-03-15 中铁十局集团第二工程有限公司 具有临时支架的桥梁及其拆除方法

Similar Documents

Publication Publication Date Title
CN106758818A (zh) 一种贝雷梁拆卸装置
CN104131704A (zh) 一种钢管柱混凝土的侧浇方法及所用的钢管柱结构
CN107604827A (zh) 一种多孔大跨度简支钢桁梁桥架设方法
CN106436718B (zh) 一种地铁基坑大跨度支撑体系及其施工方法
CN107142832B (zh) 一种弧形钢箱梁的施工方法
CN108374351B (zh) 一种拆除箱梁贝雷片的简易起重装置及方法
CN208219384U (zh) 一种叠合梁节段
CN207750084U (zh) 新建地下工程密贴穿越既有建筑的施工支护结构
CN206887771U (zh) 一种小跨径板梁施工平台结构
CN102587280B (zh) 底座支架辅助架梁吊机架设主塔区钢桁梁方法及底座支架
CN204850048U (zh) 辅助高层钢梁快速吊装的搭接结构
CN203834809U (zh) 一种用于钢管柱混凝土侧浇方法的钢管柱结构
CN207717504U (zh) 一种用于超大型岔管群水压试验的支撑结构
CN110468721A (zh) 一种大跨度栈桥悬臂施工方法
CN107299596B (zh) 混凝土支撑栈桥板下支撑梁模板系统及其施工方法
CN209066837U (zh) 一种组合式施工支撑平台
CN103205983B (zh) 一种地下室后支撑体系的施工方法
CN107313355B (zh) 一种水上钢栈桥施工方法
CN209129029U (zh) 一种地铁盖挖顺作法车站钢支撑提升系统
CN211522822U (zh) 一种配合隧道盾构施工用栈桥钢结构
CN207016345U (zh) 一种钢架结构吊具
CN106149574B (zh) 一种刚架拱桥的加固结构和方法
CN206173812U (zh) 一种桥梁新型连续梁施工滑移装置
CN206070385U (zh) 临时匝道桥头支护装置
CN209891088U (zh) 一种贝雷梁牵拉装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531