CN106284587A - Urban road is with oozing water tank and construction method thereof - Google Patents

Urban road is with oozing water tank and construction method thereof Download PDF

Info

Publication number
CN106284587A
CN106284587A CN201610676507.8A CN201610676507A CN106284587A CN 106284587 A CN106284587 A CN 106284587A CN 201610676507 A CN201610676507 A CN 201610676507A CN 106284587 A CN106284587 A CN 106284587A
Authority
CN
China
Prior art keywords
water tank
oozing
ooze
urban road
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610676507.8A
Other languages
Chinese (zh)
Other versions
CN106284587B (en
Inventor
成玉宁
谢明坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING ZICHENG ENGINEERING DESIGN Co.,Ltd.
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610676507.8A priority Critical patent/CN106284587B/en
Publication of CN106284587A publication Critical patent/CN106284587A/en
Application granted granted Critical
Publication of CN106284587B publication Critical patent/CN106284587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The invention discloses urban road with oozing water tank, belong to urban road drainage and rainwater utilization technology field, including oozing water tank, ooze water tank upper side and be connected with rainwater collection collector;Ooze the bottom lock of water tank, be provided with ooze water tank cover plate oozing water tank top;Uniformly have the circular rain penetration hole of 1 5mm diameter oozing the water tank whole body, ooze water tank cover plate and ooze water tank and be concrete material;The invention also discloses its construction method.Completely and traffic flow is bigger to present invention is generally directed to existing urban road surfaces, it is not suitable for carrying out the city road of Pavement Improvement, make rainwater pass through collecting pipe and import in device, directly penetrate into side to divide in band soil and under footpath shade tree in soil, rainwater slow release is utilized to irrigate plant, the construction of this technology is convenient, it is not necessary to blocked road;Reducing the cost of man-made irrigation, saving water resource, soil irrigation is more thorough, and total system inputs without artificial energy source and power, runs and maintenance cost is low, possess good practicality.

Description

Urban road is with oozing water tank and construction method thereof
Technical field
The invention belongs to urban road drainage and rainwater utilization technology field, be specifically related to urban road with ooze water tank and Its construction method.
Technical background
In recent years, the road hydrops that heavy showers causes is to affect pedestrian's trip, even jeopardize the persistent ailment of urban traffic safety, In China city, there is universality, on the one hand, traditional Colophonium or cement pavement top drainage can only be carried out by inlet for stom water, consumption Time longer and easily produce vapour lock, impeded drainage causes surface gathered water, not only results in vehicle tyre and skids and become potential safety hazard, The more location of hydrops, the most also can cause that vehicle is soaked to be scrapped, and pollutant overflow and cause environmental pollution;On the other hand, city It is big that Road Green Space irrigates demand, but conventional drainage systems lacks with roadside greening irrigation system and associates, and rainfall hydrops can not Application is afforested with irrigating very well, causes the wasting of resources.How to solve water on urban streets and the dilemma of Road Green Space hydropenia, Become the major issue that contemporary cities road environment faces.
PE water storage device is expensive, and intensity, hardness are poor, and compressive property is relatively low, and service life is shorter, construction cost Height, typically has single water storage function, needs geotextiles, water permeable membrane etc. just can realize pervious function, it is impossible to directly to accomplish profit Bleed back soil with storage rainwater to irrigate.How to make while storage rainwater the automatic slow release of rainwater in surrounding soil, Unmanned be or under minimizing human intervention premise more to make full use of rainwater and vegetation is carried out irrigation become urban road rainwater instantly Utilize technical field problem demanding prompt solution.
Summary of the invention
Goal of the invention: it is an object of the invention to provide urban road with oozing water tank, in can be placed in, band is divided in point band, side In soil and by footpath shade tree, rainwater is collected on the spot to side and divide storage infiltration under band, footpath, supplement Road Green Space Irrigation water;Another object of the present invention is to the construction method providing urban road with oozing water tank.
Technical scheme: for achieving the above object, the present invention adopts the following technical scheme that
Urban road is with oozing water tank, including oozing water tank, oozes water tank upper side and is connected with rainwater collection collector;Described The bottom lock oozing water tank, be provided with ooze water tank cover plate oozing water tank top;1-is uniformly had oozing the water tank whole body The circular rain penetration hole of 5mm diameter, described ooze water tank cover plate and oozes water tank and be concrete material.
Also include wrapping up and be arranged on the drainage geotextiles oozing water tank periphery, arrange in drainage geotextiles periphery particle diameter 15~ 25 millimeters of metallings.
Described oozes water tank circle of position tubular, and its mouth of pipe external diameter is 1200mm, body wall thickness 50mm, and internal diameter is 1000mm.
Described water tank cover plate diameter of oozing is 1200mm, and thickness is 50mm.
Described water tank cover plate lower end of oozing is protruded, a diameter of 1000mm of projection, and protrusion distance is 30mm, and oozes storage The internal diameter mouth size coupling of water pot.
The described urban road construction method oozing water tank, comprises the steps:
1) first Tree Planting Earthdrill burrows in base, and dimension of opening is 1300mm*1300mm;
2) bottom burrowed mouth, 50mm thickness particle diameter 15~25 millimeters of metallings are laid;
3) Tree Planting Earthdrill will be oozed water tank cover plate and be built and oozing above water tank, together insert in hole together with tank body, Ooze water tank periphery parcel drainage geotextiles, around drainage geotextiles, fill 50mm thickness particle diameter 15~25 millimeters of metallings;
4) it is 500mm oozing laying depth above water tank cover plate, clear water geotextiles and particle diameter 15~25 millimeters of metallings Soil;
5) carrying out vegetation plantation in earthing, infiltration type irrigation can effectively supplement the main root system of arbor and can arrive soil layer Water content.
Beneficial effect: compared with prior art, the urban road of the present invention with oozing water tank and construction method thereof, possess with Lower advantage:
(1) do not change existing road surface, it is not necessary to closure construction, there is construction convenient, for the low advantage of traffic impact;(2) Cylindrical appliance is conducive to mechanized construction, operation;(2) storage rainwater can be collected, increase rainwater and bleed back the ratio of soil; (3) device can realize offside and divides the self-organizing of band band vegetation to irrigate, and reduces the cost of man-made irrigation, has saved water resource;(4) Soil irrigation more thoroughly and improves water utilization rate, and a small amount of manual watering and rainfall are difficult to make water arrive certain depth Soil layer, this is unfavorable for the growth of Tree root system, and the infiltration type of this engineering system is irrigated and can effectively be supplemented arbor main root system institute The water content of soil layer can be arrived;(5) the equally distributed water tank that independently oozes solves the Benefits for all of distribution of water resources, really well Protect growing up healthy and sound of roadside greening;(6) oozing water tank and use strong concrete material, bearing pressure is big, and cost of investment is low; (7) control to permeability rate can be realized by oozing the parcel of the outside geotextiles of water tank;(8) Stability Analysis of Structures, assemble simple, utilize Year limit for length, operation and maintenance cost is low, applied widely, safety durable, have very in existing road spongeization improvement project The good suitability and practicality.
Accompanying drawing explanation
Fig. 1 is to ooze water tank plane of arrangement figure;
Fig. 2 is to ooze water tank to arrange sectional drawing;
Fig. 3 is to ooze water tank device elevation;
Fig. 4 is to ooze water tank cover plate top plan view;
Fig. 5 is to ooze water tank cover plate elevation;
Fig. 6 is to ooze water tank scheme of installation.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
Fig. 1-6 reference is: soil 1, ooze water tank cover plate 2, particle diameter 15~25 millimeters of metallings 3, ooze water tank 4, Ooze water tank inwall 5, rain penetration hole 6, collecting pipe 7, original road tooth 8, permeable cover plate 9, the gutter 10 that catchments, desilting well 11, side Divide band 12, bicycle lane 13, car lane 14, footpath 15, Tree Planting Earthdrill 16 and drainage geotextiles 17.
As shown in Figure 1-2, rainwater imports, by permeable cover plate 9, the gutter 10 that catchments through car lane 14 horizontal wall inscription, then by receiving Collector 7 imports and oozes in water tank 4, oozes the periphery parcel drainage geotextiles 17 of water tank 4, arranges grain in drainage geotextiles 17 periphery Footpath 15~25 millimeters of metallings 3 so that oozing a part of rainwater in water tank 4 can directly infiltrate in surrounding soil, plays filling Irrigate the effect of afforestation vegetation and recharging groundwater.
As in Figure 3-5, ooze water tank 4 cylindrically, use strong concrete material.Ooze water tank 4 bottom end closure, Top be tank body adaptive ooze water tank cover plate 2, upper side is connected with rainwater collection collector.Ooze water tank 4 according to 1, soil Part, oozes water tank inwall 5 whole body and uniformly has the circular rain penetration hole 6 of 1-5mm diameter, and coupling apparatus is wrapped with drainage soil Work cloth 17 and particle diameter 15~25 millimeters of metallings 3, according to different soils 1 condition regulation drainage geotextiles 17 and the number of permeable membrane Amount, can play the effect of irrigating plant by the rain penetration of storage to surrounding soil.
The mouth of pipe external diameter oozing water tank 4 is 1200mm, body wall thickness 50mm, internal diameter 1000mm, and total height is 1200mm (note: the high visibility of tank body collects the corresponding regulation of water yield needs work and saves water needs to meet), is oozing water tank 4 upper end side Face punches, and is connected with the plastics rainwater collection collector 7 of internal diameter 80mm.
Oozing water tank cover plate 2 is concrete material, a diameter of 1200mm, thick 50mm.Ooze water tank cover plate 2 lower end to protrude, The a diameter of 1000mm of projection, protrusion distance is 30mm, mates with the internal diameter mouth size oozing water tank 4.
The urban road construction method oozing water tank, comprises the steps:
1) tree planting is digged pit, and 16 prows are first to burrow in base, and dimension of opening is 1300mm*1300mm, as shown in Fig. 6 (a);
2) as shown in Fig. 6 (b), bottom burrowed mouth, 50mm thickness particle diameter 15~25 millimeters of metallings are laid;
3) as shown in Fig. 6 (c), Tree Planting Earthdrill 16 will be oozed water tank cover plate 2 and be built and oozing above water tank 4, together with tank Body is together inserted in hole, is oozing water tank 4 periphery parcel drainage geotextiles 17, is filling 50mm thickness grain around drainage geotextiles 17 Footpath 15~25 millimeters of metallings 3;
4) as shown in Fig. 6 (d), above particle diameter 15~25 millimeters of metallings 3, laying depth is the soil 1 of 500mm;
5) as shown in Fig. 6 (e), carrying out vegetation plantation in earthing, infiltration type is irrigated can effectively supplement the main root of arbor System can arrive the water content of soil layer.
Operation principle: urban road oozes water tank and belongs to road based on existing urban road Yu drainage condition with oozing water tank A part for road sponge engineering system;After rainwater drops to road surface, it is pooled to original road tooth 8 by urban road horizontal wall inscription other, two Catchmenting gutter 10 position in side, then is imported inside the gutter that catchments by the gutter 10 cover plate gap of catchmenting of particular design, it is achieved satisfies the need Face diameter stream rainwater is tentatively collected.Along catchmenting, gutter 10 arranges desilting well 11 every 5 to 6 meters, in order to precipitate primary rainwater, in desilting Well 11 side arranges Prefabricated combined septic tank and the rainwater mouth of pipe.Arrange between existing arbor and ooze water tank 4, and with desilting well 11 position one One is corresponding, conveniently oozes maintenance and the cleaning of water tank 4.Rainwater through precipitation is transported to road by Prefabricated combined septic tank and rain pipe Middle side divide with 12 and footpath 15 ooze water tank 4, it is achieved to collecting the naturally osmotic of rainwater on road surface and utilization.Rainwater is via receipts Collector 7 imports and oozes in water tank 4, and then band 12 and people are divided in the side directly penetrating into bicycle lane 13 and car lane 14 centre In the shade tree Soil Surrounding of trade 15, play irrigation afforestation vegetation and the effect of recharging groundwater, be greatly saved man-made irrigation By water resource, reduce cost of investment.

Claims (6)

1. urban road is with oozing water tank, it is characterised in that: include oozing water tank (4), ooze water tank (4) upper side and rainwater Collecting pipe (7) is connected;The described bottom lock oozing water tank (4), is provided with oozes water tank cover plate oozing water tank (4) top (2);Uniformly having the circular rain penetration hole (6) of 1-5mm diameter oozing water tank (4) whole body, described oozes water tank cover plate And ooze water tank (4) and be concrete material (2).
Urban road the most according to claim 1 is with oozing water tank, it is characterised in that: also include that parcel is arranged on and ooze water-retention The drainage geotextiles (17) of tank (4) periphery, arranges particle diameter 15~25 millimeters of metallings (3) in drainage geotextiles (17) periphery.
Urban road the most according to claim 1 is with oozing water tank, it is characterised in that: described oozes water tank (4) circle of position Tubular, its mouth of pipe external diameter is 1200mm, body wall thickness 50mm, and internal diameter is 1000mm.
Urban road the most according to claim 3 is with oozing water tank, it is characterised in that: described oozes water tank cover plate (2) A diameter of 1200mm, thickness is 50mm.
Urban road the most according to claim 4 is with oozing water tank, it is characterised in that: described oozes water tank cover plate (2) Lower end is protruded, and a diameter of 1000mm of projection, protrusion distance is 30mm, mates with the internal diameter mouth size oozing water tank (4).
6. urban road described in any one construction method oozing water tank in claim 1-5, it is characterised in that: include Following steps:
1) first Tree Planting Earthdrill burrows in base, and dimension of opening is 1300mm*1300mm;
2) bottom burrowed mouth, 50mm thickness particle diameter 15~25 millimeters of metallings are laid;
3) Tree Planting Earthdrill will be oozed water tank cover plate and be built and oozing above water tank, together insert in hole together with tank body, ooze storage Water pot periphery parcel drainage geotextiles, fills 50mm thickness particle diameter 15~25 millimeters of metallings around drainage geotextiles;
4) it is the soil of 500mm oozing laying depth above water tank cover plate, clear water geotextiles and particle diameter 15~25 millimeters of metallings Earth;
5) carrying out vegetation plantation in earthing, infiltration type irrigation can effectively supplement the main root system of arbor and can arrive containing of soil layer The water yield.
CN201610676507.8A 2016-08-15 2016-08-15 Urban road is with oozing water tank and its construction method Active CN106284587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610676507.8A CN106284587B (en) 2016-08-15 2016-08-15 Urban road is with oozing water tank and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610676507.8A CN106284587B (en) 2016-08-15 2016-08-15 Urban road is with oozing water tank and its construction method

Publications (2)

Publication Number Publication Date
CN106284587A true CN106284587A (en) 2017-01-04
CN106284587B CN106284587B (en) 2017-12-22

Family

ID=57678298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610676507.8A Active CN106284587B (en) 2016-08-15 2016-08-15 Urban road is with oozing water tank and its construction method

Country Status (1)

Country Link
CN (1) CN106284587B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409708A (en) * 2018-10-12 2019-03-01 国网浙江省电力有限公司温州供电公司 Traffic lights based on big data protect power supply prioritisation algorithm
CN111809685A (en) * 2019-12-03 2020-10-23 太原理工大学 Series-connection type water and fertilizer resource collecting and utilizing system for greenbelt and farmland
CN112627305A (en) * 2020-12-16 2021-04-09 赵光 Water purification device is received to sunken greenbelt of municipal works road

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050238432A1 (en) * 2004-04-21 2005-10-27 Wen Chen J A method for constructing a water resource recycling system
CN103174079A (en) * 2012-10-31 2013-06-26 北京仁创科技集团有限公司 Road rainwater collecting system for preventing surface gathered water
CN104947781A (en) * 2015-07-07 2015-09-30 济南轨道交通集团有限公司 Rainwater collection diversion and strata conservation regulation and storage system
CN104988825A (en) * 2015-07-09 2015-10-21 东南大学 Ecological road engineering system
CN105794523A (en) * 2016-04-11 2016-07-27 重庆大学 Tree pool device with rainwater infiltration, storage and purification functions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050238432A1 (en) * 2004-04-21 2005-10-27 Wen Chen J A method for constructing a water resource recycling system
CN103174079A (en) * 2012-10-31 2013-06-26 北京仁创科技集团有限公司 Road rainwater collecting system for preventing surface gathered water
CN104947781A (en) * 2015-07-07 2015-09-30 济南轨道交通集团有限公司 Rainwater collection diversion and strata conservation regulation and storage system
CN104988825A (en) * 2015-07-09 2015-10-21 东南大学 Ecological road engineering system
CN105794523A (en) * 2016-04-11 2016-07-27 重庆大学 Tree pool device with rainwater infiltration, storage and purification functions

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409708A (en) * 2018-10-12 2019-03-01 国网浙江省电力有限公司温州供电公司 Traffic lights based on big data protect power supply prioritisation algorithm
CN111809685A (en) * 2019-12-03 2020-10-23 太原理工大学 Series-connection type water and fertilizer resource collecting and utilizing system for greenbelt and farmland
CN112627305A (en) * 2020-12-16 2021-04-09 赵光 Water purification device is received to sunken greenbelt of municipal works road
CN112627305B (en) * 2020-12-16 2022-02-15 赵光 Water purification device is received to sunken greenbelt of municipal works road

Also Published As

Publication number Publication date
CN106284587B (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN202374807U (en) Solar rainwater irrigation device for green belts
CN110249844B (en) Street tree pool with water storage and drainage device
CN104988825B (en) Ecological road engineering system
CN104196277B (en) Functional rainwater garden suitable for interior of urban community grassy area in Shanghai
CN201976543U (en) Green belt rain collecting automatic micro-sprinkling irrigation device
CN101091448B (en) Irrigation and drainage pipes
CN204875417U (en) Ecological way engineering system
CN209779370U (en) Urban road rainwater is collected and is utilized and discharge system
CN202364617U (en) Sidewalk self-irrigation tree pool
CN107711461A (en) Arid area arbor integration irrigation system
CN202425400U (en) Water-saving structure utilizing rainwater on bridge floor of viaduct bridge to irrigate green space under bridge
CN200974985Y (en) rainwater collecting facility for uncovered ground
CN106284587B (en) Urban road is with oozing water tank and its construction method
CN101869045A (en) Automatic rain-collecting water supply system for road greenbelts
CN201883360U (en) Road rainwater collecting and utilizing device
CN106320494B (en) The construction method of sponge engineering system based on existing urban road and drainage condition
CN106499002B (en) Lawn greenery patches rainwater cyclic utilization system
CN106245487B (en) The construction method of the urban road sponge engineering system of combining road maintenance
CN206205290U (en) A kind of roof rainwater collection processing system
CN105064496A (en) Self-utilization rainwater detention storage tank
CN208167858U (en) A kind of ornamental trees and shrubs collection rain device
CN207461064U (en) Arid area arbor integration irrigation system
CN105660323A (en) Woodland rain collection type irrigation system
CN206233301U (en) Green grassland rainwater cyclic utilization system
CN102870651B (en) Underground water storage infiltrating irrigation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: Building 17, headquarters base, 70 Phoenix Road, Jiangning Development Zone, Nanjing, Jiangsu Province 210000 (Jiangning Development Zone)

Patentee after: NANJING ZICHENG ENGINEERING DESIGN Co.,Ltd.

Address before: 210096, No. four archway, Xuanwu District, Jiangsu, Nanjing 2

Patentee before: SOUTHEAST University

TR01 Transfer of patent right