CN106639180B - A kind of rainwater accumulation system and its construction method for roof garden - Google Patents
A kind of rainwater accumulation system and its construction method for roof garden Download PDFInfo
- Publication number
- CN106639180B CN106639180B CN201611145895.3A CN201611145895A CN106639180B CN 106639180 B CN106639180 B CN 106639180B CN 201611145895 A CN201611145895 A CN 201611145895A CN 106639180 B CN106639180 B CN 106639180B
- Authority
- CN
- China
- Prior art keywords
- water
- reservoir
- layer
- roof
- rainwater collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G25/00—Watering gardens, fields, sports grounds or the like
- A01G25/02—Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G25/00—Watering gardens, fields, sports grounds or the like
- A01G25/02—Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
- A01G25/023—Dispensing fittings for drip irrigation, e.g. drippers
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/14—Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/12—Devices or arrangements allowing walking on the roof or in the gutter
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Water Supply & Treatment (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Sewage (AREA)
Abstract
本发明主要公开了一种用于屋顶花园的雨水集蓄系统及其施工方法,包括屋顶、集水单元、处理单元、蓄水单元和用水单元,屋顶上设有由鹅卵石铺设而成的石子道路以及第一植被层,集水单元包括设置在石子道路下方的雨水收集斗和输水管,处理单元包括依次连接的景观池、沉淀池和净化器,蓄水单元包括第一蓄水池和第二蓄水池,第一蓄水池位于屋顶上,第二蓄水池位于房屋下方。本发明将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。
The invention mainly discloses a rainwater collection and storage system for a roof garden and a construction method thereof. and the first vegetation layer, the water collection unit includes a rainwater collection bucket and a water delivery pipe arranged under the gravel road, the processing unit includes a landscape pool, a sedimentation tank and a purifier connected in sequence, and the water storage unit includes a first storage tank and a second storage tank. Reservoirs, the first cistern is located on the roof and the second cistern is located under the house. The present invention integrates roof construction, rainwater collection and treatment, and water terminal into one, takes overall consideration into consideration, effectively reduces the pollution of rainwater, protects the water environment, realizes the collection, purification, storage and reuse of rainwater, and improves the utilization of water resources. At the same time, it can make the maintenance and irrigation of the roof garden more convenient, reduce the energy of water transmission, and be more economical and environmentally friendly.
Description
技术领域technical field
本发明涉及一种用于屋顶花园的雨水集蓄系统及其施工方法。The invention relates to a rainwater collection and storage system for roof gardens and a construction method thereof.
背景技术Background technique
现有技术中,雨水收集,完整的说应该叫做“雨水收集与利用系统”,是指收集、利用建筑物屋顶及道路、广场等硬化地表汇集的降雨径流,经收集——输水——净水——储存等渠道积蓄雨水,为绿化、景观水体、洗涤及地下水源提供雨水补给,以达到综合利用雨水资源和节约用水的目的。很多城市和地区的自来水供应已难以同步跟上城市化发展的步伐。城市的浇灌绿化、冲洗马路等公益用水及洗车等新兴的用水行业又进一步加重了自来水供应的负担。可是每年的暴雨季节,泛滥的雨水又给城市排水造成了极大的困难。而雨水的收集和利用正好解决了这一给城市建设带来的两大难题。雨水收集利用系统具有减缓城区雨水洪涝和地下水位下降、控制雨水径流污染、改善城市生态环境等广泛的意义。In the prior art, rainwater collection, in its entirety, should be called "rainwater collection and utilization system", which refers to the collection and utilization of rainwater runoff collected from building roofs, roads, squares and other hardened surfaces, and after collection - water delivery - purification. Water—Storage and other channels accumulate rainwater to provide rainwater supply for greening, landscape water bodies, washing and groundwater sources, so as to achieve the purpose of comprehensive utilization of rainwater resources and water conservation. The supply of tap water in many cities and regions has been unable to keep pace with the development of urbanization. The urban watering and greening, road flushing and other public water use and emerging water industries such as car washing have further increased the burden of tap water supply. However, in the rainstorm season every year, the flood of rainwater has caused great difficulties for urban drainage. The collection and utilization of rainwater just solves the two major problems brought to urban construction. Rainwater collection and utilization system has a wide range of significance, such as slowing down urban rainwater floods and groundwater level decline, controlling rainwater runoff pollution, and improving urban ecological environment.
在日常生活中,屋顶的降雨积水量不可小视,如果能把这部分雨水收集起来再利用,可在一定程度上节约资源。屋顶花园不但降温隔热效果优良,而且能美化环境、净化空气、改善局部小气候,还能丰富城市的俯仰景观,能补偿建筑物占用的绿化地面,大大提高了城市的绿化覆盖率,改善人们的居住条件,提高生活质量,是一种值得大力推广的屋面形式。但是屋顶花园的需水量较大,用水较多,在水资源日益缺乏的如今,养护屋顶花园压力较大,且一般的蓄水单元建设在房屋地下,当上层楼房或者屋顶花园需要用水时,需要从地面输送到屋顶,路程较长,耗费的能源多,灌溉不方便。In daily life, the amount of rainwater accumulated on the roof cannot be underestimated. If this part of rainwater can be collected and reused, resources can be saved to a certain extent. Roof gardens not only have excellent cooling and heat insulation effects, but also can beautify the environment, purify the air, improve local microclimates, enrich the pitching landscape of the city, compensate for the green ground occupied by buildings, greatly improve the green coverage rate of the city, and improve people's living conditions. Living conditions and improving the quality of life are a kind of roofing form worthy of vigorous promotion. However, roof gardens require a large amount of water and use more water. Nowadays, with the increasing shortage of water resources, the maintenance of roof gardens is more stressful, and the general water storage unit is built underground. When the upper buildings or roof gardens need water, they need to The transportation from the ground to the roof is long, consumes a lot of energy, and is inconvenient for irrigation.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于针对现有技术的诸多不足,提供一种用于屋顶花园的雨水集蓄系统及其施工方法,将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。The object of the present invention is to provide a rainwater collection and storage system for roof gardens and a construction method thereof in view of the deficiencies of the prior art, which combine roof construction, rainwater collection and treatment, and water terminals into one, take overall consideration into consideration, and effectively It reduces the pollution of rainwater, protects the water environment, realizes the collection, purification, storage and reuse of rainwater, improves the utilization rate of water resources, and reduces the pressure of water use. energy, more economical and environmentally friendly.
为了解决上述技术问题,本发明采用如下技术方案:In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions:
一种用于屋顶花园的雨水集蓄系统,包括屋顶、集水单元、处理单元、蓄水单元和用水单元,屋顶上设有由鹅卵石铺设而成的石子道路以及第一植被层,石子道路与第一植被层交错设置,集水单元包括雨水收集斗和输水管,雨水收集斗按均匀间隔设置在石子道路的下侧,处理单元包括依次连接的景观池、沉淀池和净化器,雨水收集斗通过输水管与景观池连接,净化器通过连接管与蓄水单元连接,蓄水单元包括第一蓄水池和第二蓄水池,第一蓄水池位于屋顶上,第二蓄水池位于房屋下方。降雨时的雨水以及第一植被层中的多余雨水通过雨水收集斗收集,在鹅卵石铺设而成的石子道路下设计雨水收集斗,使得雨水在进入到雨水收集斗前,先经过鹅卵石的层层过滤,再进入到雨水收集斗内,避免大颗粒物质堵塞雨水收集斗,经过雨水收集斗收集到的雨水通过输水管进入到景观池内,景观池内种植有水生生物,雨水在景观池内通过生物反应进行初次净化,同时也为景观池提供水资源,然后通过连接管将景观池内多余的经过净化的水输送到沉淀池,在沉淀池内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器进行最终的净化处理,并将处理好的水分别输送到第一蓄水池和第二蓄水池储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用,另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池设置在屋顶,方便对屋顶花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。A rainwater collection and storage system for a roof garden, comprising a roof, a water collection unit, a treatment unit, a water storage unit and a water use unit, the roof is provided with a cobblestone road and a first vegetation layer, the cobble road and the The first vegetation layer is staggered. The water collection unit includes a rainwater collection bucket and a water delivery pipe. The rainwater collection bucket is arranged on the lower side of the gravel road at regular intervals. It is connected to the landscape pool through a water delivery pipe, and the purifier is connected to the water storage unit through a connecting pipe. The water storage unit includes a first water storage tank and a second water storage tank. below the house. The rainwater during rainfall and the excess rainwater in the first vegetation layer are collected by the rainwater collection bucket. The rainwater collection bucket is designed under the cobblestone road, so that the rainwater is filtered through the layers of cobblestones before entering the rainwater collection bucket. , and then enter the rainwater collection bucket to prevent large particles from clogging the rainwater collection bucket. The rainwater collected through the rainwater collection bucket enters the landscape pool through the water pipe, and aquatic organisms are planted in the landscape pool. At the same time, it also provides water resources for the landscape pool. Then, the excess purified water in the landscape pool is transported to the sedimentation tank through the connecting pipe, and the sedimentation reaction is carried out in the sedimentation tank to precipitate the impurities in the water for further purification. The water that has undergone precipitation reaction is sent to the purifier for final purification treatment, and the treated water is sent to the first reservoir and the second reservoir for storage, so as to facilitate household use, save energy, environmental protection, economy and pollution. Less and healthier, to maximize the use of natural resources, in addition, the water storage unit can also play a role in adjusting the water storage to reduce the pressure on the municipal pipe network, improve the economic benefits of rainwater treatment projects, and greatly reduce the workload of operation and maintenance , greatly increasing the practicability and operability of the rainwater treatment project, which is conducive to promoting the development of the sponge city; the two water reservoirs are set up to improve the water storage capacity, and the first water reservoir is set on the roof, which is convenient for the roof garden. Watering and water use on high floors, the water delivery distance is short, there is no need to add too much power equipment, and electricity is saved. The second reservoir is set under the house, which is convenient for water use on the ground and low floors, and the water delivery speed is fast. Make full use of rain.
进一步,沉淀池的内部设有隔离板,隔离板上设有通孔,隔离板将沉淀池分隔成水层和药物层,药物层内设有沉淀剂,水层通过连接管与净化器连接。设置的隔离板将水层和药物层分离出来,使水中的污染、有害物质在沉淀剂的作用下沉淀在药物层内,保证水层的澄清,使水层中干净的水输出到净化器;在隔离板设置的通孔使得沉淀剂与水层中的水相互接触,从而使其产生化学或者物理反应,发生沉降,沉淀剂可以选择碱性物质、硫化物等。Further, the interior of the sedimentation tank is provided with an isolation plate, the isolation plate is provided with through holes, the isolation plate separates the sedimentation tank into a water layer and a drug layer, the drug layer is provided with a precipitant, and the water layer is connected to the purifier through a connecting pipe. The installed isolation plate separates the water layer and the drug layer, so that the polluted and harmful substances in the water are deposited in the drug layer under the action of the precipitant, so as to ensure the clarification of the water layer, so that the clean water in the water layer is output to the purifier; The through holes provided in the isolation plate make the precipitant and the water in the water layer contact each other, so as to cause chemical or physical reaction and sedimentation. The precipitant can be selected from alkaline substances, sulfides, etc.
进一步,雨水收集斗呈上大下小的漏斗状,雨水收集斗的顶面设有过滤网格筛,雨水收集斗的内侧壁上均匀设有尖刺部。设置的漏斗状的雨水收集斗防止雨水四溅,设置的过滤网格筛进一步对进入到雨水收集斗的水进行过滤,设置的尖刺部粉碎进入到雨水收集斗的大颗粒物质,将其颗粒变小,使其不易堵塞输水管。Further, the rainwater collection hopper is in the shape of a large upper and lower small funnel, the top surface of the rainwater collection hopper is provided with a filter mesh screen, and the inner side wall of the rainwater collection hopper is evenly provided with spikes. The funnel-shaped rainwater collection hopper is set to prevent rainwater from splashing, the filter mesh screen is set to further filter the water entering the rainwater collection hopper, and the set spikes smash the large particles that enter the rainwater collection hopper and granulate them. Smaller, so that it is not easy to block the water pipe.
进一步,第一蓄水池的上侧浇灌有混凝土层,混凝土层的上侧设有防水层,防水层的上侧设有第二植被层。混凝土层用来加固第一蓄水池和第二蓄水池,设置的防水层防止外界的污水进入到第一蓄水池,污染第一蓄水池内的清水,设置的第二植被层用来遮盖第一蓄水池,美化外观,同时也起到蓄水作用,防止雨水渗入到第一蓄水池内。Further, a concrete layer is poured on the upper side of the first water reservoir, a waterproof layer is arranged on the upper side of the concrete layer, and a second vegetation layer is arranged on the upper side of the waterproof layer. The concrete layer is used to reinforce the first reservoir and the second reservoir. The waterproof layer is provided to prevent external sewage from entering the first reservoir and pollute the clean water in the first reservoir. The second vegetation layer is provided for Covering the first water reservoir, beautifying the appearance, and also playing the role of water storage to prevent rainwater from infiltrating into the first water reservoir.
进一步,集水单元还包括集水沟,集水沟呈阶梯状设置在第一植被层上,集水沟分别与石子道路和房屋外侧的排水管连接。集水沟将第一植被层上多余的雨水一部分输送到雨水收集斗处,一部分沿着排水管排出,排水管与雨水收集斗配合工作,加快排水速度,避免第一植被层因雨水过多而缺氧死亡。Further, the water collecting unit further includes a water collecting ditch, the water collecting ditch is arranged on the first vegetation layer in a stepped shape, and the water collecting ditch is respectively connected with the gravel road and the drainage pipe outside the house. The water collecting ditch transports part of the excess rainwater on the first vegetation layer to the rainwater collection bucket, and part of it is discharged along the drainage pipe. The drainage pipe and the rainwater collection bucket work together to speed up the drainage speed and prevent the first vegetation layer from being damaged by excessive rainwater. hypoxia death.
进一步,用水单元包括灌溉管,灌溉管与第一蓄水池连接,灌溉管上设有雾化喷头、滴水孔、定时器和闸门,定时器和闸门连接,雾化喷头和滴水孔间隔设置,滴水孔上设有过滤膜,雾化喷头包括喷水管、底座和锁紧头,底座上设有凹槽,锁紧头转动连接在凹槽内,凹槽的底面上设有连接孔,喷水管穿过连接孔与锁紧头连接,底座的侧壁上按圆周方向均匀设有至少八个第一喷水孔,锁紧头的侧壁上设有与第一喷水孔相对应的第二喷水孔。当需要对第一植被层和第二植被层浇水时,开启阀门,第一蓄水池内的水沿着灌溉管流出,并分别通过雾化喷头和滴水孔对植被进行浇灌,浇灌范围广,保证屋顶花园中植被的正常生长,减少对外界的水资源需求,进一步达到充分利用回收的雨水的作用,利用定时器可以根据实际情况而设定浇灌的时间,实现自动化浇水,提高浇灌的效率,避免浇水过多或者过少;滴水孔上的过滤膜防止外部的泥土等颗粒物质堵塞滴水孔,保证灌溉管的正常工作;雾化喷头工作时,第一喷水孔与第二喷水孔相对应,水流从喷水管进入到锁紧头,再从八个第二喷水孔和第一喷水孔喷出,增加了灌溉面积,浇灌均匀,能很好地对周围植被进行灌溉,当不需要雾化喷头工作时,只要旋转锁紧头,使第二喷水孔与第一喷水孔相交错,就可以堵塞第二喷水孔,使水无法喷出。Further, the water use unit includes an irrigation pipe, the irrigation pipe is connected with the first reservoir, the irrigation pipe is provided with an atomizing nozzle, a drip hole, a timer and a gate, the timer and the gate are connected, and the atomizing nozzle and the drip hole are arranged at intervals, There is a filter membrane on the drip hole. The atomizing nozzle includes a water spray pipe, a base and a locking head. The base is provided with a groove, and the locking head is rotatably connected in the groove. The water pipe is connected with the locking head through the connecting hole, at least eight first water spray holes are evenly arranged on the side wall of the base according to the circumferential direction, and the side wall of the locking head is provided with corresponding first water spray holes. The second water spray hole. When the first vegetation layer and the second vegetation layer need to be watered, the valve is opened, the water in the first reservoir flows out along the irrigation pipe, and the vegetation is irrigated through the atomizing nozzle and the drip hole respectively. Ensure the normal growth of vegetation in the roof garden, reduce the demand for external water resources, and further achieve the effect of making full use of the recycled rainwater. The timer can be used to set the watering time according to the actual situation, realize automatic watering, and improve the efficiency of watering. , avoid watering too much or too little; the filter membrane on the drip hole prevents the external soil and other particulate matter from blocking the drip hole, and ensures the normal operation of the irrigation pipe; when the atomizing nozzle is working, the first water spray hole and the second water spray hole Corresponding to the holes, the water flow enters the locking head from the spray pipe, and then sprays out from the eight second spray holes and the first spray hole, which increases the irrigation area, and the irrigation is uniform, which can well irrigate the surrounding vegetation. , When the atomizing nozzle is not required to work, as long as the locking head is rotated to make the second nozzle and the first nozzle intersect, the second nozzle can be blocked so that water cannot be sprayed out.
进一步,锁紧头的外侧壁上设有滑块,底座的内侧壁上设有滑槽,滑槽与滑块相匹配,滑槽包括第一卡槽、弧形槽和第二卡槽,第一卡槽和第二卡槽分别位于弧形槽的左右两侧,锁紧头的顶面上设有旋转块。设置的滑槽便于滑块的滑动和限制,当滑块位于第一卡槽时,第一喷水孔与第二喷水孔相连通,当滑块位于第二卡槽时,第一喷水孔和第二喷水孔相交错,使得锁紧头的开启和关闭更加方便,设置的旋转块便于操控锁紧头的旋转。Further, the outer side wall of the locking head is provided with a slider, the inner side wall of the base is provided with a chute, the chute is matched with the slider, and the chute includes a first slot, an arc slot and a second slot. A card slot and a second card slot are respectively located on the left and right sides of the arc-shaped slot, and a rotating block is arranged on the top surface of the locking head. The set chute is convenient for the sliding and restricting of the slider. When the slider is in the first slot, the first water spray hole is connected with the second water spray hole. When the slider is in the second slot, the first water spray hole is connected. The holes and the second water spray holes are staggered, which makes the opening and closing of the locking head more convenient, and the provided rotating block is convenient for controlling the rotation of the locking head.
如上述的一种用于屋顶花园的雨水集蓄系统的施工方法,包括如下步骤:As above-mentioned a kind of construction method for the rainwater collection and storage system of roof garden, comprises the steps:
步骤一、第二蓄水池的施工Step 1. Construction of the second reservoir
a、根据家庭的用水量确定第二蓄水池的体积大小,再根据第二蓄水池的大小确定基坑的深度和宽度,并在设计图中标明,然后根据房屋设计图,确定第二蓄水池的安装位置,并将该位置的表面清理干净,去除垃圾、碎石,然后在该位置处做好标记,以便于基坑的开挖;a. Determine the volume of the second reservoir according to the water consumption of the family, and then determine the depth and width of the foundation pit according to the size of the second reservoir, and indicate it in the design drawing, and then determine the second reservoir according to the house design drawing. The installation location of the reservoir, clean the surface of the location, remove the garbage and gravel, and then mark the location to facilitate the excavation of the foundation pit;
b、根据设计图,采用挖土机在做好标记的位置开挖基坑,然后清理基坑内的碎石和垃圾,并夯实基坑,然后在基坑内铺设土工布和缓冲层,并在基坑一侧预留管道通道;b. According to the design drawing, use excavator to excavate the foundation pit at the marked position, then clean up the gravel and garbage in the foundation pit, and ram the foundation pit, then lay geotextile and buffer layer in the foundation pit, and lay the foundation pit in the foundation pit. A pipeline channel is reserved on one side of the pit;
c、在基坑内砌筑第二蓄水池,并在第二蓄水池上预留连接管口,在连接管口处安装防水胶;c. Build a second reservoir in the foundation pit, reserve a connecting nozzle on the second reservoir, and install waterproof glue at the connecting nozzle;
d、进行密封性测试,将第二蓄水池漏水的位置用环氧树脂填补,保证第二蓄水池的密封性;d. Carry out the tightness test, and fill the leaking position of the second reservoir with epoxy resin to ensure the tightness of the second reservoir;
步骤二、处理单元的施工Step 2. Construction of the treatment unit
步骤三、集水单元的施工Step 3. Construction of the catchment unit
1、雨水收集斗的施工1. Construction of rainwater collection bucket
a、根据设计图,在规定位置处安装雨水收集斗,相邻雨水收集斗之间的距离为20~50cm,在雨水收集斗的底部分别安装有收集管,收集管通过一根总的输水管与景观池连接;a. According to the design drawing, install the rainwater collection bucket at the specified position, the distance between adjacent rainwater collection buckets is 20-50cm, and respectively install collection pipes at the bottom of the rainwater collection buckets, and the collection pipes pass through a general water pipe connected to the landscape pool;
b、在屋顶的顶层铺设隔根层,根据设计图在隔根层的上侧分别铺设第一植被层和鹅卵石,将鹅卵石铺设在雨水收集斗的上方,在第一植被层上种植植物,并预留第一蓄水池的安装空间;b. Lay the root layer on the top layer of the roof, lay the first vegetation layer and pebbles on the upper side of the root layer according to the design drawing, lay the pebbles above the rainwater collection bucket, plant plants on the first vegetation layer, and Reserve the installation space of the first reservoir;
2、集水沟的开挖2. Excavation of the catchment ditch
在第一植被层上按照地势高低开挖集水沟,集水沟呈阶梯状,并将集水沟分别与由鹅卵石铺设而成的石子道路和排水管连接;On the first vegetation layer, excavate a water collecting ditch according to the terrain, and the water collecting ditch is stepped, and the water collecting ditch is connected with the cobblestone road and the drainage pipe respectively;
步骤四、第一蓄水池的安装Step 4. Installation of the first reservoir
a、根据设计图以及用水量,在第一蓄水池的安装空间处砌筑第一蓄水池,在第一蓄水池内铺设密封布,然后进行密封性测试,将第一蓄水池漏水的位置用环氧树脂填补,保证第一蓄水池的密封性;a. According to the design drawing and water consumption, build the first reservoir at the installation space of the first reservoir, lay a sealing cloth in the first reservoir, and then carry out the tightness test to check the leakage of the first reservoir. The position of the first reservoir is filled with epoxy resin to ensure the tightness of the first reservoir;
b、在第一蓄水池的上方浇筑混凝土层,在混凝土层的上方铺设防水层,在防水层的上方铺设第二植被层;b. A concrete layer is poured on the top of the first reservoir, a waterproof layer is laid on the top of the concrete layer, and a second vegetation layer is laid on the top of the waterproof layer;
c、将第一蓄水池与净化器的输出端通过连接管连接;c. Connect the first reservoir and the output end of the purifier through a connecting pipe;
步骤五、用水单元的施工Step 5. Construction of water unit
在第一蓄水池上连接灌溉管,灌溉管横纵交叉设置在第一植被层上。An irrigation pipe is connected to the first water reservoir, and the irrigation pipes are arranged on the first vegetation layer horizontally and vertically.
进一步,步骤二的处理单元的施工包括Further, the construction of the processing unit of step 2 includes
1、净化器的安装1. Installation of the purifier
a、将屋顶用混凝土浇灌,并清理屋顶的表面,将屋顶整平,在屋顶上涂覆上防水涂料,然后铺设防水层,再根据设计图在屋顶上选取净化器的安装点;a. Pour the roof with concrete, clean the surface of the roof, level the roof, apply waterproof paint on the roof, then lay a waterproof layer, and then select the installation point of the purifier on the roof according to the design drawing;
b、在净化器的安装点处架设支架,将净化器通过螺钉固定连接在支架上,将净化器通过连接管与第二蓄水池的连接管口连接;b. Set up a bracket at the installation point of the purifier, fix the purifier on the bracket by screws, and connect the purifier with the connecting pipe of the second reservoir through a connecting pipe;
2、沉淀池的安装2. Installation of sedimentation tank
a、根据设计图,在屋顶上选取沉淀池的安装点,并利用标尺和石灰粉做好标记,然后在标记处绘制中心十字线和基准线;a. According to the design drawing, select the installation point of the sedimentation tank on the roof, mark it with a ruler and lime powder, and then draw a central cross line and a reference line at the mark;
b、在标记处支立模板,然后再用混凝土进行浇筑,浇筑完成后拆除模板并进行密封性测试;b. Set up the formwork at the mark, and then pour it with concrete. After the pouring is completed, remove the formwork and carry out the sealing test;
c、在沉淀池的底部放置沉淀剂,然后在沉淀池的内壁上浇筑对称的卡块,接着在卡块上放置隔离板,保证隔离板与沉淀池的底部之间的距离为30~50cm;c. Place the precipitant at the bottom of the sedimentation tank, then pour symmetrical blocks on the inner wall of the sedimentation tank, and then place the isolation plate on the block to ensure that the distance between the isolation plate and the bottom of the sedimentation tank is 30 ~ 50cm;
d、在沉淀池的顶部安装密封板;d. Install a sealing plate on the top of the sedimentation tank;
e、将沉淀池与净化器通过连接管连接,然后回土填埋,将沉淀池和净化器埋设在屋顶底部;e. Connect the sedimentation tank and the purifier through a connecting pipe, then return to soil for landfill, and bury the sedimentation tank and the purifier at the bottom of the roof;
3、景观池的开挖3. Excavation of landscape pool
a、在屋顶的左右两侧分别建设景观池,在景观池的底部铺设基层,在景观池的四周建设围栏;a. Build landscape pools on the left and right sides of the roof, lay the base layer at the bottom of the landscape pool, and build fences around the landscape pool;
b、在景观池内养殖水生生物,将景观池的上层通过连接管与沉淀池连接。b. Cultivate aquatic organisms in the landscape pond, and connect the upper layer of the landscape pond to the sedimentation tank through a connecting pipe.
本发明由于采用了上述技术方案,具有以下有益效果:The present invention has the following beneficial effects due to the adoption of the above-mentioned technical solutions:
降雨时的雨水以及第一植被层中的多余雨水通过雨水收集斗收集,在鹅卵石铺设而成的石子道路下设计雨水收集斗,使得雨水在进入到雨水收集斗前,先经过鹅卵石的层层过滤,再进入到雨水收集斗内,避免大颗粒物质堵塞雨水收集斗,经过雨水收集斗收集到的雨水通过输水管进入到景观池内,景观池内种植有水生生物,雨水在景观池内通过生物反应进行初次净化,同时也为景观池提供水资源,然后通过连接管将景观池内多余的经过净化的水输送到沉淀池,在沉淀池内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器进行最终的净化处理,并将处理好的水分别输送到第一蓄水池和第二蓄水池储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用;另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池设置在屋顶,方便对屋顶花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。The rainwater during rainfall and the excess rainwater in the first vegetation layer are collected by the rainwater collection bucket. The rainwater collection bucket is designed under the cobblestone road, so that the rainwater is filtered through the layers of cobblestones before entering the rainwater collection bucket. , and then enter the rainwater collection bucket to prevent large particles from clogging the rainwater collection bucket. The rainwater collected through the rainwater collection bucket enters the landscape pool through the water pipe, and aquatic organisms are planted in the landscape pool. At the same time, it also provides water resources for the landscape pool. Then, the excess purified water in the landscape pool is transported to the sedimentation tank through the connecting pipe, and the sedimentation reaction is carried out in the sedimentation tank to precipitate the impurities in the water for further purification. The water that has undergone precipitation reaction is sent to the purifier for final purification treatment, and the treated water is sent to the first reservoir and the second reservoir for storage, so as to facilitate household use, save energy, environmental protection, economy and pollution. Less and healthier, to maximize the use of natural resources; in addition, the water storage unit can also play a role in adjusting the water storage to reduce the pressure on the municipal pipe network, improve the economic benefits of rainwater treatment projects, and greatly reduce the workload of operation and maintenance , greatly increasing the practicability and operability of the rainwater treatment project, which is conducive to promoting the development of the sponge city; the two water reservoirs are set up to improve the water storage capacity, and the first water reservoir is set on the roof, which is convenient for the roof garden. Watering and water use on high floors, the water delivery distance is short, there is no need to add too much power equipment, and electricity is saved. The second reservoir is set under the house, which is convenient for water use on the ground and low floors, and the water delivery speed is fast. Make full use of rain.
本发明将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。The present invention integrates roof construction, rainwater collection and treatment, and water terminal into one, takes overall consideration into consideration, effectively reduces the pollution of rainwater, protects the water environment, realizes the collection, purification, storage and reuse of rainwater, and improves the utilization of water resources. At the same time, it can make the maintenance and irrigation of the roof garden more convenient, reduce the energy of water transmission, and be more economical and environmentally friendly.
附图说明Description of drawings
下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with the accompanying drawings:
图1为本发明一种用于屋顶花园的雨水集蓄系统的结构示意图;1 is a schematic structural diagram of a rainwater collection and storage system for roof gardens according to the present invention;
图2为图1中A向的结构示意图;Fig. 2 is the structural representation of A direction in Fig. 1;
图3为本发明中屋顶的平面结构示意图;Fig. 3 is the plan structure schematic diagram of the roof in the present invention;
图4为本发明中雨水收集斗的结构示意图;Fig. 4 is the structural representation of rainwater collecting bucket in the present invention;
图5为本发明中灌溉管的结构示意图;Fig. 5 is the structural representation of irrigation pipe in the present invention;
图6为本发明中雾化喷头的结构示意图。6 is a schematic structural diagram of an atomizing nozzle in the present invention.
附图标记:1、屋顶;2、石子道路;3、第一植被层;4、雨水收集斗;5、输水管;6、景观池;7、沉淀池;8、净化器;9、第一蓄水池;10、第二蓄水池;11、隔离板;12、通孔;13、水层;14、药物层;15、过滤网格筛;16、尖刺部;17、混凝土层;18、防水层;19、第二植被层;20、灌溉管;21、雾化喷头;22、滴水孔;23、过滤膜;24、喷水管;25、底座;26、锁紧头;27、凹槽;28、连接孔;29、第一喷水孔;30、第二喷水孔;31、滑块;32、第一卡槽;33、弧形槽;34、第二卡槽;35、旋转块;36、连接管;37、集水沟。Reference numerals: 1. roof; 2. gravel road; 3. first vegetation layer; 4. rainwater collection bucket; 5. water pipe; 6. landscape pool; 7. sedimentation tank; 8. purifier; 9. first Reservoir; 10. Second Reservoir; 11. Separation plate; 12. Through hole; 13. Water layer; 14. Drug layer; 15. Filter mesh screen; 16. Spike part; 17. Concrete layer; 18, waterproof layer; 19, second vegetation layer; 20, irrigation pipe; 21, atomizing nozzle; 22, drip hole; 23, filter membrane; 24, water spray pipe; 25, base; 26, locking head; 27 , groove; 28, connecting hole; 29, the first water spray hole; 30, the second water spray hole; 31, the slider; 32, the first slot; 33, the arc slot; 34, the second slot; 35, rotating block; 36, connecting pipe; 37, collecting ditch.
具体实施方式Detailed ways
如图1-6所示,为本发明的一种用于屋顶花园的雨水集蓄系统,包括屋顶1、集水单元、处理单元、蓄水单元和用水单元,屋顶1上设有由鹅卵石铺设而成的石子道路2以及第一植被层3,石子道路2与第一植被层3交错设置,集水单元包括雨水收集斗4和输水管5,雨水收集斗4按均匀间隔设置在石子道路2的下侧,雨水收集斗4呈上大下小的漏斗状,雨水收集斗4的顶面设有过滤网格筛15,雨水收集斗4的内侧壁上均匀设有尖刺部16。设置的漏斗状的雨水收集斗4防止雨水四溅,设置的过滤网格筛15进一步对进入到雨水收集斗4的水进行过滤,设置的尖刺部16粉碎进入到雨水收集斗4的大颗粒物质,将其颗粒变小,使其不易堵塞输水管5。集水单元还包括集水沟37,集水沟37呈阶梯状设置在第一植被层3上,集水沟37分别与石子道路2和房屋外侧的排水管连接。集水沟37将第一植被层3上多余的雨水一部分输送到雨水收集斗4处,一部分沿着排水管排出,排水管与雨水收集斗4配合工作,加快排水速度,避免第一植被层3因雨水过多而缺氧死亡。As shown in Figures 1-6, it is a rainwater collection and storage system for a roof garden of the present invention, comprising a roof 1, a water collection unit, a treatment unit, a water storage unit and a water use unit, and the roof 1 is provided with cobblestone paving. The formed gravel road 2 and the first vegetation layer 3, the gravel road 2 and the first vegetation layer 3 are alternately arranged, the water collection unit includes a rainwater collection bucket 4 and a water delivery pipe 5, and the rainwater collection bucket 4 is arranged on the gravel road 2 at uniform intervals. On the lower side of the rainwater collecting bucket 4, the rainwater collecting bucket 4 is in the shape of a funnel with a large upper and a small lower. The funnel-shaped rainwater collecting bucket 4 is installed to prevent rainwater from splashing, the filter mesh screen 15 is installed to further filter the water entering the rainwater collecting bucket 4, and the spiked portion 16 is installed to crush the large particles entering the rainwater collecting bucket 4. Substances, make their particles smaller, so that it is not easy to block the water pipe 5. The water collecting unit further includes a water collecting ditch 37, which is arranged on the first vegetation layer 3 in a stepped shape. The water collecting ditch 37 is respectively connected with the gravel road 2 and the drainage pipe outside the house. The water collecting ditch 37 transports part of the excess rainwater on the first vegetation layer 3 to the rainwater collection bucket 4, and part of it is discharged along the drain pipe. The drainpipe cooperates with the rainwater collection bucket 4 to accelerate the drainage speed and avoid the first vegetation layer 3. Death due to lack of oxygen due to excessive rain.
处理单元包括依次连接的景观池6、沉淀池7和净化器8,雨水收集斗4通过输水管5与景观池6连接,沉淀池7的内部设有隔离板11,隔离板11上设有通孔12,隔离板11将沉淀池7分隔成水层13和药物层14,药物层14内设有沉淀剂,水层13通过连接管36与净化器8连接。设置的隔离板11将水层13和药物层14分离出来,使水中的污染、有害物质在沉淀剂的作用下沉淀在药物层14内,保证水层13的澄清,使水层13中干净的水输出到净化器8;在隔离板11设置的通孔12使得沉淀剂与水层13中的水相互接触,从而使其产生化学或者物理反应,发生沉降,沉淀剂可以选择碱性物质、硫化物等。净化器8通过连接管36与蓄水单元连接,蓄水单元包括第一蓄水池9和第二蓄水池10,第一蓄水池9位于屋顶1上,第二蓄水池10位于房屋下方。第一蓄水池9的上侧浇灌有混凝土层17,混凝土层17的上侧设有防水层18,防水层18的上侧设有第二植被层19。混凝土层17用来加固第一蓄水池9,设置的防水层18防止外界的污水进入到第一蓄水池9,污染第一蓄水池9内的清水,设置的第二植被层19用来遮盖第一蓄水池9,美化外观,同时也起到蓄水、固水的作用,防止雨水渗入到第一蓄水池9内。The processing unit includes a landscape tank 6, a sedimentation tank 7 and a purifier 8 connected in sequence. The rainwater collection bucket 4 is connected to the landscape tank 6 through a water delivery pipe 5. The interior of the sedimentation tank 7 is provided with an isolation board 11, and the isolation board 11 is provided with a pass through. The hole 12 and the isolation plate 11 separate the sedimentation tank 7 into a water layer 13 and a drug layer 14 . The provided isolation plate 11 separates the water layer 13 and the drug layer 14, so that the pollution and harmful substances in the water are deposited in the drug layer 14 under the action of the precipitant, so as to ensure the clarification of the water layer 13 and make the water layer 13 clean. The water is output to the purifier 8; the through holes 12 provided in the isolation plate 11 make the precipitant and the water in the water layer 13 contact each other, so that the chemical or physical reaction occurs, and sedimentation occurs, and the precipitant can be selected from alkaline substances, sulfurized things etc. The purifier 8 is connected to the water storage unit through the connecting pipe 36. The water storage unit includes a first water storage tank 9 and a second water storage tank 10. The first water storage tank 9 is located on the roof 1, and the second water storage tank 10 is located in the house. below. A concrete layer 17 is poured on the upper side of the first reservoir 9 , a waterproof layer 18 is arranged on the upper side of the concrete layer 17 , and a second vegetation layer 19 is arranged on the upper side of the waterproof layer 18 . The concrete layer 17 is used to reinforce the first reservoir 9, the waterproof layer 18 provided prevents the sewage from the outside from entering the first reservoir 9 and pollutes the clear water in the first reservoir 9, and the second vegetation layer 19 is provided for To cover the first water reservoir 9 , beautify the appearance, and also play the role of water storage and water retention, and prevent rainwater from infiltrating into the first water reservoir 9 .
用水单元包括灌溉管20,灌溉管20与第一蓄水池9连接,灌溉管20上设有雾化喷头21、滴水孔22、定时器和闸门,定时器和闸门连接,雾化喷头21和滴水孔22间隔设置,滴水孔22上设有过滤膜23,滴水孔22上的过滤膜23防止外部的泥土等颗粒物质堵塞滴水孔22,保证灌溉管20的正常工作;当需要对第一植被层3和第二植被层19浇水时,开启阀门,第一蓄水池9内的水沿着灌溉管20流出,并分别通过雾化喷头21和滴水孔22对植被进行浇灌,浇灌范围广,保证屋顶1花园中植被的正常生长,减少对外界的水资源需求,进一步达到充分利用回收的雨水的作用,利用定时器可以根据实际情况而设定浇灌的时间,实现自动化浇水,提高浇灌的效率,避免浇水过多或者过少。雾化喷头21包括喷水管24、底座25和锁紧头26,底座25上设有凹槽27,锁紧头26转动连接在凹槽27内,凹槽27的底面上设有连接孔28,喷水管24穿过连接孔28与锁紧头26连接,底座25的侧壁上按圆周方向均匀设有至少八个第一喷水孔29,锁紧头26的侧壁上设有与第一喷水孔29相对应的第二喷水孔30。雾化喷头21工作时,第一喷水孔29与第二喷水孔30相对应,水流从喷水管24进入到锁紧头26,再从八个第二喷水孔30和第一喷水孔29喷出,增加了灌溉面积,浇灌均匀,能很好地对周围植被进行灌溉,当不需要雾化喷头21工作时,只要旋转锁紧头26,使第二喷水孔30与第一喷水孔29相交错,就可以堵塞第二喷水孔30,使水无法喷出。锁紧头26的外侧壁上设有滑块31,底座25的内侧壁上设有滑槽,滑槽与滑块31相匹配,滑槽包括第一卡槽32、弧形槽33和第二卡槽34,第一卡槽32和第二卡槽34分别位于弧形槽33的左右两侧,锁紧头26的顶面上设有旋转块35。设置的滑槽便于滑块31的滑动和限制,当滑块31位于第一卡槽32时,第一喷水孔29与第二喷水孔30相连通,当滑块31位于第二卡槽34时,第一喷水孔29和第二喷水孔30相交错,使得锁紧头26的开启和关闭更加方便,设置的旋转块35便于操控锁紧头26的旋转。The water unit includes an irrigation pipe 20, the irrigation pipe 20 is connected with the first reservoir 9, and the irrigation pipe 20 is provided with an atomizing nozzle 21, a drip hole 22, a timer and a gate, the timer is connected with the gate, and the atomizing nozzle 21 and the gate are connected. The drip holes 22 are arranged at intervals, and the drip holes 22 are provided with a filter membrane 23, and the filter membrane 23 on the drip holes 22 prevents particulate matter such as external soil from blocking the drip holes 22, so as to ensure the normal operation of the irrigation pipe 20; When the layer 3 and the second vegetation layer 19 are watered, the valve is opened, and the water in the first reservoir 9 flows out along the irrigation pipe 20, and the vegetation is watered through the atomizing nozzle 21 and the drip hole 22 respectively, and the watering range is wide. , to ensure the normal growth of vegetation in the roof 1 garden, reduce the demand for external water resources, and further achieve the effect of making full use of the recycled rainwater. The timer can be used to set the watering time according to the actual situation, realize automatic watering, and improve watering. efficiency and avoid over- or under-watering. The atomizing nozzle 21 includes a water spray pipe 24, a base 25 and a locking head 26. The base 25 is provided with a groove 27, the locking head 26 is rotatably connected in the groove 27, and the bottom surface of the groove 27 is provided with a connecting hole 28 The water spray pipe 24 is connected to the locking head 26 through the connecting hole 28, at least eight first water spray holes 29 are evenly arranged on the side wall of the base 25 in the circumferential direction, and the side wall of the locking head 26 is provided with The first water spray holes 29 correspond to the second water spray holes 30 . When the atomizing nozzle 21 is working, the first water spray holes 29 correspond to the second water spray holes 30, and the water flow enters the locking head 26 from the water spray pipe 24, and then flows from the eight second water spray holes 30 and the first spray holes 30 to the locking head 26. The water hole 29 is sprayed out, which increases the irrigation area, and the watering is uniform, which can irrigate the surrounding vegetation well. When the atomizing nozzle 21 does not need to work, just rotate the locking head 26 to make the second water nozzle 30 and the first nozzle 30. Once the water spray holes 29 are staggered, the second water spray holes 30 can be blocked, so that water cannot be sprayed out. A slider 31 is provided on the outer side wall of the locking head 26, and a chute is provided on the inner side wall of the base 25. The chute matches the slider 31, and the chute includes a first card slot 32, an arc slot 33 and a second The card slot 34 , the first card slot 32 and the second card slot 34 are respectively located on the left and right sides of the arc-shaped slot 33 , and a rotating block 35 is provided on the top surface of the locking head 26 . The provided chute facilitates the sliding and restriction of the slider 31. When the slider 31 is located in the first slot 32, the first water spray hole 29 communicates with the second spray hole 30, and when the slider 31 is located in the second slot 32 At 34 o'clock, the first water spray holes 29 and the second water spray holes 30 are staggered, which makes the opening and closing of the locking head 26 more convenient.
降雨时的雨水以及第一植被层3中的多余雨水通过雨水收集斗4收集,在鹅卵石铺设而成的石子道路2下设计雨水收集斗4,使得雨水在进入到雨水收集斗4前,先经过鹅卵石的层层过滤,再进入到雨水收集斗4内,避免大颗粒物质堵塞雨水收集斗4,经过雨水收集斗4收集到的雨水通过输水管5进入到景观池6内,景观池6内种植有水生生物,雨水在景观池6内通过生物反应进行初次净化,同时也为景观池6提供水资源,然后通过连接管36将景观池6内多余的经过净化的水输送到沉淀池7,在沉淀池7内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器8进行最终的净化处理,并将处理好的水分别输送到第一蓄水池9和第二蓄水池10储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用,另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池9设置在屋顶1,方便对屋顶1花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池10设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。The rainwater during rainfall and the excess rainwater in the first vegetation layer 3 are collected by the rainwater collection bucket 4. The rainwater collection bucket 4 is designed under the cobblestone road 2, so that the rainwater passes through the rainwater collection bucket 4 before entering the rainwater collection bucket 4. The pebbles are filtered layer by layer, and then enter the rainwater collection bucket 4 to prevent large particles from blocking the rainwater collection bucket 4. The rainwater collected through the rainwater collection bucket 4 enters the landscape pool 6 through the water pipe 5, and the landscape pool 6 is planted. There are aquatic organisms, and the rainwater is first purified by biological reaction in the landscape pond 6, and also provides water resources for the landscape pond 6, and then the excess purified water in the landscape pond 6 is transported to the sedimentation tank 7 through the connecting pipe 36. The precipitation reaction is carried out in the sedimentation tank 7, and the impurities in the water are precipitated for further purification, and then the water that has undergone the precipitation reaction is transported to the purifier 8 for final purification treatment, and the treated water is transported to the first. The reservoir 9 and the second reservoir 10 are stored for family use, energy saving, environmental protection and economy, less pollution, more health, and maximized utilization of natural resources. In addition, the water storage unit can also adjust the water storage capacity. In order to reduce the pressure of the municipal pipe network, improve the economic benefits of rainwater treatment projects, greatly reduce the workload of operation and maintenance, greatly increase the implementability and operability of rainwater treatment projects, and help promote the development of sponge cities; Two water storage tanks to improve the water storage capacity. The first water storage tank 9 is set on the roof 1, which is convenient for the watering of the garden on the roof 1 and the water for high floors. The water delivery distance is short, and there is no need to add excessive power equipment, saving Electric energy, the second water storage tank 10 is arranged below the house, which is convenient for water use on the ground and low floors, the water delivery speed is fast, and the rainwater is fully utilized.
如上述的一种用于屋顶花园的雨水集蓄系统的施工方法,包括如下步骤:As above-mentioned a kind of construction method for the rainwater collection and storage system of roof garden, comprises the steps:
步骤一、第二蓄水池10的施工Step 1. Construction of the second reservoir 10
a、根据家庭的用水量确定第二蓄水池10的体积大小,再根据第二蓄水池10的大小确定基坑的深度和宽度,并在设计图中标明,然后根据房屋设计图,确定第二蓄水池10的安装位置,并将该位置的表面清理干净,去除垃圾、碎石,然后在该位置处做好标记,以便于基坑的开挖;a. Determine the volume size of the second reservoir 10 according to the water consumption of the household, and then determine the depth and width of the foundation pit according to the size of the second reservoir 10, and indicate it in the design drawing, and then determine according to the house design drawing. The installation position of the second reservoir 10, clean the surface of the position, remove the garbage and gravel, and then mark the position to facilitate the excavation of the foundation pit;
b、根据设计图,采用挖土机在做好标记的位置开挖基坑,然后清理基坑内的碎石和垃圾,并夯实基坑,然后在基坑内铺设土工布和缓冲层,并在基坑一侧预留管道通道;b. According to the design drawing, use excavator to excavate the foundation pit at the marked position, then clean up the gravel and garbage in the foundation pit, and ram the foundation pit, then lay geotextile and buffer layer in the foundation pit, and lay the foundation pit in the foundation pit. A pipeline channel is reserved on one side of the pit;
c、在基坑内砌筑第二蓄水池10,并在第二蓄水池10上预留连接管口,在连接管口处安装防水胶;c. Masonry the second reservoir 10 in the foundation pit, and reserve a connection nozzle on the second reservoir 10, and install waterproof glue at the connection nozzle;
d、进行密封性测试,将第二蓄水池10漏水的位置用环氧树脂填补,保证第二蓄水池10的密封性;d. Carry out a tightness test, and fill the leaking position of the second reservoir 10 with epoxy resin to ensure the tightness of the second reservoir 10;
步骤二、处理单元的施工Step 2. Construction of the treatment unit
1、净化器8的安装1. Installation of purifier 8
a、将屋顶1用混凝土浇灌,并清理屋顶1的表面,将屋顶1整平,在屋顶1上涂覆上防水涂料,然后铺设防水层18,再根据设计图在屋顶1上选取净化器8的安装点;a. Pour the roof 1 with concrete, clean the surface of the roof 1, level the roof 1, apply waterproof paint on the roof 1, then lay the waterproof layer 18, and then select the purifier 8 on the roof 1 according to the design drawing. the installation point;
b、在净化器8的安装点处架设支架,将净化器8通过螺钉固定连接在支架上,将净化器8通过连接管36与第二蓄水池10的连接管口连接;b. Set up a bracket at the installation point of the purifier 8, fix the purifier 8 on the bracket through screws, and connect the purifier 8 to the connection nozzle of the second reservoir 10 through the connecting pipe 36;
2、沉淀池7的安装2. Installation of sedimentation tank 7
a、根据设计图,在屋顶1上选取沉淀池7的安装点,并利用标尺和石灰粉做好标记,然后在标记处绘制中心十字线和基准线;a. According to the design drawing, select the installation point of the sedimentation tank 7 on the roof 1, and make a mark with a ruler and lime powder, and then draw a central cross line and a reference line at the mark;
b、在标记处支立模板,然后再用混凝土进行浇筑,浇筑完成后拆除模板并进行密封性测试;b. Set up the formwork at the mark, and then pour it with concrete. After the pouring is completed, remove the formwork and carry out the sealing test;
c、在沉淀池7的底部放置沉淀剂,然后在沉淀池7的内壁上浇筑对称的卡块,接着在卡块上放置隔离板11,保证隔离板11与沉淀池7的底部之间的距离为30~50cm;c. Place the precipitant at the bottom of the sedimentation tank 7, then pour a symmetrical block on the inner wall of the sedimentation tank 7, and then place the isolation plate 11 on the block to ensure the distance between the isolation plate 11 and the bottom of the sedimentation tank 7 30~50cm;
d、在沉淀池7的顶部安装密封板;d. A sealing plate is installed on the top of the sedimentation tank 7;
e、将沉淀池7与净化器8通过连接管36连接,然后回土填埋,将沉淀池7和净化器8埋设在屋顶底部;e, the sedimentation tank 7 and the purifier 8 are connected through the connecting pipe 36, and then back to earth for landfill, and the sedimentation tank 7 and the purifier 8 are buried at the bottom of the roof;
3、景观池6的开挖3. Excavation of landscape pool 6
a、在屋顶1的左右两侧分别建设景观池6,在景观池6的底部铺设基层,在景观池6的四周建设围栏;A, build landscape pool 6 on the left and right sides of roof 1 respectively, lay the base layer at the bottom of landscape pool 6, and build fences around landscape pool 6;
b、在景观池6内养殖水生生物,将景观池6的上层通过连接管36与沉淀池7连接。b. Cultivate aquatic organisms in the landscape tank 6, and connect the upper layer of the landscape tank 6 to the sedimentation tank 7 through the connecting pipe 36.
步骤三、集水单元的施工Step 3. Construction of the catchment unit
1、雨水收集斗4的施工1. Construction of rainwater collection bucket 4
a、根据设计图,在规定位置处安装雨水收集斗4,相邻雨水收集斗4之间的距离为20~50cm,在雨水收集斗4的底部分别安装有收集管,收集管通过一根总的输水管5与景观池6连接;a. According to the design drawing, install the rainwater collection bucket 4 at the specified position, and the distance between the adjacent rainwater collection buckets 4 is 20-50cm. The bottom of the rainwater collection bucket 4 is respectively installed with collection pipes, and the collection pipes pass through a total The water pipe 5 is connected with the landscape pool 6;
b、在屋顶1的顶层铺设隔根层,根据设计图在隔根层的上侧分别铺设第一植被层3和鹅卵石,将鹅卵石铺设在雨水收集斗4的上方,在第一植被层3上种植植物,并预留第一蓄水池9的安装空间;b, laying a root layer on the top layer of the roof 1, laying the first vegetation layer 3 and cobblestones respectively on the upper side of the root layer according to the design drawing, laying the cobblestones above the rainwater collection bucket 4, on the first vegetation layer 3 Planting plants, and reserving the installation space of the first reservoir 9;
2、集水沟37的开挖2. Excavation of catchment ditch 37
在第一植被层3上按照地势高低开挖集水沟37,集水沟37呈阶梯状,并将集水沟37分别与由鹅卵石铺设而成的石子道路2和排水管连接;On the first vegetation layer 3, excavate a water collecting ditch 37 according to the terrain height, and the water collecting ditch 37 is in a stepped shape, and the water collecting ditch 37 is respectively connected with the cobblestone road 2 and the drainage pipe;
步骤四、第一蓄水池9的安装Step 4. Installation of the first reservoir 9
a、根据设计图以及用水量,在第一蓄水池9的安装空间处砌筑第一蓄水池9,在第一蓄水池9内铺设密封布,然后进行密封性测试,将第一蓄水池9漏水的位置用环氧树脂填补,保证第一蓄水池9的密封性;a. According to the design drawing and the water consumption, build the first reservoir 9 at the installation space of the first reservoir 9, lay a sealing cloth in the first reservoir 9, and then carry out the tightness test. The leaking position of the reservoir 9 is filled with epoxy resin to ensure the tightness of the first reservoir 9;
b、在第一蓄水池9的上方浇筑混凝土层17,在混凝土层17的上方铺设防水层18,在防水层18的上方铺设第二植被层19;b, pour concrete layer 17 above the first reservoir 9, lay waterproof layer 18 above the concrete layer 17, and lay the second vegetation layer 19 above the waterproof layer 18;
c、将第一蓄水池9与净化器8的输出端通过连接管36连接;c. Connect the output end of the first reservoir 9 and the purifier 8 through the connecting pipe 36;
步骤五、用水单元的施工Step 5. Construction of water unit
在第一蓄水池9上连接灌溉管20,灌溉管20横纵交叉设置在第一植被层3上。Irrigation pipes 20 are connected to the first reservoir 9 , and the irrigation pipes 20 are arranged on the first vegetation layer 3 in a horizontal and vertical manner.
以上仅为本发明的具体实施例,但本发明的技术特征并不局限于此。任何以本发明为基础,为解决基本相同的技术问题,实现基本相同的技术效果,所作出的简单变化、等同替换或者修饰等,皆涵盖于本发明的保护范围之中。The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention in order to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611145895.3A CN106639180B (en) | 2016-12-13 | 2016-12-13 | A kind of rainwater accumulation system and its construction method for roof garden |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611145895.3A CN106639180B (en) | 2016-12-13 | 2016-12-13 | A kind of rainwater accumulation system and its construction method for roof garden |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106639180A CN106639180A (en) | 2017-05-10 |
| CN106639180B true CN106639180B (en) | 2019-07-19 |
Family
ID=58825258
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611145895.3A Expired - Fee Related CN106639180B (en) | 2016-12-13 | 2016-12-13 | A kind of rainwater accumulation system and its construction method for roof garden |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106639180B (en) |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107347591A (en) * | 2017-08-01 | 2017-11-17 | 河南城建学院 | A kind of urban landscape or ecological garden greening system |
| CN109083339A (en) * | 2018-04-21 | 2018-12-25 | 龚亨灿 | Multifunctional roof ecology body-building paradise |
| CN108979208B (en) * | 2018-07-30 | 2020-10-30 | 安徽旭能电力股份有限公司 | Rain-shielding ceiling of solar energy on viaduct |
| CN109208426B (en) * | 2018-09-21 | 2020-12-08 | 深圳市鹏升建设有限公司 | Municipal road construction structure and construction method thereof |
| CN109267772B (en) * | 2018-11-29 | 2023-09-08 | 扬州大学 | An intelligent three-dimensional rainwater reuse ecological landscape corridor and its work flow |
| CN109853705A (en) * | 2019-01-24 | 2019-06-07 | 四汇建设集团有限公司 | The short route processing system of cell rainwater reuse |
| CN109673477B (en) * | 2019-01-24 | 2022-01-25 | 王菲 | Ecological garden roof vegetation irrigation equipment |
| CN110144992B (en) * | 2019-04-20 | 2020-08-25 | 北京北控生态建设集团有限公司 | Flood prevention device for rainwater garden |
| CN111719777B (en) * | 2020-03-21 | 2021-10-22 | 东莞市大乘建筑工程技术有限公司 | Waterproof reinforcement device and construction method for building roof |
| CN111792779B (en) * | 2020-06-03 | 2023-07-18 | 中国一冶集团有限公司 | Residential area waterscape system |
| CN111771676A (en) * | 2020-07-02 | 2020-10-16 | 重庆思尔达信息科技有限公司 | Automatic spraying system for smart environment |
| IT202100000005A1 (en) | 2021-01-04 | 2022-07-04 | Univ Della Calabria Dipartimento Di Ingegneria Civile Dinci | GREEN ROOF SYSTEM |
| CN112798492B (en) * | 2021-01-28 | 2025-02-07 | 浙江华东工程咨询有限公司 | A device for measuring the permeability coefficient of muddy water in porous cover plates for slope drainage ditches |
| CN113026861A (en) * | 2021-03-12 | 2021-06-25 | 黄河勘测规划设计研究院有限公司 | Rainwater collection, filtration and re-irrigation device based on landscape and garden and use method thereof |
| CN114097472B (en) * | 2021-09-30 | 2023-03-14 | 国网宁夏电力有限公司电力科学研究院 | Ecological restoration system of power transmission and transformation tower footing |
| CN115643936A (en) * | 2022-10-17 | 2023-01-31 | 中园景观设计(苏州)有限公司 | Flower pond system of roof garden |
| CN119491437B (en) * | 2025-01-02 | 2025-09-23 | 广东工业大学 | Integrated device is supported in road surface waterlogging removal cooling |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202370078U (en) * | 2011-12-06 | 2012-08-08 | 福建联邦三禾纺织贸易有限公司 | Ground rainwater recycling system |
| KR101273679B1 (en) * | 2013-03-04 | 2013-06-12 | 주식회사 지이글로벌 | An eco-friendly hybrid type rainwater reusing system including a treatment of first rainwater reactor |
| CN203174665U (en) * | 2013-04-03 | 2013-09-04 | 江苏山水环境建设集团股份有限公司 | Urban rainwater collection and utilization system |
| CN203675787U (en) * | 2014-01-04 | 2014-07-02 | 沧州临港金太阳绿色农业有限公司 | Intelligent water-saving garden irrigation device |
| CN204266293U (en) * | 2014-12-03 | 2015-04-15 | 鲁晓珊 | Building roof and facade Rainwater collection system |
| CN105145286A (en) * | 2015-09-17 | 2015-12-16 | 广东工业大学 | Rainwater collection and powerless intelligent irrigation system of ecological green roof of building |
| CN205688486U (en) * | 2016-06-15 | 2016-11-16 | 纪欣雨 | A kind of energy saving building with rain water collecting system |
| CN106193263A (en) * | 2016-08-31 | 2016-12-07 | 苏州金螳螂园林绿化景观有限公司 | The biological stagnant pool system in sponge city |
-
2016
- 2016-12-13 CN CN201611145895.3A patent/CN106639180B/en not_active Expired - Fee Related
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202370078U (en) * | 2011-12-06 | 2012-08-08 | 福建联邦三禾纺织贸易有限公司 | Ground rainwater recycling system |
| KR101273679B1 (en) * | 2013-03-04 | 2013-06-12 | 주식회사 지이글로벌 | An eco-friendly hybrid type rainwater reusing system including a treatment of first rainwater reactor |
| CN203174665U (en) * | 2013-04-03 | 2013-09-04 | 江苏山水环境建设集团股份有限公司 | Urban rainwater collection and utilization system |
| CN203675787U (en) * | 2014-01-04 | 2014-07-02 | 沧州临港金太阳绿色农业有限公司 | Intelligent water-saving garden irrigation device |
| CN204266293U (en) * | 2014-12-03 | 2015-04-15 | 鲁晓珊 | Building roof and facade Rainwater collection system |
| CN105145286A (en) * | 2015-09-17 | 2015-12-16 | 广东工业大学 | Rainwater collection and powerless intelligent irrigation system of ecological green roof of building |
| CN205688486U (en) * | 2016-06-15 | 2016-11-16 | 纪欣雨 | A kind of energy saving building with rain water collecting system |
| CN106193263A (en) * | 2016-08-31 | 2016-12-07 | 苏州金螳螂园林绿化景观有限公司 | The biological stagnant pool system in sponge city |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106639180A (en) | 2017-05-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106639180A (en) | Rainwater collecting system for roof garden and construction method | |
| CN110249844B (en) | Street tree pool with water storage and drainage device | |
| CN204959952U (en) | Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system | |
| CN105089142A (en) | Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system | |
| CN105625549A (en) | Multifunctional system for rainwater infiltration, collection and storage and purification of sponge city | |
| CN106869237A (en) | A kind of gardens rainwater-collecting water storage system and its construction method | |
| CN103088897A (en) | Green community impact resistance rainwater ecological utilization system | |
| CN207567889U (en) | Residential quarters Rainwater collection system | |
| CN211112989U (en) | Intelligent water collecting and draining system applied to sponge city | |
| CN110042724A (en) | Collapsible Loess District road sponge facility rainwater catchment system and exhaust system | |
| CN106245487B (en) | The construction method of the urban road sponge engineering system of combining road maintenance | |
| CN203080678U (en) | Environment-friendly community shock-resistant rainwater ecological utilizing system | |
| CN205348354U (en) | System that utilizes is handled to regional low rainwater that influences | |
| CN103233433A (en) | Urban road pavement rainwater collection and utilization system | |
| CN213571388U (en) | Landscape design is with people's road structure | |
| CN211547991U (en) | Rainwater drainage and utilization system capable of preventing urban road waterlogging | |
| CN206575876U (en) | A kind of slope vegetation water-saving structure | |
| CN109555275A (en) | A kind of roof garden Intelligent rain Collection utilization system | |
| CN206625105U (en) | A kind of permeable road structure in environmentally friendly gardens with rainwater-collecting purification function | |
| CN106499002B (en) | Lawn greenery patches rainwater cyclic utilization system | |
| CN112031114A (en) | Seepage stagnation type storage regulation sponge parking lot and rainwater storage regulation method | |
| CN108625453A (en) | Skyscraper sponge City complex system | |
| CN204001467U (en) | A kind of Rainwater Resources is utilized system | |
| CN214089311U (en) | Sponge urban road curb penetrant unit | |
| CN206545257U (en) | A kind of novel greening band water storage structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190719 |