Town road gardens construction is with full-automatic road dental calculus laying apparatus
It is on December 29th, 2016, Application No. 201611241650.0, entitled " municipal administration the applying date that the application is
Road gardens construction is with full-automatic road dental calculus laydown machine " application for a patent for invention divisional application.
Technical field
The invention belongs to Architectural Equipment field, more particularly to a kind of town road gardens construction is laid with full-automatic road dental calculus
Device.
Background technology
Road dental calculus refers to the boundary stone used in pavement edge made of granite material, and road dental calculus is also referred to as curbstone (kerbstone) or roadside
Stone.Road dental calculus is the boundary line that driveway, pavement, greenery patches, isolation strip and road other parts are distinguished on road surface, plays guarantee
Pedestrian, vehicular traffic safety and the neat effect of guarantee pavement edge.
Every piece of weight of road dental calculus is all very big, and proportion is 2.7 g/cm3, and one cube of weight is exactly 2.7 tons, in reality
In work progress, the usage amount of road dental calculus is very big, and each piece is required for workman to move carrying and installation, labour intensity by hand
Very greatly, it is necessary to a large amount of manpowers, lay high cost.
The Chinese invention patent of Application No. 201410257844.4 discloses a kind of road dental calculus laydown machine, mainly by car body
Mechanism, hoisting mechanism, laser guidance mechanism and scraping machine structure composition, the propons of car body lift up structure away from 0.4 meter of ground for gantry, after
Bridge semiaxis differential gearing;Hoisting mechanism be arranged on car body side, be made up of three-dimensional platform and tongs, laser guidance mechanism by
Laser instrument for marking line is constituted with laser pickoff, and laser pickoff is light target formula structure, and laser target is arranged on tongs side and hangs
Dress pincers are moved together.Scraping machine is by DC motor Driver.Disclosed road dental calculus installation apparatus function is more single in the prior art,
The part-structure for laying road dental calculus simultaneously is complex.
The content of the invention
In view of the shortcomings of the prior art, the technical problem to be solved in the present invention is to provide one kind and can realize laying road automatically
Dental calculus, high working efficiency, easy to operate town road gardens construction are with full-automatic road dental calculus laying apparatus.
In order to solve technical problem proposed by the invention, used entirely certainly the invention discloses a kind of town road gardens construction
Dynamic road dental calculus laying apparatus, including track-type facilities, road dental calculus laying apparatus, side provisions for grouting, attachment means and slide
Device, the track-type facilities are fixedly installed on the ground, by connecting between the road dental calculus laying apparatus and side provisions for grouting
Connection device is connected, and the same side of the road dental calculus laying apparatus and side provisions for grouting is fixedly installed rail sliding apparatus respectively,
The rail sliding apparatus are arranged in track-type facilities by way of engaging and can the slips of opposite rail device, the road dental calculus
Laying apparatus include conveyer, road dental calculus upper conveyor and support under the 4th waggon, road dental calculus holding structure, road dental calculus
Axle, the road dental calculus holding structure is fixedly installed on the 4th waggon, and conveyer is fixedly installed under the road dental calculus
On four waggons, conveyer is correspondingly arranged with road dental calculus holding structure under the road dental calculus, conveyer under the road dental calculus
It is fixedly connected by support shaft and the dental calculus upper conveyor of road between.
Used as a modification of the present invention, the road dental calculus holding structure includes that positioning base, the first sliding block, second are slided
Block, the 3rd sliding block, Four-slider, the first screw mandrel, the second screw mandrel and alignment pin, it is defeated that the positioning base is fixedly installed on the 4th
Send on car, the positioning base middle part forms room corresponding with conveyer under the dental calculus of road, first sliding block, second are slided
Block, the 3rd sliding block and Four-slider are arranged on positioning base and complement each other to form the room for accommodating road dental calculus, described
First sliding block and the second sliding block are located at the same side, and the 3rd sliding block and Four-slider are located at the same side, first sliding block and
Connected by alignment pin between second sliding block, connected by the first screw mandrel between the 3rd sliding block and Four-slider, it is described
Connected by the second screw mandrel between second sliding block and Four-slider;
Under the road dental calculus conveyer include lower conveyer shell, feed belt, the second motor and lower positioning seat, it is described under
Conveyer shell inner side sets rotating shaft, and the feed belt is arranged in the rotating shaft on the inside of lower conveyer shell, the biography
Belt is sent to be made up of horizontal feed portion and vertical transport portion, second motor is fixed with the rotating shaft on the inside of lower conveyer shell
Connection, the lower positioning seat is fixedly installed on lower conveyer outer side;
The road dental calculus upper conveyor includes upper conveyor shell, roller and upper positioning seat, and the roller is arranged on upload
Crust of the device inner side is sent, the roller forms horizontal feed portion and vertical transport portion, and the roller is correspondingly arranged with feed belt,
The upper positioning seat is fixedly installed on upper conveyor outer side, and the upper positioning seat is correspondingly arranged with lower positioning seat, described
It is fixedly connected by support shaft between lower positioning seat and upper positioning seat.
Used as a modification of the present invention, the side provisions for grouting includes the 5th waggon, the 4th balancing weight, the second slurry
Cylinder positioning seat, the second agitating device, slush pump, the second slurry conduit, go out sizing device and cement mortar cleaning plant, the described 4th matches somebody with somebody
Pouring weight is fixedly installed on the 5th waggon, and the second slurry cylinder positioning seat is fixedly installed on the 5th waggon, and described second
Agitating device is fixedly installed on the second slurry cylinder positioning seat, and the slush pump is fixedly connected with the grout outlet of the second agitating device,
The input of second slurry conduit is fixedly connected with slush pump, it is described go out sizing device and the second slurry conduit output end consolidate
Fixed connection, the cement mortar cleaning plant is fixedly installed in the second slurry conduit, it is described go out sizing device clear up dress with cement mortar
Put and be correspondingly arranged.
Used as a modification of the present invention, second agitating device includes the second cement mortar barrel side wall, the second slurry cylinder bottom
Seat, the second stirring power device, the second stirring vane and the second slurry outlet, the second cement mortar barrel side wall are fixedly installed on
On two slurry cylinder bases, the second stirring power device is fixedly installed on the second slurry cylinder Its lower side and extends to the second cement mortar
In barrel side wall, second stirring vane is arranged in the second cement mortar barrel side wall and is fixed with the second stirring power device and connects
Connect, second slurry outlet is arranged on the second slurry cylinder base and corresponding with the input of the second slurry conduit.
Used as a modification of the present invention, the second stirring power device includes the 3rd motor, the second rotating shaft, the second end
Lid, the second adapter flange, the second bolt, second bearing and the second sealing, second rotating shaft are fixedly connected with the second motor, institute
State the second bolt the second adapter flange and the second end cap are fixedly installed on the second slurry cylinder base, second end cap is located at the
Between two slurry cylinder bases and the second adapter flange, second motor is fixedly installed on the second adapter flange, described second turn
Axle is extended in the second cement mortar barrel side wall after starching cylinder base through the second end cap and second, and the second bearing and second is sealed
It is arranged between the second rotating shaft and the second slurry cylinder base, second sealing is located at second bearing upside.
As a modification of the present invention, it is described go out sizing device include slurry pipe jointing part, cement mortar jet pipe, stifled ball and the 3rd
Spring, the slurry pipe jointing part is fixedly connected with the output end of the second slurry conduit, the cement mortar jet pipe quantity be two and
It is fixedly connected with slurry pipe jointing part, the space for accommodating road dental calculus, the 3rd spring is formed between the cement mortar jet pipe
One end is fixedly installed on the cement mortar jet pipe inner side other end and is fixedly connected with stifled ball, the stifled ball be arranged on cement mortar jet pipe it is outer and
The grout outlet diameter with diameter greater than cement mortar jet pipe of stifled ball.
Used as a modification of the present invention, the cement mortar cleaning plant includes horizontal connecting plate, vertical center web, support
Seat, the 4th motor and hairbrush, the horizontal connecting plate are fixedly connected with the second slurry conduit, and the vertical center web connects with level
Fishplate bar is fixedly connected, and the support base quantity is two and is fixedly installed on the downside of vertical center web, shape between the support base
Into the space for accommodating road dental calculus, the 4th motor is fixedly installed on support base and is fixedly connected with hairbrush.
As a modification of the present invention, the attachment means include hinged seat, first connecting rod, second connecting rod, bearing pin and
4th spring, the hinged seat quantity is two and to be separately fixed on device to be connected, the first connecting rod and second connecting rod
Between connected by bearing pin, the first connecting rod and second connecting rod be hinged with hinged seat respectively, the 4th both ends of the spring difference
It is fixedly connected with device to be connected.
Used as a modification of the present invention, the rail sliding apparatus include rail sliding apparatus frame, the second jointed shaft, lead
Rail carriage block, the 3rd ball and positioning rail, the rail sliding apparatus block are fixedly installed on guide rail by the second jointed shaft
On carriage frame, the 3rd ball is arranged on rail sliding apparatus block, and the positioning rail is fixedly installed on slide
On device frame.
Generally speaking the present invention has the advantages that:
1. town road gardens construction disclosed by the invention belongs to multifunctional equipment, Neng Goushi with full-automatic road dental calculus laying apparatus
The functions such as road dental calculus, the grouting of road dental calculus side are now laid, while can also be circular arc road surfacing road dental calculus, it is multiple functional, from
Dynamicization degree is high, saves labour, is that workmen brings convenience;
2. town road gardens construction disclosed by the invention is used between the module and module of full-automatic road dental calculus laying apparatus
It is flexible coupling, such modules mutual when working is not disturbed, and can be adjusted as needed, using more facilitating, is adapted to
Different working environments, meets different construction requirements;
3. the road dental calculus holding structure in road dental calculus laying apparatus can adapt to difference according to road dental calculus size adjustment size
The road dental calculus of size, conveyer and road dental calculus upper conveyor cooperate and can stablize transport road dental calculus under the dental calculus of road, whole
Individual conveying is simple and reliable, can be good at completing the conveying of road dental calculus, reduces the working strength of workman;
4. the side of side provisions for grouting Neng Wei roads dental calculus is in the milk, and can be used hairbrush to brush off unnecessary slurries after grouting,
So that road dental calculus surface cleaning, it is not necessary to additional designs road dental calculus cleaning plant, workload is reduced, while using hairbrush by slurries
The road dental calculus laid after brushing off is more attractive in appearance;
5. track-type facilities can be spliced into the arc-shaped of different-diameter, and can be stably fixed on ground, guide rail
Chute both sides are fixedly installed rubber chute can be made between guide rail sliding chute well excessively, when equipment is walked along guide rail sliding chute,
Can pass through, after the completion of construction, guide rail can be dismantled, convenient transport;
6., mounted in the side of equipment, the rail sliding apparatus block of rail sliding apparatus is upper and lower, bottom surface is equipped with rolling for rail sliding apparatus
Pearl, can easily enter guide rail sliding chute, and rail sliding apparatus can move up and down a certain amount of, adapt to the situation of Uneven road.
Brief description of the drawings
The gardens construction of Fig. 1 town roads is with full-automatic road dental calculus laydown machine front view;
The gardens construction of Fig. 2 town roads is with full-automatic road dental calculus laydown machine stereogram;
The partial enlarged drawing of Fig. 3 Fig. 2;
Fig. 4 track-type facilities stereograms;
Fig. 5 track-type facilities front views;
The A-A directions sectional view of Fig. 6 Fig. 5;
I regional enlarged drawing of Fig. 7 Fig. 6;
Fig. 8 track-type facilities schematic diagrames;
Fig. 9 channeling device stereograms;
Figure 10 channelings mechanism stereogram;
The stereogram of Figure 11 tamping units first;
The stereogram of Figure 12 tamping units second;
Figure 13 rams the stereogram of frame first;
Figure 14 rams the stereogram of frame second;
Figure 15 presss from both sides tamping machine the first stereogram of structure;
Figure 16 presss from both sides tamping machine the second stereogram of structure;
Figure 17 rams block stereogram;
Figure 18 watering mud mechanism stereogram;
Figure 19 watering mud mechanism sections assembling figure 1;
The sectional view of Figure 20 Figure 19;
I regional enlarged drawing of Figure 21 Figure 20;
Figure 22 watering mud mechanism sections assembling figure 2;
II regional enlarged drawing of Figure 23 Figure 22;
Figure 24 cement mortar scraping device stereograms;
Figure 25 cement mortar scraping device sectional views;
Figure 26 roads dental calculus laying apparatus stereogram;
Figure 27 roads dental calculus laying apparatus front view;
Figure 28 roads dental calculus the first schematic diagram of holding structure;
Figure 29 roads dental calculus the second schematic diagram of holding structure;
Conveyer and road dental calculus upper conveyor assembling figure under the dental calculus of Figure 30 roads;
Figure 31 Figure 30 sectional views;
Conveyer and road dental calculus upper conveyor assembling top view under the dental calculus of Figure 32 roads;
Figure 33 roads dental calculus upper conveyor stereogram;
Figure 34 sides provisions for grouting stereogram;
Figure 35 sides provisions for grouting part assembling figure;
Figure 36 sides provisions for grouting part assembling figure top view;
Figure 37 sides provisions for grouting part assembling figure front view;
Figure 38 Figure 37 A-A directions sectional view;
I regional enlarged drawing of Figure 39 Figure 38;
II regional enlarged drawing of Figure 40 Figure 38;
Figure 41 sides provisions for grouting part assembling figure right view;
III regional enlarged drawing of Figure 42 Figure 41;
Figure 43 rail sliding apparatus stereograms;
Wherein:
1-track-type facilities, the 11-the first locating piece, 12-guide rail bracket, 121-guide rail bracket body, 122-locating rod, 123-fixed
Position groove, the 13-the second locating piece, 14-guide rail sliding chute, 15-rubber chute, 16-flat thin magnet, 17-locating rod;
2-channeling device, 21-driver's cabin, the 22-the first waggon, the 23-the first balancing weight, 24-channeling mechanism, 241-bottom
Seat, 2411-base body, 2412-lifting arm hinged seat, the 2413-the first hinged seat, the 242-the first lifting arm, 2421-
First lifting arm body, the 2422-the second hinged seat, the 2423-the three hinged seat, the 243-the first oil cylinder, the 244-the second oil cylinder,
245-the second lifting arm, the 2451-the second lifting arm body, the 2452-the four hinged seat, 2453-otic placode positioning seat, 2454-
Slide otic placode, 2455-regulation screw mandrel, 246-channeling knife;
3-tamping unit, the 31-the second waggon, the 32-the second balancing weight, 33-frame is rammed, 331-rammer erects plate, 332-the
One pulley positioning seat, 333-de- tamping plate, 334-ram block chute, 335-rammer frame base plate, 336-rammer frame side plate, 337-rammer frame
Connecting plate, 338-pulley, 34-elevator, 35-folder tamping machine structure, 351-way block, 3511-guide rail location-plate, 3512-the
Two pulley positioning seats, 3513-slide rail, the 3514-the first ball, 352-assembly pulley, 353-folder rammer frame, the 354-the first spring,
355-the first jointed shaft, 36-ram block, 361-rammer block body, 362-rammer block slide rail, the 363-the second ball;
4-watering mud mechanism, the 41-the three waggon, the 42-the three balancing weight, the 43-the first slurry cylinder positioning seat, 44-the first
Agitating device, the 441-the first cement mortar barrel side wall, the 442-the first slurry cylinder base, the 443-the first stirring power device, 4431-
First motor, 4432-first rotating shaft, the 4433-the first end cap, the 4434-the first adapter flange, the 4435-the first bolt,
4436-clutch shaft bearing, the 4437-the first sealing, the 444-the first stirring vane, the 445-the first slurry outlet, the 45-the first mud
Conduit, 46-cement mortar scraping device, 461-collar, 462-supporting plate, 463-strike off lath, 464-through hole, 465-fixed
Position plate, 466-locating dowel, 467-second spring, 47-flow control valve;
5-road dental calculus laying apparatus, the 51-the four waggon, 52-road dental calculus holding structure, 521-positioning base, 522-the
One sliding block, the 523-the second sliding block, the 524-the three sliding block, the 525-the Four-slider, the 526-the first screw mandrel, the 527-the second screw mandrel,
528-alignment pin, conveyer under the dental calculus of 53-road, 531-lower conveyer shell, 532-feed belt, 533-the
Two motors, 534-lower positioning seat, 54-road dental calculus upper conveyor, 541-upper conveyor shell, 542-roller, 543-
Upper positioning seat, 55-support shaft;
6-side provisions for grouting, the 61-the five waggon, the 62-the four balancing weight, the 63-the second slurry cylinder positioning seat, 64-the second
Agitating device, the 641-the second cement mortar barrel side wall, the 642-the second slurry cylinder base, the 643-the second stirring power device, 6431-
3rd motor, the 6432-the second rotating shaft, the 6433-the second end cap, the 6434-the second adapter flange, the 6435-the second bolt,
6436-second bearing, the 6437-the second sealing, the 644-the second stirring vane, the 645-the second slurry outlet, 65-slush pump,
66-the second slurry conduit, 67-go out sizing device, 671-slurry pipe jointing part, 672-cement mortar jet pipe, 673-stifled ball, 674-
3rd spring, 68-cement mortar cleaning plant, 681-horizontal connecting plate, 682-vertical center web, 683-support base, 684-
4th motor, 685-hairbrush;
7-attachment means, 71-hinged seat, 72-first connecting rod, 73-second connecting rod, 74-bearing pin, the 75-the four spring;
8-rail sliding apparatus, 81-rail sliding apparatus frame, the 82-the second jointed shaft, 83-rail sliding apparatus block, 84-
3rd ball, 85-positioning rail;
9-road dental calculus.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 9, town road gardens construction full-automatic road dental calculus laydown machine, including guide rail
Device 1, channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus laying apparatus 5, side provisions for grouting 6, connection dress
7 and rail sliding apparatus 8 are put, the track-type facilities 1 are fixedly installed on the ground, the channeling device 2, tamping unit 3, watering
Mud mechanism 4, road dental calculus laying apparatus 5 and side provisions for grouting 6 set gradually, between the channeling device 2 and tamping unit 3
Connected by attachment means 7, connected by attachment means 7 between the tamping unit 3 and watering mud mechanism 4, the watering
Connected by attachment means 7 between mud mechanism 4 and road dental calculus laying apparatus 5, the road dental calculus laying apparatus 5 and side are in the milk
Connected by attachment means 7 between device 6, the channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus laying dress
Put 5 and the same side of side provisions for grouting 6 be fixedly installed rail sliding apparatus 8 respectively, the rail sliding apparatus 8 are by engaging
Mode be arranged in track-type facilities 1 and can opposite rail device 1 slide.
As shown in Fig. 4, Fig. 5, Fig. 6, Fig. 7 and Fig. 8, track-type facilities 1 include that the first locating piece 11, guide rail bracket 12, second are determined
Position block 13, guide rail sliding chute 14, rubber chute 15, flat thin magnet 16 and locating rod 17, the guide rail bracket 12 include guide rail bracket body
121st, locating rod 122 and locating slot 123, the locating rod 122 and locating slot 123 are arranged on the both sides of guide rail bracket body 121, described
It is correspondingly arranged between guide rail bracket body 121 and locating rod 122, the locating piece 13 of first locating piece 11 and second is fixedly installed on
The both sides of guide rail bracket body 121 of guide rail bracket 12 and it is correspondingly arranged, the guide rail sliding chute 14 is fixedly installed on the guide rail of guide rail bracket 12
On frame body 121, the guide rail sliding chute 14 is correspondingly arranged with rail sliding apparatus 8, and the rubber chute 15 is fixedly installed on leads
The both sides of rail chute 14, the flat thin magnet 16 is fixedly installed on rubber chute 15 and is located remotely from the side of guide rail sliding chute 14, institute
State locating rod 17 and the first locating piece 11, the second locating piece 13 is corresponding can be fixed on the first locating piece 11 and the second locating piece 13
On ground.
As shown in Figure 9 and Figure 10, channeling device 2 includes driver's cabin 21, the first waggon 22, the first balancing weight 23 and channeling
Mechanism 24, the driver's cabin 21 is fixedly installed on the first waggon 22, and first balancing weight 23 and channeling mechanism 24 are fixed
It is arranged on the first waggon 22;The channeling mechanism 24 includes base 241, the first lifting arm 242, the first oil cylinder 243, second
Oil cylinder 244, the second lifting arm 245 and channeling knife 246, the base 241 include base body 2411, lifting arm hinged seat 2412
With the first hinged seat 2413, the hinged seat 2413 of the lifting arm hinged seat 2412 and first is fixedly installed on base body 2411
On, the base body 2411 is arranged on the first waggon 22;First lifting arm 242 includes the first lifting arm body
2421st, the second hinged seat 2422 and the 3rd hinged seat 2423, second hinged seat 2422 and the 3rd hinged seat 2423 are fixed and set
Put on the first lifting arm body 2421, second hinged seat 2422 is located at and is hinged with base 241 near the first lifting arm 242
One end;Second lifting arm 245 include second lifting arm body 2451, the 4th hinged seat 2452, otic placode positioning seat 2453,
Otic placode 2454 and regulation screw mandrel 2455 are slided, the 4th hinged seat 2452 is fixedly installed on the second lifting arm body 2451,
The second lifting arm body 2451 is hinged with the first lifting arm body 2421, and the otic placode positioning seat 2453 is fixedly installed on the
Two lift by crane the one end of arm bodies 2451 away from the first lifting arm body 2421, and the slip otic placode 2454 is arranged on otic placode positioning seat
On 2453, slip otic placode 2454 quantity is for two pieces and parallel, by adjusting screw mandrel 2455 between the slip otic placode 2454
Connection;The first lifting arm body 2421 cuts with scissors away from one end of the second lifting arm body 2451 with lifting arm hinged seat 2412
Connect, described one end of first oil cylinder 243 is hinged the other end and is hinged with the second hinged seat 2422 with the first hinged seat 2413, described second
The one end of oil cylinder 244 is hinged the other end and is hinged with the 4th hinged seat 2452 with the 3rd hinged seat 2423, and the channeling knife 246 is arranged on
Between slip otic placode 2454.
As shown in Figure 11, Figure 12, Figure 13, Figure 14, Figure 15, Figure 16 and Figure 17, tamping unit 3 include the second waggon 31,
Second balancing weight 32, rammer frame 33, elevator 34, folder tamping machine structure 35 and rammer block 36, second balancing weight 32 are fixedly installed on second
On waggon 31, the rammer frame 33 is fixedly installed on the second waggon 31, and the rammer frame 33 includes ramming erection plate 331, first
Pulley positioning seat 332, de- tamping plate 333, block chute 334 is rammed, frame base plate 335 is rammed, is rammed frame side plate 336, rams frame connecting plate 337 and sliding
Wheel 338, the erection plate 331 that rams is fixedly installed on rammer frame base plate 335 and is mutually perpendicular to, and the rammer frame side plate 336 is fixed and set
Put on frame base plate 335 is rammed and be mutually perpendicular to, the erection plate 331 that rams is vertical with frame 336 place planes of side plate are rammed, the rammer frame
Connecting plate 337 is fixedly installed on rammer frame side plate 336, and the first pulley positioning seat 332 is fixedly installed on rammer and erects on plate 331
Side, the pulley 338 is arranged on first pulley positioning seat 332, and the de- tamping plate 333 is fixedly installed on rammer and erects on plate 331
And positioned at ram the corresponding opposite side of frame side plate 336, the rammer block chute 334 be arranged on rammer erect on plate 331 and with de- tamping plate
333 are located at the same side;The folder tamping machine structure 35 is arranged on rammer frame 33 and relative can ram frame 33 and slides, the folder tamping machine structure 35 with
Elevator 34 is connected, and the folder tamping machine structure 35 includes that way block 351, assembly pulley 352, folder ram frame 353, the first spring 354 and first
Jointed shaft 355, the way block 351 includes that guide rail location-plate 3511, second pulley positioning seat 3512, slide rail 3513 and first are rolled
Pearl 3514, the second pulley positioning seat 3512 is fixedly installed on the upside of guide rail location-plate 3511, and the slide rail 3513 is fixed and set
Put on guide rail location-plate 3511, first ball 3514 is arranged on slide rail 3513, the slide rail 3513 with ram block chute
334 correspondences, the assembly pulley 352 is arranged on the second pulley positioning seat 3512 of way block 351, and the way block 351 is set
On block chute 334 is rammed and relative can ram block chute 334 and slide, first jointed shaft 355 is fixedly installed on way block 351
On guide rail location-plate 3511, the folder rams frame 353 and is made up of the handgrip being hinged, and the folder rams frame 353 and is arranged on the first hinge
In spindle 355, first spring 354 is fixedly installed between the handgrip that folder rams frame 353;The rammer block 36 is arranged on rammer frame 33
Upper and relative can ram frame 33 and slide, the folder tamping machine structure 35 is correspondingly arranged with block 36 is rammed, and the rammer block 36 includes rammer block body
361st, block slide rail 362 and the second ball 363 are rammed, the rammer block slide rail 362 is fixedly installed on rammer block body 361, the rammer block
Body 361 rams frame 353 and is correspondingly arranged with folder, and second ball 363 is arranged on rammer block slide rail 362, the rammer block slide rail 362
It is corresponding with block chute 334 is rammed;The elevator 34 is fixedly installed on rammer frame base plate 335, the steel wire penetrating on the elevator 34
It is connected with assembly pulley 352 after pulley 338.
As shown in Figure 18, Figure 19, Figure 20, Figure 21, Figure 22, Figure 23, Figure 24 and Figure 25, watering mud mechanism 4 includes the 3rd
Waggon 41, the 3rd balancing weight 42, first are starched cylinder positioning seat 43, the first agitating device 44, the first slurry conduit 45, cement mortar and are scraped
Leveling device 46 and flow control valve 47, the 3rd balancing weight 42 are fixedly installed on the 3rd waggon 41, the first slurry cylinder
Positioning seat 43 is fixedly installed on the 3rd waggon 41;First agitating device 44 includes the first cement mortar barrel side wall 441, the
One slurry cylinder base 442, the first stirring power device 443, the first stirring vane 444 and the first slurry outlet 445, first cement
Slurry bucket side wall 441 is fixedly installed on the first slurry cylinder base 442, and the first stirring power device 443 is fixedly installed on first
Starch the downside of cylinder base 442 and extend in the first cement mortar barrel side wall 441, the first stirring power device 443 includes first
Motor 4431, first rotating shaft 4432, the first end cap 4433, the first adapter flange 4434, the first bolt 4435, clutch shaft bearing 4436
With the first sealing 4437, the first rotating shaft 4432 is fixedly connected with the first motor 4431, and first bolt 4435 is by first
The end cap 4433 of adapter flange 4434 and first is fixedly installed on the first slurry cylinder base 442, and first end cap 4433 is located at the
Between one slurry cylinder base 442 and the first adapter flange 4434, first motor 4431 is fixedly installed on the first adapter flange
On 4434, the first rotating shaft 4432 extends to the first cement slurry bucket after passing through the first end cap 4433 and the first slurry cylinder base 442
In side wall 441, the sealing of the clutch shaft bearing 4436 and first 4437 be arranged on first rotating shaft 4432 and first starch cylinder base 442 it
Between, first sealing 4437 is located at the upside of clutch shaft bearing 4436, and first stirring vane 444 is arranged on the first cement slurry bucket
It is fixedly connected in side wall 441 and with the first rotating shaft 4432 of the first stirring power device 443, first slurry outlet 445 is set
On the first slurry cylinder base 442 and corresponding with the input of the first slurry conduit 45, first agitating device 44 is fixedly installed
On the first slurry cylinder positioning seat 43;First slurry outlet of the input of first slurry conduit 45 and the first agitating device 44
445 are fixedly connected, and the cement mortar scraping device 46 is fixedly installed on the output end of the first slurry conduit 45, and the cement mortar strikes off
Device 46 includes the collar 461, supporting plate 462, strikes off lath 463, through hole 464, location-plate 465, locating dowel 466 and second spring
467, the supporting plate 462 is fixedly connected with the collar 461, and the lath 463 that strikes off is arranged in supporting plate 462, described to strike off
Flat thin magnet is fixedly installed on lath 463, the through hole 464 is arranged on the collar 461, the one end of the second spring 467 and the collar
461 are fixedly connected the other end is fixedly connected with location-plate 465, the locating dowel 466 be fixedly installed on location-plate 465 and with it is logical
The correspondence of hole 464, is provided with first slurry conduit 45 and is set with the corresponding groove of through hole 464, the flow control valve 47
In the first slurry conduit 45.
As shown in Figure 26, Figure 27, Figure 28, Figure 29, Figure 30, Figure 31, Figure 32 and Figure 33, road dental calculus laying apparatus 5 include the
Conveyer 53 under four waggons 51, road dental calculus holding structure 52, road dental calculus, road dental calculus upper conveyor 54 and support shaft 55,
The road dental calculus holding structure 52 is fixedly installed on the 4th waggon 51, and conveyer 53 is fixedly installed under the road dental calculus
On 4th waggon 51, conveyer 53 is correspondingly arranged with road dental calculus holding structure 52 under the road dental calculus, under the road dental calculus
It is fixedly connected by support shaft 55 between conveyer 53 and road dental calculus upper conveyor 54;The road dental calculus holding structure 52 is wrapped
Include positioning base 521, the first sliding block 522, the second sliding block 523, the 3rd sliding block 524, Four-slider 525, the first screw mandrel 526,
Two screw mandrels 527 and alignment pin 528, the positioning base 521 are fixedly installed on the 4th waggon 51, the positioning base
521 middle parts are formed to be slided with the corresponding room of conveyer under the dental calculus of road 53, first sliding block 522, the second sliding block the 523, the 3rd
Block 524 and Four-slider 525 are arranged on positioning base 521 and complement each other to form the room for accommodating road dental calculus, described
First sliding block 522 and the second sliding block 523 are located at the same side, and the 3rd sliding block 524 and Four-slider 525 are located at the same side, institute
State and connected by alignment pin 528 between the first sliding block 522 and the second sliding block 523, the 3rd sliding block 524 and Four-slider
Connected by the first screw mandrel 526 between 525, connected by the second screw mandrel 527 between second sliding block 523 and Four-slider 525
Connect;Conveyer 53 includes lower conveyer shell 531, feed belt 532, the second motor 533 and lower fixed under the road dental calculus
Position seat 534, the inner side of the lower conveyer shell 531 sets rotating shaft, and the feed belt 532 is arranged on lower conveyer shell
531 inner side rotating shaft on, the feed belt 532 is made up of horizontal feed portion and vertical transport portion, second motor 533 with
The rotating shaft of the inner side of lower conveyer shell 531 is fixedly connected, and the lower positioning seat 534 is fixedly installed on lower conveyer shell
531 outsides;The road dental calculus upper conveyor 54 includes upper conveyor shell 541, roller 542 and upper positioning seat 543, described
Roller 542 is arranged on the inner side of upper conveyor shell 541, and the roller 542 forms horizontal feed portion and vertical transport portion, described
Roller 542 is correspondingly arranged with feed belt 532, and the upper positioning seat 543 is fixedly installed on the outside of upper conveyor shell 541,
The upper positioning seat 543 is correspondingly arranged with lower positioning seat 534, by support between the lower positioning seat 534 and upper positioning seat 543
Axle 55 is fixedly connected.
As shown in Figure 34, Figure 35, Figure 36 and Figure 37, side provisions for grouting 6 includes the 5th waggon 61, the 4th balancing weight
62nd, the second slurry cylinder positioning seat 63, the second agitating device 64, slush pump 65, the second slurry conduit 66, go out sizing device 67 and cement mortar
Cleaning plant 68, the 4th balancing weight 62 is fixedly installed on the 5th waggon 61, and the second slurry cylinder positioning seat 63 is fixed
It is arranged on the 5th waggon 61, second agitating device 64 is fixedly installed on the second slurry cylinder positioning seat 63, the mud
Pump 65 is fixedly connected with the grout outlet of the second agitating device 64, and input and the slush pump 65 of second slurry conduit 66 are fixed
Connection, it is described go out sizing device 67 be fixedly connected with the output end of the second slurry conduit 66, the cement mortar cleaning plant 68 is fixed
Be arranged in the second slurry conduit 66, it is described go out sizing device 67 be correspondingly arranged with cement mortar cleaning plant 68.
As shown in Figure 36, Figure 38, Figure 39, Figure 40, Figure 41 and Figure 42, the second agitating device 64 includes the second cement mortar barrel side
The slurry cylinder of wall 641, second base 642, the second stirring power device 643, the second stirring vane 644 and the second slurry outlet 645, it is described
Second cement mortar barrel side wall 641 is fixedly installed on the second slurry cylinder base 642, and the second stirring power device 643 is fixed and set
Put in the downside of the second slurry cylinder base 642 and extend in the second cement mortar barrel side wall 641, the second stirring power device 643
Including the 3rd motor 6431, the second rotating shaft 6432, the second end cap 6433, the second adapter flange 6434, the second bolt 6435, second
The sealing of bearing 6436 and second 6437, second rotating shaft 6432 is fixedly connected with the 3rd motor 6431, second bolt
6435 are fixedly installed on the second slurry cylinder base 642 second adapter flange 6434 and the second end cap 6433, second end cap
6433 are located between the second slurry cylinder base 642 and the second adapter flange 6434, and the 3rd motor 6431 is fixedly installed on second
On adapter flange 6434, second rotating shaft 6432 extends to second after passing through the second end cap 6433 and the second slurry cylinder base 642
In cement mortar barrel side wall 641, the sealing of the second bearing 6436 and second 6437 is arranged on the second rotating shaft 6432 and the second slurry cylinder
Between base 642, second sealing 6437 is located at the upside of second bearing 6436;Second stirring vane 644 is arranged on
It is fixedly connected in two cement mortar barrel side walls 641 and with the second rotating shaft 6432 of the second stirring power device 643, second pulp
Hole 645 is arranged on the second slurry cylinder base 642 and corresponding with the input of the second slurry conduit 66;It is described go out sizing device 67 include
Slurry pipe jointing part 671, cement mortar jet pipe 672, the stifled spring 674 of ball 673 and the 3rd, the slurry mud of pipe jointing part 671 and second
The output end of conduit 66 is fixedly connected, and the quantity of cement mortar jet pipe 672 is two and is fixedly connected with slurry pipe jointing part 671,
The space for accommodating road dental calculus is formed between the cement mortar jet pipe 672, described one end of 3rd spring 674 is fixedly installed on water
The inner side other end of mud jet pipe 672 is fixedly connected with stifled ball 673, and the stifled ball 673 is arranged on outside cement mortar jet pipe 672 and stifled ball
The 673 grout outlet diameter with diameter greater than cement mortar jet pipe 672;The cement mortar cleaning plant 68 include horizontal connecting plate 681,
Vertical center web 682, support base 683, the 4th motor 684 and hairbrush 685, the slurry conduit of the horizontal connecting plate 681 and second
66 are fixedly connected, and the vertical center web 682 is fixedly connected with horizontal connecting plate 681, the quantity of the support base 683 be two and
The downside of vertical center web 682 is fixedly installed on, the space for accommodating road dental calculus, the 4th electricity are formed between the support base 683
Machine 684 is fixedly installed on support base 683 and is fixedly connected with hairbrush 685.
As shown in figure 3, attachment means 7 include hinged seat 71, first connecting rod 72, second connecting rod 73, the bullet of bearing pin 74 and the 4th
Spring 75, the quantity of the hinged seat 71 is two and to be separately fixed on device to be connected, the first connecting rod 72 and second connecting rod
Connected by bearing pin 74 between 73, the first connecting rod 72 and second connecting rod 73 are hinged with hinged seat 71 respectively, the 4th bullet
The two ends of spring 75 are fixedly connected with device to be connected respectively.
As shown in figure 43, rail sliding apparatus 8 include that rail sliding apparatus frame 81, the second jointed shaft 82, slide are filled
Block 83, the 3rd ball 84 and positioning rail 85 are put, the rail sliding apparatus block 83 is fixedly installed on by the second jointed shaft 82 and led
On rail carriage frame 81, the 3rd ball 84 is arranged on rail sliding apparatus block 83, and the positioning rail 85 is fixedly installed
On rail sliding apparatus frame 81.
Operation principle of the invention is briefly described below:
First, track-type facilities 1 are fixed as needed, by 17 pairs of the first locating pieces 11 of locating rod and the during fixed track-type facilities 1
Two locating pieces 13 are fixed, while being attached by the cooperation of locating rod 122 and locating slot 123 between guide rail bracket 12;It is complete
The rail sliding apparatus 8 that will be fixed on each device after into the connection of track-type facilities 1 are arranged on the guide rail sliding chute 14 of track-type facilities 1
Interior, whole device moves the track determined along track-type facilities 1;Starting channeling device 2 carries out channeling, the oil of regulation first
Cylinder 243, the second oil cylinder 244 determine that position carries out channeling, while tamping unit 3 carries out Ramming operation, elevator 34 is constantly weighed
Work of returning to work drives folder tamping machine structure 35 to grip and rams block 36, and de- tamping plate 333 is corresponding with tamping machine structure 35 is pressed from both sides rises to folder tamping machine structure 35
Top makes release ram the completion Ramming operation of block 36;Watering mud mechanism 4 will be sprinkled with cement mortar on the ground of compacting, pass through first
First agitating device 44 is stirred to cement mortar, and stirring the slurry for completing will be exported by the first slurry conduit 45, be exported
The output quantity of slurry is adjusted by flow control valve 47 in journey, while the cement mortar being arranged in the first slurry conduit 45
Scraping device 46 will strike off the mud that the first slurry conduit 45 is exported;Regulation will after completing the first screw mandrel 526 and the second screw mandrel 527
Road dental calculus 9 is put into road dental calculus holding structure 52, and conveyer 53 will export the road in road dental calculus holding structure 52 under the dental calculus of road
Dental calculus 9, meanwhile, conveyer 53 and road dental calculus upper conveyor 54 dental calculus 9 that will satisfy the need are exported under the dental calculus of road, by road tooth
The cooperation of conveyer 53 and road dental calculus upper conveyor 54 exports road dental calculus 9 by vertical direction under stone, in output procedure
Feed belt 532 and roller 542 coordinate the dental calculus 9 that satisfies the need to carry out clamping to ensure that dental calculus stabilization in road is exported, and the road dental calculus 9 of output is fallen
On the mud of the output of the first slurry conduit 45;Side provisions for grouting 6 will be in the milk to the gap between the road dental calculus 9 of laying,
Second agitating device 64 will be stirred to slurry, stir complete slurry will have slush pump 65 carry out pressurization enter the second mud
Conduit 66, cement mortar will be exported by the sizing device 67 that goes out of the output end of the second slurry conduit 66, go out sizing device 67 positioned at road tooth
Road dental calculus 9 withstands stifled ball 673 during 9 both sides of stone, and now cement mortar can't be exported, and road dental calculus 9 is moved to when sizing device 67 is gone out
Between gap when slush pump 65 will overcome the elastic force of the 3rd spring 674 that stifled ball 673 is sprayed by cement mortar to the pressure of cement mortar
Pipe 672 is pushed open, cement mortar by by cement mortar jet pipe 672 it is spouting enter approach dental calculus 9 between gap in, complete whitewashing, together
When cement mortar cleaning plant 68 the 4th motor 684 work, hairbrush 685 will brush off unnecessary slurry, by a series of work
Complete the work such as channeling, compacting, paving slurry, the laying of road dental calculus, the side grouting of road pavement.
Better embodiment of the invention is the foregoing is only, the invention is not limited in above-mentioned implementation method, is being implemented
During there may be local small structural modification, if not departing from essence of the invention to various changes of the invention or modification
God and scope, and within the scope of belonging to claim of the invention and equivalent technologies, then invention be also intended to comprising these changes and
Modification.