CN106702866A - Fully-automatic road traffic stone paving device for municipal road park and garden construction - Google Patents

Fully-automatic road traffic stone paving device for municipal road park and garden construction Download PDF

Info

Publication number
CN106702866A
CN106702866A CN201611267730.3A CN201611267730A CN106702866A CN 106702866 A CN106702866 A CN 106702866A CN 201611267730 A CN201611267730 A CN 201611267730A CN 106702866 A CN106702866 A CN 106702866A
Authority
CN
China
Prior art keywords
dental calculus
road
fixedly installed
slurry
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611267730.3A
Other languages
Chinese (zh)
Other versions
CN106702866B (en
Inventor
曾繁舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiarunzhou Landscape Decoration Engineering Co., Ltd.
Original Assignee
Qinhuangdao Run Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Run Technology Development Co Ltd filed Critical Qinhuangdao Run Technology Development Co Ltd
Priority to CN201611267730.3A priority Critical patent/CN106702866B/en
Publication of CN106702866A publication Critical patent/CN106702866A/en
Application granted granted Critical
Publication of CN106702866B publication Critical patent/CN106702866B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)
  • Soil Working Implements (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a fully-automatic road traffic stone paving device for municipal road park and garden construction. The fully-automatic road traffic stone paving device comprises a guide device, a road traffic stone paving device, a lateral grouting device, a connecting device and guide rail sliding devices. The guide rail device is fixedly arranged on the ground; the road traffic stone paving device and the lateral grouting device are connected through the connecting device; the same sides of the road traffic stone paving device and the lateral grouting device are each fixedly provided with one guide rail sliding device; and the guide rail sliding devices are arranged in the guide rail device in a clamping mode and can slide relative to the guide rail. The fully-automatic road traffic stone paving device belongs to multifunctional equipment, can achieve the functions of road traffic stone pavement, road traffic stone lateral grouting and the like, also can be used for paving road traffic stone for arc pavements, is complete in function and high in automation degree, saves labor, and brings convenience to construction personnel.

Description

Town road gardens construction is with full-automatic road dental calculus laying apparatus
It is on December 29th, 2016, Application No. 201611241650.0, entitled " municipal administration the applying date that the application is Road gardens construction is with full-automatic road dental calculus laydown machine " application for a patent for invention divisional application.
Technical field
The invention belongs to Architectural Equipment field, more particularly to a kind of town road gardens construction is laid with full-automatic road dental calculus Device.
Background technology
Road dental calculus refers to the boundary stone used in pavement edge made of granite material, and road dental calculus is also referred to as curbstone (kerbstone) or roadside Stone.Road dental calculus is the boundary line that driveway, pavement, greenery patches, isolation strip and road other parts are distinguished on road surface, plays guarantee Pedestrian, vehicular traffic safety and the neat effect of guarantee pavement edge.
Every piece of weight of road dental calculus is all very big, and proportion is 2.7 g/cm3, and one cube of weight is exactly 2.7 tons, in reality In work progress, the usage amount of road dental calculus is very big, and each piece is required for workman to move carrying and installation, labour intensity by hand Very greatly, it is necessary to a large amount of manpowers, lay high cost.
The Chinese invention patent of Application No. 201410257844.4 discloses a kind of road dental calculus laydown machine, mainly by car body Mechanism, hoisting mechanism, laser guidance mechanism and scraping machine structure composition, the propons of car body lift up structure away from 0.4 meter of ground for gantry, after Bridge semiaxis differential gearing;Hoisting mechanism be arranged on car body side, be made up of three-dimensional platform and tongs, laser guidance mechanism by Laser instrument for marking line is constituted with laser pickoff, and laser pickoff is light target formula structure, and laser target is arranged on tongs side and hangs Dress pincers are moved together.Scraping machine is by DC motor Driver.Disclosed road dental calculus installation apparatus function is more single in the prior art, The part-structure for laying road dental calculus simultaneously is complex.
The content of the invention
In view of the shortcomings of the prior art, the technical problem to be solved in the present invention is to provide one kind and can realize laying road automatically Dental calculus, high working efficiency, easy to operate town road gardens construction are with full-automatic road dental calculus laying apparatus.
In order to solve technical problem proposed by the invention, used entirely certainly the invention discloses a kind of town road gardens construction Dynamic road dental calculus laying apparatus, including track-type facilities, road dental calculus laying apparatus, side provisions for grouting, attachment means and slide Device, the track-type facilities are fixedly installed on the ground, by connecting between the road dental calculus laying apparatus and side provisions for grouting Connection device is connected, and the same side of the road dental calculus laying apparatus and side provisions for grouting is fixedly installed rail sliding apparatus respectively, The rail sliding apparatus are arranged in track-type facilities by way of engaging and can the slips of opposite rail device, the road dental calculus Laying apparatus include conveyer, road dental calculus upper conveyor and support under the 4th waggon, road dental calculus holding structure, road dental calculus Axle, the road dental calculus holding structure is fixedly installed on the 4th waggon, and conveyer is fixedly installed under the road dental calculus On four waggons, conveyer is correspondingly arranged with road dental calculus holding structure under the road dental calculus, conveyer under the road dental calculus It is fixedly connected by support shaft and the dental calculus upper conveyor of road between.
Used as a modification of the present invention, the road dental calculus holding structure includes that positioning base, the first sliding block, second are slided Block, the 3rd sliding block, Four-slider, the first screw mandrel, the second screw mandrel and alignment pin, it is defeated that the positioning base is fixedly installed on the 4th Send on car, the positioning base middle part forms room corresponding with conveyer under the dental calculus of road, first sliding block, second are slided Block, the 3rd sliding block and Four-slider are arranged on positioning base and complement each other to form the room for accommodating road dental calculus, described First sliding block and the second sliding block are located at the same side, and the 3rd sliding block and Four-slider are located at the same side, first sliding block and Connected by alignment pin between second sliding block, connected by the first screw mandrel between the 3rd sliding block and Four-slider, it is described Connected by the second screw mandrel between second sliding block and Four-slider;
Under the road dental calculus conveyer include lower conveyer shell, feed belt, the second motor and lower positioning seat, it is described under Conveyer shell inner side sets rotating shaft, and the feed belt is arranged in the rotating shaft on the inside of lower conveyer shell, the biography Belt is sent to be made up of horizontal feed portion and vertical transport portion, second motor is fixed with the rotating shaft on the inside of lower conveyer shell Connection, the lower positioning seat is fixedly installed on lower conveyer outer side;
The road dental calculus upper conveyor includes upper conveyor shell, roller and upper positioning seat, and the roller is arranged on upload Crust of the device inner side is sent, the roller forms horizontal feed portion and vertical transport portion, and the roller is correspondingly arranged with feed belt, The upper positioning seat is fixedly installed on upper conveyor outer side, and the upper positioning seat is correspondingly arranged with lower positioning seat, described It is fixedly connected by support shaft between lower positioning seat and upper positioning seat.
Used as a modification of the present invention, the side provisions for grouting includes the 5th waggon, the 4th balancing weight, the second slurry Cylinder positioning seat, the second agitating device, slush pump, the second slurry conduit, go out sizing device and cement mortar cleaning plant, the described 4th matches somebody with somebody Pouring weight is fixedly installed on the 5th waggon, and the second slurry cylinder positioning seat is fixedly installed on the 5th waggon, and described second Agitating device is fixedly installed on the second slurry cylinder positioning seat, and the slush pump is fixedly connected with the grout outlet of the second agitating device, The input of second slurry conduit is fixedly connected with slush pump, it is described go out sizing device and the second slurry conduit output end consolidate Fixed connection, the cement mortar cleaning plant is fixedly installed in the second slurry conduit, it is described go out sizing device clear up dress with cement mortar Put and be correspondingly arranged.
Used as a modification of the present invention, second agitating device includes the second cement mortar barrel side wall, the second slurry cylinder bottom Seat, the second stirring power device, the second stirring vane and the second slurry outlet, the second cement mortar barrel side wall are fixedly installed on On two slurry cylinder bases, the second stirring power device is fixedly installed on the second slurry cylinder Its lower side and extends to the second cement mortar In barrel side wall, second stirring vane is arranged in the second cement mortar barrel side wall and is fixed with the second stirring power device and connects Connect, second slurry outlet is arranged on the second slurry cylinder base and corresponding with the input of the second slurry conduit.
Used as a modification of the present invention, the second stirring power device includes the 3rd motor, the second rotating shaft, the second end Lid, the second adapter flange, the second bolt, second bearing and the second sealing, second rotating shaft are fixedly connected with the second motor, institute State the second bolt the second adapter flange and the second end cap are fixedly installed on the second slurry cylinder base, second end cap is located at the Between two slurry cylinder bases and the second adapter flange, second motor is fixedly installed on the second adapter flange, described second turn Axle is extended in the second cement mortar barrel side wall after starching cylinder base through the second end cap and second, and the second bearing and second is sealed It is arranged between the second rotating shaft and the second slurry cylinder base, second sealing is located at second bearing upside.
As a modification of the present invention, it is described go out sizing device include slurry pipe jointing part, cement mortar jet pipe, stifled ball and the 3rd Spring, the slurry pipe jointing part is fixedly connected with the output end of the second slurry conduit, the cement mortar jet pipe quantity be two and It is fixedly connected with slurry pipe jointing part, the space for accommodating road dental calculus, the 3rd spring is formed between the cement mortar jet pipe One end is fixedly installed on the cement mortar jet pipe inner side other end and is fixedly connected with stifled ball, the stifled ball be arranged on cement mortar jet pipe it is outer and The grout outlet diameter with diameter greater than cement mortar jet pipe of stifled ball.
Used as a modification of the present invention, the cement mortar cleaning plant includes horizontal connecting plate, vertical center web, support Seat, the 4th motor and hairbrush, the horizontal connecting plate are fixedly connected with the second slurry conduit, and the vertical center web connects with level Fishplate bar is fixedly connected, and the support base quantity is two and is fixedly installed on the downside of vertical center web, shape between the support base Into the space for accommodating road dental calculus, the 4th motor is fixedly installed on support base and is fixedly connected with hairbrush.
As a modification of the present invention, the attachment means include hinged seat, first connecting rod, second connecting rod, bearing pin and 4th spring, the hinged seat quantity is two and to be separately fixed on device to be connected, the first connecting rod and second connecting rod Between connected by bearing pin, the first connecting rod and second connecting rod be hinged with hinged seat respectively, the 4th both ends of the spring difference It is fixedly connected with device to be connected.
Used as a modification of the present invention, the rail sliding apparatus include rail sliding apparatus frame, the second jointed shaft, lead Rail carriage block, the 3rd ball and positioning rail, the rail sliding apparatus block are fixedly installed on guide rail by the second jointed shaft On carriage frame, the 3rd ball is arranged on rail sliding apparatus block, and the positioning rail is fixedly installed on slide On device frame.
Generally speaking the present invention has the advantages that:
1. town road gardens construction disclosed by the invention belongs to multifunctional equipment, Neng Goushi with full-automatic road dental calculus laying apparatus The functions such as road dental calculus, the grouting of road dental calculus side are now laid, while can also be circular arc road surfacing road dental calculus, it is multiple functional, from Dynamicization degree is high, saves labour, is that workmen brings convenience;
2. town road gardens construction disclosed by the invention is used between the module and module of full-automatic road dental calculus laying apparatus It is flexible coupling, such modules mutual when working is not disturbed, and can be adjusted as needed, using more facilitating, is adapted to Different working environments, meets different construction requirements;
3. the road dental calculus holding structure in road dental calculus laying apparatus can adapt to difference according to road dental calculus size adjustment size The road dental calculus of size, conveyer and road dental calculus upper conveyor cooperate and can stablize transport road dental calculus under the dental calculus of road, whole Individual conveying is simple and reliable, can be good at completing the conveying of road dental calculus, reduces the working strength of workman;
4. the side of side provisions for grouting Neng Wei roads dental calculus is in the milk, and can be used hairbrush to brush off unnecessary slurries after grouting, So that road dental calculus surface cleaning, it is not necessary to additional designs road dental calculus cleaning plant, workload is reduced, while using hairbrush by slurries The road dental calculus laid after brushing off is more attractive in appearance;
5. track-type facilities can be spliced into the arc-shaped of different-diameter, and can be stably fixed on ground, guide rail Chute both sides are fixedly installed rubber chute can be made between guide rail sliding chute well excessively, when equipment is walked along guide rail sliding chute, Can pass through, after the completion of construction, guide rail can be dismantled, convenient transport;
6., mounted in the side of equipment, the rail sliding apparatus block of rail sliding apparatus is upper and lower, bottom surface is equipped with rolling for rail sliding apparatus Pearl, can easily enter guide rail sliding chute, and rail sliding apparatus can move up and down a certain amount of, adapt to the situation of Uneven road.
Brief description of the drawings
The gardens construction of Fig. 1 town roads is with full-automatic road dental calculus laydown machine front view;
The gardens construction of Fig. 2 town roads is with full-automatic road dental calculus laydown machine stereogram;
The partial enlarged drawing of Fig. 3 Fig. 2;
Fig. 4 track-type facilities stereograms;
Fig. 5 track-type facilities front views;
The A-A directions sectional view of Fig. 6 Fig. 5;
I regional enlarged drawing of Fig. 7 Fig. 6;
Fig. 8 track-type facilities schematic diagrames;
Fig. 9 channeling device stereograms;
Figure 10 channelings mechanism stereogram;
The stereogram of Figure 11 tamping units first;
The stereogram of Figure 12 tamping units second;
Figure 13 rams the stereogram of frame first;
Figure 14 rams the stereogram of frame second;
Figure 15 presss from both sides tamping machine the first stereogram of structure;
Figure 16 presss from both sides tamping machine the second stereogram of structure;
Figure 17 rams block stereogram;
Figure 18 watering mud mechanism stereogram;
Figure 19 watering mud mechanism sections assembling figure 1;
The sectional view of Figure 20 Figure 19;
I regional enlarged drawing of Figure 21 Figure 20;
Figure 22 watering mud mechanism sections assembling figure 2;
II regional enlarged drawing of Figure 23 Figure 22;
Figure 24 cement mortar scraping device stereograms;
Figure 25 cement mortar scraping device sectional views;
Figure 26 roads dental calculus laying apparatus stereogram;
Figure 27 roads dental calculus laying apparatus front view;
Figure 28 roads dental calculus the first schematic diagram of holding structure;
Figure 29 roads dental calculus the second schematic diagram of holding structure;
Conveyer and road dental calculus upper conveyor assembling figure under the dental calculus of Figure 30 roads;
Figure 31 Figure 30 sectional views;
Conveyer and road dental calculus upper conveyor assembling top view under the dental calculus of Figure 32 roads;
Figure 33 roads dental calculus upper conveyor stereogram;
Figure 34 sides provisions for grouting stereogram;
Figure 35 sides provisions for grouting part assembling figure;
Figure 36 sides provisions for grouting part assembling figure top view;
Figure 37 sides provisions for grouting part assembling figure front view;
Figure 38 Figure 37 A-A directions sectional view;
I regional enlarged drawing of Figure 39 Figure 38;
II regional enlarged drawing of Figure 40 Figure 38;
Figure 41 sides provisions for grouting part assembling figure right view;
III regional enlarged drawing of Figure 42 Figure 41;
Figure 43 rail sliding apparatus stereograms;
Wherein:
1-track-type facilities, the 11-the first locating piece, 12-guide rail bracket, 121-guide rail bracket body, 122-locating rod, 123-fixed Position groove, the 13-the second locating piece, 14-guide rail sliding chute, 15-rubber chute, 16-flat thin magnet, 17-locating rod;
2-channeling device, 21-driver's cabin, the 22-the first waggon, the 23-the first balancing weight, 24-channeling mechanism, 241-bottom Seat, 2411-base body, 2412-lifting arm hinged seat, the 2413-the first hinged seat, the 242-the first lifting arm, 2421- First lifting arm body, the 2422-the second hinged seat, the 2423-the three hinged seat, the 243-the first oil cylinder, the 244-the second oil cylinder, 245-the second lifting arm, the 2451-the second lifting arm body, the 2452-the four hinged seat, 2453-otic placode positioning seat, 2454- Slide otic placode, 2455-regulation screw mandrel, 246-channeling knife;
3-tamping unit, the 31-the second waggon, the 32-the second balancing weight, 33-frame is rammed, 331-rammer erects plate, 332-the One pulley positioning seat, 333-de- tamping plate, 334-ram block chute, 335-rammer frame base plate, 336-rammer frame side plate, 337-rammer frame Connecting plate, 338-pulley, 34-elevator, 35-folder tamping machine structure, 351-way block, 3511-guide rail location-plate, 3512-the Two pulley positioning seats, 3513-slide rail, the 3514-the first ball, 352-assembly pulley, 353-folder rammer frame, the 354-the first spring, 355-the first jointed shaft, 36-ram block, 361-rammer block body, 362-rammer block slide rail, the 363-the second ball;
4-watering mud mechanism, the 41-the three waggon, the 42-the three balancing weight, the 43-the first slurry cylinder positioning seat, 44-the first Agitating device, the 441-the first cement mortar barrel side wall, the 442-the first slurry cylinder base, the 443-the first stirring power device, 4431- First motor, 4432-first rotating shaft, the 4433-the first end cap, the 4434-the first adapter flange, the 4435-the first bolt, 4436-clutch shaft bearing, the 4437-the first sealing, the 444-the first stirring vane, the 445-the first slurry outlet, the 45-the first mud Conduit, 46-cement mortar scraping device, 461-collar, 462-supporting plate, 463-strike off lath, 464-through hole, 465-fixed Position plate, 466-locating dowel, 467-second spring, 47-flow control valve;
5-road dental calculus laying apparatus, the 51-the four waggon, 52-road dental calculus holding structure, 521-positioning base, 522-the One sliding block, the 523-the second sliding block, the 524-the three sliding block, the 525-the Four-slider, the 526-the first screw mandrel, the 527-the second screw mandrel, 528-alignment pin, conveyer under the dental calculus of 53-road, 531-lower conveyer shell, 532-feed belt, 533-the Two motors, 534-lower positioning seat, 54-road dental calculus upper conveyor, 541-upper conveyor shell, 542-roller, 543- Upper positioning seat, 55-support shaft;
6-side provisions for grouting, the 61-the five waggon, the 62-the four balancing weight, the 63-the second slurry cylinder positioning seat, 64-the second Agitating device, the 641-the second cement mortar barrel side wall, the 642-the second slurry cylinder base, the 643-the second stirring power device, 6431- 3rd motor, the 6432-the second rotating shaft, the 6433-the second end cap, the 6434-the second adapter flange, the 6435-the second bolt, 6436-second bearing, the 6437-the second sealing, the 644-the second stirring vane, the 645-the second slurry outlet, 65-slush pump, 66-the second slurry conduit, 67-go out sizing device, 671-slurry pipe jointing part, 672-cement mortar jet pipe, 673-stifled ball, 674- 3rd spring, 68-cement mortar cleaning plant, 681-horizontal connecting plate, 682-vertical center web, 683-support base, 684- 4th motor, 685-hairbrush;
7-attachment means, 71-hinged seat, 72-first connecting rod, 73-second connecting rod, 74-bearing pin, the 75-the four spring;
8-rail sliding apparatus, 81-rail sliding apparatus frame, the 82-the second jointed shaft, 83-rail sliding apparatus block, 84- 3rd ball, 85-positioning rail;
9-road dental calculus.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 9, town road gardens construction full-automatic road dental calculus laydown machine, including guide rail Device 1, channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus laying apparatus 5, side provisions for grouting 6, connection dress 7 and rail sliding apparatus 8 are put, the track-type facilities 1 are fixedly installed on the ground, the channeling device 2, tamping unit 3, watering Mud mechanism 4, road dental calculus laying apparatus 5 and side provisions for grouting 6 set gradually, between the channeling device 2 and tamping unit 3 Connected by attachment means 7, connected by attachment means 7 between the tamping unit 3 and watering mud mechanism 4, the watering Connected by attachment means 7 between mud mechanism 4 and road dental calculus laying apparatus 5, the road dental calculus laying apparatus 5 and side are in the milk Connected by attachment means 7 between device 6, the channeling device 2, tamping unit 3, watering mud mechanism 4, road dental calculus laying dress Put 5 and the same side of side provisions for grouting 6 be fixedly installed rail sliding apparatus 8 respectively, the rail sliding apparatus 8 are by engaging Mode be arranged in track-type facilities 1 and can opposite rail device 1 slide.
As shown in Fig. 4, Fig. 5, Fig. 6, Fig. 7 and Fig. 8, track-type facilities 1 include that the first locating piece 11, guide rail bracket 12, second are determined Position block 13, guide rail sliding chute 14, rubber chute 15, flat thin magnet 16 and locating rod 17, the guide rail bracket 12 include guide rail bracket body 121st, locating rod 122 and locating slot 123, the locating rod 122 and locating slot 123 are arranged on the both sides of guide rail bracket body 121, described It is correspondingly arranged between guide rail bracket body 121 and locating rod 122, the locating piece 13 of first locating piece 11 and second is fixedly installed on The both sides of guide rail bracket body 121 of guide rail bracket 12 and it is correspondingly arranged, the guide rail sliding chute 14 is fixedly installed on the guide rail of guide rail bracket 12 On frame body 121, the guide rail sliding chute 14 is correspondingly arranged with rail sliding apparatus 8, and the rubber chute 15 is fixedly installed on leads The both sides of rail chute 14, the flat thin magnet 16 is fixedly installed on rubber chute 15 and is located remotely from the side of guide rail sliding chute 14, institute State locating rod 17 and the first locating piece 11, the second locating piece 13 is corresponding can be fixed on the first locating piece 11 and the second locating piece 13 On ground.
As shown in Figure 9 and Figure 10, channeling device 2 includes driver's cabin 21, the first waggon 22, the first balancing weight 23 and channeling Mechanism 24, the driver's cabin 21 is fixedly installed on the first waggon 22, and first balancing weight 23 and channeling mechanism 24 are fixed It is arranged on the first waggon 22;The channeling mechanism 24 includes base 241, the first lifting arm 242, the first oil cylinder 243, second Oil cylinder 244, the second lifting arm 245 and channeling knife 246, the base 241 include base body 2411, lifting arm hinged seat 2412 With the first hinged seat 2413, the hinged seat 2413 of the lifting arm hinged seat 2412 and first is fixedly installed on base body 2411 On, the base body 2411 is arranged on the first waggon 22;First lifting arm 242 includes the first lifting arm body 2421st, the second hinged seat 2422 and the 3rd hinged seat 2423, second hinged seat 2422 and the 3rd hinged seat 2423 are fixed and set Put on the first lifting arm body 2421, second hinged seat 2422 is located at and is hinged with base 241 near the first lifting arm 242 One end;Second lifting arm 245 include second lifting arm body 2451, the 4th hinged seat 2452, otic placode positioning seat 2453, Otic placode 2454 and regulation screw mandrel 2455 are slided, the 4th hinged seat 2452 is fixedly installed on the second lifting arm body 2451, The second lifting arm body 2451 is hinged with the first lifting arm body 2421, and the otic placode positioning seat 2453 is fixedly installed on the Two lift by crane the one end of arm bodies 2451 away from the first lifting arm body 2421, and the slip otic placode 2454 is arranged on otic placode positioning seat On 2453, slip otic placode 2454 quantity is for two pieces and parallel, by adjusting screw mandrel 2455 between the slip otic placode 2454 Connection;The first lifting arm body 2421 cuts with scissors away from one end of the second lifting arm body 2451 with lifting arm hinged seat 2412 Connect, described one end of first oil cylinder 243 is hinged the other end and is hinged with the second hinged seat 2422 with the first hinged seat 2413, described second The one end of oil cylinder 244 is hinged the other end and is hinged with the 4th hinged seat 2452 with the 3rd hinged seat 2423, and the channeling knife 246 is arranged on Between slip otic placode 2454.
As shown in Figure 11, Figure 12, Figure 13, Figure 14, Figure 15, Figure 16 and Figure 17, tamping unit 3 include the second waggon 31, Second balancing weight 32, rammer frame 33, elevator 34, folder tamping machine structure 35 and rammer block 36, second balancing weight 32 are fixedly installed on second On waggon 31, the rammer frame 33 is fixedly installed on the second waggon 31, and the rammer frame 33 includes ramming erection plate 331, first Pulley positioning seat 332, de- tamping plate 333, block chute 334 is rammed, frame base plate 335 is rammed, is rammed frame side plate 336, rams frame connecting plate 337 and sliding Wheel 338, the erection plate 331 that rams is fixedly installed on rammer frame base plate 335 and is mutually perpendicular to, and the rammer frame side plate 336 is fixed and set Put on frame base plate 335 is rammed and be mutually perpendicular to, the erection plate 331 that rams is vertical with frame 336 place planes of side plate are rammed, the rammer frame Connecting plate 337 is fixedly installed on rammer frame side plate 336, and the first pulley positioning seat 332 is fixedly installed on rammer and erects on plate 331 Side, the pulley 338 is arranged on first pulley positioning seat 332, and the de- tamping plate 333 is fixedly installed on rammer and erects on plate 331 And positioned at ram the corresponding opposite side of frame side plate 336, the rammer block chute 334 be arranged on rammer erect on plate 331 and with de- tamping plate 333 are located at the same side;The folder tamping machine structure 35 is arranged on rammer frame 33 and relative can ram frame 33 and slides, the folder tamping machine structure 35 with Elevator 34 is connected, and the folder tamping machine structure 35 includes that way block 351, assembly pulley 352, folder ram frame 353, the first spring 354 and first Jointed shaft 355, the way block 351 includes that guide rail location-plate 3511, second pulley positioning seat 3512, slide rail 3513 and first are rolled Pearl 3514, the second pulley positioning seat 3512 is fixedly installed on the upside of guide rail location-plate 3511, and the slide rail 3513 is fixed and set Put on guide rail location-plate 3511, first ball 3514 is arranged on slide rail 3513, the slide rail 3513 with ram block chute 334 correspondences, the assembly pulley 352 is arranged on the second pulley positioning seat 3512 of way block 351, and the way block 351 is set On block chute 334 is rammed and relative can ram block chute 334 and slide, first jointed shaft 355 is fixedly installed on way block 351 On guide rail location-plate 3511, the folder rams frame 353 and is made up of the handgrip being hinged, and the folder rams frame 353 and is arranged on the first hinge In spindle 355, first spring 354 is fixedly installed between the handgrip that folder rams frame 353;The rammer block 36 is arranged on rammer frame 33 Upper and relative can ram frame 33 and slide, the folder tamping machine structure 35 is correspondingly arranged with block 36 is rammed, and the rammer block 36 includes rammer block body 361st, block slide rail 362 and the second ball 363 are rammed, the rammer block slide rail 362 is fixedly installed on rammer block body 361, the rammer block Body 361 rams frame 353 and is correspondingly arranged with folder, and second ball 363 is arranged on rammer block slide rail 362, the rammer block slide rail 362 It is corresponding with block chute 334 is rammed;The elevator 34 is fixedly installed on rammer frame base plate 335, the steel wire penetrating on the elevator 34 It is connected with assembly pulley 352 after pulley 338.
As shown in Figure 18, Figure 19, Figure 20, Figure 21, Figure 22, Figure 23, Figure 24 and Figure 25, watering mud mechanism 4 includes the 3rd Waggon 41, the 3rd balancing weight 42, first are starched cylinder positioning seat 43, the first agitating device 44, the first slurry conduit 45, cement mortar and are scraped Leveling device 46 and flow control valve 47, the 3rd balancing weight 42 are fixedly installed on the 3rd waggon 41, the first slurry cylinder Positioning seat 43 is fixedly installed on the 3rd waggon 41;First agitating device 44 includes the first cement mortar barrel side wall 441, the One slurry cylinder base 442, the first stirring power device 443, the first stirring vane 444 and the first slurry outlet 445, first cement Slurry bucket side wall 441 is fixedly installed on the first slurry cylinder base 442, and the first stirring power device 443 is fixedly installed on first Starch the downside of cylinder base 442 and extend in the first cement mortar barrel side wall 441, the first stirring power device 443 includes first Motor 4431, first rotating shaft 4432, the first end cap 4433, the first adapter flange 4434, the first bolt 4435, clutch shaft bearing 4436 With the first sealing 4437, the first rotating shaft 4432 is fixedly connected with the first motor 4431, and first bolt 4435 is by first The end cap 4433 of adapter flange 4434 and first is fixedly installed on the first slurry cylinder base 442, and first end cap 4433 is located at the Between one slurry cylinder base 442 and the first adapter flange 4434, first motor 4431 is fixedly installed on the first adapter flange On 4434, the first rotating shaft 4432 extends to the first cement slurry bucket after passing through the first end cap 4433 and the first slurry cylinder base 442 In side wall 441, the sealing of the clutch shaft bearing 4436 and first 4437 be arranged on first rotating shaft 4432 and first starch cylinder base 442 it Between, first sealing 4437 is located at the upside of clutch shaft bearing 4436, and first stirring vane 444 is arranged on the first cement slurry bucket It is fixedly connected in side wall 441 and with the first rotating shaft 4432 of the first stirring power device 443, first slurry outlet 445 is set On the first slurry cylinder base 442 and corresponding with the input of the first slurry conduit 45, first agitating device 44 is fixedly installed On the first slurry cylinder positioning seat 43;First slurry outlet of the input of first slurry conduit 45 and the first agitating device 44 445 are fixedly connected, and the cement mortar scraping device 46 is fixedly installed on the output end of the first slurry conduit 45, and the cement mortar strikes off Device 46 includes the collar 461, supporting plate 462, strikes off lath 463, through hole 464, location-plate 465, locating dowel 466 and second spring 467, the supporting plate 462 is fixedly connected with the collar 461, and the lath 463 that strikes off is arranged in supporting plate 462, described to strike off Flat thin magnet is fixedly installed on lath 463, the through hole 464 is arranged on the collar 461, the one end of the second spring 467 and the collar 461 are fixedly connected the other end is fixedly connected with location-plate 465, the locating dowel 466 be fixedly installed on location-plate 465 and with it is logical The correspondence of hole 464, is provided with first slurry conduit 45 and is set with the corresponding groove of through hole 464, the flow control valve 47 In the first slurry conduit 45.
As shown in Figure 26, Figure 27, Figure 28, Figure 29, Figure 30, Figure 31, Figure 32 and Figure 33, road dental calculus laying apparatus 5 include the Conveyer 53 under four waggons 51, road dental calculus holding structure 52, road dental calculus, road dental calculus upper conveyor 54 and support shaft 55, The road dental calculus holding structure 52 is fixedly installed on the 4th waggon 51, and conveyer 53 is fixedly installed under the road dental calculus On 4th waggon 51, conveyer 53 is correspondingly arranged with road dental calculus holding structure 52 under the road dental calculus, under the road dental calculus It is fixedly connected by support shaft 55 between conveyer 53 and road dental calculus upper conveyor 54;The road dental calculus holding structure 52 is wrapped Include positioning base 521, the first sliding block 522, the second sliding block 523, the 3rd sliding block 524, Four-slider 525, the first screw mandrel 526, Two screw mandrels 527 and alignment pin 528, the positioning base 521 are fixedly installed on the 4th waggon 51, the positioning base 521 middle parts are formed to be slided with the corresponding room of conveyer under the dental calculus of road 53, first sliding block 522, the second sliding block the 523, the 3rd Block 524 and Four-slider 525 are arranged on positioning base 521 and complement each other to form the room for accommodating road dental calculus, described First sliding block 522 and the second sliding block 523 are located at the same side, and the 3rd sliding block 524 and Four-slider 525 are located at the same side, institute State and connected by alignment pin 528 between the first sliding block 522 and the second sliding block 523, the 3rd sliding block 524 and Four-slider Connected by the first screw mandrel 526 between 525, connected by the second screw mandrel 527 between second sliding block 523 and Four-slider 525 Connect;Conveyer 53 includes lower conveyer shell 531, feed belt 532, the second motor 533 and lower fixed under the road dental calculus Position seat 534, the inner side of the lower conveyer shell 531 sets rotating shaft, and the feed belt 532 is arranged on lower conveyer shell 531 inner side rotating shaft on, the feed belt 532 is made up of horizontal feed portion and vertical transport portion, second motor 533 with The rotating shaft of the inner side of lower conveyer shell 531 is fixedly connected, and the lower positioning seat 534 is fixedly installed on lower conveyer shell 531 outsides;The road dental calculus upper conveyor 54 includes upper conveyor shell 541, roller 542 and upper positioning seat 543, described Roller 542 is arranged on the inner side of upper conveyor shell 541, and the roller 542 forms horizontal feed portion and vertical transport portion, described Roller 542 is correspondingly arranged with feed belt 532, and the upper positioning seat 543 is fixedly installed on the outside of upper conveyor shell 541, The upper positioning seat 543 is correspondingly arranged with lower positioning seat 534, by support between the lower positioning seat 534 and upper positioning seat 543 Axle 55 is fixedly connected.
As shown in Figure 34, Figure 35, Figure 36 and Figure 37, side provisions for grouting 6 includes the 5th waggon 61, the 4th balancing weight 62nd, the second slurry cylinder positioning seat 63, the second agitating device 64, slush pump 65, the second slurry conduit 66, go out sizing device 67 and cement mortar Cleaning plant 68, the 4th balancing weight 62 is fixedly installed on the 5th waggon 61, and the second slurry cylinder positioning seat 63 is fixed It is arranged on the 5th waggon 61, second agitating device 64 is fixedly installed on the second slurry cylinder positioning seat 63, the mud Pump 65 is fixedly connected with the grout outlet of the second agitating device 64, and input and the slush pump 65 of second slurry conduit 66 are fixed Connection, it is described go out sizing device 67 be fixedly connected with the output end of the second slurry conduit 66, the cement mortar cleaning plant 68 is fixed Be arranged in the second slurry conduit 66, it is described go out sizing device 67 be correspondingly arranged with cement mortar cleaning plant 68.
As shown in Figure 36, Figure 38, Figure 39, Figure 40, Figure 41 and Figure 42, the second agitating device 64 includes the second cement mortar barrel side The slurry cylinder of wall 641, second base 642, the second stirring power device 643, the second stirring vane 644 and the second slurry outlet 645, it is described Second cement mortar barrel side wall 641 is fixedly installed on the second slurry cylinder base 642, and the second stirring power device 643 is fixed and set Put in the downside of the second slurry cylinder base 642 and extend in the second cement mortar barrel side wall 641, the second stirring power device 643 Including the 3rd motor 6431, the second rotating shaft 6432, the second end cap 6433, the second adapter flange 6434, the second bolt 6435, second The sealing of bearing 6436 and second 6437, second rotating shaft 6432 is fixedly connected with the 3rd motor 6431, second bolt 6435 are fixedly installed on the second slurry cylinder base 642 second adapter flange 6434 and the second end cap 6433, second end cap 6433 are located between the second slurry cylinder base 642 and the second adapter flange 6434, and the 3rd motor 6431 is fixedly installed on second On adapter flange 6434, second rotating shaft 6432 extends to second after passing through the second end cap 6433 and the second slurry cylinder base 642 In cement mortar barrel side wall 641, the sealing of the second bearing 6436 and second 6437 is arranged on the second rotating shaft 6432 and the second slurry cylinder Between base 642, second sealing 6437 is located at the upside of second bearing 6436;Second stirring vane 644 is arranged on It is fixedly connected in two cement mortar barrel side walls 641 and with the second rotating shaft 6432 of the second stirring power device 643, second pulp Hole 645 is arranged on the second slurry cylinder base 642 and corresponding with the input of the second slurry conduit 66;It is described go out sizing device 67 include Slurry pipe jointing part 671, cement mortar jet pipe 672, the stifled spring 674 of ball 673 and the 3rd, the slurry mud of pipe jointing part 671 and second The output end of conduit 66 is fixedly connected, and the quantity of cement mortar jet pipe 672 is two and is fixedly connected with slurry pipe jointing part 671, The space for accommodating road dental calculus is formed between the cement mortar jet pipe 672, described one end of 3rd spring 674 is fixedly installed on water The inner side other end of mud jet pipe 672 is fixedly connected with stifled ball 673, and the stifled ball 673 is arranged on outside cement mortar jet pipe 672 and stifled ball The 673 grout outlet diameter with diameter greater than cement mortar jet pipe 672;The cement mortar cleaning plant 68 include horizontal connecting plate 681, Vertical center web 682, support base 683, the 4th motor 684 and hairbrush 685, the slurry conduit of the horizontal connecting plate 681 and second 66 are fixedly connected, and the vertical center web 682 is fixedly connected with horizontal connecting plate 681, the quantity of the support base 683 be two and The downside of vertical center web 682 is fixedly installed on, the space for accommodating road dental calculus, the 4th electricity are formed between the support base 683 Machine 684 is fixedly installed on support base 683 and is fixedly connected with hairbrush 685.
As shown in figure 3, attachment means 7 include hinged seat 71, first connecting rod 72, second connecting rod 73, the bullet of bearing pin 74 and the 4th Spring 75, the quantity of the hinged seat 71 is two and to be separately fixed on device to be connected, the first connecting rod 72 and second connecting rod Connected by bearing pin 74 between 73, the first connecting rod 72 and second connecting rod 73 are hinged with hinged seat 71 respectively, the 4th bullet The two ends of spring 75 are fixedly connected with device to be connected respectively.
As shown in figure 43, rail sliding apparatus 8 include that rail sliding apparatus frame 81, the second jointed shaft 82, slide are filled Block 83, the 3rd ball 84 and positioning rail 85 are put, the rail sliding apparatus block 83 is fixedly installed on by the second jointed shaft 82 and led On rail carriage frame 81, the 3rd ball 84 is arranged on rail sliding apparatus block 83, and the positioning rail 85 is fixedly installed On rail sliding apparatus frame 81.
Operation principle of the invention is briefly described below:
First, track-type facilities 1 are fixed as needed, by 17 pairs of the first locating pieces 11 of locating rod and the during fixed track-type facilities 1 Two locating pieces 13 are fixed, while being attached by the cooperation of locating rod 122 and locating slot 123 between guide rail bracket 12;It is complete The rail sliding apparatus 8 that will be fixed on each device after into the connection of track-type facilities 1 are arranged on the guide rail sliding chute 14 of track-type facilities 1 Interior, whole device moves the track determined along track-type facilities 1;Starting channeling device 2 carries out channeling, the oil of regulation first Cylinder 243, the second oil cylinder 244 determine that position carries out channeling, while tamping unit 3 carries out Ramming operation, elevator 34 is constantly weighed Work of returning to work drives folder tamping machine structure 35 to grip and rams block 36, and de- tamping plate 333 is corresponding with tamping machine structure 35 is pressed from both sides rises to folder tamping machine structure 35 Top makes release ram the completion Ramming operation of block 36;Watering mud mechanism 4 will be sprinkled with cement mortar on the ground of compacting, pass through first First agitating device 44 is stirred to cement mortar, and stirring the slurry for completing will be exported by the first slurry conduit 45, be exported The output quantity of slurry is adjusted by flow control valve 47 in journey, while the cement mortar being arranged in the first slurry conduit 45 Scraping device 46 will strike off the mud that the first slurry conduit 45 is exported;Regulation will after completing the first screw mandrel 526 and the second screw mandrel 527 Road dental calculus 9 is put into road dental calculus holding structure 52, and conveyer 53 will export the road in road dental calculus holding structure 52 under the dental calculus of road Dental calculus 9, meanwhile, conveyer 53 and road dental calculus upper conveyor 54 dental calculus 9 that will satisfy the need are exported under the dental calculus of road, by road tooth The cooperation of conveyer 53 and road dental calculus upper conveyor 54 exports road dental calculus 9 by vertical direction under stone, in output procedure Feed belt 532 and roller 542 coordinate the dental calculus 9 that satisfies the need to carry out clamping to ensure that dental calculus stabilization in road is exported, and the road dental calculus 9 of output is fallen On the mud of the output of the first slurry conduit 45;Side provisions for grouting 6 will be in the milk to the gap between the road dental calculus 9 of laying, Second agitating device 64 will be stirred to slurry, stir complete slurry will have slush pump 65 carry out pressurization enter the second mud Conduit 66, cement mortar will be exported by the sizing device 67 that goes out of the output end of the second slurry conduit 66, go out sizing device 67 positioned at road tooth Road dental calculus 9 withstands stifled ball 673 during 9 both sides of stone, and now cement mortar can't be exported, and road dental calculus 9 is moved to when sizing device 67 is gone out Between gap when slush pump 65 will overcome the elastic force of the 3rd spring 674 that stifled ball 673 is sprayed by cement mortar to the pressure of cement mortar Pipe 672 is pushed open, cement mortar by by cement mortar jet pipe 672 it is spouting enter approach dental calculus 9 between gap in, complete whitewashing, together When cement mortar cleaning plant 68 the 4th motor 684 work, hairbrush 685 will brush off unnecessary slurry, by a series of work Complete the work such as channeling, compacting, paving slurry, the laying of road dental calculus, the side grouting of road pavement.
Better embodiment of the invention is the foregoing is only, the invention is not limited in above-mentioned implementation method, is being implemented During there may be local small structural modification, if not departing from essence of the invention to various changes of the invention or modification God and scope, and within the scope of belonging to claim of the invention and equivalent technologies, then invention be also intended to comprising these changes and Modification.

Claims (10)

1. town road gardens construction full-automatic road dental calculus laying apparatus, including track-type facilities(1), road dental calculus laying apparatus (5), side provisions for grouting(6), attachment means(7)And rail sliding apparatus(8), the track-type facilities(1)It is fixedly installed on ground On face, the road dental calculus laying apparatus(5)With side provisions for grouting(6)Between pass through attachment means(7)Connection, the road dental calculus Laying apparatus(5)With side provisions for grouting(6)The same side rail sliding apparatus are fixedly installed respectively(8), the slide Device(8)Track-type facilities are arranged on by way of engaging(1)It is interior and can opposite rail device(1)Slide, it is characterised in that:Institute State road dental calculus laying apparatus(5)Including the 4th waggon(51), road dental calculus holding structure(52), conveyer under the dental calculus of road (53), road dental calculus upper conveyor(54)And support shaft(55), the road dental calculus holding structure(52)It is fixedly installed on the 4th defeated Send car(51)On, conveyer under the road dental calculus(53)It is fixedly installed on the 4th waggon(51)On, passed under the road dental calculus Send device(53)With road dental calculus holding structure(52)It is correspondingly arranged, conveyer under the road dental calculus(53)Transmitted with the dental calculus of road Device(54)Between pass through support shaft(55)It is fixedly connected.
2. according to the town road gardens construction described in claim 1 with full-automatic road dental calculus laying apparatus, it is characterised in that:It is described Road dental calculus holding structure(52)Including positioning base(521), the first sliding block(522), the second sliding block(523), the 3rd sliding block (524), Four-slider(525), the first screw mandrel(526), the second screw mandrel(527)And alignment pin(528), the positioning base (521)It is fixedly installed on the 4th waggon(51)On, the positioning base(521)Middle part is formed and conveyer under the dental calculus of road (53)Corresponding room, first sliding block(522), the second sliding block(523), the 3rd sliding block(524)With Four-slider(525)If Put in positioning base(521)Go up and complement each other to form the room for accommodating road dental calculus, first sliding block(522)With second Sliding block(523)Positioned at the same side, the 3rd sliding block(524)With Four-slider(525)Positioned at the same side, first sliding block (522)With the second sliding block(523)Between pass through alignment pin(528)Connection, the 3rd sliding block(524)With Four-slider (525)Between pass through the first screw mandrel(526)Connection, second sliding block(523)With Four-slider(525)Between pass through second Bar(527)Connection.
3. town road gardens construction according to claim 1 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State conveyer under the dental calculus of road(53)Including lower conveyer shell(531), feed belt(532), the second motor(533)With under Positioning seat(534), the lower conveyer shell(531)Inner side sets rotating shaft, the feed belt(532)It is arranged on lower transmission Crust of the device(531)In the rotating shaft of inner side, the feed belt(532)It is made up of horizontal feed portion and vertical transport portion, it is described Second motor(533)With lower conveyer shell(531)The rotating shaft of inner side is fixedly connected, the lower positioning seat(534)Fixation sets Put in lower conveyer shell(531)Outside.
4. town road gardens construction according to claim 1 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State road dental calculus upper conveyor(54)Including upper conveyor shell(541), roller(542)With upper positioning seat(543), the rolling Wheel(542)It is arranged on upper conveyor shell(541)Inner side, the roller(542)Horizontal feed portion and vertical transport portion are formed, The roller(542)With feed belt(532)It is correspondingly arranged, the upper positioning seat(543)It is fixedly installed on outside upper conveyor Shell(541)Outside, the upper positioning seat(543)With lower positioning seat(534)It is correspondingly arranged, the lower positioning seat(534)It is fixed with upper Position seat(543)Between pass through support shaft(55)It is fixedly connected.
5. town road gardens construction according to claim 1 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State side provisions for grouting(6)Including the 5th waggon(61), the 4th balancing weight(62), second slurry cylinder positioning seat(63), second stir Mix device(64), slush pump(65), the second slurry conduit(66), go out sizing device(67)With cement mortar cleaning plant(68), it is described 4th balancing weight(62)It is fixedly installed on the 5th waggon(61)On, the second slurry cylinder positioning seat(63)It is fixedly installed on the 5th Waggon(61)On, second agitating device(64)It is fixedly installed on the second slurry cylinder positioning seat(63)On, the slush pump (65)With the second agitating device(64)Grout outlet be fixedly connected, second slurry conduit(66)Input and slush pump (65)Be fixedly connected, it is described go out sizing device(67)With the second slurry conduit(66)Output end be fixedly connected, the cement mortar is clear Reason device(68)It is fixedly installed on the second slurry conduit(66)On, it is described go out sizing device(67)With cement mortar cleaning plant(68)It is right Should set.
6. town road gardens construction according to claim 5 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State the second agitating device(64)Including the second cement mortar barrel side wall(641), second slurry cylinder base(642), the second stirring power dress Put(643), the second stirring vane(644)With the second slurry outlet(645), the second cement mortar barrel side wall(641)It is fixedly installed Cylinder base is starched second(642)On, the second stirring power device(643)It is fixedly installed on the second slurry cylinder base(642)Under Side and extend to the second cement mortar barrel side wall(641)It is interior, second stirring vane(644)It is arranged on the second cement mortar barrel side wall (641)It is interior and with the second stirring power device(643)It is fixedly connected, second slurry outlet(645)It is arranged on the second slurry cylinder bottom Seat(642)It is upper and with the second slurry conduit(66)Input correspondence.
7. town road gardens construction according to claim 6 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State the second stirring power device(643)Including the 3rd motor(6431), the second rotating shaft(6432), the second end cap(6433), second Adapter flange(6434), the second bolt(6435), second bearing(6436)With the second sealing(6437), second rotating shaft (6432)With the second motor(6431)It is fixedly connected, second bolt(6435)By the second adapter flange(6434)With the second end Lid(6433)It is fixedly installed on the second slurry cylinder base(642)On, second end cap(6433)Positioned at the second slurry cylinder base(642) With the second adapter flange(6434)Between, second motor(6431)It is fixedly installed on the second adapter flange(6434)On, institute State the second rotating shaft(6432)Through the second end cap(6433)With the second slurry cylinder base(642)After extend to the second cement mortar barrel side wall (641)It is interior, the second bearing(6436)With the second sealing(6437)It is arranged on the second rotating shaft(6432)With the second slurry cylinder base (642)Between, second sealing(6437)Positioned at second bearing(6436)Upside.
8. town road gardens construction according to claim 5 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State out sizing device(67)Including slurry pipe jointing part(671), cement mortar jet pipe(672), stifled ball(673)With the 3rd spring(674), institute State slurry pipe jointing part(671)With the second slurry conduit(66)Output end be fixedly connected, the cement mortar jet pipe(672)Quantity is Two and with slurry pipe jointing part(671)It is fixedly connected, the cement mortar jet pipe(672)Between form sky for accommodating road dental calculus Gap, the 3rd spring(674)One end is fixedly installed on cement mortar jet pipe(672)The inner side other end and stifled ball(673)It is fixed to connect Connect, the stifled ball(673)It is arranged on cement mortar jet pipe(672)Outer and stifled ball(673)With diameter greater than cement mortar jet pipe(672)'s Grout outlet diameter.
9. town road gardens construction according to claim 5 is with full-automatic road dental calculus laying apparatus, it is characterised in that:Institute State cement mortar cleaning plant(68)Including horizontal connecting plate(681), vertical center web(682), support base(683), the 4th motor (684)And hairbrush(685), the horizontal connecting plate(681)With the second slurry conduit(66)It is fixedly connected, the vertical center web (682)With horizontal connecting plate(681)It is fixedly connected, the support base(683)Quantity is two and is fixedly installed on vertical connection Plate(682)Downside, the support base(683)Between formed accommodate road dental calculus space, the 4th motor(684)It is fixedly installed In support base(683)Upper and and hairbrush(685)It is fixedly connected.
10. town road gardens construction according to claim 1 is with full-automatic road dental calculus laying apparatus, it is characterised in that: The attachment means(7)Including hinged seat(71), first connecting rod(72), second connecting rod(73), bearing pin(74)With the 4th spring (75), the hinged seat(71)Quantity is two and is separately fixed on device to be connected, the first connecting rod(72)With second Connecting rod(73)Between pass through bearing pin(74)Connection, the first connecting rod(72)And second connecting rod(73)Respectively with hinged seat(71)Hinge Connect, the 4th spring(75)Two ends are fixedly connected with device to be connected respectively;The rail sliding apparatus(8)Slided including guide rail Dynamic device frame(81), the second jointed shaft(82), rail sliding apparatus block(83), the 3rd ball(84)And positioning rail(85), it is described Rail sliding apparatus block(83)By the second jointed shaft(82)It is fixedly installed on rail sliding apparatus frame(81)On, the 3rd rolling Pearl(84)It is arranged on rail sliding apparatus block(83)On, the positioning rail(85)It is fixedly installed on rail sliding apparatus frame(81) On.
CN201611267730.3A 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction Expired - Fee Related CN106702866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611267730.3A CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611241650.0A CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction
CN201611267730.3A CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201611241650.0A Division CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Publications (2)

Publication Number Publication Date
CN106702866A true CN106702866A (en) 2017-05-24
CN106702866B CN106702866B (en) 2019-02-12

Family

ID=58905921

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201611267774.6A Active CN106758707B (en) 2016-12-29 2016-12-29 The full-automatic road paver of town road gardens construction
CN201611267730.3A Expired - Fee Related CN106702866B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laying apparatus of town road gardens construction
CN201611241650.0A Active CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201611267774.6A Active CN106758707B (en) 2016-12-29 2016-12-29 The full-automatic road paver of town road gardens construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201611241650.0A Active CN106702865B (en) 2016-12-29 2016-12-29 The full-automatic road dental calculus laydown machine of town road gardens construction

Country Status (1)

Country Link
CN (3) CN106758707B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152908A (en) * 2017-12-29 2018-06-12 周保中 A kind of optical cable laying robot
CN110965437A (en) * 2019-12-24 2020-04-07 金建伟 Automatic laying machine for urban road shoulder stones
CN113605185A (en) * 2021-08-11 2021-11-05 李晓平 Garden construction is with full-automatic special-shaped curbstone laying device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108435084B (en) * 2018-03-19 2020-09-25 徐州工程学院 A kind of injector in carbon tetrachloride treatment equipment
CN109537413B (en) * 2018-11-16 2021-02-23 中国建筑第八工程局有限公司 Curb conveying device and method
CN111350118A (en) * 2020-03-02 2020-06-30 悉地(苏州)勘察设计顾问有限公司 Urban road curbstone erection equipment
CN111636278B (en) * 2020-06-12 2021-11-02 新疆丝路六合电气科技有限公司 A pour former for garden road
CN112195731A (en) * 2020-10-13 2021-01-08 余祖广 Efficient automatic installation equipment for curbstone

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2549038Y (en) * 2001-11-15 2003-05-07 李鹏 Self moving black kerbstone moulding apparatus
KR101194797B1 (en) * 2012-01-19 2012-11-09 (주)광양건설 Method for constructing boundary with light apparatus
KR20120135711A (en) * 2011-06-07 2012-12-17 주식회사 성우기업 Continuous curb equipped with lighting and constructing method thereof
CN203360985U (en) * 2013-05-09 2013-12-25 秦皇岛市卢龙华通工程机械厂 Self-walking type self-adapting height adjustment edge stone sliding machine
KR101461084B1 (en) * 2014-06-17 2014-11-13 신두식 Apparatus for constructing boundary stone
CN104911981A (en) * 2015-05-28 2015-09-16 秦皇岛市卢龙华通工程机械厂 A New Curb Sliding Form Machine
CN205313946U (en) * 2015-12-09 2016-06-15 国家电网公司 Way dental calculus and prefabricated mould thereof
US20160199998A1 (en) * 2015-01-13 2016-07-14 Metal Forms Corporation Height adjustable concrete form assembly

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2259503B1 (en) * 2003-12-05 2007-09-16 Jaime Corcoll Virgili DEVICE FOR THE ASSEMBLY OF CHANNELS IN RAILWAY PLATFORMS.
US7549821B2 (en) * 2005-03-01 2009-06-23 Hall David R Wireless remote-controlled pavement recycling machine
CN201983775U (en) * 2011-03-22 2011-09-21 青岛麦科三维测量设备有限公司 Granite guide rail device and three-coordinate measuring machine
CN202849910U (en) * 2012-11-05 2013-04-03 山东畅通路桥股份有限公司 Machine tool for casting kerb in situ
CN203049521U (en) * 2012-12-05 2013-07-10 四川顶点建筑工程有限公司 High-efficiency dedusting system for pavement
CN203212988U (en) * 2013-05-07 2013-09-25 桑胜军 Road brick laying machine
CN104099843A (en) * 2014-07-23 2014-10-15 中国水利水电第五工程局有限公司 One-step forming construction method for expressway high-modulus asphalt composite
CN104278612A (en) * 2014-08-21 2015-01-14 国家电网公司 Pavement method for road edge stones of transformer substation road
CA2986274C (en) * 2015-05-19 2023-08-22 Stabilcorp Pty Ltd A paver
CN105836364B (en) * 2016-04-27 2018-02-02 李健 A kind of method that utilizing works road maintenance device carries out road maintenance

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2549038Y (en) * 2001-11-15 2003-05-07 李鹏 Self moving black kerbstone moulding apparatus
KR20120135711A (en) * 2011-06-07 2012-12-17 주식회사 성우기업 Continuous curb equipped with lighting and constructing method thereof
KR101194797B1 (en) * 2012-01-19 2012-11-09 (주)광양건설 Method for constructing boundary with light apparatus
CN203360985U (en) * 2013-05-09 2013-12-25 秦皇岛市卢龙华通工程机械厂 Self-walking type self-adapting height adjustment edge stone sliding machine
KR101461084B1 (en) * 2014-06-17 2014-11-13 신두식 Apparatus for constructing boundary stone
US20160199998A1 (en) * 2015-01-13 2016-07-14 Metal Forms Corporation Height adjustable concrete form assembly
CN104911981A (en) * 2015-05-28 2015-09-16 秦皇岛市卢龙华通工程机械厂 A New Curb Sliding Form Machine
CN205313946U (en) * 2015-12-09 2016-06-15 国家电网公司 Way dental calculus and prefabricated mould thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152908A (en) * 2017-12-29 2018-06-12 周保中 A kind of optical cable laying robot
CN108152908B (en) * 2017-12-29 2020-12-04 南京溧水高新创业投资管理有限公司 Optical cable laying robot
CN110965437A (en) * 2019-12-24 2020-04-07 金建伟 Automatic laying machine for urban road shoulder stones
CN113605185A (en) * 2021-08-11 2021-11-05 李晓平 Garden construction is with full-automatic special-shaped curbstone laying device

Also Published As

Publication number Publication date
CN106758707B (en) 2019-03-01
CN106758707A (en) 2017-05-31
CN106702865B (en) 2019-02-26
CN106702866B (en) 2019-02-12
CN106702865A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106702866A (en) Fully-automatic road traffic stone paving device for municipal road park and garden construction
CN205025113U (en) Laser flattening machine people that paves
CN108019045A (en) A kind of ground apparatus for leveling
CN111350116B (en) Material discharging and spreading device and material spreading robot
CN203383484U (en) Interior wall plastering machine
CN105544940B (en) A kind of wall ground construction accessory system and its vertical calibrating method
CN205976392U (en) Full -automatic floor tie machine
CN108517744B (en) Highway construction is with muddy dirt road surface leveling device
CN106121208A (en) A kind of full-automatic floor tile machine
CN108221609B (en) A kind of the road surface embedded device and method of piezoelectric substrate
CN209099727U (en) Smart levelling machine
CN205348699U (en) Wall floor construction auxiliary system
CN108867276A (en) A kind of park cement roadbed pours all-in-one machine
CN107574811A (en) A kind of native face rammer compacter of engineering machinery
CN209989676U (en) Self-propelled multifunctional paving and forming equipment
CN207240430U (en) The vibrating forming machine of base of high-speed railway plate construction
CN216379029U (en) Highway is concrete device of pouring fast for engineering
CN213358242U (en) Intelligent leveling machine
CN212534965U (en) Leveling mechanism and ground leveling robot
CN208104985U (en) A kind of vibration device for kerbstone construction
CN103774539A (en) Concrete pavement comprehensive maintenance vehicle
CN209741632U (en) Small dimension stone material rule jointing instrument of mating formation
CN108691255A (en) Rural highway concrete road construction method
CN206769400U (en) A kind of portable concrete-face closure machine
CN207331793U (en) A kind of scraping mechanism and curb synchronous construction scrape indigenous equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181211

Address after: 518000 Xin'an Street, Baoan District, Shenzhen City, Guangdong Province

Applicant after: Shenzhen Jiarunzhou Landscape Decoration Engineering Co., Ltd.

Address before: 066000 Room 704, Block C, 696 Chengpin District, Yanshan Street, Haigang District, Qinhuangdao City, Hebei Province

Applicant before: Qinhuangdao run Technology Development Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212

Termination date: 20191229