KR20120135711A - Continuous curb equipped with lighting and constructing method thereof - Google Patents

Continuous curb equipped with lighting and constructing method thereof Download PDF

Info

Publication number
KR20120135711A
KR20120135711A KR1020110054575A KR20110054575A KR20120135711A KR 20120135711 A KR20120135711 A KR 20120135711A KR 1020110054575 A KR1020110054575 A KR 1020110054575A KR 20110054575 A KR20110054575 A KR 20110054575A KR 20120135711 A KR20120135711 A KR 20120135711A
Authority
KR
South Korea
Prior art keywords
boundary stone
weight
lighting means
road
sponge
Prior art date
Application number
KR1020110054575A
Other languages
Korean (ko)
Inventor
김종호
박현상
Original Assignee
주식회사 성우기업
김종호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 성우기업, 김종호 filed Critical 주식회사 성우기업
Priority to KR1020110054575A priority Critical patent/KR20120135711A/en
Publication of KR20120135711A publication Critical patent/KR20120135711A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/50Road surface markings; Kerbs or road edgings, specially adapted for alerting road users
    • E01F9/535Kerbs or road edgings specially adapted for alerting road users
    • E01F9/547Kerbs or road edgings specially adapted for alerting road users illuminated

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention manufactures a boundary stone to be installed directly on the existing asphalt or concrete road or for landscaping in a park, etc., without limitation of length in a variety of colors and shapes in the field, and integrated LEDNEON-FLEX in the boundary stone The present invention relates to a continuous boundary stone equipped with a lighting means capable of producing various lights at night by inserting and manufacturing the same, and a construction method thereof.
Method for constructing a continuous boundary stone equipped with a lighting means according to the invention, the step of cleaning the surface of the road to install the boundary stone, applying a urethane resin to the surface of the cleaned road, the boundary stone shape of the material mixed with the molding apparatus Forming a boundary stone by inserting a sponge at a position to install the lighting means at the same time as installing the lighting means, etching the surface of the installed boundary stone, removing the sponge inserted in the boundary stone, and an LED flux at the position where the sponge is removed. Inserting the step, the silicone injection work to bond the LED to the boundary stone inserted into the boundary stone, the step of coating the boundary stone to protect the boundary stone and to prevent discoloration.

Figure P1020110054575

Description

Continuous curb equipped with lighting and constructing method

The present invention relates to a continuous boundary stone equipped with lighting means, and more particularly, the boundary stone to be installed directly on the existing asphalt or concrete road or installed for landscaping in a park, etc. in the field without being limited in length in various colors and shapes The present invention relates to a continuous boundary stone equipped with lighting means capable of producing various lights at night by directly inserting and manufacturing LEDNEON-FLEX integrally into a boundary stone, and a construction method thereof.

In general, the boundary stone is a facility that separates the driveway and the sidewalk by installing along the edge of the roadway, and is installed to ensure the safety of pedestrians by preventing vehicles from entering the sidewalk. It is a stone boundary stone manufactured by processing molded square pillar-shaped concrete or stone.The boundary stone is placed on the ground or sidewall concrete between the roadway and the sidewalk, and the boundary stones are continuously installed on each other. have.

The boundary stone should not be damaged even if the vehicle collides with it, so it should have a certain strength and weight.There is a problem of poor workability due to the heavy weight. Not only need to be installed through construction work in the field, but also the design of various shapes, sizes, and curves is very complicated and difficult to install in the field. There is a problem.

Meanwhile, in order to prevent road accidents due to the recent use of bicycles, bicycle lanes have been installed at the edges of roadways and parks in parks. In the case of installation, cut asphalt or concrete of roadway which is already paved and install it so that boundary stone is buried in a certain thickness, and in parks, etc. I install it.

Therefore, when the boundary stone is installed on the existing paved road to separate the bicycle path or the promenade, the road must be cut, which increases the construction time and cost, as well as the traffic during the construction period. It is inconvenient, and these boundary stones merely function as blocks that mark the boundary of the roadway, so that the boundary stone in the place where the street light is not turned on is rather an obstacle causing an accident at night.

In view of these problems, the technologies that emerged are the same technology as Patent Registration No. 950283 "Continuous Boundary Stone for Landscaping of Parks and Green Landscaping" and Utility Model Registration No. 448146, "Boundary Stone with Light Emitting Rod". The light emitting rod 2 inserted into (1) is provided with fixing means 3 inserted into and fixed to the boundary stone 1, and the fixing means 3 has a width toward the outside in the longitudinal direction around the light emitting rod 2. The protrusion jaw is inclined so as to become large, and a plurality of fixing holes 32 are formed to prevent the light emitting rod 2 from being separated from the boundary stone 1.

Although the boundary stone is provided with a light emitting rod as a lighting means, since a separate fixing means for fixing the light emitting rod to the boundary stone is required, it is complicated in construction and difficult to install, and also installs the boundary stone on an existing road. In this case, the paved road should be cut along the part where the boundary stone will be installed, excavated and installed so that the boundary stone is buried to some extent. Therefore, the existing road must be damaged. Costly, there is a problem that noise and dust is generated due to road cutting and excavation and a lot of inconvenience is accompanied by traffic.

The present invention has been made to solve the above problems, the object of the present invention is not limited to the length of the various colors and patterns (patterns) as well as directly install the boundary stone on the asphalt or concrete road without damaging the existing road. It is possible to provide natural and beautiful landscaping environment by installing directly in the field by making and installing in the field.In addition, LEDNEON-FLEX is integrated into the boundary stone to produce and install various lights at night so that the streetlight function is also possible. It is to provide a continuous boundary stone provided with a lighting means that can be done and its construction method.

Method for constructing a continuous boundary stone equipped with a lighting means according to the invention, the step of cleaning the surface of the road to install the boundary stone, applying a urethane resin to the surface of the cleaned road, the boundary stone shape of the material mixed with the molding apparatus Forming a boundary stone by inserting a sponge at a position to install the lighting means at the same time as installing the lighting means, etching the surface of the installed boundary stone, removing the sponge inserted in the boundary stone, and an LED flux at the position where the sponge is removed. (Including the LEDNEON-FLEX), the step of injecting silicon to bond the LED to the boundary stone inserted in the boundary stone, the coating of the boundary stone to prevent the discoloration and protection of the boundary stone It features.

Continuous boundary stone equipped with a lighting means according to the present invention for solving the above problems, 70 to 79% by weight of sand, 20 to 29% by weight of cement, 0.5 to 1% by weight of pigment, 3 to 5% by weight of It is characterized in that the ocher is stirred, and 4 to 6% by weight of water of the stirred material is added and molded, and the LED is attached to the side of the boundary stone.

Continuous boundary stone equipped with a lighting means according to the present invention having the characteristics as described above, when installing a boundary road to install a bicycle road or walkway, etc. on the existing road or to create a garden or green space, without damaging the existing road Not only can be installed directly on the asphalt, concrete or soil pavement, but the boundary stone is manufactured in the field without any length limitation in various colors and patterns (pattern), and the surface of the boundary stone is coated so that after a long time after installation of the boundary stone Even if you can keep the original shape of the boundary stone.

In addition, the continuous boundary stone equipped with the lighting means of the present invention, when applied to the landscaping field can produce a variety of atmospheres due to various colors of light at night due to the various patterns (patterns) and colors, as well as LED light fluxes. In addition, when applied to a bicycle path or a promenade where no street light is installed, it may also function as a street lamp replacement in a place where dangers are always present, such as a boundary point or a crosswalk of a bicycle road or a promenade.

The method of constructing a continuous boundary stone equipped with a lighting means according to the present invention is not limited to the length and shape of the boundary stone at the construction site, so that it can be continuously manufactured and installed integrally. Can be shortened significantly. In addition, after the boundary stone is formed, the concrete stain may be coated with airless spray without etching the surface of the boundary stone to construct colored concrete or marble textured concrete boundary stone.

1 is a view for explaining a boundary stone equipped with a conventional light-emitting rod.
2 is a view for explaining the process of constructing a boundary stone according to the present invention.
3 is a tool (roller) for etching various patterns on the surface of the boundary stone and a photograph for explaining the shape thereof.
4 is a flowchart of the boundary stone construction method according to the present invention.

The biggest technical feature of the continuous boundary stone equipped with a lighting means according to the present invention is that when the boundary stone is installed on an existing road, the boundary stone is directly installed on the road without cutting and damaging the already paved asphalt or concrete. When installed in parks or gardens for roads, as well as landscaping, various shapes and colors as well as curved lines can be formed freely, and the street lamp functions at night by integrating LEDNEON-FLEX on the boundary stone. And various lighting can be produced.

According to the present invention, a method of constructing a continuous boundary stone provided with lighting means includes arranging a bottom surface of a work section to be constructed, forming a boundary stone, etching, removing a sponge, and removing a sponge. It basically goes through the steps of inserting a neon light (LEDNEON-FLEX), gluing with silicon and coating.

The step of arranging the floor of the work section to be constructed is a step of arranging the floor to be flat even when the boundary stone is installed in the garden or park for landscaping. In addition, when the boundary stone is installed on the existing paved concrete or asphalt road, the step of cleaning the boundary stone so that no foreign matter remains on the surface of the road to be constructed, and the step of applying a urethane resin on the surface of the cleaned road.

When a bicycle-only road is installed on a road by the existing construction method, a boundary stone is installed to prevent a vehicle driving on a road from entering a bicycle-only road. In order to prevent the road from being pushed toward the bike lane, the concrete or asphalt is cut and the boundary stone is buried in the road to a certain depth. At this time, the road surface must be cut and excavated. There was a problem that the construction period is long and costly because it must be.

In order to solve such a problem, in the present invention, a urethane resin, which is used exclusively for adhesive, is applied to the surface of the road where the boundary stone is to be installed, and the urethane resin preferably has a urethane content of 90% by weight or more. Therefore, the boundary stone is adhesively fixed to the surface of the road so that even if the vehicle collides with the boundary stone, the boundary stone is not separated. Thus, by applying the adhesive on the road surface and installing the boundary stone, the road is not damaged and the construction period is much shorter.

The step of forming the boundary stone comprises a first stirring of a material composed of 70 to 79% by weight of sand, 20 to 29% by weight of cement, 0.5 to 1% by weight of pigment, and 3 to 5% by weight of loess. 4 to 6% by weight of water of the agitated material is added to the material by mixing with a second agitator, and the step of laying and plastering the desired shape using a molding apparatus, as shown in Figure 2, While laying the shape of the boundary stone 20 with materials mixed with the molding apparatus 10, the sponge 21 is installed at the position where the lighting means is to be installed. Slag may be used instead of loess.

When the boundary stone material is stirred, a crack prevention net made of a fiber or metal having a diameter of 0.3 to 3 mm is put together in a net shape (ie, a single # shape or a plurality of # shapes in a net shape as a whole) to prevent cracking. It is preferable to stir. By mixing the crack prevention net with the material, the crack prevention net increases the adhesive force, thereby preventing the phenomenon of cracking and material separation or falling off.

In the present invention, since the molding apparatus itself is not the object of the invention, a detailed description of the molding apparatus is omitted. Until now, the boundary stone was manufactured in a factory with a standardized product having a certain length and shape, and then transported and installed to the installation site, so that the boundary stone according to the present invention could not be manufactured in various designs and continuous length stones. Since it is manufactured and manufactured directly through a molding apparatus in the field, it can be manufactured in various shapes and continuous lengths as shown in FIG. In addition to directing, it can also function as a street lamp.

The etching step may be performed by forming a joint at regular intervals with a tool (roller) having various patterns (glyphs) formed as shown in FIG. Form branches.

Basically, the construction method of etching the boundary stone was explained.However, after forming the boundary stone, the surface of the boundary stone was coated by airless spray by diluting water and stain to 50:50 without etching the boundary stone surface. Concrete boundary stones with textured concrete or marble texture may also be constructed.

In the step of removing the sponge, while laying the boundary stone, the sponge 21 inserted together with the side surface or the upper surface of the boundary stone is removed, and the removal of the sponge 21 is performed when the boundary stone is completely hardened, preferably about 70% ( That is, when cured)-it is good to remove. If the boundary stone is completely hardened and then removed, the sponge is torn and a part of the sponge is attached to the boundary stone, and if it is removed too early, a part of the concrete constituting the boundary stone is damaged.

In the step of inserting the LED lighting flux, the LED lighting flux, which is a lighting means that illuminates the light at the position where the sponge is removed, is inserted. When LED is supplied, LED lighting emits LED light of various colors such as red, green, blue, orange, and white, and it is widely sold on the market. This sharpness can produce a variety of lighting.

In the step of working with silicon, silicon is injected around the LED in order to completely adhere the LED to the boundary stone.

The coating step is to coat the surface of the boundary stone to prevent and protect color discoloration after the silicone injection is finished. Various coating agents can be used, but a sunscreen is applied to prevent discoloration of the pigment from ultraviolet rays. Preference is given to using mixed coatings. In addition, without mixing the pigment when mixing the material, it is also possible to mix and coat the MMA (Methyl Metha Acrylate) resin and the pigment in the coating step.

After all of the above steps are completed, the curing, 24 hours in the winter, 12 hours in the summer to finish the production and installation of a continuous boundary stone equipped with a lighting means is finished.

The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and changes without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical spirit of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

10: molding apparatus
20: boundary stone 21: sponge

Claims (6)

Arranging a work period for constructing the boundary stone;
Forming a boundary stone with a mixed material using a molding apparatus and simultaneously inserting a sponge in a position where the lighting means is to be installed, thereby forming the boundary stone;
Etching the surface of the laid boundary stone;
Removing the sponge inserted in the boundary stone;
Inserting an LEDNEON-FLEX into a position where the sponge is removed;
Performing silicon implantation to bond the LED ion flux inserted into the boundary stone to the boundary stone;
Coating the boundary stones to protect them and prevent discoloration
Construction method of a continuous boundary stone equipped with a lighting means, characterized in that the construction through.
The method of claim 1,
The arranging of the work section includes: cleaning the surface of the road on which the boundary stone is to be constructed; and applying a urethane resin to the surface of the cleaned road.
The method of claim 1,
The mixed material is a mixture of 70 to 79% by weight of sand, 20 to 29% by weight of cement, 0.5 to 1% by weight of pigment and 3 to 5% by weight of yellow soil, and then A method of constructing a continuous boundary stone provided with lighting means, characterized in that the material is added by mixing 4-6% by weight of water in the stirred material and mixing the mixture by second stirring.
The method of claim 1,
The coating agent used in the coating step is a method of constructing a continuous boundary stone with a lighting means, characterized in that it comprises a sunscreen.
The method of claim 1,
In the etching step, instead of etching, water and stain (stain) to 50: 50 dilution by coating the airless spray, characterized in that the construction method of the continuous boundary stone provided with a lighting means.
In the boundary stone that is directly installed and constructed in the field by mixing materials,
The boundary stone is agitated 70 to 79% by weight of sand, 20 to 29% by weight of cement, 0.5 to 1% by weight of pigment, 3 to 5% by weight of ocher, and 4 to 6% by weight of water of the stirred material Manufactured by putting a continuous boundary stone with a lighting means, characterized in that the LED is installed on the side of the boundary stone adhesive bonding.
KR1020110054575A 2011-06-07 2011-06-07 Continuous curb equipped with lighting and constructing method thereof KR20120135711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110054575A KR20120135711A (en) 2011-06-07 2011-06-07 Continuous curb equipped with lighting and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110054575A KR20120135711A (en) 2011-06-07 2011-06-07 Continuous curb equipped with lighting and constructing method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020130055968A Division KR101277571B1 (en) 2013-05-16 2013-05-16 Constructing method of continuous curb equipped with lighting

Publications (1)

Publication Number Publication Date
KR20120135711A true KR20120135711A (en) 2012-12-17

Family

ID=47903366

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110054575A KR20120135711A (en) 2011-06-07 2011-06-07 Continuous curb equipped with lighting and constructing method thereof

Country Status (1)

Country Link
KR (1) KR20120135711A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104911981A (en) * 2015-05-28 2015-09-16 秦皇岛市卢龙华通工程机械厂 Novel kerb mold sliding machine
CN106120520A (en) * 2016-08-26 2016-11-16 南通威而多专用汽车制造有限公司 Hydraulic drive type kerbstone paver
CN106702866A (en) * 2016-12-29 2017-05-24 秦皇岛润昌科技开发有限公司 Fully-automatic road traffic stone paving device for municipal road park and garden construction
CN109958040A (en) * 2017-12-23 2019-07-02 蒋芳荣 A kind of cast-in-place lying device of Kerb of concrete sliding formwork
CN110387793A (en) * 2019-07-01 2019-10-29 滕小茶 A kind of paving border stone slip-form device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104911981A (en) * 2015-05-28 2015-09-16 秦皇岛市卢龙华通工程机械厂 Novel kerb mold sliding machine
CN106120520A (en) * 2016-08-26 2016-11-16 南通威而多专用汽车制造有限公司 Hydraulic drive type kerbstone paver
CN106702866A (en) * 2016-12-29 2017-05-24 秦皇岛润昌科技开发有限公司 Fully-automatic road traffic stone paving device for municipal road park and garden construction
CN109958040A (en) * 2017-12-23 2019-07-02 蒋芳荣 A kind of cast-in-place lying device of Kerb of concrete sliding formwork
CN110387793A (en) * 2019-07-01 2019-10-29 滕小茶 A kind of paving border stone slip-form device

Similar Documents

Publication Publication Date Title
KR20120135711A (en) Continuous curb equipped with lighting and constructing method thereof
US20230002279A1 (en) Photoluminescent sand
EP3121334A1 (en) Prefabricated element containing a permanently embedded sign and the production method of prefabricated element
US9157197B2 (en) Functional road structure and construction method thereof
KR101277571B1 (en) Constructing method of continuous curb equipped with lighting
NL2013607B1 (en) Substrate provided with a pattern of luminescent elements.
KR100763416B1 (en) Functional Hump-Crosswalk using precast concrete panel
JPH11181707A (en) Pavement method using water-permeable resin pavement material, and manufacture of block
US10611134B2 (en) Groutless patterns for pavement surfaces using thermoplastic preforms
KR101050205B1 (en) Apparatus and method for constructing concrete structure with boundary stone, boundary stone support of public works, landscaping, road
CN108103866B (en) Sidewalk and construction method thereof
CN220685680U (en) Assembled concrete pavement structure
KR200399087Y1 (en) The side walk block
KR100963298B1 (en) The construction method of the paving layers having an elasticity
KR20110134777A (en) Parking block
CA3123128C (en) Photoluminescent sand
KR100945194B1 (en) Color curb and constructing method thereof
JP2003253607A (en) Fluorescent emission type glass cullet pavement structure
CN211772993U (en) Stone pedestrian crossing line
US20220098123A1 (en) Marking trafficked pavement substrates using a dry polymer modified cement
KR100741410B1 (en) The construction method of the pavement layer having water permeability
JP3207872U (en) Herbicide treatment material
WO2016164055A1 (en) Groutless patterns for pavement surfaces using thermoplastic preforms
CN2692198Y (en) Long effect road boundary stone
KR20170069451A (en) Paving Stone

Legal Events

Date Code Title Description
A201 Request for examination
AMND Amendment
E601 Decision to refuse application
AMND Amendment
A107 Divisional application of patent