CN106702866B - The full-automatic road dental calculus laying apparatus of town road gardens construction - Google Patents

The full-automatic road dental calculus laying apparatus of town road gardens construction Download PDF

Info

Publication number
CN106702866B
CN106702866B CN201611267730.3A CN201611267730A CN106702866B CN 106702866 B CN106702866 B CN 106702866B CN 201611267730 A CN201611267730 A CN 201611267730A CN 106702866 B CN106702866 B CN 106702866B
Authority
CN
China
Prior art keywords
dental calculus
road
slurry
road dental
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611267730.3A
Other languages
Chinese (zh)
Other versions
CN106702866A (en
Inventor
曾繁舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiarunzhou Landscape Decoration Engineering Co Ltd
Original Assignee
Shenzhen Jiarunzhou Garden Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jiarunzhou Garden Decoration Engineering Co ltd filed Critical Shenzhen Jiarunzhou Garden Decoration Engineering Co ltd
Priority to CN201611267730.3A priority Critical patent/CN106702866B/en
Publication of CN106702866A publication Critical patent/CN106702866A/en
Application granted granted Critical
Publication of CN106702866B publication Critical patent/CN106702866B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Abstract

The invention discloses a kind of full-automatic road dental calculus laying apparatus of town road gardens construction, including track-type facilities, road dental calculus laying apparatus, side provisions for grouting, attachment device and rail sliding apparatus, the track-type facilities fixed setting is on the ground, it is connected between the road dental calculus laying apparatus and side provisions for grouting by attachment device, rail sliding apparatus is fixedly installed in the same side of the road dental calculus laying apparatus and side provisions for grouting respectively, and the rail sliding apparatus is arranged in track-type facilities by way of engaging and can the sliding of opposite rail device;The road dental calculus laying apparatus belongs to multifunctional equipment, can be realized and is laid with the functions such as road dental calculus, the grouting of road dental calculus side, while may be circular arc road surfacing road dental calculus, multiple functional, high degree of automation is saved labour, brought convenience for construction personnel.

Description

The full-automatic road dental calculus laying apparatus of town road gardens construction
Technical field
The invention belongs to Architectural Equipment field, in particular to a kind of town road gardens construction is laid with full-automatic road dental calculus Device.
Background technique
Road dental calculus refers to that the boundary stone used in pavement edge made of granite material, road dental calculus are also referred to as curbstone (kerbstone) or roadside Stone.Road dental calculus be on road surface distinguish driveway, pavement, greenery patches, isolation strip and road other parts boundary line, play guarantee Pedestrian, vehicular traffic is safe and guarantees the neat effect of pavement edge.
The weight of every piece of road dental calculus is all very big, and specific gravity 2.7g/cm3, one cube of weight is exactly 2.7 tons, in reality In work progress, the usage amount of road dental calculus is very big, and each piece requires worker and carry out mobile carrying and installation, labor intensity by hand It is very big, a large amount of manpowers are needed, are laid at high cost.
Application No. is 201410257844.4 Chinese invention patents to disclose a kind of road dental calculus laydown machine, mainly by car body Mechanism, hoisting mechanism, laser guidance mechanism and scraping machine structure composition, the preceding bridge of car body are that gantry lifts up 0.4 meter away from ground of structure, after Bridge semiaxis differential gearing;Hoisting mechanism is mounted on the side of car body, is made of three-dimensional platform and tongs, laser guidance mechanism by Laser instrument for marking line and laser pickoff form, and laser pickoff is light target formula structure, and laser target is mounted on tongs side and hangs Dress pincers move together.Scraping machine is driven by direct current generator.Dental calculus installation apparatus function in road disclosed in the prior art is more single, The part-structure for being laid with road dental calculus simultaneously is complex.
Summary of the invention
In view of the deficiencies of the prior art, the technical problem to be solved in the present invention is to provide one kind can be realized automatic laying road Dental calculus, the full-automatic road dental calculus laying apparatus of the town road gardens construction that work efficiency is high, easy to operate.
In order to solve technical problem proposed by the invention, the invention discloses a kind of town road gardens constructions to use entirely certainly Dynamic road dental calculus laying apparatus, including track-type facilities, road dental calculus laying apparatus, side provisions for grouting, attachment device and guide rail sliding Device, the track-type facilities fixed setting on the ground, pass through company between the road dental calculus laying apparatus and side provisions for grouting Rail sliding apparatus is fixedly installed in the same side of connection device connection, the road dental calculus laying apparatus and side provisions for grouting respectively, The rail sliding apparatus be arranged in track-type facilities by way of engaging and can opposite rail device sliding, the road dental calculus Laying apparatus includes transmission device, road dental calculus upper conveyor and support under the 4th waggon, road dental calculus holding structure, road dental calculus Axis, the road dental calculus holding structure are fixed on the 4th waggon, and transmission device is fixed under the road dental calculus On four waggons, transmission device is correspondingly arranged with road dental calculus holding structure under the road dental calculus, transmission device under the road dental calculus It is fixedly connected between the dental calculus upper conveyor of road by support shaft.
As an improvement of the present invention, the road dental calculus holding structure includes positioning base, the first sliding block, the second cunning Block, third sliding block, Four-slider, the first screw rod, the second screw rod and alignment pin, it is defeated that the positioning base is fixed at the 4th It send on vehicle, forms vacancy corresponding with transmission device under the dental calculus of road in the middle part of the positioning base, first sliding block, second are slided Block, third sliding block and Four-slider are arranged on positioning base and complement each other to form the vacancy for accommodating road dental calculus, described First sliding block and the second sliding block are located at the same side, and the third sliding block and Four-slider are located at the same side, first sliding block and It is connected between second sliding block by alignment pin, is connected between the third sliding block and Four-slider by the first screw rod, it is described It is connected between second sliding block and Four-slider by the second screw rod;
Transmission device includes lower transmission device shell, feed belt, the second motor and lower positioning seat, institute under the road dental calculus It states and shaft is set on the inside of lower transmission device shell, the feed belt is arranged in the shaft on the inside of lower transmission device shell, institute It states feed belt to be made of horizontal feed portion and vertical transport portion, the shaft on the inside of second motor and lower transmission device shell It is fixedly connected, the lower positioning seat is fixed at lower transmission device outer side of shell;
The road dental calculus upper conveyor includes upper conveyor shell, idler wheel and upper positioning seat, and the idler wheel setting exists On the inside of upper conveyor shell, the idler wheel forms horizontal feed portion and vertical transport portion, the idler wheel are corresponding with feed belt Setting, the upper positioning seat are fixed at upper conveyor outer side of shell, and the upper positioning seat is correspondingly arranged with lower positioning seat, It is fixedly connected between the lower positioning seat and upper positioning seat by support shaft.
As an improvement of the present invention, the side provisions for grouting includes the 5th waggon, the 4th clump weight, the second slurry Cylinder positioning seat, slush pump, the second slurry conduit, goes out sizing device and cement slurry cleaning plant at the second agitating device, and the described 4th matches Pouring weight is fixed on the 5th waggon, and the second slurry cylinder positioning seat is fixed on the 5th waggon, and described second Agitating device is fixed on the second slurry cylinder positioning seat, and the slush pump is fixedly connected with the grout outlet of the second agitating device, The input terminal of second slurry conduit is fixedly connected with slush pump, and the sizing device out and the output end of the second slurry conduit are solid Fixed connection, the cement slurry cleaning plant are fixed in the second slurry conduit, and the sizing device out and cement slurry cleaning fill It sets and is correspondingly arranged.
As an improvement of the present invention, second agitating device includes the second cement slurry barrel side wall, the second slurry cylinder bottom Seat, the second stirring power device, the second stirring blade and the second slurry outlet, the second cement slurry barrel side wall are fixed at On two slurry cylinder pedestals, the second stirring power device is fixed at the second slurry cylinder Its lower side and extends to the second cement slurry In barrel side wall, second stirring blade, which is arranged in the second cement slurry barrel side wall and fixes with the second stirring power device, to be connected It connects, second slurry outlet is arranged on the second slurry cylinder pedestal and corresponding with the input terminal of the second slurry conduit.
As an improvement of the present invention, the second stirring power device includes third motor, the second shaft, second end Lid, the second adapter flange, the second bolt, second bearing and the second sealing, second shaft are fixedly connected with third motor, institute It states the second bolt the second adapter flange and second end cover are fixed on the second slurry cylinder pedestal, the second end cover is located at the Between two slurry cylinder pedestals and the second adapter flange, the third motor is fixed on the second adapter flange, and described second turn Axis extends in the second cement slurry barrel side wall after passing through second end cover and the second slurry cylinder pedestal, the second bearing and the second sealing Between the second shaft and the second slurry cylinder pedestal, second sealing is located on the upside of second bearing for setting.
As an improvement of the present invention, the sizing device out includes slurry pipe jointing part, cement slurry jet pipe, stifled ball and third Spring, the slurry pipe jointing part are fixedly connected with the output end of the second slurry conduit, the cement slurry jet pipe quantity be two and It is fixedly connected with slurry pipe jointing part, forms the gap for accommodating road dental calculus, the third spring between the cement slurry jet pipe One end is fixed at the other end on the inside of cement slurry jet pipe and is fixedly connected with stifled ball, the stifled ball setting outside cement slurry jet pipe and The diameter of stifled ball is greater than the grout outlet diameter of cement slurry jet pipe.
As an improvement of the present invention, the cement slurry cleaning plant includes horizontal connecting plate, vertical center web, support Seat, the 4th motor and hairbrush, the horizontal connecting plate are fixedly connected with the second slurry conduit, and the vertical center web and level are even Fishplate bar is fixedly connected, and the support base quantity is two and is fixed on the downside of vertical center web, shape between the support base At the gap for accommodating road dental calculus, the 4th motor is fixed on support base and is fixedly connected with hairbrush.
As an improvement of the present invention, the attachment device include hinged seat, first connecting rod, second connecting rod, pin shaft and 4th spring, the hinged seat quantity are two and are separately fixed in attachment device, the first connecting rod and second connecting rod Between connected by pin shaft, the first connecting rod and second connecting rod are hinged with hinged seat respectively, the 4th both ends of the spring difference It is fixedly connected with to attachment device.
As an improvement of the present invention, the rail sliding apparatus includes rail sliding apparatus frame, the second articulated shaft, leads Rail carriage block, third ball and positioning rail, the rail sliding apparatus block are fixed at guide rail by the second articulated shaft On carriage frame, the third ball is arranged on rail sliding apparatus block, and the positioning rail is fixed at guide rail sliding On device frame.
Generally speaking the invention has the following beneficial effects:
1. town road gardens construction disclosed by the invention belongs to multifunctional equipment, energy with full-automatic road dental calculus laying apparatus Enough realize is laid with the functions such as road dental calculus, the grouting of road dental calculus side, while may be circular arc road surfacing road dental calculus, and function is neat Entirely, high degree of automation is saved labour, is brought convenience for construction personnel;
2. between module and module of the town road gardens construction disclosed by the invention with full-automatic road dental calculus laying apparatus Using being flexible coupling, such modules are not interfere with each other when working, and be can according to need and are adjusted, more convenient to use, can be with Different working environments is adapted to, different construction requirements is met;
3. the road dental calculus holding structure in the dental calculus laying apparatus of road can be sized according to road dental calculus size, can adapt to Various sizes of road dental calculus, transmission device and the mutual cooperation of road dental calculus upper conveyor can stablize conveying path tooth under the dental calculus of road Stone, entirely convey it is simple and reliable, can be good at complete road dental calculus conveying, reduce the working strength of worker;
4. the side of the side road provisions for grouting Neng Wei dental calculus is in the milk, it can be used hairbrush by extra slurries brush after grouting Fall, so that road dental calculus surface cleaning, does not need additional designs road dental calculus cleaning plant, reduces workload, while will using hairbrush The road dental calculus that slurries are laid with after brushing off is more beautiful;
5. track-type facilities can according to need the arc-shaped for being spliced into different-diameter, and can be stably fixed on ground, Guide rail sliding chute two sides fixed setting rubber chute can make between guide rail sliding chute well excessively, when equipment is walked along guide rail sliding chute When, it can pass through, after the completion of construction, guide rail can be dismantled, convenient transportation;
6. rail sliding apparatus is mounted in the side of equipment, the rail sliding apparatus block of rail sliding apparatus is upper and lower, bottom surface fills There is ball, guide rail sliding chute can easily be entered, rail sliding apparatus can move up and down a certain amount of, adapt to the feelings of Uneven road Condition.
Detailed description of the invention
The full-automatic road dental calculus laydown machine main view of Fig. 1 town road gardens construction;
The full-automatic road dental calculus laydown machine perspective view of Fig. 2 town road gardens construction;
The partial enlarged view of Fig. 3 Fig. 2;
Fig. 4 track-type facilities perspective view;
Fig. 5 track-type facilities main view;
The A-A sectional view of Fig. 6 Fig. 5;
I regional enlarged drawing of Fig. 7 Fig. 6;
Fig. 8 track-type facilities schematic diagram;
Fig. 9 channeling device perspective view;
Figure 10 channeling mechanism perspective view;
The first perspective view of Figure 11 tamping unit;
The second perspective view of Figure 12 tamping unit;
Figure 13 rams the first perspective view of frame;
Figure 14 rams the second perspective view of frame;
Figure 15 presss from both sides the first perspective view of tamping machine structure;
Figure 16 presss from both sides the second perspective view of tamping machine structure;
Figure 17 rams block perspective view;
Figure 18 watering mud mechanism perspective view;
Figure 19 watering mud mechanism section assembling figure 1;
The cross-sectional view of Figure 20 Figure 19;
I regional enlarged drawing of Figure 21 Figure 20;
Figure 22 watering mud mechanism section assembling figure 2;
II regional enlarged drawing of Figure 23 Figure 22;
Figure 24 cement slurry scraping device perspective view;
Figure 25 cement slurry scraping device cross-sectional view;
The road Figure 26 dental calculus laying apparatus perspective view;
The road Figure 27 dental calculus laying apparatus main view;
The road Figure 28 the first schematic diagram of dental calculus holding structure;
The road Figure 29 the second schematic diagram of dental calculus holding structure;
Transmission device and road dental calculus upper conveyor assembling figure under the dental calculus of the road Figure 30;
Figure 31 Figure 30 cross-sectional view;
Transmission device and road dental calculus upper conveyor assemble top view under the dental calculus of the road Figure 32;
The road Figure 33 dental calculus upper conveyor perspective view;
The side Figure 34 provisions for grouting perspective view;
The side Figure 35 provisions for grouting part assembling figure;
The side Figure 36 provisions for grouting part assembling figure top view;
The side Figure 37 provisions for grouting part assembling figure main view;
Figure 38 Figure 37 A-A sectional view;
I regional enlarged drawing of Figure 39 Figure 38;
II regional enlarged drawing of Figure 40 Figure 38;
The side Figure 41 provisions for grouting part assembling figure right view;
III regional enlarged drawing of Figure 42 Figure 41;
Figure 43 rail sliding apparatus perspective view;
Wherein:
1-track-type facilities, the 11-the first locating piece, 12-guide rail brackets, 121-guide rail bracket ontologies, the 122-the first positioning Bar, 123-locating slots, the 13-the second locating piece, 14-guide rail sliding chutes, 15-rubber chutes, 16-flat thin magnets, 17-the second is fixed Position bar;
2-channeling devices, 21-driver's cabins, the 22-the first waggon, the 23-the first clump weight, 24-channeling mechanisms, 241-pedestals, 2411-base bodies, 2412-lifting arm hinged seats, the 2413-the first hinged seat, the 242-the first lifting arm, 2421-the first lifting arm ontology, the 2422-the second hinged seat, 2423-third hinged seats, the 243-the first oil cylinder, 244-the Two oil cylinders, the 245-the second lifting arm, the 2451-the second lifting arm body, the 2452-the four hinged seat, the positioning of 2453-otic placodes Seat, 2454-sliding otic placodes, 2455-adjust screw rod, 246-channeling knives;
3-tamping units, the 31-the second waggon, the 32-the second clump weight, 33-ram frame, and 331-ram erection plate, 332-first pulley positioning seats, 333-de- tamping plates, 334-ram block sliding slot, and 335-ram frame bottom plate, and 336-ram frame side plate, 337-rammer frame connecting plates, 338-pulleys, 34-elevators, 35-folder tamping machine structures, 351-way blocks, 3511-guide rail positioning plates, 3512-second pulley positioning seats, 3513-sliding rails, the 3514-the first ball, 352-pulley blocks, 353-folder rammer framves, 354- First spring, the 355-the first articulated shaft, 36-ram block, and 361-ram block body, and 362-ram block sliding rail, the 363-the second ball;
4-watering mud mechanisms, 41-third waggons, 42-third clump weights, the 43-the first slurry cylinder positioning seat, 44- First agitating device, the 441-the first cement slurry barrel side wall, the 442-the first slurry cylinder pedestal, the 443-the first stirring power device, 4431-first motors, 4432-first rotating shafts, 4433-first end covers, the 4434-the first adapter flange, the 4435-the first spiral shell Bolt, 4436-first bearings, the 4437-the first sealing, the 444-the first stirring blade, the 445-the first slurry outlet, the 45-the first mud Conduit is starched, 46-cement slurry scraping devices, 461-lantern rings, 462-support plates, 463-strike off lath, 464-through-holes, and 465- Positioning plate, 466-positioning columns, 467-second springs, 47-flow control valves;
5-road dental calculus laying apparatus, the 51-the four waggon, 52-road dental calculus holding structures, 521-positioning bases, 522-the first sliding block, the 523-the second sliding block, 524-third sliding blocks, the 525-the Four-slider, the 526-the first screw rod, 527-the Two screw rods, 528-alignment pins, transmission device under 53-road dental calculus, 531-lower transmission device shells, 532-feed belts, 533-the second motor, 534-lower positioning seats, 54-road dental calculus upper conveyors, 541-upper conveyor shells, 542-rollings Wheel, 543-upper positioning seats, 55-support shafts;
6-side provisions for groutings, the 61-the five waggon, the 62-the four clump weight, the 63-the second slurry cylinder positioning seat, 64- Second agitating device, the 641-the second cement slurry barrel side wall, the 642-the second slurry cylinder pedestal, the 643-the second stirring power device, 6431-third motors, the 6432-the second shaft, 6433-second end covers, the 6434-the second adapter flange, the 6435-the second spiral shell Bolt, 6436-second bearings, the 6437-the second sealing, the 644-the second stirring blade, the 645-the second slurry outlet, 65-mud Pump, the 66-the second slurry conduit, 67-go out sizing device, and 671-slurry pipe jointing parts, 672-cement slurry jet pipes, 673-block up balls, 674-third springs, 68-cement slurry cleaning plants, 681-horizontal connecting plates, 682-vertical center webs, 683-support bases, 684-the four motor, 685-hairbrush;
7-attachment devices, 71-hinged seats, 72-first connecting rods, 73-second connecting rods, 74-pin shafts, the 75-the four bullet Spring;
8-rail sliding apparatus, 81-rail sliding apparatus framves, the 82-the second articulated shaft, 83-rail sliding apparatus blocks, 84-third balls, 85-positioning rails;
9-road dental calculus.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
As shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 9, town road gardens construction full-automatic road dental calculus laydown machine, including guide rail Device 1, channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus laying apparatus 5, side provisions for grouting 6, connection dress 7 and rail sliding apparatus 8 are set, on the ground, the channeling device 2, is sprinkled water at tamping unit 3 for the fixed setting of track-type facilities 1 Mud mechanism 4, road dental calculus laying apparatus 5 and side provisions for grouting 6 are set gradually, between the channeling device 2 and tamping unit 3 It is connected, is connected between the tamping unit 3 and watering mud mechanism 4 by attachment device 7, the watering by attachment device 7 It is connected between mud mechanism 4 and road dental calculus laying apparatus 5 by attachment device 7, the road dental calculus laying apparatus 5 and side grouting It is connected between device 6 by attachment device 7, the channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus are laid with dress Set 5 and the same side of side provisions for grouting 6 rail sliding apparatus 8 is fixedly installed respectively, the rail sliding apparatus 8 passes through engaging Mode be arranged in track-type facilities 1 and can opposite rail device 1 slide.
As shown in Fig. 4, Fig. 5, Fig. 6, Fig. 7 and Fig. 8, track-type facilities 1 are fixed including the first locating piece 11, guide rail bracket 12, second Position block 13, guide rail sliding chute 14, rubber chute 15, flat thin magnet 16 and the second locating rod 17, the guide rail bracket 12 include guide rail bracket sheet Body 121, the first locating rod 122 and locating slot 123, first locating rod 122 and locating slot 123 are arranged in guide rail bracket ontology 121 two sides are correspondingly arranged between the guide rail bracket ontology 121 and the first locating rod 122, and first locating piece 11 and second is fixed Position block 13 is fixed at 121 two sides of guide rail bracket ontology of guide rail bracket 12 and is correspondingly arranged, and the guide rail sliding chute 14 is fixedly installed On the guide rail bracket ontology 121 of guide rail bracket 12, the guide rail sliding chute 14 is correspondingly arranged with rail sliding apparatus 8, and the rubber is sliding Slot 15 is fixed at 14 two sides of guide rail sliding chute, and the flat thin magnet 16 is fixed on rubber chute 15 and is located remotely from guide rail The side of sliding slot 14, second locating rod 17 and the first locating piece 11, the second locating piece 13 is corresponding can be by the first locating piece 11 It is fixed on the ground with the second locating piece 13.
As shown in Figure 9 and Figure 10, channeling device 2 includes driver's cabin 21, the first waggon 22, the first clump weight 23 and channeling Mechanism 24, the driver's cabin 21 are fixed on the first waggon 22, and first clump weight 23 and channeling mechanism 24 are fixed It is arranged on the first waggon 22;The channeling mechanism 24 includes pedestal 241, the first lifting arm 242, Ffirst cylinder 2 43, second Oil cylinder 244, the second lifting arm 245 and channeling knife 246, the pedestal 241 include base body 2411, lifting arm hinged seat 2412 With the first hinged seat 2413, the lifting arm hinged seat 2412 and the first hinged seat 2413 are fixed at base body 2411 On, the base body 2411 is arranged on the first waggon 22;First lifting arm 242 includes the first lifting arm ontology 2421, the second hinged seat 2422 and third hinged seat 2423, second hinged seat 2422 and the fixation of third hinged seat 2423 are set It sets on the first lifting arm ontology 2421, second hinged seat 2422 is located at hinged close to the first lifting arm 242 and pedestal 241 One end;Second lifting arm 245 include second lifting arm body 2451, the 4th hinged seat 2452, otic placode positioning seat 2453, It sliding otic placode 2454 and adjusts screw rod 2455, the 4th hinged seat 2452 is fixed on the second lifting arm body 2451, Hingedly with the first lifting arm ontology 2421, the otic placode positioning seat 2453 is fixed at the to the second lifting arm body 2451 The two lifting one end of arm body 2451 far from the first lifting arm ontology 2421, the sliding otic placode 2454 are arranged in otic placode positioning seat On 2453,2454 quantity of sliding otic placode is two pieces and passes through adjusting screw rod 2455 in parallel, between the sliding otic placode 2454 Connection;The first lifting arm ontology 2421 one end and lifting arm hinged seat 2412 far from the second lifting arm body 2451 are cut with scissors It connecing, described 43 one end of Ffirst cylinder 2 and the hinged other end of the first hinged seat 2413 and the second hinged seat 2422 are hinged, and described second 244 one end of oil cylinder and the hinged other end of third hinged seat 2423 and the 4th hinged seat 2452 are hinged, and the setting of channeling knife 246 exists It slides between otic placode 2454.
As shown in Figure 11, Figure 12, Figure 13, Figure 14, Figure 15, Figure 16 and Figure 17, tamping unit 3 include the second waggon 31, Second clump weight 32 rams frame 33, elevator 34, folder tamping machine structure 35 and rams block 36, and second clump weight 32 is fixed at second On waggon 31, the rammer frame 33 is fixed on the second waggon 31, and the rammer frame 33 includes ramming to erect plate 331, first Pulley positioning seat 332 takes off tamping plate 333, rams block sliding slot 334, ram frame bottom plate 335, ram frame side plate 336, ramming frame connecting plate 337 and slide Wheel 338, the rammer erect plate 331 and are fixed on rammer frame bottom plate 335 and are mutually perpendicular to, and the fixation of rammer frame side plate 336 is set It sets on ramming frame bottom plate 335 and is mutually perpendicular to, the rammer erection plate 331 is vertical with 336 place plane of frame side plate is rammed, the rammer frame Connecting plate 337, which is fixed at, to be rammed on frame side plate 336, and the first pulley positioning seat 332 is fixed at rammer and erects on plate 331 Side, the pulley 338 are arranged on first pulley positioning seat 332, and the de- tamping plate 333 is fixed at rammer and erects on plate 331 And be located at and ram the corresponding other side of frame side plate 336, the setting of rammers block sliding slot 334 on ramming erection plate 331 and with de- tamping plate 333 are located at the same side;The folder tamping machine structure 35 setting is on ramming frame 33 and opposite can ram frame 33 and slides, the folder tamping machine structure 35 and Elevator 34 connects, and the folder tamping machine structure 35 includes way block 351, pulley blocks 352, folder rammer frame 353, the first spring 354 and first Articulated shaft 355, the way block 351 include guide rail positioning plate 3511, second pulley positioning seat 3512, sliding rail 3513 and the first rolling Pearl 3514, the second pulley positioning seat 3512 are fixed at 3511 upside of guide rail positioning plate, and the fixation of sliding rail 3513 is set It sets on guide rail positioning plate 3511, first ball 3514 is arranged on sliding rail 3513, the sliding rail 3513 and rammer block sliding slot 334 is corresponding, and the pulley blocks 352 are arranged on the second pulley positioning seat 3512 of way block 351, and the way block 351 is arranged On ramming block sliding slot 334 and the sliding of block sliding slot 334 opposite can be rammed, first articulated shaft 355 is fixed at way block 351 On guide rail positioning plate 3511, the folder rams frame 353 and is made of the handgrip being hinged, and the folder rams the setting of frame 353 in the first hinge In spindle 355, first spring 354 is fixed at folder and rams between the handgrip of frame 353;Frame 33 is being rammed in the setting of rammer block 36 Above and the sliding of frame 33 opposite can be rammed, the folder tamping machine structure 35 be correspondingly arranged with block 36 is rammed, and the rammer block 36 is including ramming block body 361, block sliding rail 362 and the second ball 363 are rammed, the rammer block sliding rail 362, which is fixed at, to be rammed on block body 361, the rammer block Ontology 361 rams frame 353 with folder and is correspondingly arranged, and the setting of the second ball 363 is on ramming block sliding rail 362, the rammer block sliding rail 362 It is corresponding with block sliding slot 334 is rammed;The elevator 34, which is fixed at, to be rammed on frame bottom plate 335, the steel wire penetrating on the elevator 34 It is connect after pulley 338 with pulley blocks 352.
As shown in Figure 18, Figure 19, Figure 20, Figure 21, Figure 22, Figure 23, Figure 24 and Figure 25, watering mud mechanism 4 includes third Waggon 41, third clump weight 42, first are starched cylinder positioning seat 43, the first agitating device 44, the first slurry conduit 45, cement slurry and are scraped Leveling device 46 and flow control valve 47, the third clump weight 42 are fixed on third waggon 41, the first slurry cylinder Positioning seat 43 is fixed on third waggon 41;First agitating device 44 includes the first cement slurry barrel side wall 441, the One slurry cylinder pedestal 442, the first stirring power device 443, the first stirring blade 444 and the first slurry outlet 445, first cement Slurry bucket side wall 441 is fixed on the first slurry cylinder pedestal 442, and the first stirring power device 443 is fixed at first It on the downside of slurry cylinder pedestal 442 and extends in the first cement slurry barrel side wall 441, the first stirring power device 443 includes first Motor 4431, first rotating shaft 4432, first end cover 4433, the first adapter flange 4434, the first bolt 4435, first bearing 4436 With the first sealing 4437, the first rotating shaft 4432 is fixedly connected with first motor 4431, and first bolt 4435 is by first Adapter flange 4434 and first end cover 4433 are fixed on the first slurry cylinder pedestal 442, and the first end cover 4433 is located at the Between one slurry cylinder pedestal 442 and the first adapter flange 4434, the first motor 4431 is fixed at the first adapter flange On 4434, the first rotating shaft 4432 extends to the first cement slurry bucket after passing through first end cover 4433 and the first slurry cylinder pedestal 442 In side wall 441, the first bearing 4436 and 4437 setting of the first sealing first rotating shaft 4432 with first starch cylinder pedestal 442 it Between, first sealing 4437 is located at 4436 upside of first bearing, and first stirring blade 444 is arranged in the first cement slurry bucket It is fixedly connected in side wall 441 and with the first rotating shaft 4432 of the first stirring power device 443, first slurry outlet 445 is arranged On the first slurry cylinder pedestal 442 and corresponding with the input terminal of the first slurry conduit 45, first agitating device 44 is fixedly installed On the first slurry cylinder positioning seat 43;First slurry outlet of the input terminal of first slurry conduit 45 and the first agitating device 44 445 are fixedly connected, and the cement slurry scraping device 46 is fixed at 45 output end of the first slurry conduit, and the cement slurry strikes off Device 46 includes lantern ring 461, support plate 462, strikes off lath 463, through-hole 464, positioning plate 465, positioning column 466 and second spring 467, the support plate 462 is fixedly connected with lantern ring 461, and the lath 463 that strikes off is arranged in support plate 462, described to strike off Flat thin magnet is fixedly installed on lath 463, the through-hole 464 is arranged on lantern ring 461, described 467 one end of second spring and lantern ring 461 are fixedly connected with the other end is fixedly connected with positioning plate 465, the positioning column 466 be fixed on positioning plate 465 and with it is logical Hole 464 is corresponding, and groove corresponding with through-hole 464 is provided in first slurry conduit 45, and the flow control valve 47 is arranged In the first slurry conduit 45.
As shown in Figure 26, Figure 27, Figure 28, Figure 29, Figure 30, Figure 31, Figure 32 and Figure 33, road dental calculus laying apparatus 5 includes the Transmission device 53, road dental calculus upper conveyor 54 and support shaft 55 under four waggons 51, road dental calculus holding structure 52, road dental calculus, The road dental calculus holding structure 52 is fixed on the 4th waggon 51, and transmission device 53 is fixed under the road dental calculus On 4th waggon 51, transmission device 53 is correspondingly arranged with road dental calculus holding structure 52 under the road dental calculus, under the road dental calculus It is fixedly connected between transmission device 53 and road dental calculus upper conveyor 54 by support shaft 55;The road dental calculus holding structure 52 wraps Include positioning base 521, the first sliding block 522, the second sliding block 523, third sliding block 524, Four-slider 525, the first screw rod 526, Two screw rods 527 and alignment pin 528, the positioning base 521 are fixed on the 4th waggon 51, the positioning base 521 middle parts form vacancy corresponding with transmission device 53 under the dental calculus of road, and first sliding block 522, the second sliding block 523, third are sliding Block 524 and Four-slider 525 are arranged on positioning base 521 and complement each other to form the vacancy for accommodating road dental calculus, described First sliding block 522 and the second sliding block 523 are located at the same side, and the third sliding block 524 and Four-slider 525 are located at the same side, institute It states and is connected between the first sliding block 522 and the second sliding block 523 by alignment pin 528, the third sliding block 524 and Four-slider It is connected between 525 by the first screw rod 526, is connected between second sliding block 523 and Four-slider 525 by the second screw rod 527 It connects;Transmission device 53 includes lower transmission device shell 531, feed belt 532, the second motor 533 and lower fixed under the road dental calculus Position seat 534, shaft is arranged on the inside of the lower transmission device shell 531, and the feed belt 532 is arranged in lower transmission device shell In the shaft of 531 insides, the feed belt 532 is made of horizontal feed portion and vertical transport portion, second motor 533 with The shaft of lower 531 inside of transmission device shell is fixedly connected, and the lower positioning seat 534 is fixed at lower transmission device shell 531 outsides;The road dental calculus upper conveyor 54 includes upper conveyor shell 541, idler wheel 542 and upper positioning seat 543, described For the setting of idler wheel 542 in 541 inside of upper conveyor shell, the idler wheel 542 forms horizontal feed portion and vertical transport portion, described Idler wheel 542 is correspondingly arranged with feed belt 532, and the upper positioning seat 543 is fixed at 541 outside of upper conveyor shell, The upper positioning seat 543 is correspondingly arranged with lower positioning seat 534, passes through support between the lower positioning seat 534 and upper positioning seat 543 Axis 55 is fixedly connected.
As shown in Figure 34, Figure 35, Figure 36 and Figure 37, side provisions for grouting 6 includes the 5th waggon 61, the 4th clump weight 62, the second slurry cylinder positioning seat 63, the second agitating device 64, slush pump 65, the second slurry conduit 66, out sizing device 67 and cement slurry Cleaning plant 68, the 4th clump weight 62 are fixed on the 5th waggon 61, and the second slurry cylinder positioning seat 63 is fixed It is arranged on the 5th waggon 61, second agitating device 64 is fixed on the second slurry cylinder positioning seat 63, the mud Pump 65 is fixedly connected with the grout outlet of the second agitating device 64, and the input terminal and slush pump 65 of second slurry conduit 66 are fixed Connection, the sizing device 67 out are fixedly connected with the output end of the second slurry conduit 66, and the cement slurry cleaning plant 68 is fixed It is arranged in the second slurry conduit 66, the sizing device 67 out is correspondingly arranged with cement slurry cleaning plant 68.
As shown in Figure 36, Figure 38, Figure 39, Figure 40, Figure 41 and Figure 42, the second agitating device 64 includes the second cement slurry barrel side Wall 641, second starches cylinder pedestal 642, the second stirring power device 643, the second stirring blade 644 and the second slurry outlet 645, described Second cement slurry barrel side wall 641 is fixed on the second slurry cylinder pedestal 642, and the fixation of the second stirring power device 643 is set It sets in 642 downside of the second slurry cylinder pedestal and extends in the second cement slurry barrel side wall 641, the second stirring power device 643 Including third motor 6431, the second shaft 6432, second end cover 6433, the second adapter flange 6434, the second bolt 6435, second Bearing 6436 and the second sealing 6437, second shaft 6432 is fixedly connected with third motor 6431, second bolt 6435 are fixed at the second adapter flange 6434 and second end cover 6433 on second slurry cylinder pedestal 642, the second end cover 6433 are located between the second slurry cylinder pedestal 642 and the second adapter flange 6434, and the third motor 6431 is fixed at second On adapter flange 6434, second shaft 6432 extends to second after passing through second end cover 6433 and the second slurry cylinder pedestal 642 In cement slurry barrel side wall 641, the second bearing 6436 and 6437 setting of the second sealing are in the second shaft 6432 and the second slurry cylinder Between pedestal 642, second sealing 6437 is located at 6436 upside of second bearing;Second stirring blade 644 setting is the It is fixedly connected in two cement slurry barrel side walls 641 and with the second shaft 6432 of the second stirring power device 643, second pulp Hole 645 is arranged on the second slurry cylinder pedestal 642 and corresponding with the input terminal of the second slurry conduit 66;It is described go out sizing device 67 include Starch pipe jointing part 671, cement slurry jet pipe 672, stifled ball 673 and third spring 674, the slurry pipe jointing part 671 and the second mud The output end of conduit 66 is fixedly connected, and 672 quantity of cement slurry jet pipe is two and is fixedly connected with slurry pipe jointing part 671, The gap for accommodating road dental calculus is formed between the cement slurry jet pipe 672, described 674 one end of third spring is fixed at water The 672 inside other end of mud jet pipe is fixedly connected with stifled ball 673, the stifled setting of ball 673 outer and stifled ball in cement slurry jet pipe 672 673 diameter is greater than the grout outlet diameter of cement slurry jet pipe 672;The cement slurry cleaning plant 68 include horizontal connecting plate 681, Vertical center web 682, support base 683, the 4th motor 684 and hairbrush 685, the horizontal connecting plate 681 and the second slurry conduit 66 are fixedly connected, and the vertical center web 682 is fixedly connected with horizontal connecting plate 681,683 quantity of support base be two and It is fixed at 682 downside of vertical center web, forms the gap for accommodating road dental calculus, the 4th electricity between the support base 683 Machine 684 is fixed on support base 683 and is fixedly connected with hairbrush 685.
As shown in figure 3, attachment device 7 includes hinged seat 71, first connecting rod 72, second connecting rod 73, pin shaft 74 and the 4th bullet Spring 75,71 quantity of hinged seat are two and are separately fixed in attachment device, the first connecting rod 72 and second connecting rod It is connected between 73 by pin shaft 74, the first connecting rod 72 and second connecting rod 73 are hinged with hinged seat 71 respectively, the 4th bullet 75 both ends of spring are fixedly connected with to attachment device respectively.
As shown in figure 43, rail sliding apparatus 8 includes rail sliding apparatus frame 81, the second articulated shaft 82, guide rail sliding dress Block 83, third ball 84 and positioning rail 85 are set, the rail sliding apparatus block 83 is fixed at by the second articulated shaft 82 and is led On rail carriage frame 81, the third ball 84 is arranged on rail sliding apparatus block 83, and the positioning rail 85 is fixedly installed On rail sliding apparatus frame 81.
The working principle of the invention is briefly described below:
Firstly, fixing track-type facilities 1 as needed, positioned by the second locating rod 17 to first when fixing track-type facilities 1 Block 11 and the second locating piece 13 are fixed, while passing through the cooperation of the first locating rod 122 and locating slot 123 between guide rail bracket 12 It is attached;The setting of the rail sliding apparatus on each device 8 will be fixed in track-type facilities 1 after completing the connection of track-type facilities 1 Guide rail sliding chute 14 in, whole device will along track-type facilities 1 determine track move;Starting channeling device 2 is dug Slot adjusts Ffirst cylinder 2 43, the second oil cylinder 244 determines that position carries out channeling, while the progress Ramming operation of tamping unit 3, elevator 34, which carry out continuous repeated works, drives the folder clamping of tamping machine structure 35 to ram block 36, and de- tamping plate 333 is corresponding with folder tamping machine structure 35 makes to press from both sides rammer Mechanism 35, which rises to top, to be made to unclamp the rammer completion Ramming operation of block 36;Watering mud mechanism 4 will be sprinkled with water on the ground of compacting Mud is first stirred cement slurry by the first agitating device 44, and the slurry for stirring completion will be by the first slurry conduit 45 outputs, are adjusted during output by output quantity of the flow control valve 47 to slurry, while setting is led in the first mud The mud that cement slurry scraping device 46 on pipe 45 will strike off the first slurry conduit 45 and export;It adjusts and completes 526 He of the first screw rod Second screw rod, 527 road Hou Jiang dental calculus 9 is put into road dental calculus holding structure 52, and transmission device 53 is deposited road dental calculus is exported under the dental calculus of road Road dental calculus 9 in laying mechanism 52, meanwhile, under the dental calculus of road transmission device 53 and road dental calculus upper conveyor 54 will satisfy the need dental calculus 9 into Row output, by the cooperation of transmission device 53 under the dental calculus of road and road dental calculus upper conveyor 54 by road dental calculus 9 by vertical direction Output, feed belt 532 and idler wheel 542 cooperate the dental calculus 9 that satisfies the need to carry out the stable output of clamping guarantee road dental calculus during output, defeated Road dental calculus 9 out is fallen on the mud of the first slurry conduit 45 output;Side provisions for grouting 6 will be between the road dental calculus 9 to laying Gap be in the milk, the second agitating device 64 will be stirred slurry, and the slurry for stirring completion will have slush pump 65 to carry out Pressurization enters the second slurry conduit 66, and cement slurry will export by the sizing device 67 that goes out of 66 output end of the second slurry conduit, go out Road dental calculus 9 withstands stifled ball 673 when sizing device 67 is located at road 9 two sides of dental calculus, and cement slurry can't export at this time, when sizing device out 67 be moved between road dental calculus 9 gap when slush pump 65 pressure of cement slurry will be blocked up the elastic force for overcoming third spring 674 Ball 673 is pushed open by cement slurry jet pipe 672, and cement slurry will be by the spouting gap between road dental calculus 9 of cement slurry jet pipe 672 It is interior, whitewashing is completed, while the 4th motor 684 work of cement slurry cleaning plant 68, hairbrush 685 will brush off extra slurry, pass through It crosses a series of work and completes the work such as channeling, compacting, paving slurry, the laying of road dental calculus, the side grouting of road pavement.
The foregoing is merely better embodiments of the invention, and the invention is not limited to above embodiment, are implementing The structural modification small there may be part in the process, if various changes or modifications of the invention are not departed from essence of the invention Mind and range, and belong within the scope of claim and equivalent technologies of the invention, then invention be also intended to encompass these changes and Modification.

Claims (10)

1. the full-automatic road dental calculus laying apparatus of town road gardens construction, including track-type facilities (1), road dental calculus laying apparatus (5), side provisions for grouting (6), attachment device (7) and rail sliding apparatus (8), the track-type facilities (1) are fixed at ground On face, connected between the road dental calculus laying apparatus (5) and side provisions for grouting (6) by attachment device (7), the road dental calculus The same side of laying apparatus (5) and side provisions for grouting (6) is fixedly installed rail sliding apparatus (8) respectively, the guide rail sliding Device (8) is arranged in track-type facilities (1) by way of engaging and can opposite rail device (1) sliding, it is characterised in that: institute Stating road dental calculus laying apparatus (5) includes transmission device under the 4th waggon (51), road dental calculus holding structure (52), road dental calculus (53), road dental calculus upper conveyor (54) and support shaft (55), it is defeated that the road dental calculus holding structure (52) is fixed at the 4th It send on vehicle (51), transmission device (53) is fixed on the 4th waggon (51) under the road dental calculus, is passed under the road dental calculus It send device (53) to be correspondingly arranged with road dental calculus holding structure (52), is transmitted on transmission device (53) and road dental calculus under the road dental calculus It is fixedly connected between device (54) by support shaft (55).
2. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 1, it is characterised in that: institute Stating road dental calculus holding structure (52) includes positioning base (521), the first sliding block (522), the second sliding block (523), third sliding block (524), Four-slider (525), the first screw rod (526), the second screw rod (527) and alignment pin (528), the positioning base (521) it is fixed on the 4th waggon (51), is formed in the middle part of the positioning base (521) and transmission device under the dental calculus of road (53) corresponding vacancy, first sliding block (522), the second sliding block (523), third sliding block (524) and Four-slider (525) are set Set on positioning base (521) and complement each other to form the vacancy for accommodating road dental calculus, first sliding block (522) and second Sliding block (523) is located at the same side, and the third sliding block (524) and Four-slider (525) are located at the same side, first sliding block (522) it is connected between the second sliding block (523) by alignment pin (528), the third sliding block (524) and Four-slider (525) it is connected between by the first screw rod (526), passes through second between second sliding block (523) and Four-slider (525) Bar (527) connection;
3. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 1, it is characterised in that: institute State transmission device (53) under the dental calculus of road include lower transmission device shell (531), feed belt (532), the second motor (533) and under Shaft is arranged in positioning seat (534), lower transmission device shell (531) inside, and the feed belt (532) is arranged in lower transmission In shaft on the inside of crust of the device (531), the feed belt (532) is made of horizontal feed portion and vertical transport portion, described Second motor (533) is fixedly connected with the shaft on the inside of lower transmission device shell (531), and lower positioning seat (534) fixation is set It sets on the outside of lower transmission device shell (531);
4. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 1, it is characterised in that: institute Stating road dental calculus upper conveyor (54) includes upper conveyor shell (541), idler wheel (542) and upper positioning seat (543), the rolling (542) setting is taken turns on the inside of upper conveyor shell (541), the idler wheel (542) forms horizontal feed portion and vertical transport portion, The idler wheel (542) is correspondingly arranged with feed belt (532), and the upper positioning seat (543) is fixed at outside upper conveyor On the outside of shell (541), the upper positioning seat (543) is correspondingly arranged with lower positioning seat (534), the lower positioning seat (534) with it is upper fixed It is fixedly connected between position seat (543) by support shaft (55).
5. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 1, it is characterised in that: institute Side provisions for grouting (6) are stated to stir including the 5th waggon (61), the 4th clump weight (62), the second slurry cylinder positioning seat (63), second It mixes device (64), slush pump (65), the second slurry conduit (66), go out sizing device (67) and cement slurry cleaning plant (68), it is described 4th clump weight (62) is fixed on the 5th waggon (61), and second slurry cylinder positioning seat (63) is fixed at the 5th On waggon (61), second agitating device (64) is fixed on the second slurry cylinder positioning seat (63), the slush pump (65) it is fixedly connected with the grout outlet of the second agitating device (64), the input terminal and slush pump of second slurry conduit (66) (65) it is fixedly connected, sizing device (67) out are fixedly connected with the output end of the second slurry conduit (66), and the cement slurry is clear Reason device (68) is fixed on the second slurry conduit (66), and sizing device (67) and the cement slurry cleaning plant (68) out are right It should be arranged.
6. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 5, it is characterised in that: institute Stating the second agitating device (64) includes the second cement slurry barrel side wall (641), the second slurry cylinder pedestal (642), the second stirring power dress Set (643), the second stirring blade (644) and the second slurry outlet (645), the second cement slurry barrel side wall (641) fixed setting On the second slurry cylinder pedestal (642), the second stirring power device (643) is fixed under the second slurry cylinder pedestal (642) It side and extends in the second cement slurry barrel side wall (641), second stirring blade (644) is arranged in the second cement slurry barrel side wall (641) it is fixedly connected in and with the second stirring power device (643), the second slurry outlet (645) setting starches cylinder bottom second It is on seat (642) and corresponding with the input terminal of the second slurry conduit (66).
7. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 6, it is characterised in that: institute Stating the second stirring power device (643) includes third motor (6431), the second shaft (6432), second end cover (6433), second Adapter flange (6434), the second bolt (6435), second bearing (6436) and the second sealing (6437), second shaft (6432) it is fixedly connected with third motor (6431), second bolt (6435) is by the second adapter flange (6434) and second end Lid (6433) is fixed on the second slurry cylinder pedestal (642), and the second end cover (6433) is located at the second slurry cylinder pedestal (642) Between the second adapter flange (6434), the third motor (6431) is fixed on the second adapter flange (6434), institute It states the second shaft (6432) and extends to the second cement slurry barrel side wall behind second end cover (6433) and the second slurry cylinder pedestal (642) (641) in, the second bearing (6436) and the second sealing (6437) setting are in the second shaft (6432) and the second slurry cylinder pedestal (642) between, second sealing (6437) is located on the upside of second bearing (6436).
8. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 5, it is characterised in that: institute Stating out sizing device (67) includes slurry pipe jointing part (671), cement slurry jet pipe (672), stifled ball (673) and third spring (674), institute It states slurry pipe jointing part (671) to be fixedly connected with the output end of the second slurry conduit (66), cement slurry jet pipe (672) quantity is Two and with slurry pipe jointing part (671) be fixedly connected, the sky for accommodating road dental calculus is formed between the cement slurry jet pipe (672) Gap, described third spring (674) one end are fixed at the other end and stifled ball (673) fixed company on the inside of cement slurry jet pipe (672) Connect, stifled ball (673) setting cement slurry jet pipe (672) outside and the diameter of stifled ball (673) is greater than cement slurry jet pipe (672) Grout outlet diameter.
9. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 5, it is characterised in that: institute Stating cement slurry cleaning plant (68) includes horizontal connecting plate (681), vertical center web (682), support base (683), the 4th motor (684) it is fixedly connected with hairbrush (685), the horizontal connecting plate (681) with the second slurry conduit (66), the vertical center web (682) it is fixedly connected with horizontal connecting plate (681), support base (683) quantity is two and is fixed at vertical connection On the downside of plate (682), the gap for accommodating road dental calculus, the 4th motor (684) fixed setting are formed between the support base (683) It is fixedly connected on support base (683) and with hairbrush (685).
10. the full-automatic road dental calculus laying apparatus of town road gardens construction according to claim 1, it is characterised in that: The attachment device (7) includes hinged seat (71), first connecting rod (72), second connecting rod (73), pin shaft (74) and the 4th spring (75), hinged seat (71) quantity is two and is separately fixed in attachment device, the first connecting rod (72) and second It is connected between connecting rod (73) by pin shaft (74), the first connecting rod (72) and second connecting rod (73) are cut with scissors with hinged seat (71) respectively It connects, the 4th spring (75) both ends are fixedly connected with to attachment device respectively;The rail sliding apparatus (8) includes that guide rail is sliding Dynamic device frame (81), the second articulated shaft (82), rail sliding apparatus block (83), third ball (84) and positioning rail (85), it is described Rail sliding apparatus block (83) is fixed on rail sliding apparatus frame (81) by the second articulated shaft (82), the third rolling Pearl (84) is arranged on rail sliding apparatus block (83), and the positioning rail (85) is fixed at rail sliding apparatus frame (81) On.
CN201611267730.3A 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction Expired - Fee Related CN106702866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611267730.3A CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611267730.3A CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction
CN201611241650.0A CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201611241650.0A Division CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Publications (2)

Publication Number Publication Date
CN106702866A CN106702866A (en) 2017-05-24
CN106702866B true CN106702866B (en) 2019-02-12

Family

ID=58905921

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201611267774.6A Active CN106758707B (en) 2016-12-29 2016-12-29 The full-automatic road paver of town road gardens construction
CN201611267730.3A Expired - Fee Related CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction
CN201611241650.0A Active CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201611267774.6A Active CN106758707B (en) 2016-12-29 2016-12-29 The full-automatic road paver of town road gardens construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201611241650.0A Active CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Country Status (1)

Country Link
CN (3) CN106758707B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152908B (en) * 2017-12-29 2020-12-04 南京溧水高新创业投资管理有限公司 Optical cable laying robot
CN108435084B (en) * 2018-03-19 2020-09-25 徐州工程学院 Ejector in carbon tetrachloride treatment facility
CN109537413B (en) * 2018-11-16 2021-02-23 中国建筑第八工程局有限公司 Curb conveying device and method
CN110965437B (en) * 2019-12-24 2021-08-13 广东美丽建设有限公司 Automatic laying machine for urban road shoulder stones
CN111350118A (en) * 2020-03-02 2020-06-30 悉地(苏州)勘察设计顾问有限公司 Urban road curbstone erection equipment
CN111636278B (en) * 2020-06-12 2021-11-02 新疆丝路六合电气科技有限公司 A pour former for garden road
CN112195731A (en) * 2020-10-13 2021-01-08 余祖广 Efficient automatic installation equipment for curbstone
CN113605185B (en) * 2021-08-11 2022-09-06 李晓平 Garden construction is with full-automatic special-shaped curbstone laying device

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2549038Y (en) * 2001-11-15 2003-05-07 李鹏 Self moving black kerbstone moulding apparatus
ES2259503B1 (en) * 2003-12-05 2007-09-16 Jaime Corcoll Virgili DEVICE FOR THE ASSEMBLY OF CHANNELS IN RAILWAY PLATFORMS.
US7549821B2 (en) * 2005-03-01 2009-06-23 Hall David R Wireless remote-controlled pavement recycling machine
CN201983775U (en) * 2011-03-22 2011-09-21 青岛麦科三维测量设备有限公司 Granite guide rail device and three-coordinate measuring machine
KR20120135711A (en) * 2011-06-07 2012-12-17 주식회사 성우기업 Continuous curb equipped with lighting and constructing method thereof
KR101194797B1 (en) * 2012-01-19 2012-11-09 (주)광양건설 Method for constructing boundary with light apparatus
CN202849910U (en) * 2012-11-05 2013-04-03 山东畅通路桥股份有限公司 Machine tool for casting kerb in situ
CN203049521U (en) * 2012-12-05 2013-07-10 四川顶点建筑工程有限公司 High-efficiency dedusting system for pavement
CN203212988U (en) * 2013-05-07 2013-09-25 桑胜军 Road brick laying machine
CN203360985U (en) * 2013-05-09 2013-12-25 秦皇岛市卢龙华通工程机械厂 Self-walking type self-adapting height adjustment edge stone sliding machine
KR101461084B1 (en) * 2014-06-17 2014-11-13 신두식 Apparatus for constructing boundary stone
CN104099843A (en) * 2014-07-23 2014-10-15 中国水利水电第五工程局有限公司 One-step forming construction method for expressway high-modulus asphalt composite
CN104278612A (en) * 2014-08-21 2015-01-14 国家电网公司 Pavement method for road edge stones of transformer substation road
US9751236B2 (en) * 2015-01-13 2017-09-05 Metal Forms Corporation Height adjustable concrete form assembly
WO2016183632A1 (en) * 2015-05-19 2016-11-24 Stabilcorp Pty Ltd A paver
CN104911981B (en) * 2015-05-28 2017-06-16 秦皇岛科博工程机械制造有限公司 A kind of border stone slip-form machine
CN205313946U (en) * 2015-12-09 2016-06-15 国家电网公司 Way dental calculus and prefabricated mould thereof
CN105836364B (en) * 2016-04-27 2018-02-02 李健 A kind of method that utilizing works road maintenance device carries out road maintenance

Also Published As

Publication number Publication date
CN106702866A (en) 2017-05-24
CN106758707A (en) 2017-05-31
CN106702865B (en) 2019-02-26
CN106758707B (en) 2019-03-01
CN106702865A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106702866B (en) The full-automatic road dental calculus laying apparatus of town road gardens construction
CN107327128A (en) One kind white washed wall device
CN101749047B (en) Paste filling simulation test system
CN206913447U (en) A kind of Construction of Civil Engineering batch mixing feedway
CN105926598B (en) A kind of construction method of two-way cement mixing pile
CN108517744B (en) Highway construction is with muddy dirt road surface leveling device
CN112281589B (en) Utilize cobblestone to carry out paving device
CN201800123U (en) Vertical stirring device
CN105803887A (en) Barrier-free construction method for base layer of city and town road
CN108755729A (en) A kind of CFG pile foundations pile cover and pile body integrative construction device and method
CN211201073U (en) Wall spraying device for building construction
CN208343159U (en) A kind of new type mortar laying apparatus
CN216379029U (en) Highway is concrete device of pouring fast for engineering
CN216663711U (en) Micro-surfacing paver
CN203383209U (en) Six-shaft cement mixing pile machine
CN209099727U (en) Smart levelling machine
CN207944307U (en) A kind of anti-standing transport device of municipal road construction bituminous concrete
CN112663450B (en) Highway construction concrete pouring device and operation method
CN210507056U (en) Civil engineering building is with spreading husky grey device
CN113463477A (en) Micro-surfacing paver and construction method
CN201588654U (en) Novel paste body filling simulated test system
CN110700263A (en) Movable foam concrete spreader and operation method
CN217781687U (en) Municipal works road is with irritating sealing device
CN105937237A (en) Multi-axis compressed air rotary-spaying mixing pile machine and method for forming pile by utilizing pile machine
CN103740057A (en) Reactive resin adhesive and synchronous rubble scattering machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181211

Address after: 518000 Xin'an Street, Baoan District, Shenzhen City, Guangdong Province

Applicant after: Shenzhen Jiarunzhou Landscape Decoration Engineering Co., Ltd.

Address before: 066000 Room 704, Block C, 696 Chengpin District, Yanshan Street, Haigang District, Qinhuangdao City, Hebei Province

Applicant before: Qinhuangdao run Technology Development Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212

Termination date: 20191229

CF01 Termination of patent right due to non-payment of annual fee