CN106677202A - Prefabricated ground and construction method - Google Patents
Prefabricated ground and construction method Download PDFInfo
- Publication number
- CN106677202A CN106677202A CN201611081037.7A CN201611081037A CN106677202A CN 106677202 A CN106677202 A CN 106677202A CN 201611081037 A CN201611081037 A CN 201611081037A CN 106677202 A CN106677202 A CN 106677202A
- Authority
- CN
- China
- Prior art keywords
- girder
- cushion cap
- prefabricated
- pouring area
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Abstract
The invention relates to a prefabricated ground. The prefabricated ground comprises a plurality of pile foundation assemblies arranged in a foundation and distributed in an array manner, main beams each erected between two corresponding adjacent pile foundation assemblies and a bottom plate supported on the main beams. Each pile foundation assembly comprises a preformed pile and a bearing table fixedly arranged at the upper end of the preformed pile. One aim of the prefabricated ground is to provide the prefabricated ground capable of increasing the engineering construction speed and quality. The prefabricated ground has the beneficial effects that the site construction speed of the prefabricated ground is high and is one few hundredth of the time needed for a conventional foundation treatment scheme, and therefore the investment recovery period is shortened, the overall cost input is reduced, and remarkable economic benefits are achieved; and deformation of the prefabricated ground in the using period is remarkably reduced relative to that of the conventional foundation treatment scheme, and the maintenance cost of house buildings in the using period can be reduced.
Description
Technical field
The present invention relates to the realm of building construction, particularly a kind of prefabricated assembled ground and construction method.
Background technology
It is located at coastal soft clay area more in the economically developed city of China, generally requires to carry out when Large scale construction is carried out soft
Native basement process.With the continuous development of China's economy, construction scale expanding day, engineering construction is also carried to Soft Ground
Higher requirement is gone out.Engineering construction is carried out on soft soil foundation, if do not taken effective reinforcement measure, ground to slide
Shifting, cracking or depression etc.;If basement process is improper, foundation instability is easily caused so that building occurs excessive sedimentation or inequality
Even sedimentation, affects the safety of building.
At present conventional method for processing foundation has:Surface layer logos, heavy-tamping method, pre-pressure drainage consolidation method, rubble (sand pile)
Stake, sand mat of subgrade, pile foundation method, soil replacement method, grouting method and reinforcement method etc..
Soft soil foundation has the engineering characteristics such as void ratio is big, water content is more, water penetration is little, shearing strength is low, compressibility is big,
Foundation bearing capacity can not meet the needs of engineering construction substantially.Though existing method for processing foundation can solve ground to a certain extent
Base Carrying Capacity, but generally require relatively long construction period.The weak soil thickness in many areas is larger, by basement process
Cost is limited, and often settlement after construction is larger, have impact on normally using after completion of works, in some instances it may even be possible to cause engineering to fail.
The content of the invention
An object of the present invention is to provide a kind of prefabricated assembled ground that can lift engineering construction speed and quality.
The second object of the present invention is to provide a kind of speed of application soon, and holistic cost puts into low prefabricated assembled ground
Construction method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of prefabricated assembled ground, it includes some inserting in ground and the pile foundation component in array distribution, being erected at
Girder between two adjacent pile foundation components and the base plate being supported on girder;The pile foundation component includes prefabricated pile and fixed
In the cushion cap of prefabricated pile upper end.
A kind of construction method on prefabricated assembled ground, it is comprised the following steps:
Each prefabricated pile is squeezed in ground, is in array distribution between prefabricated pile;
In prefabricated pile upper end fixed bearing platform;
By main beam supporting on two adjacent cushion caps;
Base plate is laid on girder.
For than prior art, it is an advantage of the current invention that:
1. the site operation speed on prefabricated assembled ground is fast, is several percentages the time required to conventional Ground Treatment Schemes
One of, return period is invested so as to shorten, holistic cost input is reduced, with obvious economic benefit.
2. deformation during use more conventional Ground Treatment Schemes in prefabricated assembled ground are obviously reduced, it is possible to reduce room
Build the maintenance cost in validity period in room.
3. prefabricated assembled ground is in built on stilts state, it is to avoid contact of the armored concrete ground with the soil body, can be with
Reduce bottom is affected using the moisture in space, and improvement uses function;Additionally, the prefabricated assembled ground of built on stilts state, can subtract
The backfill quantity in few place, with good economic benefit.
4. stretching the scheme shelved in being connected by of girder and cushion cap can significantly simplify the construction of prefabricated beam end shearing resistance,
Save node cost.
Description of the drawings
Fig. 1 is a kind of structural representation of prefabricated assembled ground embodiment of the present invention.
Fig. 2 is A-A sectional views in Fig. 1.
Fig. 3 is the attachment structure schematic diagram for being located at the cushion cap on the inside of array and girder.
Fig. 4 is B-B sectional views in Fig. 3.
Fig. 5 is C-C sectional views in Fig. 3.
Fig. 6 is attachment structure schematic diagram of the cushion cap with girder for being located at array periphery.
Dimensional structure diagram when Fig. 7 is first direction erection of main beam.
Dimensional structure diagram when Fig. 8 is second direction erection of main beam.
Fig. 9 is dimensional structure diagram when girder is poured with cushion cap.
Figure 10 is dimensional structure diagram when base plate is installed.
Label declaration:1 prefabricated pile, 2 cushion caps, 2-1 cushion caps connection reinforcing bar, 3 girders, 3-1 beams connection reinforcing bar, 4 secondary beams, 5 bottoms
Plate, 6 center pouring areas, 7 peripheral pouring areas.
Specific embodiment
Present invention is described in detail with reference to Figure of description and embodiment:
As Fig. 1 to 10 show the embodiment schematic diagram on a kind of prefabricated assembled ground of present invention offer.
A kind of prefabricated assembled ground, it includes some inserting in ground and the pile foundation component in array distribution, being erected at
Girder 3 between two adjacent pile foundation components and the base plate 5 being supported on girder 3;The pile foundation component include prefabricated pile 1 and
It is installed in the cushion cap 2 of the upper end of prefabricated pile 1.
The girder 3 is prefabricated reinforced concrete girder, and the base plate 5 is prefabricated reinforced concrete base plate.
In order to increase the stress on prefabricated assembled ground, some secondary beams 4 can be set between respective side girder 3.
The secondary beam 4 is prefabricated reinforced concrete secondary beam.
The pile foundation component can be with rectangular array distribution or annular array distribution.
When pile foundation component rectangular array is distributed, the girder 3 is arranged in transverse and longitudinal direction, and the girder 3 in one direction is
Big girder, the girder 3 of other direction is little girder, and secondary beam 4 is arranged between big girder.The deck-molding of big girder is higher than little girder,
And its load-bearing is larger.
The girder 3 is supported on cushion cap 2, and the center formed for pouring between the end of girder 3 on same cushion cap 2 is poured
Area 6 is built, and girder 3 is provided with the beam connection reinforcing bar 3-1 extended to by its end in center pouring area 6.
The beam connection reinforcing bar 3-1 that the girder 3 not arranged in the same direction is extended in center pouring area 6 is in different horizontal planes,
The girder 3 for arranging in the same direction extends to the beam connection reinforcing bar 3-1 of center pouring area 6 and is crisscross arranged in same level.
The both sides patch weldering dowel of beam connection reinforcing bar 3-1, patch weldering dowel is vertically to setting.
Above-mentioned beam connection reinforcing bar 3-1 is arranged on while guaranteeing that node connectivity can be reliable, can avoid junction region steel
Muscle is excessively intensive, significantly facilitates in-site installation construction.
If the girder 3 of different directions must can be selected the beam connection of a direction girder using identical height
Reinforcing bar 3-1 bends up upwards in girder 3 so that stretches out beam connection reinforcing bar 3-1 and has different level heights, so as to avoid reinforcing bar
Space interference.
The upper surface the week side of boss of the cushion cap 2 is provided with peripheral pouring area 7, in the peripherally located pouring area 7 in the end of the girder 3;Institute
State cushion cap 2 and be provided with the vertical cushion cap connection reinforcing bar 2-1 extended in peripheral pouring area 7.
As shown in figure 3, the distribution of the present embodiment pile foundation component rectangular array, on the cushion cap 2 on the inside of rectangular array
Support four girders 3, the end of four girders 3 that center pouring area 6 is surrounded on cushion cap 2, four angles of cushion cap 2 are provided with periphery
Pouring area 7, the both sides of girder 3 are folded between peripheral pouring area 7, after the mounting and adjusting of girder 3 is in place, on cushion cap 2 in
Heart pouring area 6 and the peripheral casting concrete of pouring area 7 (i.e. cushion cap more than 2 does not shelve the region casting concrete of girder 3), make
Obtain between each girder 3 and formed between girder 3 and cushion cap 2 overall.
A kind of construction method on prefabricated assembled ground, it is comprised the following steps:
Each prefabricated pile 1 is squeezed in ground, is in array distribution between prefabricated pile 1;
In the upper end fixed bearing platform 2 of prefabricated pile 1;
Girder 3 is erected on two adjacent cushion caps 2;
Base plate 5 is laid on girder 3.
The concrete grammar of main beam supporting is as follows, and the end of girder 3 is supported on cushion cap 2, the beam connection reinforcing bar of the end of girder 3
3-1 stretches into center pouring area 6, and cushion cap connection reinforcing bar 2-1 is located at the both sides of girder 3, each girder 3 adjust it is in place after, installation form
And (i.e. cushion cap more than 2 does not shelve the area of girder 3 to the center pouring area 6 on cushion cap 2 and peripheral pouring area 7 casting concrete
Domain casting concrete), make to form overall between each girder 3 and between girder 3 and cushion cap 2.
The concrete grammar of base plate paving is as follows, and base plate 5 is laid on into the pouring area of girder 3 and cushion cap 2, by pouring the bottom of
Plate 5 is poured with above-mentioned pouring area and is integrated.
Girder 3 is shelved on the upper surface of cushion cap 2 by sitting slurry engineering method.
During construction, the girder 3 in same direction is first installed, then the girder 3 on other direction is installed.
Claims (10)
1. a kind of prefabricated assembled ground, it is characterised in that:It includes some inserting in ground and the pile foundation group in array distribution
Part, the girder (3) being erected between two adjacent pile foundation components and the base plate (5) being supported on girder (3);The pile foundation component
Including prefabricated pile (1) and it is installed in the cushion cap (2) of prefabricated pile (1) upper end.
2. prefabricated assembled ground according to claim 1, it is characterised in that:Respective side girder is provided with some between (3)
Secondary beam (4).
3. prefabricated assembled ground according to claim 1, it is characterised in that:The pile foundation component rectangular array point
Cloth.
4. prefabricated assembled ground according to claim 3, it is characterised in that:The girder (3) is arranged in transverse and longitudinal direction,
The girder (3) in one direction is big girder, and the girder (3) of other direction is little girder, and some secondary beams are provided between big girder
(4)。
5. the prefabricated assembled ground according to claim 1-4 any one, it is characterised in that:The girder (3) supports
On cushion cap (2), the center pouring area (6) for pouring, and girder are formed between girder (3) end on same cushion cap (2)
(3) it is provided with beam connection reinforcing bar (3-1) extended to by its end in center pouring area (6).
6. prefabricated assembled ground according to claim 5, it is characterised in that:The girder (3) not arranged in the same direction is extended to
Beam connection reinforcing bar (3-1) in center pouring area (6) is in different horizontal planes, and the girder (3) for arranging in the same direction extends to center
Beam connection reinforcing bar (3-1) of pouring area (6) is crisscross arranged in same level.
7. prefabricated assembled ground according to claim 5, it is characterised in that:Cushion cap (2) upper surface the week side of boss is provided with
Peripheral pouring area (7), in the peripherally located pouring area (7) in girder (3) end;The cushion cap (2) is provided with and extends to periphery
Vertical cushion cap connection reinforcing bar (2-1) in pouring area (7).
8. a kind of construction method on prefabricated assembled ground, it is characterised in that comprise the following steps:
It is in array distribution between prefabricated pile (1) during each prefabricated pile (1) is squeezed into into ground;
In prefabricated pile (1) upper end fixed bearing platform (2);
Girder (3) is erected on two adjacent cushion caps (2);
Base plate (5) is laid on girder (3).
9. the construction method on prefabricated assembled ground according to claim 8, it is characterised in that:The concrete side of main beam supporting
Method is as follows, and girder (3) end is supported on cushion cap (2), and beam connection reinforcing bar (3-1) center of stretching into of girder (3) end pours
Area (6), cushion cap connection reinforcing bar (2-1) is positioned at girder (3) both sides, after each girder (3) adjustment is in place, installation form and to cushion cap
(2) center pouring area (6) on and peripheral pouring area (7) casting concrete, make between each girder (3) and girder (3) with
Formed between cushion cap (2) overall.
10. the construction method on prefabricated assembled ground according to claim 9, it is characterised in that:Base plate paving it is concrete
Method is as follows, and base plate (5) is laid on into the pouring area of girder (3) and cushion cap (2), is poured base plate (5) with above-mentioned by pouring
Area pours and is integrated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611081037.7A CN106677202A (en) | 2016-11-30 | 2016-11-30 | Prefabricated ground and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611081037.7A CN106677202A (en) | 2016-11-30 | 2016-11-30 | Prefabricated ground and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106677202A true CN106677202A (en) | 2017-05-17 |
Family
ID=58867380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611081037.7A Pending CN106677202A (en) | 2016-11-30 | 2016-11-30 | Prefabricated ground and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677202A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339087A (en) * | 2018-10-08 | 2019-02-15 | 贺州通号装配式建筑有限公司 | A kind of foundation structure system of low-rise building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088915A (en) * | 2012-08-16 | 2013-05-08 | 杨众 | Cast-in-site column with column cap and construction method |
CN105862900A (en) * | 2016-05-25 | 2016-08-17 | 山东大学 | Assembled type garage structure system based on precast piles and method |
CN205530682U (en) * | 2016-04-01 | 2016-08-31 | 上海城建建设实业集团新型建筑材料有限公司 | Precast prestressed frame construction |
CN205712473U (en) * | 2015-12-29 | 2016-11-23 | 上海建工五建集团有限公司 | A kind of PC beam column node connection device |
CN206376270U (en) * | 2016-11-30 | 2017-08-04 | 福建省建筑设计研究院 | Prefabricated assembled ground |
-
2016
- 2016-11-30 CN CN201611081037.7A patent/CN106677202A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088915A (en) * | 2012-08-16 | 2013-05-08 | 杨众 | Cast-in-site column with column cap and construction method |
CN205712473U (en) * | 2015-12-29 | 2016-11-23 | 上海建工五建集团有限公司 | A kind of PC beam column node connection device |
CN205530682U (en) * | 2016-04-01 | 2016-08-31 | 上海城建建设实业集团新型建筑材料有限公司 | Precast prestressed frame construction |
CN105862900A (en) * | 2016-05-25 | 2016-08-17 | 山东大学 | Assembled type garage structure system based on precast piles and method |
CN206376270U (en) * | 2016-11-30 | 2017-08-04 | 福建省建筑设计研究院 | Prefabricated assembled ground |
Non-Patent Citations (3)
Title |
---|
中元国际工程设计研究院等: "《国家建筑标准设计图集 民用建筑工程结构施工图设计深度图样 04G103》", 31 October 2007 * |
张晓勇等: "预制全装配式混凝土框架结构施工技术", 《施工技术》 * |
张波等: "《装配式混凝土结构工程》", 30 September 2016 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339087A (en) * | 2018-10-08 | 2019-02-15 | 贺州通号装配式建筑有限公司 | A kind of foundation structure system of low-rise building |
CN109339087B (en) * | 2018-10-08 | 2023-10-27 | 贺州通号装配式建筑有限公司 | Infrastructure system of low-rise building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201546227U (en) | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall | |
CN102864795A (en) | Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method | |
CN108265618B (en) | Underground reverse storey-adding construction method for viaduct pier foundation | |
CN203021923U (en) | Big cantilever bent cap steel truss construction platform | |
CN106760615A (en) | A kind of ruggedized construction and its construction method for shear wall concrete replacement | |
CN107524096A (en) | A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method | |
CN105019645B (en) | Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth | |
CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
CN206376270U (en) | Prefabricated assembled ground | |
CN102864796A (en) | Construction spreading foundation adaptive to filled ground settlement and construction method | |
CN110904992B (en) | Elevator foundation member for integrally assembling elevator and construction method thereof | |
CN106677202A (en) | Prefabricated ground and construction method | |
CN207277211U (en) | Large steel pipe truss for bent cap cast-in-place construction | |
CN201671063U (en) | Movable steel base for construction precast beams and standard knot thereof | |
CN106381810A (en) | Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket | |
CN110607801A (en) | Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity | |
CN214883824U (en) | Pre-leveling tower foundation | |
CN113279423B (en) | Prefabricated column pier and post-cast strip foundation beam assembly integral construction method | |
CN211257051U (en) | Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity | |
CN103306285A (en) | Anchored and jacked pile construction system for increasing foundation bearing capacity | |
CN103883124B (en) | The method for designing of crab-bolt stock | |
CN108487303B (en) | Combined retaining wall of supporting pile and counterfort retaining wall and construction method | |
CN202595759U (en) | Independent pile foundation platform basic mechanism | |
CN205475300U (en) | Utilize foundation pit retaining structure's tower crane foundation cushion cap | |
CN216787120U (en) | Underground chamber lateral wall supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 350025 Tonghu Road, Drum Tower District, Fuzhou, Fujian Province, No. 188 Applicant after: FUJIAN PROVINCIAL INSTITUTE OF ARCHITECTURAL DESIGN AND RESEARCH CO.,LTD. Address before: 350000 Fuzhou, Gulou District, Fujian Lake Road, No. 188 Applicant before: FUJIAN PROVINCIAL INSTITUTE OF ARCHITECTURAL DESIGN AND RESEARCH |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |