CN106677178A - Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile - Google Patents

Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile Download PDF

Info

Publication number
CN106677178A
CN106677178A CN201611053302.0A CN201611053302A CN106677178A CN 106677178 A CN106677178 A CN 106677178A CN 201611053302 A CN201611053302 A CN 201611053302A CN 106677178 A CN106677178 A CN 106677178A
Authority
CN
China
Prior art keywords
protective cylinder
pile casting
steel pile
super
overlength
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611053302.0A
Other languages
Chinese (zh)
Inventor
黄磊
余鹏程
高士元
曾令炜
屈龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201611053302.0A priority Critical patent/CN106677178A/en
Publication of CN106677178A publication Critical patent/CN106677178A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to a graded mounting construction method for a super-long protective cylinder of a rotatably excavated cast-in-situ bored pile. The method comprises the following steps: vibrating and infiltrating a relatively short first stage steel protective cylinder by using a plate inserting machine modified by a vibrating hammer of an excavator; then borrowing earth by using a rotary drilling rig to the bottom of the first stage steel protective cylinder; then hoisting a super-long second stage steel protective cylinder to the first stage steel protective cylinder by using a truck-mounted crane; and then replacing the truck-mounted crane by a plate infiltrating machine to infiltrate the second stage steel protective cylinder underground in a vibrating manner to be aligned to the elevation of the top of the first stage steel protective cylinder to accomplish super-long steel protective cylinder mounting work. According to the graded mounting construction method for the super-long protective cylinder of the rotatably excavated cast-in-situ bored pile provided by the invention, operation is carried out by using the plate inserting machine, so that the method is simple and convenient to operate in construction, the work efficiency is improved, the quality control is ensured, and the construction cost is also lowered. The method can solve the technical problems that the requirement on construction space is relatively high as the super-long protective cylinder is buried by adopting a large carterpillar crane equipped with the vibrating hammer when the conventional rotatably excavated cast-in-situ bored pile carries out construction on relatively thick adverse stratum, and the large equipment operation is low in work efficiency and high in cost and the like.

Description

Rotary digging drilling hole bored concrete pile overlength casing is classified construction method of installation
Technical field
The present invention relates to a kind of rotary digging drilling hole bored concrete pile overlength casing is classified construction method of installation, especially one kind is to routine Rotary digging drilling hole bored concrete pile overlength casing installs the construction method being optimized.
Background technology
With economic development, artificial marine reclamation land becomes a big way of the new production of coastal area acquisition and construction land Footpath, associated ground foundation engineering project is more and more.Compared with conventional land-based area is constructed, reclaimation area geographical environment is special, Complex geologic conditions.Often there is the unfavorable soil layers such as loose artificial earth fill and current-formed silt layer in artificial reclaimation area, if here Pore-forming operation under geological conditions, is only likely to collapse hole or necking down quality accident on a large scale by mud off.In order to overcome This unfavorable factor affects, and the steel pile casting that overlength can be installed during construction passes through poor strata, then the work for carrying out rotary digging drilling hole construction Industry method.When overlength casing is installed, because overlength casing inherently there are 15 ~ 20 m high, vibration hammer and operation height are added, often Large caterpillar is needed to meet demand.Large caterpillar construction cost is high, also has extra bearing capacity to want to construction site Ask;In addition, crawler crane build is huge, the highly desirable bigger construction space of higher barre, in some land areas and height The inadequate construction area of degree just cannot flexibly put to good use;Additionally, the slow motion of giant caterpillar loop wheel machine, work efficiency is relatively low.
The content of the invention
The present invention is to provide for a kind of rotary digging drilling hole bored concrete pile overlength casing classification construction method of installation, and the method can be realized Overlength casing high efficiency, low cost are embedded, when solving conventional rotary digging drilling hole bored concrete pile overlength casing installation, it is necessary to using big The technical problem of type crawler crane, with relatively higher economic implications and social value.
For achieving the above object, the present invention is achieved by the following technical solutions:
A kind of rotary digging drilling hole bored concrete pile overlength casing is classified construction method of installation, and its step is:
1)The board-plugging device of vibration hammer repacking is equipped with using excavator, vibration on excellent stake position is put first order steel shield is squeezed into Cylinder, high 30 cm above ground level of first order steel pile casting top mark, aperture arranges extravasating hole, and first order steel pile casting internal diameter is protected than the second level Big 10 cm of external diameter of cylinder;
2)Soil taking hole forming is dug in first order steel pile casting inward turning using Spiral digging machine, until first order steel pile casting bottom;
3)Second level overlength steel pile casting is hung to first order steel pile casting using truck crane, is hung and reveal after first order steel pile casting Go out hole position about half height;
4)Second level overlength steel pile casting vibration is driven underground using board-plugging device, until second level overlength casing top and first order steel Casing top mark height is flushed, and is completed long casing classification and is installed.
The second level overlength steel pile casting external diameter is identical with cast-in-situ bored pile design stake footpath, and length is first order steel pile casting 2 Times.
Beneficial effects of the present invention:
1st, steel pile casting is longer, and perpendicularity is more difficult to control to.Overlength casing is disposably buried using giant caterpillar loop wheel machine with vibration hammer During installation, degree control difficulty is larger, often has occurred having pulled out and bury again phenomenon.If overlength casing, first order steel shield are installed in classification Cylinder is halved due to length, and degree control difficulty is reduced;Second level overlength steel pile casting hangs down under first order steel pile casting guide-localization Straight degree control ratio is more accurate, so as to improve pouring pile hole perpendicularity quality.
2nd, crawler crane build is huge, and mobility is poor in construction area, and work efficiency is relatively low.The present invention adopts excavator Being equipped with the piling machine of vibration hammer repacking carries out operation, and constructing operation is easy, efficiency of construction is high.
3rd, excavator is equipped with the piling machine replacement main equipment crawler crane outfit vibration hammer of vibration hammer repacking, has saved work Cheng Chengben.
4th, the long casing of rotary digging drilling hole bored concrete pile is classified mounting technique construction method, supplements domestic overlength casing and installs skill Art, improves operating efficiency, reduces engineering cost, and job site arrangement is more flexible, possesses certain social effect.
Description of the drawings
Fig. 1 is the embedded first order casing construction schematic diagram of repacking board-plugging device;
Fig. 2 is that Spiral digging machine fetches earth to first order casing bottom application work schematic diagram;
Fig. 3 is that truck crane hangs the long casing construction schematic diagram in the second level;
Fig. 4 is that the long casing in the second level hangs and finishes construction schematic diagram;
Fig. 5 is the long casing construction schematic diagram in the embedded second level of board-plugging device;
The long shield-tube embedment in Fig. 6 construction schematic diagrames second level completes schematic diagram of constructing.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described with embodiment.
The rotary digging drilling hole bored concrete pile overlength casing of the present invention is classified construction method of installation, and its step is:
Step one, as shown in figure 1, with excavator be equipped with vibration hammer repacking board-plugging device 1, beat having put well to be vibrated on sample stake position Enter first order steel pile casting 3, the top of first order steel pile casting 3 preferably 30 cm above ground level.
Step 2, as shown in Fig. 2 the drilling construction in place of rotary drilling rig 4, fetch earth until the bottom of first order steel pile casting 3.
Step 3, as shown in Figure 3, Figure 4, is hung second level overlength steel pile casting 6 to first order steel pile casting using truck crane 5 In 3, second level overlength steel pile casting 6 exposes the half height of stake holes one.
Step 4, as shown in Figure 5, Figure 6, the board-plugging device 1 of vibration hammer repacking is equipped with by second level overlength steel shield with excavator Cylinder vibration is squeezed into, until second level overlength steel pile casting is concordant with stake holes mouth, that is, is completed the classification of overlength casing and is installed, then using rotation Digging rig can complete follow-up routine rotary digging drilling hole bore forming.

Claims (2)

1. a kind of rotary digging drilling hole bored concrete pile overlength casing is classified construction method of installation, it is characterised in that its step is:
1)The board-plugging device (1) of vibration hammer repacking is equipped with using excavator, vibration on excellent stake position is put first order steel is squeezed into Casing (3), high 30 cm above ground level of first order steel pile casting (3) top mark, aperture arranges extravasating hole, first order steel pile casting (3) internal diameter 10 cm bigger than the external diameter of second level casing (6);
2)Soil taking hole forming is dug in first order steel pile casting (3) inward turning using Spiral digging machine (4), until first order steel pile casting (3) bottom;
3)Second level overlength steel pile casting (6) is hung to first order steel pile casting (3) using truck crane (5), is hung into the first order Expose hole position half height after steel pile casting (3);
4)Second level overlength steel pile casting (6) vibration is driven underground using board-plugging device (1), until second level overlength casing (6) top Flush with first order steel pile casting (3) top mark height, complete long casing classification and install.
2. rotary digging drilling hole bored concrete pile overlength casing according to claim 1 is classified construction method of installation, it is characterised in that:Institute State second level overlength steel pile casting (6) external diameter identical with cast-in-situ bored pile design stake footpath, length is the two of first order steel pile casting (3) Times.
CN201611053302.0A 2016-11-25 2016-11-25 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile Pending CN106677178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611053302.0A CN106677178A (en) 2016-11-25 2016-11-25 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611053302.0A CN106677178A (en) 2016-11-25 2016-11-25 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN106677178A true CN106677178A (en) 2017-05-17

Family

ID=58866076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611053302.0A Pending CN106677178A (en) 2016-11-25 2016-11-25 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN106677178A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137905A (en) * 2017-06-28 2019-01-04 中国二十冶集团有限公司 The long casing construction method of bored concrete pile in argillic horizon

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761072A (en) * 2008-12-24 2010-06-30 上海市基础工程公司 Construction process for bored pile close to flood wall through riprap layer
CN105297714A (en) * 2015-11-18 2016-02-03 中国核工业华兴建设有限公司 Integrative construction device and method for pile cap and pile body of pouring pile
CN106149683A (en) * 2015-04-23 2016-11-23 五冶集团上海有限公司 A kind of cast-in-place pile construction method using double casing to pass through deep metalling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761072A (en) * 2008-12-24 2010-06-30 上海市基础工程公司 Construction process for bored pile close to flood wall through riprap layer
CN106149683A (en) * 2015-04-23 2016-11-23 五冶集团上海有限公司 A kind of cast-in-place pile construction method using double casing to pass through deep metalling
CN105297714A (en) * 2015-11-18 2016-02-03 中国核工业华兴建设有限公司 Integrative construction device and method for pile cap and pile body of pouring pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137905A (en) * 2017-06-28 2019-01-04 中国二十冶集团有限公司 The long casing construction method of bored concrete pile in argillic horizon

Similar Documents

Publication Publication Date Title
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN104455726A (en) Pipe-jacking construction method for pipeline bottom grouting reinforcement
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN108755698B (en) Construction method for steep slope loose accumulation body large inclined rock surface foundation
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
Allenby et al. Examples of open caisson sinking in Scotland
JP2021165468A (en) Construction method of steel pipe pile
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN102953392B (en) A kind of pile foundation structure of photovoltaic plant and pile foundation construction technique
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN109653196A (en) A kind of depth mound backfill reaming casing method
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN107165640B (en) Tunnels and underground engineering surely builds method certainly
CN105926592A (en) Construction method of hole drilling pile
CN102817349B (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN112281880A (en) Construction method of complex stratum long spiral hole-leading inserting-driving locking opening steel pipe pile cofferdam
CN106677178A (en) Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile
CN103806444A (en) Soft soil layer rotary excavating pile construction method
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN110067205A (en) A kind of permanent protecting tube embedding construction method of bridge pier column outsourcing
CN108005065A (en) The constructing structure and construction method of PHC static pressure pipe piles
CN109113054A (en) A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517