CN207277211U - Large steel pipe truss for bent cap cast-in-place construction - Google Patents
Large steel pipe truss for bent cap cast-in-place construction Download PDFInfo
- Publication number
- CN207277211U CN207277211U CN201721209336.4U CN201721209336U CN207277211U CN 207277211 U CN207277211 U CN 207277211U CN 201721209336 U CN201721209336 U CN 201721209336U CN 207277211 U CN207277211 U CN 207277211U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- truss
- chord
- vertical rod
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型涉及一种用于盖梁现浇施工的大钢管桁架,两片桁架位于桥墩立柱两侧,并与桥墩立柱固定,桁架由立杆、上弦杆、下弦杆、大斜杆、腹杆构成,立杆由上立杆和下立杆组成,下立杆为置于承台面上的双拼钢管,双拼钢管上端通过下弦杆固定连接上立杆,上立杆顶部固定连接有上弦杆,上弦杆与下弦杆之间连接有大斜杆,上弦杆与大斜杆之间连接有腹杆。本实用新型能够解决盖梁位于河道边,一面临水,且道路与承台面具有高度差,K33号盖梁位于河道中央,均无法搭设落地式满堂支架的技术问题,并且充分利用承台作为支承面,采用自制大钢管桁架及施工法方。另外,该桁架也可用于一般路段上的标准盖梁,桁架两侧空间可满足通行需求。
The utility model relates to a large steel pipe truss used for cast-in-place construction of cover beams. Two trusses are located on both sides of pier columns and fixed with the pier columns. Composition, the vertical rod is composed of upper vertical rod and lower vertical rod, the lower vertical rod is a double steel pipe placed on the bearing platform, the upper end of the double steel pipe is fixedly connected to the upper vertical rod through the lower chord, and the top of the upper vertical rod is fixedly connected with the upper chord , a large oblique rod is connected between the upper chord and the lower chord, and a web rod is connected between the upper chord and the large oblique rod. The utility model can solve the technical problem that the cover beam is located on the side of the river, one side faces the water, and there is a height difference between the road and the bearing platform, and the K33 cover beam is located in the center of the river channel, and the floor-standing full hall support cannot be erected, and the bearing platform is fully used as a support On the surface, self-made large steel pipe trusses and construction methods are adopted. In addition, the truss can also be used for standard cover beams on general road sections, and the space on both sides of the truss can meet the traffic demand.
Description
技术领域technical field
本实用新型涉及一种建筑盖梁,尤其是一种用于盖梁的大钢管桁架,属于大钢管桁架技术领域。The utility model relates to a building cover beam, in particular to a large steel pipe truss used for the cover beam, and belongs to the technical field of large steel pipe trusses.
背景技术Background technique
某工程位于现状东外环路上,地基状况良好,盖梁采用支架法现浇施工。经对交通、河道、绿化带等影响因素的综合考虑,该工程盖梁支架设计将采用型式为大钢管桁架。A certain project is located on the current East Outer Ring Road, the foundation is in good condition, and the cover beams are cast-in-place by bracket method. After comprehensive consideration of traffic, rivers, green belts and other influencing factors, the design of the cover beam support of the project will be a large steel pipe truss.
其中,K23、K24、K32、K34号盖梁位于河道边,一面临水,且道路与承台面具有高度差,K33号盖梁位于河道中央,均无法搭设落地式满堂支架,为此需充分利用承台作为支承面,采用自制大钢管桁架法施工。当然,此桁架也可用于一般路段上的标准盖梁,桁架两侧空间可满足通行需求。Among them, No. K23, K24, K32, and K34 cover beams are located on the side of the river, facing the water on one side, and there is a height difference between the road and the platform. The bearing platform is used as the supporting surface, and the self-made large steel pipe truss method is used for construction. Of course, this truss can also be used for standard cover beams on general road sections, and the space on both sides of the truss can meet the traffic demand.
发明内容Contents of the invention
本实用新型是要解决盖梁位于河道中央,均无法搭设落地式满堂支架的技术问题,而提供一种用于盖梁现浇施工的大钢管桁架。The utility model aims to solve the technical problem that the floor-to-ceiling full hall support cannot be erected when the cover beam is located in the center of the river, and provides a large steel pipe truss for the cast-in-place construction of the cover beam.
本实用新型的技术方案是:一种用于盖梁现浇施工的大钢管桁架,具有两片桁架,置于承台面上,以承台面为支承面,两片桁架位于桥墩立柱的两侧,并与桥墩立柱固定,桁架由立杆、上弦杆、下弦杆、大斜杆、腹杆构成,所述立杆由上立杆和下立杆组成,下立杆为置于承台面上的双拼钢管,双拼钢管上端通过下弦杆固定连接上立杆,上立杆顶部固定连接有上弦杆,上弦杆与下弦杆之间连接有大斜杆,上弦杆与大斜杆之间连接有腹杆。The technical solution of the utility model is: a large steel pipe truss used for the cast-in-place construction of the cover beam, which has two trusses placed on the bearing platform, with the bearing platform as the supporting surface, and the two trusses are located on both sides of the pier column. And it is fixed with the pier columns. The truss is composed of vertical rods, upper chords, lower chords, large oblique rods and web rods. The vertical rods are composed of upper vertical rods and lower vertical rods. The lower vertical rods are double The upper end of the double steel pipe is fixedly connected to the upper pole through the lower chord. The top of the upper pole is fixedly connected to the upper chord. pole.
上弦杆上面设有若干纵桥向分配梁,纵桥向分配梁之间的间距300mm~600mm,纵桥向分配梁与盖梁梁底之间留有≥1.2m的空间搭设满堂支架调节层。There are several longitudinal bridge distribution beams on the top chord, the distance between the longitudinal bridge distribution beams is 300mm ~ 600mm, and there is a space ≥ 1.2m between the longitudinal bridge distribution beams and the bottom of the cover beam to set up the full hall support adjustment layer.
桁架高度为4m。上弦杆为承重大梁,采用双拼56a号工字钢,下弦杆采用双拼HW300×300型钢、腹杆采用Ф400mm×7mm和Ф277mm×6.5mm钢管。下立杆由双拼Ф400mm× 7mm钢管制作。桥向分配梁采用16#工字钢。The height of the truss is 4m. The upper chord is a bearing beam, which is made of Shuangpin 56a I-beam, the lower chord is made of Shuangpin HW300×300 steel, and the web is made of Ф400mm×7mm and Ф277mm×6.5mm steel pipes. The lower pole is made of double Ф400mm×7mm steel pipes. The bridge distribution beam adopts 16# I-beam.
为便于运输,在上下弦杆弯矩最小位置、、两支点1/4处设置拼接点,采用高强度螺栓连接。In order to facilitate transportation, a splicing point is set at the minimum bending moment position of the upper and lower chords, and 1/4 of the two fulcrums, and is connected by high-strength bolts.
本实用新型的有益效果是:The beneficial effects of the utility model are:
本实用新型能够解决盖梁位于河道边,一面临水,且道路与承台面具有高度差,K33号盖梁位于河道中央,均无法搭设落地式满堂支架的技术问题,并且充分利用承台作为支承面,采用自制大钢管桁架及施工法方。另外,该桁架也可用于一般路段上的标准盖梁,桁架两侧空间可满足通行需求。The utility model can solve the technical problem that the cover beam is located on the side of the river, one side faces the water, and there is a height difference between the road and the bearing platform, and the K33 cover beam is located in the center of the river channel, and the floor-standing full hall support cannot be erected, and the bearing platform is fully used as a support On the surface, self-made large steel pipe trusses and construction methods are adopted. In addition, the truss can also be used for standard cover beams on general road sections, and the space on both sides of the truss can meet the traffic demand.
附图说明Description of drawings
图1为本实用新型的用于盖梁现浇施工的大钢管桁架结构示意图;Fig. 1 is the structural schematic diagram of the large steel pipe truss structure that is used for the cast-in-place construction of the cover beam of the present utility model;
图2为桁架安装示意图。Figure 2 is a schematic diagram of the truss installation.
具体实施方式Detailed ways
如图1所示,一种用于盖梁现浇施工的大钢管桁架,大钢管桁架直接以承台面为支承面。大钢管桁架定型加工,现场拼装。大钢管桁架使用Q235钢材制作。两片桁架位于桥墩立柱的两侧,并与桥墩立柱固定,桁架由立杆、上弦杆3、下弦杆4、大斜杆5、腹杆6构成,立杆由上立杆2和下立杆1组成,下立杆1为置于承台面上的双拼钢管,双拼钢管上端通过下弦杆4固定连接上立杆2,上立杆2顶部固定连接有上弦杆3,上弦杆3与下弦杆4之间连接有大斜杆5,上弦杆3与大斜杆5之间连接有腹杆6。As shown in Figure 1, it is a large steel pipe truss used for the cast-in-place construction of the cover beam. The large steel pipe truss directly uses the bearing platform as the supporting surface. The large steel pipe truss is finalized and processed, and assembled on site. The large steel pipe truss is made of Q235 steel. The two trusses are located on both sides of the pier columns and are fixed to the pier columns. The trusses are composed of uprights, upper chords 3, lower chords 4, large diagonals 5, and webs 6. The uprights consist of upper 2 and lower chords. 1, the lower vertical rod 1 is a double-strand steel pipe placed on the bearing platform, the upper end of the double-strand steel pipe is fixedly connected to the upper vertical rod 2 through the lower chord 4, the top of the upper vertical rod 2 is fixedly connected to the upper chord 3, and the upper chord 3 and the lower chord A large oblique rod 5 is connected between the rods 4 , and a web rod 6 is connected between the top chord 3 and the large oblique rod 5 .
单处下立杆1由双拼Ф400mm×7mm钢管制作。大钢管桁架高度为4m。上弦杆3即承重大梁采用双拼56a号工字钢,下弦杆4采用双拼HW300×300型钢、腹杆6采用Ф400mm ×7mm和Ф277mm×6.5mm钢管,为便于运输,在上、下弦杆3,4弯矩最小位置、两支点1/4 处设置拼接点,采用高强螺栓连接。The single lower pole 1 is made of double Ф400mm×7mm steel pipes. The height of the large steel pipe truss is 4m. The upper chord 3, that is, the bearing girder, is made of Shuangpin No. 56a I-beam, the lower chord 4 is made of Shuangpin HW300×300 steel, and the web 6 is made of Ф400mm×7mm and Ф277mm×6.5mm steel pipes. For the convenience of transportation, the upper and lower chords 3 , 4 The minimum bending moment position, the splicing point is set at 1/4 of the two fulcrums, and high-strength bolts are used to connect.
桁架上方纵桥向分配梁,采用16#工字钢,间距300mm、600mm(与上层碗扣式钢管支架立杆协同)。分配梁与盖梁梁底之间留出不少于1.2m的空间搭设满堂支架调节层,并作为落架措施。The longitudinal bridge distribution beam above the truss adopts 16# I-beam with a spacing of 300mm and 600mm (cooperating with the upper pole of the bowl buckle steel pipe support). A space of no less than 1.2m shall be reserved between the distribution beam and the bottom of the cover beam to set up the adjustment layer of the full hall support and take it as a fall-off measure.
大钢管桁架加工和搭设施工方法:Large steel pipe truss processing and construction methods:
1、桁架所采用的型钢严格按设计要求,不得小于计算规格,不得有严重的锈蚀、孔洞、弯曲变形等缺陷。1. The section steel used in the truss is strictly in accordance with the design requirements, not less than the calculated specifications, and must not have serious corrosion, holes, bending deformation and other defects.
2、桁架拼装误差应满足施工精度要求,螺栓位置对准并拧紧,桁架标高控制准确。因加工和安装误差导致标高不一致处,需垫钢板找平。2. The truss assembly error should meet the construction accuracy requirements, the bolts should be aligned and tightened, and the truss elevation should be controlled accurately. Where the elevation is inconsistent due to processing and installation errors, it needs to be leveled with a backing plate.
3、单片桁架在桥跨内地面拼装成整体后,采用两台25t吊机,如图2所示,进行抬吊安装(单片桁架重约9.1t)。单片桁架竖立起来后,应立即与桥墩立柱进行临时固结绑定,待另一片桁架竖立后,及时进行对拉固结稳定。3. After the monolithic truss is assembled into a whole on the ground inside the bridge span, two 25t cranes are used for lifting installation as shown in Figure 2 (the monolithic truss weighs about 9.1t). After the single-piece truss is erected, it should be temporarily consolidated and bound to the pier column immediately. After the other piece of truss is erected, it should be consolidated and stabilized in time.
4、对于河道中间的K33号墩盖梁,应在桥墩立柱施工完成后围堰拆除前,先将下立柱钢管安装固定到位,待辅道桥主体结构成型后,吊机站在辅道桥桥面上进行吊装桁架。4. For the No. K33 pier cover beam in the middle of the river, the steel pipe of the lower column should be installed and fixed in place after the construction of the pier column is completed and before the cofferdam is removed. After the main structure of the auxiliary road bridge is formed, the crane stands on the auxiliary road bridge Lift the truss on the surface.
5、稳定系统采用抱箍使桁架与桥墩立柱连接,另设置剪刀撑和连接杆件。5. The stabilization system uses hoops to connect the trusses to the pier columns, and scissor braces and connecting rods are also provided.
6、高度调整装置使用模数式立杆拼接调整,不够调整部分在承台上浇注混凝土垫块。6. The height adjustment device is spliced and adjusted with modular vertical rods, and the parts that are not adjusted enough are poured with concrete pads on the bearing platform.
7、盖梁荷载通过桁架上的分配梁(16号工字钢),传递到桁架、立杆、承台,各节点处使用加劲钢板局部补强,立杆与承台连接部位使用15mm钢管封底,以增加受力面积。7. The load of the cover beam is transmitted to the truss, vertical pole and cap through the distribution beam (No. 16 I-beam) on the truss. Each node is partially reinforced with a stiffened steel plate, and the connection between the vertical pole and the cap is sealed with a 15mm steel pipe. , to increase the stress area.
8、操作平台设计在盖梁底纵向16#工字钢上,每边工作宽度为0.8m,每隔1.8m设置垂直立杆,在垂直立杆上安装两道水平栏杆,水平栏杆高度为1.2m,并按要求设置踢脚板和安全网。安装水平立杆的纵向16#工字钢与桁架用16#铁丝绑扎牢固。8. The operation platform is designed on the longitudinal 16# I-beam at the bottom of the cover beam, the working width of each side is 0.8m, and vertical poles are set every 1.8m. Two horizontal railings are installed on the vertical poles, and the height of the horizontal railings is 1.2 m, and set skirting boards and safety nets as required. Install the vertical 16# I-beam of the horizontal pole and the truss with 16# iron wire to bind firmly.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721209336.4U CN207277211U (en) | 2017-09-20 | 2017-09-20 | Large steel pipe truss for bent cap cast-in-place construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721209336.4U CN207277211U (en) | 2017-09-20 | 2017-09-20 | Large steel pipe truss for bent cap cast-in-place construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207277211U true CN207277211U (en) | 2018-04-27 |
Family
ID=61982491
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721209336.4U Active CN207277211U (en) | 2017-09-20 | 2017-09-20 | Large steel pipe truss for bent cap cast-in-place construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207277211U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107653781A (en) * | 2017-09-20 | 2018-02-02 | 龙元建设集团股份有限公司 | Big steel pipe truss and construction method for bent cap cast-in-place construction |
| CN110184928A (en) * | 2019-05-14 | 2019-08-30 | 宁波市政工程建设集团股份有限公司 | A kind of pier stud construction method that the public rail using falsework is built together overhead |
-
2017
- 2017-09-20 CN CN201721209336.4U patent/CN207277211U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107653781A (en) * | 2017-09-20 | 2018-02-02 | 龙元建设集团股份有限公司 | Big steel pipe truss and construction method for bent cap cast-in-place construction |
| CN110184928A (en) * | 2019-05-14 | 2019-08-30 | 宁波市政工程建设集团股份有限公司 | A kind of pier stud construction method that the public rail using falsework is built together overhead |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110387822B (en) | Cast-in-situ bent cap assembly type steel pipe support and construction method thereof | |
| CN100482892C (en) | Lower chord opening beam type corrugated steel web combination beam | |
| WO2022142999A1 (en) | Hoisting device for bridge water surface pile tie beam and construction method therefor | |
| CN111663449A (en) | Combined cast-in-place box girder support system and construction method | |
| CN103452311A (en) | Method for erecting section steel cantilever structure support frame | |
| CN105714683A (en) | Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN110878522A (en) | Construction system and construction method of beam under main tower | |
| CN102777044B (en) | Hoisting method of steel-structured spraying layer of urea prilling tower | |
| CN207277211U (en) | Large steel pipe truss for bent cap cast-in-place construction | |
| CN110318344A (en) | A kind of No. 0 block bracket of novel steel box-girder and No. 0 block erection construction method | |
| CN108678181A (en) | Silo roof steel truss and concrete combined structure high-altitude construction method | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN102518041B (en) | Construction method of support system for overhead continuous beam form-erecting falsework | |
| CN209906223U (en) | Beam gantry crane | |
| CN111809654A (en) | An assembled pressure-weight tower crane base structure | |
| CN108867548B (en) | Construction platform and construction platform erection method for on-site watering high pile wharf | |
| CN215977872U (en) | Overlapped integral prefabricated shear wall edge component | |
| CN213203667U (en) | Supporting structure for post-cast strip-striding temporary lane of top plate of ground depot | |
| CN115748469A (en) | Anti-overturn support platform for bridge construction | |
| CN115323923A (en) | Construction method of single-pylon cable-stayed bridge with integral steel anchor beam tower | |
| CN114657882A (en) | A super-large 0# block cast-in-place box girder bracket structure and its installation method | |
| CN208685457U (en) | Cast-in-place box beam bracket device | |
| CN209082953U (en) | A kind of suspended structural support system | |
| CN222120735U (en) | Platform canopy steel structure Y-shaped double columns |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20251027 Granted publication date: 20180427 |