CN104652297A - 一种贝雷梁卸载装置 - Google Patents
一种贝雷梁卸载装置 Download PDFInfo
- Publication number
- CN104652297A CN104652297A CN201310578401.0A CN201310578401A CN104652297A CN 104652297 A CN104652297 A CN 104652297A CN 201310578401 A CN201310578401 A CN 201310578401A CN 104652297 A CN104652297 A CN 104652297A
- Authority
- CN
- China
- Prior art keywords
- jack
- screw
- bailey beam
- thread steel
- control box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种贝雷梁卸载装置,包括顶板,顶板安装在千斤顶上,千斤顶安装在行走操作箱上,螺纹钢杆件穿过顶板、千斤顶以及行走操作箱,在螺纹钢杆件下端还设有托架。行走操作箱为一由钢板制成的箱体,箱体上端面和下端面及下部设有用于穿过螺纹钢杆件的预留孔,箱体前后端设有操作窗,本发明可以高效、安全卸载贝雷梁,具有成本低、使用方便、环保的特点。
Description
技术领域
本发明涉及一种贝雷梁卸载装置,具体涉及一种在桥梁现浇段施工过程中采用穿心式千斤顶卸载贝雷梁的装置。
背景技术
贝雷支架越来越广泛应用在桥梁临时结构中,传统的贝雷梁拆除采用砂箱或顶托卸载,使用吊车或卷扬机,配合滑轮系统等,使贝雷梁水平拖出,再垂直落地的方式一一拆除。不仅拆除周期长,拆卸过程中存在许多危险源,同时占用吊车等设备,需要大量人工配合,使经济成本增加。也有一种采用门架结构配合千斤顶螺纹钢卸载,需要采用较多的钢材,焊接易导致变形,使整个卸载结构平稳性较差。
发明内容
本发明的目的是提供一种操作方便和成本低廉的贝雷梁卸载简易装置,它能克服上述现有技术的不足,制作和使用简便快捷、成本低,卸载整跨现浇梁只需4个本装置和少量人工配合,能够同步对称卸载整跨贝雷梁支架。
本发明的目的通过以下技术方案实现:一种贝雷梁卸载装置,包括顶板,顶板安装在千斤顶上,千斤顶安装在行走操作箱上,螺纹钢杆件穿过顶板、千斤顶以及行走操作箱,在螺纹钢杆件下端还设有托架。
在螺纹钢杆件上设有多个螺纹钢连接器。
行走操作箱为一由钢板制成的箱体,箱体上端面和下端面及下部设有用于穿过螺纹钢杆件的预留孔,箱体前后端设有操作窗。
所述的千斤顶为现浇梁张拉穿心式千斤顶。
行走操作箱四周焊接加筋板。
行走操作箱上的预留孔的直径大于螺纹钢杆件、小于螺纹钢连接器。
本发明提供的贝雷梁卸载装置,两个本装置在托架上设一组横桥向贝雷扁担梁,两组横桥向贝雷梁用以承担整跨贝雷梁支架。本装置结构简单,操作方便,利用现浇梁张拉穿心式千斤顶可高效安全地完成贝雷梁卸载作业。
附图说明
下面结合附图和实施例作进一步说明。
图1是本发明结构示意图。
图2是图1的A-A向视图。
图3是图1的B-B向视图。
其中,7为翼缘板。
具体实施方式
本发明的结构如图1-3所示:一种贝雷梁卸载装置,包括顶板1,顶板1安装在千斤顶4上,千斤顶4安装在行走操作箱5上,螺纹钢杆件2穿过顶板1、千斤顶4以及行走操作箱5,在螺纹钢杆件2上还设有托架6。
在螺纹钢杆件2上设有多个螺纹钢连接器3。行走操作箱5为一由钢板制成的箱体,箱体上端面和下端面及下部设有用于穿过螺纹钢杆件2的预留孔,箱体前后端设有操作窗8。所述的千斤顶4为现浇梁张拉穿心式千斤顶。行走操作箱5四周焊接加筋板。
本发明中,顶板1采用2块2cm钢板焊接而成,钢板略长于千斤顶直径;千斤顶4采用张拉穿心式千斤顶;行走操作箱5也采用2cm钢板焊接,形成一个与千斤顶同宽的钢铁箱体,箱体上下及前后开孔,操作箱上下开两个直径略大于螺纹钢杆件2、小于螺纹钢连接器3的同心孔,前后开孔是操作窗口,略大于螺纹钢连接器3长度,便于螺纹钢连接器3进出。托架6在螺纹钢杆件2下端,也采用2块2cm钢板焊接而成,托架增加两条加筋板,保持托架的稳定性,防止压弯。
本发明的使用过程如下:准备卸载前,组装吊装系统,首先将现浇段翼缘板7钻孔即吊装孔,清理孔周围的弃渣,将行走操作箱5搁置在上面,螺纹钢杆件2通过顶板1、千斤顶4、操纵箱5穿至整跨贝雷梁下方。
然后组装横桥向贝雷扁担梁(两组贝雷架梁并联,长度宽于现浇梁宽度),使用两个吊车配合吊起扁担梁,通过托架6连接螺纹钢杆件2形成吊装系统。之后由千斤顶4略顶出承担整个向下压力,拆除钢管柱,使整跨贝雷梁能够整体向下移动;穿心式千斤顶4卸落时,始终有一个连接器受力,千斤顶上连接器受力后,位于操作窗8中的连接器3-1松掉并向上旋转,油缸行程完成后,位于操作窗8中的螺纹钢连接器受力。千斤顶4上升并向上旋转其上方的螺纹钢连接器3-2,快到行程后停止旋转螺纹钢连接器3-2并让螺纹钢连接器3-2受力,循环操作,直至整跨贝雷梁落地。
Claims (6)
1.一种贝雷梁卸载装置,包括顶板(1),其特征在于:顶板(1)安装在千斤顶(4)上,千斤顶(4)安装在行走操作箱(5)上,螺纹钢杆件(2)穿过顶板(1)、千斤顶(4)以及行走操作箱(5),在螺纹钢杆件(2)上还设有托架(6)。
2.根据权利要求1所述的贝雷梁卸载装置,其特征在于:在螺纹钢杆件(2)上设有多个螺纹钢连接器(3)。
3.根据权利要求1所述的贝雷梁卸载装置,其特征在于:行走操作箱(5)为一由钢板制成的箱体,箱体上端面和下端面及下部设有用于穿过螺纹钢杆件(2)的预留孔,箱体前后端设有操作窗(8)。
4.根据权利要求1所述的贝雷梁卸载装置,其特征在于:所述的千斤顶(4)为现浇梁张拉穿心式千斤顶。
5.根据权利要求3所述的贝雷梁卸载装置,其特征在于:行走操作箱(5)四周焊接加筋板。
6.根据权利要求3所述的贝雷梁卸载装置,其特征在于:行走操作箱(5)上的预留孔的直径大于螺纹钢杆件(2),小于螺纹钢连接器(3)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310578401.0A CN104652297A (zh) | 2013-11-19 | 2013-11-19 | 一种贝雷梁卸载装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310578401.0A CN104652297A (zh) | 2013-11-19 | 2013-11-19 | 一种贝雷梁卸载装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104652297A true CN104652297A (zh) | 2015-05-27 |
Family
ID=53243893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310578401.0A Pending CN104652297A (zh) | 2013-11-19 | 2013-11-19 | 一种贝雷梁卸载装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652297A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758818A (zh) * | 2016-11-17 | 2017-05-31 | 中国建筑第四工程局有限公司 | 一种贝雷梁拆卸装置 |
CN111287098A (zh) * | 2020-02-14 | 2020-06-16 | 中建八局第四建设有限公司 | 一种用于拆除贝雷梁的装置及其施工方法 |
CN115262432A (zh) * | 2022-08-16 | 2022-11-01 | 中铁一局集团有限公司 | 一种高空大跨度悬空支架拆除方法 |
-
2013
- 2013-11-19 CN CN201310578401.0A patent/CN104652297A/zh active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758818A (zh) * | 2016-11-17 | 2017-05-31 | 中国建筑第四工程局有限公司 | 一种贝雷梁拆卸装置 |
CN111287098A (zh) * | 2020-02-14 | 2020-06-16 | 中建八局第四建设有限公司 | 一种用于拆除贝雷梁的装置及其施工方法 |
CN111287098B (zh) * | 2020-02-14 | 2021-05-25 | 中建八局第四建设有限公司 | 一种用于拆除贝雷梁的装置及其施工方法 |
CN115262432A (zh) * | 2022-08-16 | 2022-11-01 | 中铁一局集团有限公司 | 一种高空大跨度悬空支架拆除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652297A (zh) | 一种贝雷梁卸载装置 | |
CN103669882B (zh) | 工业厂房内利用钢丝绳做轨道进行构件安装的方法 | |
CN205259074U (zh) | 三角挂篮行走系统 | |
CN104637418A (zh) | 一种户外升降广告牌 | |
CN203559360U (zh) | 一种贝雷梁卸载装置 | |
CN204455842U (zh) | 桥梁预制梁板起梁架 | |
CN203561559U (zh) | 一种劳保手套质量检测装置 | |
CN208055876U (zh) | 一种现浇梁用钢结构支架整体横移装置 | |
CN203571610U (zh) | 建筑用多功能立杆 | |
CN104018657A (zh) | 一种采用水平滑移平台施工高大挑檐的方法 | |
CN204238443U (zh) | 一种可拆卸柱脚固定装置 | |
CN203247828U (zh) | 一种悬空梁安装装置 | |
CN203699828U (zh) | 一种简易工具式钢筋笼安装吊架 | |
CN203938396U (zh) | 一种工程吊装设备 | |
CN203034785U (zh) | 钢筋网片脚手板 | |
CN204138153U (zh) | 一种塔机基础吊装自锁机构 | |
CN204590790U (zh) | 一种压力报警围栏的限位板 | |
CN203782579U (zh) | 一种大跨度支撑系统的反拖拉拆除装置 | |
CN204123007U (zh) | 一种用于汽车焊装夹具的导向件 | |
CN204079317U (zh) | 一种带有防脱装置的顶升横梁 | |
CN203639049U (zh) | 一种混凝土t梁液压脱模装置 | |
CN107282855A (zh) | 一种链条高效拼接装置 | |
CN203106482U (zh) | 移动式型钢样板平台 | |
CN204060150U (zh) | 一种打围施工板 | |
CN205677259U (zh) | 一种新型网架整体提升支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |