CN106639180A - Rainwater collecting system for roof garden and construction method - Google Patents

Rainwater collecting system for roof garden and construction method Download PDF

Info

Publication number
CN106639180A
CN106639180A CN201611145895.3A CN201611145895A CN106639180A CN 106639180 A CN106639180 A CN 106639180A CN 201611145895 A CN201611145895 A CN 201611145895A CN 106639180 A CN106639180 A CN 106639180A
Authority
CN
China
Prior art keywords
water
roof
reservoir
layer
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611145895.3A
Other languages
Chinese (zh)
Other versions
CN106639180B (en
Inventor
刘学应
柴啸
陈悦
崔同东
常欢
黄裕凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201611145895.3A priority Critical patent/CN106639180B/en
Publication of CN106639180A publication Critical patent/CN106639180A/en
Application granted granted Critical
Publication of CN106639180B publication Critical patent/CN106639180B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/02Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/02Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
    • A01G25/023Dispensing fittings for drip irrigation, e.g. drippers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/12Devices or arrangements allowing walking on the roof or in the gutter

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Sewage (AREA)

Abstract

本发明主要公开了一种用于屋顶花园的雨水集蓄系统及其施工方法,包括屋顶、集水单元、处理单元、蓄水单元和用水单元,屋顶上设有由鹅卵石铺设而成的石子道路以及第一植被层,集水单元包括设置在石子道路下方的雨水收集斗和输水管,处理单元包括依次连接的景观池、沉淀池和净化器,蓄水单元包括第一蓄水池和第二蓄水池,第一蓄水池位于屋顶上,第二蓄水池位于房屋下方。本发明将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。

The invention mainly discloses a rainwater collection and storage system for roof gardens and a construction method thereof, including a roof, a water collection unit, a treatment unit, a water storage unit and a water use unit, and a gravel road paved with cobblestones is arranged on the roof As well as the first vegetation layer, the water collection unit includes rainwater collection buckets and water pipes arranged under the gravel road, the treatment unit includes landscape pools, sedimentation tanks and purifiers connected in sequence, and the water storage unit includes the first water storage tank and the second Cisterns, the first cistern is located on the roof and the second cistern is located under the house. The invention integrates roof construction, rainwater collection and treatment, and water use terminals into one, overall planning, effectively reduces the pollution of rainwater, protects the water body environment, realizes the collection, purification, storage and reuse of rainwater, and improves the utilization of water resources The efficiency can reduce the water pressure, and at the same time, it can make the maintenance and irrigation of the roof garden more convenient, reduce the energy of water delivery, and be more economical and environmentally friendly.

Description

一种用于屋顶花园的雨水集蓄系统及其施工方法A rainwater collection and storage system for roof gardens and its construction method

技术领域technical field

本发明涉及一种用于屋顶花园的雨水集蓄系统及其施工方法。The invention relates to a rainwater collection and storage system for roof gardens and a construction method thereof.

背景技术Background technique

现有技术中,雨水收集,完整的说应该叫做“雨水收集与利用系统”,是指收集、利用建筑物屋顶及道路、广场等硬化地表汇集的降雨径流,经收集——输水——净水——储存等渠道积蓄雨水,为绿化、景观水体、洗涤及地下水源提供雨水补给,以达到综合利用雨水资源和节约用水的目的。很多城市和地区的自来水供应已难以同步跟上城市化发展的步伐。城市的浇灌绿化、冲洗马路等公益用水及洗车等新兴的用水行业又进一步加重了自来水供应的负担。可是每年的暴雨季节,泛滥的雨水又给城市排水造成了极大的困难。而雨水的收集和利用正好解决了这一给城市建设带来的两大难题。雨水收集利用系统具有减缓城区雨水洪涝和地下水位下降、控制雨水径流污染、改善城市生态环境等广泛的意义。In the existing technology, rainwater harvesting should be called "rainwater harvesting and utilization system" in a complete way, which refers to the collection and utilization of rainfall runoff collected on the roof of buildings, roads, squares and other hardened surfaces. Water—storage and other channels accumulate rainwater, and provide rainwater replenishment for greening, landscape water bodies, washing and groundwater sources, so as to achieve the purpose of comprehensive utilization of rainwater resources and water conservation. The tap water supply in many cities and regions has been difficult to keep up with the pace of urbanization. Emerging water industries such as watering and greening the city, flushing roads and other public welfare water, and car washing have further increased the burden on tap water supply. However, during the heavy rain season every year, the flood of rainwater has caused great difficulties for urban drainage. The collection and utilization of rainwater just solved the two major problems brought to urban construction. The rainwater harvesting and utilization system has a wide range of meanings, such as slowing down urban rainwater floods and groundwater table decline, controlling rainwater runoff pollution, and improving urban ecological environment.

在日常生活中,屋顶的降雨积水量不可小视,如果能把这部分雨水收集起来再利用,可在一定程度上节约资源。屋顶花园不但降温隔热效果优良,而且能美化环境、净化空气、改善局部小气候,还能丰富城市的俯仰景观,能补偿建筑物占用的绿化地面,大大提高了城市的绿化覆盖率,改善人们的居住条件,提高生活质量,是一种值得大力推广的屋面形式。但是屋顶花园的需水量较大,用水较多,在水资源日益缺乏的如今,养护屋顶花园压力较大,且一般的蓄水单元建设在房屋地下,当上层楼房或者屋顶花园需要用水时,需要从地面输送到屋顶,路程较长,耗费的能源多,灌溉不方便。In daily life, the amount of rainwater accumulated on the roof cannot be underestimated. If this part of rainwater can be collected and reused, resources can be saved to a certain extent. The roof garden not only has excellent cooling and heat insulation effects, but also can beautify the environment, purify the air, improve the local microclimate, enrich the city's elevation landscape, and can compensate for the green ground occupied by buildings, greatly increasing the city's green coverage and improving people's health. It is a roof form worthy of vigorous promotion to improve living conditions and improve the quality of life. However, roof gardens require a lot of water and use a lot of water. Nowadays, with the increasing shortage of water resources, the pressure of maintaining roof gardens is relatively high, and the general water storage units are built underground in houses. When the upper buildings or roof gardens need water, they need to It takes a long distance to transport from the ground to the roof, consumes a lot of energy, and is inconvenient for irrigation.

发明内容Contents of the invention

本发明的目的在于针对现有技术的诸多不足,提供一种用于屋顶花园的雨水集蓄系统及其施工方法,将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。The purpose of the present invention is to address the many deficiencies in the prior art, to provide a rainwater storage system for roof gardens and its construction method, which integrates roof construction, rainwater collection and treatment, and water terminals into one, making overall plans and effectively It reduces the pollution of rainwater, protects the water body environment, realizes the collection, purification, storage and reuse of rainwater, improves the utilization rate of water resources, and reduces water pressure. At the same time, it can make the maintenance and irrigation of roof gardens more convenient and reduce water delivery. Energy, more economical and environmentally friendly.

为了解决上述技术问题,本发明采用如下技术方案:In order to solve the above technical problems, the present invention adopts the following technical solutions:

一种用于屋顶花园的雨水集蓄系统,包括屋顶、集水单元、处理单元、蓄水单元和用水单元,屋顶上设有由鹅卵石铺设而成的石子道路以及第一植被层,石子道路与第一植被层交错设置,集水单元包括雨水收集斗和输水管,雨水收集斗按均匀间隔设置在石子道路的下侧,处理单元包括依次连接的景观池、沉淀池和净化器,雨水收集斗通过输水管与景观池连接,净化器通过连接管与蓄水单元连接,蓄水单元包括第一蓄水池和第二蓄水池,第一蓄水池位于屋顶上,第二蓄水池位于房屋下方。降雨时的雨水以及第一植被层中的多余雨水通过雨水收集斗收集,在鹅卵石铺设而成的石子道路下设计雨水收集斗,使得雨水在进入到雨水收集斗前,先经过鹅卵石的层层过滤,再进入到雨水收集斗内,避免大颗粒物质堵塞雨水收集斗,经过雨水收集斗收集到的雨水通过输水管进入到景观池内,景观池内种植有水生生物,雨水在景观池内通过生物反应进行初次净化,同时也为景观池提供水资源,然后通过连接管将景观池内多余的经过净化的水输送到沉淀池,在沉淀池内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器进行最终的净化处理,并将处理好的水分别输送到第一蓄水池和第二蓄水池储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用,另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池设置在屋顶,方便对屋顶花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。A rainwater storage system for roof gardens, including a roof, a water collection unit, a treatment unit, a water storage unit and a water unit. The roof is provided with a gravel road paved with cobblestones and the first vegetation layer, and the gravel road and The first vegetation layer is arranged in a staggered manner. The water collection unit includes rainwater collection buckets and water pipes. The rainwater collection buckets are arranged on the lower side of the gravel road at even intervals. The treatment unit includes landscape pools, sedimentation tanks and purifiers connected in sequence, and rainwater collection buckets It is connected to the landscape pool through a water pipe, and the purifier is connected to the water storage unit through a connecting pipe. The water storage unit includes a first water storage tank and a second water storage tank. below the house. The rainwater during rainfall and the excess rainwater in the first vegetation layer are collected through the rainwater collection bucket, and the rainwater collection bucket is designed under the gravel road paved with cobblestones, so that the rainwater is filtered through layers of pebbles before entering the rainwater collection bucket. , and then into the rainwater collection bucket to prevent large particles from clogging the rainwater collection bucket. The rainwater collected by the rainwater collection bucket enters the landscape pool through the water delivery pipe. Purify, and also provide water resources for the landscape pool, and then transport the excess purified water in the landscape pool to the sedimentation tank through the connecting pipe, and carry out the sedimentation reaction in the sedimentation tank to precipitate the impurities in the water for further purification, and then The water after the precipitation reaction is sent to the purifier for final purification treatment, and the treated water is sent to the first reservoir and the second reservoir for storage, so that it can be used by the family, saving energy, environmental protection, economy, and pollution less, healthier, and maximize the use of natural resources. In addition, the water storage unit can also play a role in adjusting the water storage to reduce the pressure on the municipal pipe network, improve the economic benefits of rainwater treatment projects, and greatly reduce the workload of operation and maintenance. , greatly increasing the feasibility and operability of rainwater treatment projects, which is conducive to promoting the development of sponge cities; the two reservoirs are set up to improve water storage capacity, and the first reservoir is set on the roof, which is convenient for roof gardens. The irrigation and high-floor water, the water delivery distance is short, there is no need to add too much power equipment, save electricity, and the second water storage tank is set under the house, which is convenient for the ground and low-floor water, the water delivery speed is fast, and it can be fully utilized rainwater.

进一步,沉淀池的内部设有隔离板,隔离板上设有通孔,隔离板将沉淀池分隔成水层和药物层,药物层内设有沉淀剂,水层通过连接管与净化器连接。设置的隔离板将水层和药物层分离出来,使水中的污染、有害物质在沉淀剂的作用下沉淀在药物层内,保证水层的澄清,使水层中干净的水输出到净化器;在隔离板设置的通孔使得沉淀剂与水层中的水相互接触,从而使其产生化学或者物理反应,发生沉降,沉淀剂可以选择碱性物质、硫化物等。Further, an isolation plate is provided inside the sedimentation tank, and a through hole is provided on the isolation plate. The isolation plate separates the sedimentation tank into a water layer and a drug layer, and the drug layer is provided with a precipitant, and the water layer is connected to the purifier through a connecting pipe. The set separation plate separates the water layer and the drug layer, so that the pollution and harmful substances in the water are precipitated in the drug layer under the action of the precipitant, so as to ensure the clarification of the water layer, so that the clean water in the water layer is output to the purifier; The through holes provided in the isolation plate make the precipitating agent contact with the water in the water layer, so as to cause chemical or physical reaction and sedimentation. The precipitating agent can be selected from alkaline substances, sulfides and the like.

进一步,雨水收集斗呈上大下小的漏斗状,雨水收集斗的顶面设有过滤网格筛,雨水收集斗的内侧壁上均匀设有尖刺部。设置的漏斗状的雨水收集斗防止雨水四溅,设置的过滤网格筛进一步对进入到雨水收集斗的水进行过滤,设置的尖刺部粉碎进入到雨水收集斗的大颗粒物质,将其颗粒变小,使其不易堵塞输水管。Furthermore, the rainwater collection bucket is in the shape of a funnel with a large top and a small bottom. The top surface of the rainwater collection bucket is provided with a filter mesh screen, and the inner wall of the rainwater collection bucket is uniformly provided with spikes. The funnel-shaped rainwater collection bucket is set to prevent rainwater from splashing, the filter mesh screen is set to further filter the water entering the rainwater collection bucket, and the set spikes crush the large particles entering the rainwater collection bucket, and the particles Smaller, making it less likely to clog water delivery pipes.

进一步,第一蓄水池的上侧浇灌有混凝土层,混凝土层的上侧设有防水层,防水层的上侧设有第二植被层。混凝土层用来加固第一蓄水池和第二蓄水池,设置的防水层防止外界的污水进入到第一蓄水池,污染第一蓄水池内的清水,设置的第二植被层用来遮盖第一蓄水池,美化外观,同时也起到蓄水作用,防止雨水渗入到第一蓄水池内。Further, the upper side of the first reservoir is poured with a concrete layer, the upper side of the concrete layer is provided with a waterproof layer, and the upper side of the waterproof layer is provided with a second vegetation layer. The concrete layer is used to reinforce the first reservoir and the second reservoir. The waterproof layer is set to prevent the outside sewage from entering the first reservoir and contaminating the clear water in the first reservoir. The second vegetation layer is used to Cover the first water storage tank to beautify the appearance, and also play a water storage role to prevent rainwater from seeping into the first water storage tank.

进一步,集水单元还包括集水沟,集水沟呈阶梯状设置在第一植被层上,集水沟分别与石子道路和房屋外侧的排水管连接。集水沟将第一植被层上多余的雨水一部分输送到雨水收集斗处,一部分沿着排水管排出,排水管与雨水收集斗配合工作,加快排水速度,避免第一植被层因雨水过多而缺氧死亡。Further, the water collection unit also includes a water collection ditch, which is arranged on the first vegetation layer in a stepped shape, and the water collection ditch is respectively connected with the gravel road and the drainage pipe outside the house. The gutter transports part of the excess rainwater on the first vegetation layer to the rainwater collection bucket, and part of it is discharged along the drainage pipe. Death from hypoxia.

进一步,用水单元包括灌溉管,灌溉管与第一蓄水池连接,灌溉管上设有雾化喷头、滴水孔、定时器和闸门,定时器和闸门连接,雾化喷头和滴水孔间隔设置,滴水孔上设有过滤膜,雾化喷头包括喷水管、底座和锁紧头,底座上设有凹槽,锁紧头转动连接在凹槽内,凹槽的底面上设有连接孔,喷水管穿过连接孔与锁紧头连接,底座的侧壁上按圆周方向均匀设有至少八个第一喷水孔,锁紧头的侧壁上设有与第一喷水孔相对应的第二喷水孔。当需要对第一植被层和第二植被层浇水时,开启阀门,第一蓄水池内的水沿着灌溉管流出,并分别通过雾化喷头和滴水孔对植被进行浇灌,浇灌范围广,保证屋顶花园中植被的正常生长,减少对外界的水资源需求,进一步达到充分利用回收的雨水的作用,利用定时器可以根据实际情况而设定浇灌的时间,实现自动化浇水,提高浇灌的效率,避免浇水过多或者过少;滴水孔上的过滤膜防止外部的泥土等颗粒物质堵塞滴水孔,保证灌溉管的正常工作;雾化喷头工作时,第一喷水孔与第二喷水孔相对应,水流从喷水管进入到锁紧头,再从八个第二喷水孔和第一喷水孔喷出,增加了灌溉面积,浇灌均匀,能很好地对周围植被进行灌溉,当不需要雾化喷头工作时,只要旋转锁紧头,使第二喷水孔与第一喷水孔相交错,就可以堵塞第二喷水孔,使水无法喷出。Further, the water unit includes an irrigation pipe, the irrigation pipe is connected to the first reservoir, the irrigation pipe is provided with an atomizing nozzle, a drip hole, a timer and a gate, the timer is connected to the gate, and the atomization nozzle and the drip hole are arranged at intervals, The drip hole is provided with a filter film, and the atomizing nozzle includes a water spray pipe, a base and a locking head. The water pipe is connected to the locking head through the connection hole, at least eight first water spray holes are evenly arranged on the side wall of the base according to the circumferential direction, and the side wall of the locking head is provided with corresponding to the first water spray holes. Second spray hole. When the first vegetation layer and the second vegetation layer need to be watered, the valve is opened, the water in the first reservoir flows out along the irrigation pipe, and the vegetation is watered respectively through the atomizing nozzle and the drip hole, and the irrigation range is wide. Ensure the normal growth of vegetation in the roof garden, reduce the demand for external water resources, and further achieve the effect of fully utilizing the recycled rainwater. The timer can be used to set the watering time according to the actual situation, realize automatic watering, and improve the efficiency of watering , to avoid too much or too little watering; the filter film on the drip hole prevents external soil and other particulate matter from clogging the drip hole, ensuring the normal operation of the irrigation pipe; when the atomizing nozzle is working, the first spray hole and the second spray Corresponding to the holes, the water flow enters the locking head from the water spray pipe, and then sprays out from the eight second water spray holes and the first water spray hole, which increases the irrigation area, irrigates evenly, and can well irrigate the surrounding vegetation , when the work of the atomizing nozzle is not needed, as long as the locking head is rotated so that the second water spray hole intersects with the first water spray hole, the second water spray hole can be blocked so that the water cannot be sprayed out.

进一步,锁紧头的外侧壁上设有滑块,底座的内侧壁上设有滑槽,滑槽与滑块相匹配,滑槽包括第一卡槽、弧形槽和第二卡槽,第一卡槽和第二卡槽分别位于弧形槽的左右两侧,锁紧头的顶面上设有旋转块。设置的滑槽便于滑块的滑动和限制,当滑块位于第一卡槽时,第一喷水孔与第二喷水孔相连通,当滑块位于第二卡槽时,第一喷水孔和第二喷水孔相交错,使得锁紧头的开启和关闭更加方便,设置的旋转块便于操控锁紧头的旋转。Further, a slider is provided on the outer wall of the locking head, and a chute is provided on the inner wall of the base, and the chute matches the slider. The chute includes a first slot, an arc slot and a second slot. The first card slot and the second card slot are respectively located on the left and right sides of the arc-shaped slot, and a rotating block is arranged on the top surface of the locking head. The set chute facilitates the sliding and restriction of the slider. When the slider is in the first slot, the first water spray hole communicates with the second water spray hole. When the slider is in the second slot, the first water spray The holes and the second water spray holes are interlaced, which makes the opening and closing of the locking head more convenient, and the provided rotating block is convenient for controlling the rotation of the locking head.

如上述的一种用于屋顶花园的雨水集蓄系统的施工方法,包括如下步骤:A construction method for a rainwater storage system for a roof garden as described above, comprising the following steps:

步骤一、第二蓄水池的施工Step 1. Construction of the second reservoir

a、根据家庭的用水量确定第二蓄水池的体积大小,再根据第二蓄水池的大小确定基坑的深度和宽度,并在设计图中标明,然后根据房屋设计图,确定第二蓄水池的安装位置,并将该位置的表面清理干净,去除垃圾、碎石,然后在该位置处做好标记,以便于基坑的开挖;a. Determine the volume of the second reservoir according to the water consumption of the household, then determine the depth and width of the foundation pit according to the size of the second reservoir, and mark it on the design drawing, and then determine the second reservoir according to the house design drawing. The installation location of the reservoir, and clean the surface of the location, remove garbage and gravel, and then mark the location to facilitate the excavation of the foundation pit;

b、根据设计图,采用挖土机在做好标记的位置开挖基坑,然后清理基坑内的碎石和垃圾,并夯实基坑,然后在基坑内铺设土工布和缓冲层,并在基坑一侧预留管道通道;b. According to the design drawing, use an excavator to excavate the foundation pit at the marked position, then clean up the gravel and garbage in the foundation pit, and ram the foundation pit, then lay geotextile and buffer layer in the foundation pit, and Pipeline channels are reserved on one side of the pit;

c、在基坑内砌筑第二蓄水池,并在第二蓄水池上预留连接管口,在连接管口处安装防水胶;c. Build a second reservoir in the foundation pit, reserve a connecting nozzle on the second reservoir, and install waterproof glue at the connecting nozzle;

d、进行密封性测试,将第二蓄水池漏水的位置用环氧树脂填补,保证第二蓄水池的密封性;d. Carry out a tightness test, and fill the leaking position of the second reservoir with epoxy resin to ensure the tightness of the second reservoir;

步骤二、处理单元的施工Step 2. Construction of processing unit

步骤三、集水单元的施工Step 3. Construction of the water collection unit

1、雨水收集斗的施工1. Construction of rainwater collection bucket

a、根据设计图,在规定位置处安装雨水收集斗,相邻雨水收集斗之间的距离为20~50cm,在雨水收集斗的底部分别安装有收集管,收集管通过一根总的输水管与景观池连接;a. According to the design drawing, install rainwater collection buckets at the specified positions. The distance between adjacent rainwater collection buckets is 20-50cm. There are collection pipes installed at the bottom of the rainwater collection buckets, and the collection pipes pass through a general water pipe. Connected with the landscape pool;

b、在屋顶的顶层铺设隔根层,根据设计图在隔根层的上侧分别铺设第一植被层和鹅卵石,将鹅卵石铺设在雨水收集斗的上方,在第一植被层上种植植物,并预留第一蓄水池的安装空间;b. Lay the root layer on the top layer of the roof, lay the first vegetation layer and pebbles on the upper side of the root layer according to the design drawing, lay the pebbles above the rainwater collection bucket, plant plants on the first vegetation layer, and Reserve the installation space for the first storage tank;

2、集水沟的开挖2. Excavation of catchment ditch

在第一植被层上按照地势高低开挖集水沟,集水沟呈阶梯状,并将集水沟分别与由鹅卵石铺设而成的石子道路和排水管连接;On the first vegetation layer, excavate the catchment ditch according to the height of the terrain, the catchment ditch is in the shape of steps, and connect the catchment ditch to the gravel road and drainage pipes paved with cobblestones;

步骤四、第一蓄水池的安装Step 4. Installation of the first reservoir

a、根据设计图以及用水量,在第一蓄水池的安装空间处砌筑第一蓄水池,在第一蓄水池内铺设密封布,然后进行密封性测试,将第一蓄水池漏水的位置用环氧树脂填补,保证第一蓄水池的密封性;a. According to the design drawing and water consumption, build the first reservoir in the installation space of the first reservoir, lay a sealing cloth in the first reservoir, and then conduct a sealing test to prevent the first reservoir from leaking Fill the position with epoxy resin to ensure the tightness of the first reservoir;

b、在第一蓄水池的上方浇筑混凝土层,在混凝土层的上方铺设防水层,在防水层的上方铺设第二植被层;b. Concrete layer is poured above the first reservoir, a waterproof layer is laid above the concrete layer, and a second vegetation layer is laid above the waterproof layer;

c、将第一蓄水池与净化器的输出端通过连接管连接;c. Connect the output end of the first reservoir to the purifier through a connecting pipe;

步骤五、用水单元的施工Step five, the construction of the water unit

在第一蓄水池上连接灌溉管,灌溉管横纵交叉设置在第一植被层上。The irrigation pipes are connected to the first reservoir, and the irrigation pipes are arranged on the first vegetation layer in a horizontal and vertical intersection.

进一步,步骤二的处理单元的施工包括Further, the construction of the processing unit in step 2 includes

1、净化器的安装1. Installation of the purifier

a、将屋顶用混凝土浇灌,并清理屋顶的表面,将屋顶整平,在屋顶上涂覆上防水涂料,然后铺设防水层,再根据设计图在屋顶上选取净化器的安装点;a. Pouring the roof with concrete, cleaning the surface of the roof, leveling the roof, coating the roof with waterproof paint, and then laying a waterproof layer, and then selecting the installation point of the purifier on the roof according to the design drawing;

b、在净化器的安装点处架设支架,将净化器通过螺钉固定连接在支架上,将净化器通过连接管与第二蓄水池的连接管口连接;b. Set up a bracket at the installation point of the purifier, fix the purifier on the bracket through screws, and connect the purifier to the connecting nozzle of the second reservoir through the connecting pipe;

2、沉淀池的安装2. Installation of sedimentation tank

a、根据设计图,在屋顶上选取沉淀池的安装点,并利用标尺和石灰粉做好标记,然后在标记处绘制中心十字线和基准线;a. According to the design drawing, select the installation point of the sedimentation tank on the roof, mark it with a ruler and lime powder, and then draw a central cross line and a reference line at the marked place;

b、在标记处支立模板,然后再用混凝土进行浇筑,浇筑完成后拆除模板并进行密封性测试;b. Support the formwork at the marked place, and then pour concrete. After the pouring is completed, remove the formwork and conduct a tightness test;

c、在沉淀池的底部放置沉淀剂,然后在沉淀池的内壁上浇筑对称的卡块,接着在卡块上放置隔离板,保证隔离板与沉淀池的底部之间的距离为30~50cm;c. Place the precipitant at the bottom of the sedimentation tank, then pour a symmetrical block on the inner wall of the sedimentation tank, and then place an isolation plate on the block to ensure that the distance between the isolation plate and the bottom of the sedimentation tank is 30-50cm;

d、在沉淀池的顶部安装密封板;d. Install a sealing plate on the top of the sedimentation tank;

e、将沉淀池与净化器通过连接管连接,然后回土填埋,将沉淀池和净化器埋设在屋顶底部;e. Connect the sedimentation tank and the purifier through the connecting pipe, and then return to the soil for landfill, and bury the sedimentation tank and the purifier at the bottom of the roof;

3、景观池的开挖3. Excavation of the landscape pool

a、在屋顶的左右两侧分别建设景观池,在景观池的底部铺设基层,在景观池的四周建设围栏;a. Build a landscape pool on the left and right sides of the roof, lay a base layer at the bottom of the landscape pool, and build fences around the landscape pool;

b、在景观池内养殖水生生物,将景观池的上层通过连接管与沉淀池连接。b. Aquatic organisms are cultivated in the landscape pool, and the upper layer of the landscape pool is connected to the sedimentation tank through a connecting pipe.

本发明由于采用了上述技术方案,具有以下有益效果:The present invention has the following beneficial effects due to the adoption of the above technical solution:

降雨时的雨水以及第一植被层中的多余雨水通过雨水收集斗收集,在鹅卵石铺设而成的石子道路下设计雨水收集斗,使得雨水在进入到雨水收集斗前,先经过鹅卵石的层层过滤,再进入到雨水收集斗内,避免大颗粒物质堵塞雨水收集斗,经过雨水收集斗收集到的雨水通过输水管进入到景观池内,景观池内种植有水生生物,雨水在景观池内通过生物反应进行初次净化,同时也为景观池提供水资源,然后通过连接管将景观池内多余的经过净化的水输送到沉淀池,在沉淀池内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器进行最终的净化处理,并将处理好的水分别输送到第一蓄水池和第二蓄水池储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用;另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池设置在屋顶,方便对屋顶花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。The rainwater during rainfall and the excess rainwater in the first vegetation layer are collected through the rainwater collection bucket, and the rainwater collection bucket is designed under the gravel road paved with cobblestones, so that the rainwater is filtered through layers of pebbles before entering the rainwater collection bucket. , and then into the rainwater collection bucket to prevent large particles from clogging the rainwater collection bucket. The rainwater collected by the rainwater collection bucket enters the landscape pool through the water delivery pipe. Purify, and also provide water resources for the landscape pool, and then transport the excess purified water in the landscape pool to the sedimentation tank through the connecting pipe, and carry out the sedimentation reaction in the sedimentation tank to precipitate the impurities in the water for further purification, and then The water after the precipitation reaction is sent to the purifier for final purification treatment, and the treated water is sent to the first reservoir and the second reservoir for storage, so that it can be used by the family, saving energy, environmental protection, economy, and pollution less, healthier, and maximize the use of natural resources; in addition, the water storage unit can also play a role in regulating water storage to reduce the pressure on the municipal pipe network, improve the economic benefits of rainwater treatment projects, and greatly reduce the workload of operation and maintenance , greatly increasing the feasibility and operability of rainwater treatment projects, which is conducive to promoting the development of sponge cities; the two reservoirs are set up to improve water storage capacity, and the first reservoir is set on the roof, which is convenient for roof gardens. The irrigation and high-floor water, the water delivery distance is short, there is no need to add too much power equipment, save electricity, and the second water storage tank is set under the house, which is convenient for the ground and low-floor water, the water delivery speed is fast, and it can be fully utilized rainwater.

本发明将屋面建设、雨水收集处理及用水终端合而为一、统筹兼顾,有效地减少了雨水的污染,保护了水体环境,实现了雨水的收集、净化、储蓄和再利用,提高水资源利用率,降低用水压力,同时可以使得屋顶花园的养护和灌溉更加方便,减少了输水能源,更加经济环保。The invention integrates roof construction, rainwater collection and treatment, and water use terminals into one, and takes overall considerations, effectively reduces the pollution of rainwater, protects the water body environment, realizes the collection, purification, storage and reuse of rainwater, and improves the utilization of water resources The efficiency can reduce water pressure, and at the same time, it can make the maintenance and irrigation of the roof garden more convenient, reduce the energy of water delivery, and be more economical and environmentally friendly.

附图说明Description of drawings

下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with accompanying drawing:

图1为本发明一种用于屋顶花园的雨水集蓄系统的结构示意图;Fig. 1 is a structural representation of a rainwater storage system for roof gardens of the present invention;

图2为图1中A向的结构示意图;Fig. 2 is a schematic structural diagram of direction A in Fig. 1;

图3为本发明中屋顶的平面结构示意图;Fig. 3 is the plane structure schematic diagram of roof among the present invention;

图4为本发明中雨水收集斗的结构示意图;Fig. 4 is the structural representation of rainwater collecting bucket among the present invention;

图5为本发明中灌溉管的结构示意图;Fig. 5 is the structural representation of irrigation pipe among the present invention;

图6为本发明中雾化喷头的结构示意图。Fig. 6 is a schematic structural view of the atomizing nozzle in the present invention.

附图标记:1、屋顶;2、石子道路;3、第一植被层;4、雨水收集斗;5、输水管;6、景观池;7、沉淀池;8、净化器;9、第一蓄水池;10、第二蓄水池;11、隔离板;12、通孔;13、水层;14、药物层;15、过滤网格筛;16、尖刺部;17、混凝土层;18、防水层;19、第二植被层;20、灌溉管;21、雾化喷头;22、滴水孔;23、过滤膜;24、喷水管;25、底座;26、锁紧头;27、凹槽;28、连接孔;29、第一喷水孔;30、第二喷水孔;31、滑块;32、第一卡槽;33、弧形槽;34、第二卡槽;35、旋转块;36、连接管;37、集水沟。Reference signs: 1. roof; 2. gravel road; 3. first vegetation layer; 4. rainwater collection bucket; 5. water pipe; 6. landscape pool; 7. sedimentation tank; 8. purifier; 9. first Reservoir; 10. Second reservoir; 11. Isolation plate; 12. Through hole; 13. Water layer; 14. Drug layer; 15. Filtration mesh screen; 16. Spike part; 17. Concrete layer; 18. Waterproof layer; 19. Second vegetation layer; 20. Irrigation pipe; 21. Atomizing nozzle; 22. Drip hole; 23. Filter membrane; 24. Spray pipe; 25. Base; 26. Locking head; 27 , groove; 28, connecting hole; 29, first spray hole; 30, second spray hole; 31, slider; 32, first slot; 33, arc slot; 34, second slot; 35. Rotating block; 36. Connecting pipe; 37. Ditch.

具体实施方式detailed description

如图1-6所示,为本发明的一种用于屋顶花园的雨水集蓄系统,包括屋顶1、集水单元、处理单元、蓄水单元和用水单元,屋顶1上设有由鹅卵石铺设而成的石子道路2以及第一植被层3,石子道路2与第一植被层3交错设置,集水单元包括雨水收集斗4和输水管5,雨水收集斗4按均匀间隔设置在石子道路2的下侧,雨水收集斗4呈上大下小的漏斗状,雨水收集斗4的顶面设有过滤网格筛15,雨水收集斗4的内侧壁上均匀设有尖刺部16。设置的漏斗状的雨水收集斗4防止雨水四溅,设置的过滤网格筛15进一步对进入到雨水收集斗4的水进行过滤,设置的尖刺部16粉碎进入到雨水收集斗4的大颗粒物质,将其颗粒变小,使其不易堵塞输水管5。集水单元还包括集水沟37,集水沟37呈阶梯状设置在第一植被层3上,集水沟37分别与石子道路2和房屋外侧的排水管连接。集水沟37将第一植被层3上多余的雨水一部分输送到雨水收集斗4处,一部分沿着排水管排出,排水管与雨水收集斗4配合工作,加快排水速度,避免第一植被层3因雨水过多而缺氧死亡。As shown in Figures 1-6, it is a rainwater storage system for roof gardens of the present invention, including a roof 1, a water collection unit, a treatment unit, a water storage unit and a water unit. The formed gravel road 2 and the first vegetation layer 3, the gravel road 2 and the first vegetation layer 3 are arranged alternately, the water collection unit includes rainwater collection buckets 4 and water pipes 5, and the rainwater collection buckets 4 are arranged on the gravel road 2 at even intervals The lower side of the rainwater collection bucket 4 is a funnel shape with a large top and a small bottom. The top surface of the rainwater collection bucket 4 is provided with a filter mesh screen 15, and the inner wall of the rainwater collection bucket 4 is evenly provided with spikes 16. The funnel-shaped rainwater collection bucket 4 is set to prevent rainwater from splashing, the filter mesh screen 15 is set to further filter the water entering the rainwater collection bucket 4, and the set spikes 16 crush the large particles entering the rainwater collection bucket 4 Substance, its particle becomes smaller, makes it difficult to block water delivery pipe 5. The water collecting unit also includes a water collecting ditch 37, which is arranged on the first vegetation layer 3 in a stepped shape, and the water collecting ditch 37 is respectively connected with the gravel road 2 and the drainage pipe outside the house. The gutter 37 transports part of the excess rainwater on the first vegetation layer 3 to the rainwater collection bucket 4, and part of it is discharged along the drain pipe. The drain pipe and the rainwater collection bucket 4 cooperate to speed up the drainage and avoid the first vegetation layer 3 Death due to lack of oxygen due to excessive rain.

处理单元包括依次连接的景观池6、沉淀池7和净化器8,雨水收集斗4通过输水管5与景观池6连接,沉淀池7的内部设有隔离板11,隔离板11上设有通孔12,隔离板11将沉淀池7分隔成水层13和药物层14,药物层14内设有沉淀剂,水层13通过连接管36与净化器8连接。设置的隔离板11将水层13和药物层14分离出来,使水中的污染、有害物质在沉淀剂的作用下沉淀在药物层14内,保证水层13的澄清,使水层13中干净的水输出到净化器8;在隔离板11设置的通孔12使得沉淀剂与水层13中的水相互接触,从而使其产生化学或者物理反应,发生沉降,沉淀剂可以选择碱性物质、硫化物等。净化器8通过连接管36与蓄水单元连接,蓄水单元包括第一蓄水池9和第二蓄水池10,第一蓄水池9位于屋顶1上,第二蓄水池10位于房屋下方。第一蓄水池9的上侧浇灌有混凝土层17,混凝土层17的上侧设有防水层18,防水层18的上侧设有第二植被层19。混凝土层17用来加固第一蓄水池9,设置的防水层18防止外界的污水进入到第一蓄水池9,污染第一蓄水池9内的清水,设置的第二植被层19用来遮盖第一蓄水池9,美化外观,同时也起到蓄水、固水的作用,防止雨水渗入到第一蓄水池9内。The treatment unit includes a landscape pond 6, a sedimentation pond 7 and a purifier 8 connected in sequence. The rainwater collection bucket 4 is connected to the landscape pond 6 through a water delivery pipe 5. The interior of the sedimentation pond 7 is provided with an isolation plate 11, and the isolation plate 11 is provided with a through The hole 12 and the isolation plate 11 separate the sedimentation tank 7 into a water layer 13 and a drug layer 14 , the drug layer 14 is provided with a precipitant, and the water layer 13 is connected to the purifier 8 through a connecting pipe 36 . The set separation plate 11 separates the water layer 13 and the drug layer 14, so that the pollution and harmful substances in the water are precipitated in the drug layer 14 under the action of the precipitant, so as to ensure the clarification of the water layer 13 and make the water layer 13 clean. The water is output to the purifier 8; the through hole 12 provided on the isolation plate 11 makes the precipitating agent and the water in the water layer 13 contact each other, so that it produces a chemical or physical reaction, and sedimentation occurs. The precipitating agent can be selected from alkaline substances, vulcanized things etc. The purifier 8 is connected to the water storage unit through the connecting pipe 36, the water storage unit includes a first water storage tank 9 and a second water storage tank 10, the first water storage tank 9 is located on the roof 1, and the second water storage tank 10 is located in the house. below. The upper side of the first reservoir 9 is poured with a concrete layer 17 , the upper side of the concrete layer 17 is provided with a waterproof layer 18 , and the upper side of the waterproof layer 18 is provided with a second vegetation layer 19 . Concrete layer 17 is used for reinforcing the first reservoir 9, and the waterproof layer 18 that is set prevents external sewage from entering the first reservoir 9, polluting the clear water in the first reservoir 9, and the second vegetation layer 19 that is set is used Cover the first reservoir 9 to beautify the appearance, and also play the role of water storage and water fixation to prevent rainwater from infiltrating into the first reservoir 9.

用水单元包括灌溉管20,灌溉管20与第一蓄水池9连接,灌溉管20上设有雾化喷头21、滴水孔22、定时器和闸门,定时器和闸门连接,雾化喷头21和滴水孔22间隔设置,滴水孔22上设有过滤膜23,滴水孔22上的过滤膜23防止外部的泥土等颗粒物质堵塞滴水孔22,保证灌溉管20的正常工作;当需要对第一植被层3和第二植被层19浇水时,开启阀门,第一蓄水池9内的水沿着灌溉管20流出,并分别通过雾化喷头21和滴水孔22对植被进行浇灌,浇灌范围广,保证屋顶1花园中植被的正常生长,减少对外界的水资源需求,进一步达到充分利用回收的雨水的作用,利用定时器可以根据实际情况而设定浇灌的时间,实现自动化浇水,提高浇灌的效率,避免浇水过多或者过少。雾化喷头21包括喷水管24、底座25和锁紧头26,底座25上设有凹槽27,锁紧头26转动连接在凹槽27内,凹槽27的底面上设有连接孔28,喷水管24穿过连接孔28与锁紧头26连接,底座25的侧壁上按圆周方向均匀设有至少八个第一喷水孔29,锁紧头26的侧壁上设有与第一喷水孔29相对应的第二喷水孔30。雾化喷头21工作时,第一喷水孔29与第二喷水孔30相对应,水流从喷水管24进入到锁紧头26,再从八个第二喷水孔30和第一喷水孔29喷出,增加了灌溉面积,浇灌均匀,能很好地对周围植被进行灌溉,当不需要雾化喷头21工作时,只要旋转锁紧头26,使第二喷水孔30与第一喷水孔29相交错,就可以堵塞第二喷水孔30,使水无法喷出。锁紧头26的外侧壁上设有滑块31,底座25的内侧壁上设有滑槽,滑槽与滑块31相匹配,滑槽包括第一卡槽32、弧形槽33和第二卡槽34,第一卡槽32和第二卡槽34分别位于弧形槽33的左右两侧,锁紧头26的顶面上设有旋转块35。设置的滑槽便于滑块31的滑动和限制,当滑块31位于第一卡槽32时,第一喷水孔29与第二喷水孔30相连通,当滑块31位于第二卡槽34时,第一喷水孔29和第二喷水孔30相交错,使得锁紧头26的开启和关闭更加方便,设置的旋转块35便于操控锁紧头26的旋转。The water unit comprises an irrigation pipe 20, the irrigation pipe 20 is connected with the first reservoir 9, the irrigation pipe 20 is provided with an atomizing nozzle 21, a drip hole 22, a timer and a gate, the timer is connected with the gate, the atomizing nozzle 21 and The drip holes 22 are arranged at intervals, and the drip holes 22 are provided with a filter membrane 23. The filter membrane 23 on the drip holes 22 prevents particulate matter such as external soil from blocking the drip holes 22, ensuring the normal operation of the irrigation pipe 20; When the layer 3 and the second vegetation layer 19 are watered, the valve is opened, and the water in the first reservoir 9 flows out along the irrigation pipe 20, and the vegetation is watered through the atomizing nozzle 21 and the drip hole 22 respectively, and the watering range is wide. , to ensure the normal growth of vegetation in the roof 1 garden, reduce the demand for external water resources, and further achieve the effect of fully utilizing the recycled rainwater. The timer can be used to set the watering time according to the actual situation, realize automatic watering, and improve watering efficiency. To improve the efficiency, avoid watering too much or too little. The atomizing nozzle 21 includes a water spray pipe 24, a base 25 and a locking head 26, the base 25 is provided with a groove 27, the locking head 26 is rotatably connected in the groove 27, and the bottom surface of the groove 27 is provided with a connecting hole 28 , the water spray pipe 24 passes through the connection hole 28 and is connected with the locking head 26, and the side wall of the base 25 is evenly provided with at least eight first water spray holes 29 according to the circumferential direction, and the side wall of the locking head 26 is provided with The first water spray hole 29 corresponds to the second water spray hole 30 . When the atomizing nozzle 21 was working, the first water spray hole 29 was corresponding to the second water spray hole 30, and the water flow entered the locking head 26 from the water spray pipe 24, and then from the eight second water spray holes 30 and the first water spray hole. Water hole 29 sprays out, has increased irrigation area, waters evenly, can well irrigate surrounding vegetation, when not needing spray nozzle 21 work, as long as rotation locking head 26, make the second water spray hole 30 and the first Once the water spray holes 29 are staggered, the second water spray holes 30 can be blocked so that the water cannot be sprayed out. The outer side wall of locking head 26 is provided with slide block 31, and the inner side wall of base 25 is provided with chute, and chute matches with slide block 31, and chute comprises first draw-in groove 32, arc groove 33 and the second The locking slot 34 , the first locking slot 32 and the second locking slot 34 are respectively located on the left and right sides of the arc-shaped slot 33 , and the top surface of the locking head 26 is provided with a rotating block 35 . The provided chute facilitates the sliding and restriction of the slider 31. When the slider 31 is located in the first slot 32, the first water spray hole 29 communicates with the second water spray hole 30. When the slider 31 is located in the second slot 32 At 34 o'clock, the first water spray hole 29 and the second water spray hole 30 are staggered, so that the opening and closing of the locking head 26 is more convenient, and the rotating block 35 provided is convenient to control the rotation of the locking head 26.

降雨时的雨水以及第一植被层3中的多余雨水通过雨水收集斗4收集,在鹅卵石铺设而成的石子道路2下设计雨水收集斗4,使得雨水在进入到雨水收集斗4前,先经过鹅卵石的层层过滤,再进入到雨水收集斗4内,避免大颗粒物质堵塞雨水收集斗4,经过雨水收集斗4收集到的雨水通过输水管5进入到景观池6内,景观池6内种植有水生生物,雨水在景观池6内通过生物反应进行初次净化,同时也为景观池6提供水资源,然后通过连接管36将景观池6内多余的经过净化的水输送到沉淀池7,在沉淀池7内进行沉淀反应,将水中的杂质沉淀下来,进行进一步的净化,然后再将经过沉淀反应的水输送到净化器8进行最终的净化处理,并将处理好的水分别输送到第一蓄水池9和第二蓄水池10储存,以便家庭的使用,节约能源、环保经济、污染少、更健康,实现自然资源的最大化利用,另外,蓄水单元还可以起到调蓄水量以减轻市政管网压力的作用,提高雨水处理工程的经济效益,大幅度减少了运行维护工作量,大大增加雨水处理工程的可实施性和可操作性,有利于推动海绵城市的发展;设置的两个蓄水池,提高蓄水能力,将第一蓄水池9设置在屋顶1,方便对屋顶1花园的浇灌以及高楼层的用水,输水路程短,无需增加过多的动力设备,节省电能,将第二蓄水池10设置在房屋下方,方便地面、低楼层的用水,输水速度快,充分利用了雨水。The rainwater during rainfall and the excess rainwater in the first vegetation layer 3 are collected by the rainwater collection bucket 4, and the rainwater collection bucket 4 is designed under the gravel road 2 paved with cobblestones, so that the rainwater passes through the rainwater collection bucket 4 before entering the rainwater collection bucket 4. The pebbles are filtered layer by layer, and then enter the rainwater collection bucket 4 to prevent large particles from clogging the rainwater collection bucket 4. The rainwater collected by the rainwater collection bucket 4 enters the landscape pool 6 through the water delivery pipe 5, and the landscape pool 6 is planted There are aquatic organisms, and the rainwater is first purified through biological reaction in the landscape pool 6, and also provides water resources for the landscape pool 6 at the same time, and then the excess purified water in the landscape pool 6 is transported to the sedimentation tank 7 through the connecting pipe 36. The precipitation reaction is carried out in the sedimentation tank 7, and the impurities in the water are precipitated for further purification, and then the water after the precipitation reaction is transported to the purifier 8 for final purification treatment, and the treated water is respectively transported to the first The storage tank 9 and the second storage tank 10 are stored for family use, energy saving, environmental protection, economy, less pollution, healthier, and maximum utilization of natural resources. In addition, the water storage unit can also play a role in adjusting and storing water. In order to reduce the pressure on the municipal pipe network, improve the economic benefits of rainwater treatment projects, greatly reduce the workload of operation and maintenance, greatly increase the implementability and operability of rainwater treatment projects, and help promote the development of sponge cities; Two reservoirs improve the water storage capacity. The first reservoir 9 is set on the roof 1 to facilitate the watering of the garden on the roof 1 and the water on the high floors. For electric energy, the second water storage tank 10 is arranged under the house to facilitate water use on the ground and lower floors, and the water delivery speed is fast, making full use of rainwater.

如上述的一种用于屋顶花园的雨水集蓄系统的施工方法,包括如下步骤:A construction method for a rainwater storage system for a roof garden as described above, comprising the following steps:

步骤一、第二蓄水池10的施工Step 1, the construction of the second reservoir 10

a、根据家庭的用水量确定第二蓄水池10的体积大小,再根据第二蓄水池10的大小确定基坑的深度和宽度,并在设计图中标明,然后根据房屋设计图,确定第二蓄水池10的安装位置,并将该位置的表面清理干净,去除垃圾、碎石,然后在该位置处做好标记,以便于基坑的开挖;a. Determine the volume of the second reservoir 10 according to the water consumption of the household, then determine the depth and width of the foundation pit according to the size of the second reservoir 10, and mark it in the design drawing, and then determine it according to the house design drawing The installation position of the second water storage tank 10, and the surface of this position is cleaned up, and garbage and gravel are removed, and then a mark is made at this position, so that the excavation of the foundation pit;

b、根据设计图,采用挖土机在做好标记的位置开挖基坑,然后清理基坑内的碎石和垃圾,并夯实基坑,然后在基坑内铺设土工布和缓冲层,并在基坑一侧预留管道通道;b. According to the design drawing, use an excavator to excavate the foundation pit at the marked position, then clean up the gravel and garbage in the foundation pit, and ram the foundation pit, then lay geotextile and buffer layer in the foundation pit, and Pipeline channels are reserved on one side of the pit;

c、在基坑内砌筑第二蓄水池10,并在第二蓄水池10上预留连接管口,在连接管口处安装防水胶;c. Build a second reservoir 10 in the foundation pit, reserve a connecting nozzle on the second reservoir 10, and install waterproof glue at the connecting nozzle;

d、进行密封性测试,将第二蓄水池10漏水的位置用环氧树脂填补,保证第二蓄水池10的密封性;d. Carry out a tightness test, and fill the leaking position of the second water storage tank 10 with epoxy resin to ensure the tightness of the second water storage tank 10;

步骤二、处理单元的施工Step 2. Construction of processing unit

1、净化器8的安装1. Installation of purifier 8

a、将屋顶1用混凝土浇灌,并清理屋顶1的表面,将屋顶1整平,在屋顶1上涂覆上防水涂料,然后铺设防水层18,再根据设计图在屋顶1上选取净化器8的安装点;a. Pouring the roof 1 with concrete, cleaning the surface of the roof 1, leveling the roof 1, coating the roof 1 with waterproof paint, and then laying the waterproof layer 18, and then selecting the purifier 8 on the roof 1 according to the design drawing the installation point;

b、在净化器8的安装点处架设支架,将净化器8通过螺钉固定连接在支架上,将净化器8通过连接管36与第二蓄水池10的连接管口连接;B, set up a support at the installation point of the purifier 8, the purifier 8 is fixedly connected on the support by screws, and the purifier 8 is connected with the connecting nozzle of the second reservoir 10 through the connecting pipe 36;

2、沉淀池7的安装2. Installation of sedimentation tank 7

a、根据设计图,在屋顶1上选取沉淀池7的安装点,并利用标尺和石灰粉做好标记,然后在标记处绘制中心十字线和基准线;a. According to the design drawing, select the installation point of the sedimentation tank 7 on the roof 1, and mark it with a ruler and lime powder, and then draw a central cross line and a reference line at the mark;

b、在标记处支立模板,然后再用混凝土进行浇筑,浇筑完成后拆除模板并进行密封性测试;b. Support the formwork at the marked place, and then pour concrete. After the pouring is completed, remove the formwork and conduct a tightness test;

c、在沉淀池7的底部放置沉淀剂,然后在沉淀池7的内壁上浇筑对称的卡块,接着在卡块上放置隔离板11,保证隔离板11与沉淀池7的底部之间的距离为30~50cm;c. Place the precipitant at the bottom of the sedimentation tank 7, then pour a symmetrical block on the inner wall of the sedimentation tank 7, and then place the isolation plate 11 on the block to ensure the distance between the isolation plate 11 and the bottom of the sedimentation tank 7 30-50cm;

d、在沉淀池7的顶部安装密封板;d. Install a sealing plate on the top of the sedimentation tank 7;

e、将沉淀池7与净化器8通过连接管36连接,然后回土填埋,将沉淀池7和净化器8埋设在屋顶底部;e, the sedimentation tank 7 is connected with the purifier 8 through the connecting pipe 36, and then returned to landfill, and the sedimentation tank 7 and the purifier 8 are buried at the bottom of the roof;

3、景观池6的开挖3. Excavation of landscape pool 6

a、在屋顶1的左右两侧分别建设景观池6,在景观池6的底部铺设基层,在景观池6的四周建设围栏;A, construct landscape pool 6 respectively on the left and right sides of roof 1, lay the base layer at the bottom of landscape pool 6, build fence around landscape pool 6;

b、在景观池6内养殖水生生物,将景观池6的上层通过连接管36与沉淀池7连接。b. Aquatic organisms are cultivated in the landscape pool 6, and the upper layer of the landscape pool 6 is connected with the sedimentation tank 7 through the connecting pipe 36.

步骤三、集水单元的施工Step 3. Construction of the water collection unit

1、雨水收集斗4的施工1. Construction of rainwater collection bucket 4

a、根据设计图,在规定位置处安装雨水收集斗4,相邻雨水收集斗4之间的距离为20~50cm,在雨水收集斗4的底部分别安装有收集管,收集管通过一根总的输水管5与景观池6连接;a. According to the design drawing, install rainwater collecting buckets 4 at specified positions, the distance between adjacent rainwater collecting buckets 4 is 20-50cm, and collecting pipes are respectively installed at the bottom of rainwater collecting buckets 4, and the collecting pipes pass through a main The water pipe 5 is connected with the landscape pool 6;

b、在屋顶1的顶层铺设隔根层,根据设计图在隔根层的上侧分别铺设第一植被层3和鹅卵石,将鹅卵石铺设在雨水收集斗4的上方,在第一植被层3上种植植物,并预留第一蓄水池9的安装空间;B. Lay the root layer on the top layer of the roof 1, lay the first vegetation layer 3 and pebbles respectively on the upper side of the root layer according to the design drawing, and lay the pebbles above the rainwater collection bucket 4, on the first vegetation layer 3 Planting plants, and reserving the installation space of the first reservoir 9;

2、集水沟37的开挖2. Excavation of catchment ditch 37

在第一植被层3上按照地势高低开挖集水沟37,集水沟37呈阶梯状,并将集水沟37分别与由鹅卵石铺设而成的石子道路2和排水管连接;On the first vegetation layer 3, excavate the catchment ditch 37 according to the height of the terrain, the catchment ditch 37 is stepped, and the catchment ditch 37 is connected with the cobblestone road 2 and the drainpipe respectively;

步骤四、第一蓄水池9的安装Step 4, the installation of the first reservoir 9

a、根据设计图以及用水量,在第一蓄水池9的安装空间处砌筑第一蓄水池9,在第一蓄水池9内铺设密封布,然后进行密封性测试,将第一蓄水池9漏水的位置用环氧树脂填补,保证第一蓄水池9的密封性;a. According to the design drawing and water consumption, build the first reservoir 9 in the installation space of the first reservoir 9, lay a sealing cloth in the first reservoir 9, and then perform a tightness test. The leaking position of the reservoir 9 is filled with epoxy resin to ensure the tightness of the first reservoir 9;

b、在第一蓄水池9的上方浇筑混凝土层17,在混凝土层17的上方铺设防水层18,在防水层18的上方铺设第二植被层19;B, pour concrete layer 17 above the first reservoir 9, lay waterproof layer 18 above the concrete layer 17, lay the second vegetation layer 19 above the waterproof layer 18;

c、将第一蓄水池9与净化器8的输出端通过连接管36连接;c, the first reservoir 9 is connected to the output end of the purifier 8 through the connecting pipe 36;

步骤五、用水单元的施工Step five, the construction of the water unit

在第一蓄水池9上连接灌溉管20,灌溉管20横纵交叉设置在第一植被层3上。The irrigation pipes 20 are connected to the first reservoir 9 , and the irrigation pipes 20 are arranged on the first vegetation layer 3 in a horizontal and vertical direction.

以上仅为本发明的具体实施例,但本发明的技术特征并不局限于此。任何以本发明为基础,为解决基本相同的技术问题,实现基本相同的技术效果,所作出的简单变化、等同替换或者修饰等,皆涵盖于本发明的保护范围之中。The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are covered by the protection scope of the present invention.

Claims (9)

1.一种用于屋顶花园的雨水集蓄系统,包括屋顶、集水单元、处理单元、蓄水单元和用水单元,其特征在于:所述屋顶上设有由鹅卵石铺设而成的石子道路以及第一植被层,所述石子道路与所述第一植被层交错设置,所述集水单元包括雨水收集斗和输水管,所述雨水收集斗按均匀间隔设置在所述石子道路的下侧,所述处理单元包括依次连接的景观池、沉淀池和净化器,所述雨水收集斗通过所述输水管与所述景观池连接,所述净化器通过连接管与所述蓄水单元连接,所述蓄水单元包括第一蓄水池和第二蓄水池,所述第一蓄水池位于所述屋顶上,所述第二蓄水池位于房屋下方。1. A rainwater storage system for roof gardens, comprising a roof, a water collection unit, a treatment unit, a water storage unit and a water unit, is characterized in that: the roof is provided with a gravel road paved by cobblestones and The first vegetation layer, the gravel road and the first vegetation layer are interlaced, the water collection unit includes rainwater collection buckets and water pipes, and the rainwater collection buckets are arranged at even intervals on the lower side of the gravel road, The treatment unit includes a landscape pond, a sedimentation pond, and a purifier connected in sequence, the rainwater collection bucket is connected to the landscape pond through the water delivery pipe, and the purifier is connected to the water storage unit through a connecting pipe. The water storage unit includes a first water storage tank and a second water storage tank, the first water storage tank is located on the roof, and the second water storage tank is located under the house. 2.根据权利要求1所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述沉淀池的内部设有隔离板,所述隔离板上设有通孔,所述隔离板将所述沉淀池分隔成水层和药物层,所述药物层内设有沉淀剂,所述水层通过所述连接管与所述净化器连接。2. A rainwater collection and storage system for roof gardens according to claim 1, characterized in that: the inside of the sedimentation tank is provided with an isolation plate, and the isolation plate is provided with through holes, and the isolation plate The sedimentation tank is divided into a water layer and a drug layer, the drug layer is provided with a precipitant, and the water layer is connected to the purifier through the connecting pipe. 3.根据权利要求1所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述雨水收集斗呈上大下小的漏斗状,所述雨水收集斗的顶面设有过滤网格筛,所述雨水收集斗的内侧壁上均匀设有尖刺部。3. A rainwater collection and storage system for roof gardens according to claim 1, wherein the rainwater collection bucket is in the shape of a funnel with a large top and a small bottom, and the top surface of the rainwater collection bucket is provided with a filter Mesh screen, the inner wall of the rainwater collection bucket is uniformly provided with spikes. 4.根据权利要求1所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述第一蓄水池的上侧浇灌有混凝土层,所述混凝土层的上侧设有防水层,所述防水层的上侧设有第二植被层。4. A rainwater storage system for roof gardens according to claim 1, characterized in that: the upper side of the first reservoir is poured with a concrete layer, and the upper side of the concrete layer is provided with a waterproof layer, the upper side of the waterproof layer is provided with a second vegetation layer. 5.根据权利要求1所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述集水单元还包括集水沟,所述集水沟呈阶梯状设置在所述第一植被层上,所述集水沟分别与所述石子道路和房屋外侧的排水管连接。5. A rainwater storage system for roof gardens according to claim 1, characterized in that: the water collection unit further includes a water collection ditch, and the water collection ditch is arranged in a ladder shape on the first On the vegetation layer, the gutter is respectively connected with the gravel road and the drainage pipe outside the house. 6.根据权利要求1所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述用水单元包括灌溉管,所述灌溉管与所述第一蓄水池连接,所述灌溉管上设有雾化喷头、滴水孔、定时器和闸门,所述定时器和所述闸门连接,所述雾化喷头和所述滴水孔间隔设置,所述滴水孔上设有过滤膜,所述雾化喷头包括喷水管、底座和锁紧头,所述底座上设有凹槽,所述锁紧头转动连接在所述凹槽内,所述凹槽的底面上设有连接孔,所述喷水管穿过所述连接孔与所述锁紧头连接,所述底座的侧壁上按圆周方向均匀设有至少八个第一喷水孔,所述锁紧头的侧壁上设有与所述第一喷水孔相对应的第二喷水孔。6. A rainwater storage system for roof gardens according to claim 1, characterized in that: the water unit includes an irrigation pipe, the irrigation pipe is connected to the first reservoir, and the irrigation The tube is provided with an atomizing nozzle, a drip hole, a timer and a gate, the timer is connected to the gate, the atomizing nozzle and the drip hole are arranged at intervals, and a filter membrane is provided on the drip hole, so The atomizing nozzle includes a water spray pipe, a base and a locking head, the base is provided with a groove, the locking head is rotatably connected in the groove, and the bottom surface of the groove is provided with a connecting hole, The water spray pipe is connected to the locking head through the connecting hole, at least eight first water spray holes are uniformly arranged on the side wall of the base according to the circumferential direction, and on the side wall of the locking head A second water spray hole corresponding to the first water spray hole is provided. 7.根据权利要求6所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:所述锁紧头的外侧壁上设有滑块,所述底座的内侧壁上设有滑槽,所述滑槽与所述滑块相匹配,所述滑槽包括第一卡槽、弧形槽和第二卡槽,所述第一卡槽和所述第二卡槽分别位于所述弧形槽的左右两侧,所述锁紧头的顶面上设有旋转块。7. A rainwater storage system for roof gardens according to claim 6, characterized in that: a slider is provided on the outer wall of the locking head, and a chute is provided on the inner wall of the base , the chute matches the slider, the chute includes a first slot, an arc slot and a second slot, the first slot and the second slot are respectively located on the arc On the left and right sides of the shaped groove, a rotating block is arranged on the top surface of the locking head. 8.如权利要求1所述的一种用于屋顶花园的雨水集蓄系统的施工方法,其特征在于:包括如下步骤:8. A construction method for a rainwater storage system for roof gardens as claimed in claim 1, characterized in that: comprising the steps of: 步骤一、第二蓄水池的施工Step 1. Construction of the second reservoir a、根据家庭的用水量确定第二蓄水池的体积大小,再根据第二蓄水池的大小确定基坑的深度和宽度,并在设计图中标明,然后根据房屋设计图,确定第二蓄水池的安装位置,并将该位置的表面清理干净,去除垃圾、碎石,然后在该位置处做好标记,以便于基坑的开挖;a. Determine the volume of the second reservoir according to the water consumption of the household, then determine the depth and width of the foundation pit according to the size of the second reservoir, and mark it on the design drawing, and then determine the second reservoir according to the house design drawing. The installation location of the reservoir, and clean the surface of the location, remove garbage and gravel, and then mark the location to facilitate the excavation of the foundation pit; b、根据设计图,采用挖土机在做好标记的位置开挖基坑,然后清理基坑内的碎石和垃圾,并夯实基坑,然后在基坑内铺设土工布和缓冲层,并在基坑一侧预留管道通道;b. According to the design drawing, use an excavator to excavate the foundation pit at the marked position, then clean up the gravel and garbage in the foundation pit, and ram the foundation pit, then lay geotextile and buffer layer in the foundation pit, and Pipeline channels are reserved on one side of the pit; c、在基坑内砌筑第二蓄水池,并在第二蓄水池上预留连接管口,在连接管口处安装防水胶;c. Build a second reservoir in the foundation pit, reserve a connecting nozzle on the second reservoir, and install waterproof glue at the connecting nozzle; d、进行密封性测试,将第二蓄水池漏水的位置用环氧树脂填补,保证第二蓄水池的密封性;d. Carry out a tightness test, and fill the leaking position of the second reservoir with epoxy resin to ensure the tightness of the second reservoir; 步骤二、处理单元的施工Step 2. Construction of processing unit 步骤三、集水单元的施工Step 3. Construction of water collection unit 1、雨水收集斗的施工1. Construction of rainwater collection bucket a、根据设计图,在规定位置处安装雨水收集斗,相邻雨水收集斗之间的距离为20~50cm,在雨水收集斗的底部分别安装有收集管,收集管通过一根总的输水管与景观池连接;a. According to the design drawing, install rainwater collection buckets at the specified positions. The distance between adjacent rainwater collection buckets is 20-50cm. There are collection pipes installed at the bottom of the rainwater collection buckets, and the collection pipes pass through a general water pipe. Connected with the landscape pool; b、在屋顶的顶层铺设隔根层,根据设计图在隔根层的上侧分别铺设第一植被层和鹅卵石,将鹅卵石铺设在雨水收集斗的上方,在第一植被层上种植植物,并预留第一蓄水池的安装空间;b. Lay the root layer on the top layer of the roof, lay the first vegetation layer and pebbles on the upper side of the root layer according to the design drawing, lay the pebbles above the rainwater collection bucket, plant plants on the first vegetation layer, and Reserve the installation space for the first storage tank; 2、集水沟的开挖2. Excavation of catchment ditch 在第一植被层上按照地势高低开挖集水沟,集水沟呈阶梯状,并将集水沟分别与由鹅卵石铺设而成的石子道路和排水管连接;On the first vegetation layer, excavate the catchment ditch according to the height of the terrain, the catchment ditch is in the shape of steps, and connect the catchment ditch to the gravel road and drainage pipes paved with cobblestones; 步骤四、第一蓄水池的安装Step 4. Installation of the first reservoir a、根据设计图以及用水量,在第一蓄水池的安装空间处砌筑第一蓄水池,在第一蓄水池内铺设密封布,然后进行密封性测试,将第一蓄水池漏水的位置用环氧树脂填补,保证第一蓄水池的密封性;a. According to the design drawing and water consumption, build the first reservoir in the installation space of the first reservoir, lay a sealing cloth in the first reservoir, and then conduct a sealing test to prevent the first reservoir from leaking Fill the position with epoxy resin to ensure the tightness of the first reservoir; b、在第一蓄水池的上方浇筑混凝土层,在混凝土层的上方铺设防水层,在防水层的上方铺设第二植被层;b. Concrete layer is poured above the first reservoir, a waterproof layer is laid above the concrete layer, and a second vegetation layer is laid above the waterproof layer; c、将第一蓄水池与净化器的输出端通过连接管连接;c. Connect the output end of the first reservoir to the purifier through a connecting pipe; 步骤五、用水单元的施工Step five, the construction of the water unit 在第一蓄水池上连接灌溉管,灌溉管横纵交叉设置在第一植被层上。The irrigation pipes are connected to the first reservoir, and the irrigation pipes are arranged on the first vegetation layer in a horizontal and vertical intersection. 9.根据权利要求8所述的一种用于屋顶花园的雨水集蓄系统,其特征在于:9. A rainwater storage system for roof gardens according to claim 8, characterized in that: 步骤二的处理单元的施工包括The construction of the processing unit in step two includes 1、净化器的安装1. Installation of the purifier a、将屋顶用混凝土浇灌,并清理屋顶的表面,将屋顶整平,在屋顶上涂覆上防水涂料,然后铺设防水层,再根据设计图在屋顶上选取净化器的安装点;a. Pouring the roof with concrete, cleaning the surface of the roof, leveling the roof, coating the roof with waterproof paint, and then laying a waterproof layer, and then selecting the installation point of the purifier on the roof according to the design drawing; b、在净化器的安装点处架设支架,将净化器通过螺钉固定连接在支架上,将净化器通过连接管与第二蓄水池的连接管口连接;b. Set up a bracket at the installation point of the purifier, fix the purifier on the bracket through screws, and connect the purifier to the connecting nozzle of the second reservoir through the connecting pipe; 2、沉淀池的安装2. Installation of sedimentation tank a、根据设计图,在屋顶上选取沉淀池的安装点,并利用标尺和石灰粉做好标记,然后在标记处绘制中心十字线和基准线;a. According to the design drawing, select the installation point of the sedimentation tank on the roof, mark it with a ruler and lime powder, and then draw a central cross line and a reference line at the marked place; b、在标记处支立模板,然后再用混凝土进行浇筑,浇筑完成后拆除模板并进行密封性测试;b. Support the formwork at the marked place, and then pour concrete. After the pouring is completed, remove the formwork and conduct a tightness test; c、在沉淀池的底部放置沉淀剂,然后在沉淀池的内壁上浇筑对称的卡块,接着在卡块上放置隔离板,保证隔离板与沉淀池的底部之间的距离为30~50cm;c. Place the precipitant at the bottom of the sedimentation tank, then pour a symmetrical block on the inner wall of the sedimentation tank, and then place an isolation plate on the block to ensure that the distance between the isolation plate and the bottom of the sedimentation tank is 30-50cm; d、在沉淀池的顶部安装密封板;d. Install a sealing plate on the top of the sedimentation tank; e、将沉淀池与净化器通过连接管连接,然后回土填埋,将沉淀池和净化器埋设在屋顶底部;e. Connect the sedimentation tank and the purifier through the connecting pipe, and then return to the soil for landfill, and bury the sedimentation tank and the purifier at the bottom of the roof; 3、景观池的开挖3. Excavation of the landscape pool a、在屋顶的左右两侧分别建设景观池,在景观池的底部铺设基层,在景观池的四周建设围栏;a. Build a landscape pool on the left and right sides of the roof, lay a base layer at the bottom of the landscape pool, and build fences around the landscape pool; b、在景观池内养殖水生生物,将景观池的上层通过连接管与沉淀池连接。b. Aquatic organisms are cultivated in the landscape pool, and the upper layer of the landscape pool is connected to the sedimentation tank through a connecting pipe.
CN201611145895.3A 2016-12-13 2016-12-13 A kind of rainwater accumulation system and its construction method for roof garden Expired - Fee Related CN106639180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611145895.3A CN106639180B (en) 2016-12-13 2016-12-13 A kind of rainwater accumulation system and its construction method for roof garden

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611145895.3A CN106639180B (en) 2016-12-13 2016-12-13 A kind of rainwater accumulation system and its construction method for roof garden

Publications (2)

Publication Number Publication Date
CN106639180A true CN106639180A (en) 2017-05-10
CN106639180B CN106639180B (en) 2019-07-19

Family

ID=58825258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611145895.3A Expired - Fee Related CN106639180B (en) 2016-12-13 2016-12-13 A kind of rainwater accumulation system and its construction method for roof garden

Country Status (1)

Country Link
CN (1) CN106639180B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107347591A (en) * 2017-08-01 2017-11-17 河南城建学院 A kind of urban landscape or ecological garden greening system
CN108979208A (en) * 2018-07-30 2018-12-11 安徽旭能电力股份有限公司 A kind of rain cover ceiling of solar energy on overpass
CN109083339A (en) * 2018-04-21 2018-12-25 龚亨灿 Multifunctional roof ecology body-building paradise
CN109208426A (en) * 2018-09-21 2019-01-15 深圳市鹏升建设有限公司 A kind of municipal road construction structure and its construction method
CN109267772A (en) * 2018-11-29 2019-01-25 扬州大学 A kind of Ecological Landscape gallery and its workflow of intelligent three-dimensional rainwater reuse
CN109673477A (en) * 2019-01-24 2019-04-26 王菲 A kind of ecological park roof vegetation irrigation rig
CN109853705A (en) * 2019-01-24 2019-06-07 四汇建设集团有限公司 The short route processing system of cell rainwater reuse
CN110144992A (en) * 2019-04-20 2019-08-20 北京北发生态园林有限公司 Rain Garden Flood Protection Device
CN111719777A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Waterproof reinforcement device and construction method for building roof
CN111771676A (en) * 2020-07-02 2020-10-16 重庆思尔达信息科技有限公司 Automatic spraying system for smart environment
CN111792779A (en) * 2020-06-03 2020-10-20 中国一冶集团有限公司 Water scenery system for residential area
CN112798492A (en) * 2021-01-28 2021-05-14 浙江华东工程咨询有限公司 Device for measuring permeability coefficient of muddy water of porous cover plate for side slope drainage ditch
CN113026861A (en) * 2021-03-12 2021-06-25 黄河勘测规划设计研究院有限公司 Rainwater collection, filtration and re-irrigation device based on landscape and garden and use method thereof
CN114097472A (en) * 2021-09-30 2022-03-01 国网宁夏电力有限公司电力科学研究院 Power transmission and transformation tower footing ecological remediation system
IT202100000005A1 (en) 2021-01-04 2022-07-04 Univ Della Calabria Dipartimento Di Ingegneria Civile Dinci GREEN ROOF SYSTEM
CN115643936A (en) * 2022-10-17 2023-01-31 中园景观设计(苏州)有限公司 Flower pond system of roof garden
CN119491437A (en) * 2025-01-02 2025-02-21 广东工业大学 An integrated device for road surface waterlogging removal, cooling and maintenance

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202370078U (en) * 2011-12-06 2012-08-08 福建联邦三禾纺织贸易有限公司 Ground rainwater recycling system
KR101273679B1 (en) * 2013-03-04 2013-06-12 주식회사 지이글로벌 An eco-friendly hybrid type rainwater reusing system including a treatment of first rainwater reactor
CN203174665U (en) * 2013-04-03 2013-09-04 江苏山水环境建设集团股份有限公司 Urban rainwater collection and utilization system
CN203675787U (en) * 2014-01-04 2014-07-02 沧州临港金太阳绿色农业有限公司 Intelligent water-saving garden irrigation device
CN204266293U (en) * 2014-12-03 2015-04-15 鲁晓珊 Building roof and facade Rainwater collection system
CN105145286A (en) * 2015-09-17 2015-12-16 广东工业大学 Rainwater collection and powerless intelligent irrigation system of ecological green roof of building
CN205688486U (en) * 2016-06-15 2016-11-16 纪欣雨 A kind of energy saving building with rain water collecting system
CN106193263A (en) * 2016-08-31 2016-12-07 苏州金螳螂园林绿化景观有限公司 The biological stagnant pool system in sponge city

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202370078U (en) * 2011-12-06 2012-08-08 福建联邦三禾纺织贸易有限公司 Ground rainwater recycling system
KR101273679B1 (en) * 2013-03-04 2013-06-12 주식회사 지이글로벌 An eco-friendly hybrid type rainwater reusing system including a treatment of first rainwater reactor
CN203174665U (en) * 2013-04-03 2013-09-04 江苏山水环境建设集团股份有限公司 Urban rainwater collection and utilization system
CN203675787U (en) * 2014-01-04 2014-07-02 沧州临港金太阳绿色农业有限公司 Intelligent water-saving garden irrigation device
CN204266293U (en) * 2014-12-03 2015-04-15 鲁晓珊 Building roof and facade Rainwater collection system
CN105145286A (en) * 2015-09-17 2015-12-16 广东工业大学 Rainwater collection and powerless intelligent irrigation system of ecological green roof of building
CN205688486U (en) * 2016-06-15 2016-11-16 纪欣雨 A kind of energy saving building with rain water collecting system
CN106193263A (en) * 2016-08-31 2016-12-07 苏州金螳螂园林绿化景观有限公司 The biological stagnant pool system in sponge city

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107347591A (en) * 2017-08-01 2017-11-17 河南城建学院 A kind of urban landscape or ecological garden greening system
CN109083339A (en) * 2018-04-21 2018-12-25 龚亨灿 Multifunctional roof ecology body-building paradise
CN108979208A (en) * 2018-07-30 2018-12-11 安徽旭能电力股份有限公司 A kind of rain cover ceiling of solar energy on overpass
CN109208426A (en) * 2018-09-21 2019-01-15 深圳市鹏升建设有限公司 A kind of municipal road construction structure and its construction method
CN109208426B (en) * 2018-09-21 2020-12-08 深圳市鹏升建设有限公司 Municipal road construction structure and construction method thereof
CN109267772A (en) * 2018-11-29 2019-01-25 扬州大学 A kind of Ecological Landscape gallery and its workflow of intelligent three-dimensional rainwater reuse
CN109267772B (en) * 2018-11-29 2023-09-08 扬州大学 An intelligent three-dimensional rainwater reuse ecological landscape corridor and its work flow
CN109673477B (en) * 2019-01-24 2022-01-25 王菲 Ecological garden roof vegetation irrigation equipment
CN109673477A (en) * 2019-01-24 2019-04-26 王菲 A kind of ecological park roof vegetation irrigation rig
CN109853705A (en) * 2019-01-24 2019-06-07 四汇建设集团有限公司 The short route processing system of cell rainwater reuse
CN110144992A (en) * 2019-04-20 2019-08-20 北京北发生态园林有限公司 Rain Garden Flood Protection Device
CN111719777A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Waterproof reinforcement device and construction method for building roof
CN111792779A (en) * 2020-06-03 2020-10-20 中国一冶集团有限公司 Water scenery system for residential area
CN111792779B (en) * 2020-06-03 2023-07-18 中国一冶集团有限公司 Residential area waterscape system
CN111771676A (en) * 2020-07-02 2020-10-16 重庆思尔达信息科技有限公司 Automatic spraying system for smart environment
IT202100000005A1 (en) 2021-01-04 2022-07-04 Univ Della Calabria Dipartimento Di Ingegneria Civile Dinci GREEN ROOF SYSTEM
CN112798492A (en) * 2021-01-28 2021-05-14 浙江华东工程咨询有限公司 Device for measuring permeability coefficient of muddy water of porous cover plate for side slope drainage ditch
CN113026861A (en) * 2021-03-12 2021-06-25 黄河勘测规划设计研究院有限公司 Rainwater collection, filtration and re-irrigation device based on landscape and garden and use method thereof
CN114097472A (en) * 2021-09-30 2022-03-01 国网宁夏电力有限公司电力科学研究院 Power transmission and transformation tower footing ecological remediation system
CN114097472B (en) * 2021-09-30 2023-03-14 国网宁夏电力有限公司电力科学研究院 Ecological restoration system of power transmission and transformation tower footing
CN115643936A (en) * 2022-10-17 2023-01-31 中园景观设计(苏州)有限公司 Flower pond system of roof garden
CN119491437A (en) * 2025-01-02 2025-02-21 广东工业大学 An integrated device for road surface waterlogging removal, cooling and maintenance

Also Published As

Publication number Publication date
CN106639180B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN106639180B (en) A kind of rainwater accumulation system and its construction method for roof garden
CN105089142B (en) Concave rainwater storage and dispatching pool for green space and decentralized rainwater storage and dispatching pool system
CN110249844B (en) Street tree pool with water storage and drainage device
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN201976543U (en) Green belt rain collecting automatic micro-sprinkling irrigation device
CN209779370U (en) Urban road rainwater is collected and is utilized and discharge system
CN207567889U (en) Residential quarters Rainwater collection system
CN211112989U (en) Intelligent water collecting and draining system applied to sponge city
CN106759646A (en) A kind of sponge urban pavement rain water collecting system and installation method
CN103233433A (en) Urban road pavement rainwater collection and utilization system
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN106351308A (en) Urban trunk road rainwater collection utilization system
CN209509056U (en) A kind of water storage reclamation set of rain water on roof disconnecting
CN109555275A (en) A kind of roof garden Intelligent rain Collection utilization system
CN206625105U (en) A kind of permeable road structure in environmentally friendly gardens with rainwater-collecting purification function
CN106499002B (en) Lawn greenery patches rainwater cyclic utilization system
CN207633496U (en) Integrated rainwater recycling system for sponge cities in super-large square
CN118958460B (en) Greening rainwater collection system for sponge city and construction method
CN211547991U (en) Rainwater drainage and utilization system capable of preventing urban road waterlogging
CN211897679U (en) Novel sponge urban road system
CN114197605B (en) Water-saving rainwater wetting pond and construction method
CN215594290U (en) Novel zero-power-consumption lawn water storage device for sponge city
CN206110232U (en) Community landscaping rainwater utilization device
CN116752518A (en) A sponge city rainwater collection, infiltration and recharge system
CN210827760U (en) Ecological pavement with municipal administration reposition of redundant personnel water guide function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190719

CF01 Termination of patent right due to non-payment of annual fee