CN109137905A CN201710507165.1A CN201710507165A CN109137905A CN 109137905 A CN109137905 A CN 109137905A CN 201710507165 A CN201710507165 A CN 201710507165A CN 109137905 A CN109137905 A CN 109137905A
Authority
CN
China
Prior art keywords
casing
verticality
pile
point
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710507165.1A
Other languages
Chinese (zh)
Inventor
陆进军
何健
陈志辉
白银
郑学刚
陈建成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710507165.1A priority Critical patent/CN109137905A/en
Publication of CN109137905A publication Critical patent/CN109137905A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of filling pile constructions.The long casing construction method of bored concrete pile in a kind of argillic horizon, comprising: smooth location: place is changed as needed fills out certain thickness stone and rock ballast, cooperates place mat steel plate;Measurement is put a little: casing, which needs to measure before setting, releases three points, including bored concrete pile central point, two locating rod central points, and two locating rods are apart from 2 meters of pile center's point or more, two locating rods and pile center's point is in 90 ° is inserted into place using Large-size rebar;Sash weight installation: sash weight is bundled in the center point of lifting casing wirerope, exposes casing bottom below sash weight and guarantees casing centering stake position;The control of stake position and casing degree control: casing is squeezed into before place with behind sash weight align piles position, and steel sheet pile machine starts to suppress casing;Stake position and verticality are verified in segmentation, are such as found that one of stake position or verticality do not meet design specification requirement, are set casing again.The present invention is highly-safe and construction efficiency is high, and stake position and the verticality effect for controlling bored concrete pile are obvious.

Description

The long casing construction method of bored concrete pile in argillic horizon
Technical field
The present invention relates to a kind of filling pile constructions, more particularly to the long casing construction method of bored concrete pile.
Background technique
During filling pile construction, shield-tube embedment or the verticality to bored concrete pile is set, at pile integrality and pile matter It measures most important.It being set in long casing construction method in traditional electronic vibration hammer, the verticality that casing is set is more secure, but To the casing of clay geology and 10 meters or more, powerful electric vibrating is needed to hammer into shape, to construction site power requirement height, and hung Dress equipment requirement, Hoisting Security requirement are relatively high, i.e., the practicability of electric vibrating hammer and specific aim be not strong.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, the long casing construction method of bored concrete pile in a kind of argillic horizon is provided.This Invention sets long casing using steel sheet pile machine, and highly-safe and construction efficiency is high, controls stake position and the verticality effect of bored concrete pile Obviously.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows: the long casing construction of bored concrete pile in a kind of argillic horizon Method includes the following steps:
Step 1: smooth location: crane and steel sheet pile machine are during setting long casing, for the verticality and safety for guaranteeing casing Construction, place is changed as needed fills out certain thickness stone and rock ballast, cooperates place mat steel plate, sets casing with steel sheet pile machine and do not sink It falls into as standard;
Step 2, measurement are put a little: casing, which needs to measure before setting, releases three points, including bored concrete pile central point, two locating rods Central point, two locating rods are apart from 2 meters of pile center's point or more, two locating rods and pile center's point is in 90 ° uses Large-size rebar It is inserted into place;
Step 3, sash weight installation: sash weight is bundled in the center point of lifting casing wirerope, and binding method is not slided with sash weight is Standard;To expose casing bottom below sash weight, to guarantee casing centering stake position;
Step 4, the control of stake position and casing degree control: casing is squeezed into before place with behind sash weight align piles position, and steel sheet pile machine is opened Beginning suppresses casing;Stake position and verticality are verified in segmentation, such as find that one of stake position or verticality do not meet design specification requirement, again Set casing.
The long casing construction method of bored concrete pile in the argillic horizon, it includes casing that stake position is verified in segmentation in the step 4 Before driving depth reaches the length of 1/3 casing, casing often squeezes into 0.5 meter, and the position using total station review locating rod is errorless After, use the distance for marking graduated measuring staff measurement two locating rods of casing distance;If two distances of measurement are not identical, Casing position does not meet design specification requirement, needs to set casing again;If two of measurement apart from identical, are continued to set shield Length of the cylinder to depth in 1/3 casing starts, and casing often squeezes into 1.0 meters, whether meets stake using locating rod review casing position The design specification requirement of position;
The long casing construction method of bored concrete pile in the argillic horizon, casing degree control includes: that casing is beaten in the step 4 Before entering the length that depth reaches 1/3 casing, casing often squeezes into 0.5 meter, uses 1 points of casing hang down of horizontal ruler verification Directly spend it is errorless after, continue to set casing, if measurement the verticality for having a point it is problematic, adjustment casing is vertical again Degree, while whether the position for verifying casing meets the requirements;If casing position deviation does not meet design specification requirement, need again Set casing;For casing driving depth after the length of 1/3 casing, casing often squeezes into 1.0 meters, verifies casing at least using horizontal ruler Whether the verticality of three points meets design specification requirement;If the verticality for having a point of measurement is problematic, adjustment again The verticality of casing, while whether the position for verifying casing meets the requirements;If casing position deviation does not meet design specification and wants It asks, needs to set casing again.
The present invention, which uses the steel sheet pile machine equipped with hydraulic vibration driver to set long casing, to be had many advantages, such as: one, hydraulic vibration driver It can be provided in special steel sheet pile machine, the equipment such as digging machine can also be retrofitted in, flexibility is high;Two, steel sheet pile machine mobility is strong, Service efficiency is high;Three, steel sheet pile machine does not need to can be very good to solve the problems, such as construction site shortage of electric power using electricity;Four, steel plate It is fast that stake machine pulls up long casing speed, highly-safe;Five, stake position and the verticality effect for controlling bored concrete pile are obvious, guarantee the later period at Pile integrity and pile quality.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is schematic diagram of the present invention;
1 is locating rod in figure, and 2 be sash weight, and 3 be horizontal ruler, and 4 be crane, and 5 be steel sheet pile machine, and 6 be measuring staff.
Specific embodiment
As shown in Figure 1: the present invention is implemented as follows: the long casing construction method of bored concrete pile in a kind of argillic horizon, including such as Lower step:
Step 1: smooth location: crane and steel sheet pile machine are during setting long casing, for the verticality and safety for guaranteeing casing Construction, place is changed as needed fills out certain thickness stone and rock ballast, cooperates place mat steel plate, sets casing not with steel sheet pile machine 5 Depression is standard;
Step 2, measurement are put a little: casing, which needs to measure before setting, releases three points, including bored concrete pile central point, two locating rods Central point, two locating rods 1 are apart from two meters of pile center's point or more, two locating rods and pile center's point is in 90 ° uses Large-diameter Steel Muscle is inserted into place;
Step 3, sash weight installation: sash weight 2 is bundled in the center point of lifting casing wirerope, and binding method is not slided with sash weight For standard;To expose casing bottom below sash weight, to guarantee casing centering stake position;
Step 4, the control of stake position and casing degree control: casing is squeezed into before place with behind sash weight align piles position, and steel sheet pile machine is opened Beginning suppresses casing;Stake position and verticality are verified in segmentation, such as find that one of stake position or verticality do not meet design specification requirement, again Set casing;
The long casing construction method of bored concrete pile in the argillic horizon, it includes that casing is squeezed into that stake position is verified in segmentation in the step 4 Before depth reaches the length of 1/3 casing, casing often squeezes into 0.5 meter, using total station review locating rod position it is errorless after, Use the distance for marking graduated measuring staff measurement two locating rods of casing distance;If two distances of measurement are not identical, casing Position does not meet design specification requirement, needs to set casing again;If two of measurement apart from identical, continued to set casing and be arrived Depth starts in the length of 1/3 casing, and casing often squeezes into 1.0 meters, whether meets stake position using locating rod review casing position Design specification requirement;
The long casing construction method of bored concrete pile in the argillic horizon, casing degree control includes: that casing is beaten in the step 4 Before entering the length that depth reaches 1/3 casing, casing often squeezes into 0.5 meter, uses 1 points of casing hang down of the verification of horizontal ruler 3 Directly spend it is errorless after, continue to set casing, if measurement the verticality for having a point it is problematic, adjustment casing is vertical again Degree, while whether the position for verifying casing meets the requirements;If casing position deviation does not meet design specification requirement, need again Set casing;For casing driving depth after the length of 1/3 casing, casing often squeezes into 1.0 meters, verifies casing at least using horizontal ruler Whether the verticality of three points meets design specification requirement;If the verticality for having a point of measurement is problematic, adjustment again The verticality of casing, while whether the position for verifying casing meets the requirements;If casing position deviation does not meet design specification and wants It asks, needs to set casing again.

Claims (3)

1. the long casing construction method of bored concrete pile in a kind of argillic horizon, which comprises the steps of:
Step 1: smooth location: crane and steel sheet pile machine are during setting long casing, for the verticality and safety for guaranteeing casing Construction, place is changed as needed fills out certain thickness stone and rock ballast, cooperates place mat steel plate, sets casing with steel sheet pile machine and do not sink It falls into as standard;
Step 2, measurement are put a little: casing, which needs to measure before setting, releases three points, including bored concrete pile central point, two locating rods Central point, two locating rods are apart from 2 meters of pile center's point or more, two locating rods and pile center's point is in 90 ° uses Large-size rebar It is inserted into place;
Step 3, sash weight installation: sash weight is bundled in the center point of lifting casing wirerope, and binding method is not slided with sash weight is Standard;To expose casing bottom below sash weight, to guarantee casing centering stake position;
Step 4, the control of stake position and casing degree control: casing is squeezed into before place with behind sash weight align piles position, and steel sheet pile machine is opened Beginning suppresses casing;Stake position and verticality are verified in segmentation, such as find that one of stake position or verticality do not meet design specification requirement, again Set casing.
2. the long casing construction method of bored concrete pile in argillic horizon according to claim 1, which is characterized in that in the step 4 It includes that before casing driving depth reaches the length of 1/3 casing, casing often squeezes into 0.5 meter that stake position is verified in segmentation, uses total station After the position of review locating rod is errorless, the distance for marking graduated measuring staff measurement two locating rods of casing distance is used;If Two distances of measurement are not identical, and casing position does not meet design specification requirement, needs to set casing again;If the two of measurement A to continue to set casing and start to depth in the length of 1/3 casing apart from identical, casing often squeezes into 1.0 meters, multiple using locating rod Whether core casing position meets the design specification requirement of stake position.
3. the long casing construction method of bored concrete pile in argillic horizon according to claim 1, which is characterized in that in the step 4 Before casing degree control includes: the length that casing driving depth reaches 1/3 casing, casing often squeezes into 0.5 meter, uses level After the verticality of 1 points of casing of ruler verification is errorless, continue to set casing, if the verticality for having a point of measurement It is problematic, the verticality of adjustment casing again, while whether the position for verifying casing meets the requirements;If casing position deviation is not Meet design specification requirement, needs to set casing again;For casing driving depth after the length of 1/3 casing, casing often squeezes into 1.0 Whether rice meets design specification requirement using the verticality that horizontal ruler verifies 1 points of casing;If measurement has one The verticality of point is problematic, again the verticality of adjustment casing, while whether the position for verifying casing meets the requirements;If casing Position deviation does not meet design specification requirement, needs to set casing again.
CN201710507165.1A 2017-06-28 2017-06-28 The long casing construction method of bored concrete pile in argillic horizon Pending CN109137905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710507165.1A CN109137905A (en) 2017-06-28 2017-06-28 The long casing construction method of bored concrete pile in argillic horizon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710507165.1A CN109137905A (en) 2017-06-28 2017-06-28 The long casing construction method of bored concrete pile in argillic horizon

Publications (1)

Publication Number Publication Date
CN109137905A true CN109137905A (en) 2019-01-04

Family

ID=64805695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710507165.1A Pending CN109137905A (en) 2017-06-28 2017-06-28 The long casing construction method of bored concrete pile in argillic horizon

Country Status (1)

Country Link
CN (1) CN109137905A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016911A (en) * 2019-05-05 2019-07-16 中国建筑一局(集团)有限公司 A kind of depth casing mechanical hole building bore forming technique

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677178A (en) * 2016-11-25 2017-05-17 上海市基础工程集团有限公司 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677178A (en) * 2016-11-25 2017-05-17 上海市基础工程集团有限公司 Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李士海等: ""全护筒旋挖灌注桩施工技术的应用"", 《地质装备》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016911A (en) * 2019-05-05 2019-07-16 中国建筑一局(集团)有限公司 A kind of depth casing mechanical hole building bore forming technique

Similar Documents

Publication Publication Date Title
CN110206493B (en) Construction process of full-sleeve full-rotation bored pile
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN103195058B (en) Be convenient to solution cavity and grow the method that regional bridge pier adopts many casings to construct
CN107938676A (en) A kind of pile base construction method for passing through full packing type solution cavity
CN203846485U (en) Long pile percussion drill hole forming construction device
CN104747088B (en) A kind of leafy hosqe bit of cast-in-situ bored pile list waist and drilling construction method
CN103088814A (en) Rotary drilling rig coordinated with percussion drill hole-forming construction method
CN107130592B (en) construction method for long spiral drill and impact drill double-machine composite hole-forming cast-in-place pile
CN108149678A (en) A kind of loess retaining wall does the construction method of operation pore-creating filling pile
CN104032743B (en) Steel pile casting under deep water, torrent and inclined rock base condition transfers inserted to play method
CN106988302A (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN102720186A (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN109137885A (en) A kind of construction method of underground continuous wall
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN203729322U (en) Precast concrete pipeline foundation
CN103015427B (en) Hole pile underwater concrete pouring positioning device and positioning device thereof
CN112709529A (en) Radial grading pore-forming construction method and application of hard rock layer drilled pile
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN104153403B (en) The construction method of contrary sequence method bored concrete pile static load test pile
CN104912093B (en) A kind of pile foundation in deep water positioning, the construction method of guide frame
CN109137905A (en) The long casing construction method of bored concrete pile in argillic horizon
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN106703021B (en) A kind of construction method and its device of screw rod pile pile cover
CN103147469B (en) Vertical compression-resistance static load test method for foundation pile of high-rise building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104