CN106638933B - Detachable green terrace with garden carrier and manufacturing method thereof - Google Patents

Detachable green terrace with garden carrier and manufacturing method thereof Download PDF

Info

Publication number
CN106638933B
CN106638933B CN201610914356.5A CN201610914356A CN106638933B CN 106638933 B CN106638933 B CN 106638933B CN 201610914356 A CN201610914356 A CN 201610914356A CN 106638933 B CN106638933 B CN 106638933B
Authority
CN
China
Prior art keywords
steel cable
cable pull
platform frame
fixed
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610914356.5A
Other languages
Chinese (zh)
Other versions
CN106638933A (en
Inventor
孙跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Huaxia Tiancheng Construction Co., Ltd.
Original Assignee
Nanjing Huaxia Tiancheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Huaxia Tiancheng Construction Co Ltd filed Critical Nanjing Huaxia Tiancheng Construction Co Ltd
Priority to CN201910924597.1A priority Critical patent/CN110644611B/en
Priority to CN201610914356.5A priority patent/CN106638933B/en
Publication of CN106638933A publication Critical patent/CN106638933A/en
Application granted granted Critical
Publication of CN106638933B publication Critical patent/CN106638933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts

Abstract

the invention discloses a detachable green terrace with a garden carrier, which comprises a platform frame and a movable pipe head, wherein the platform frame is formed by welding profile steel skeletons, the platform frame is connected with a concrete beam column of a house through a hinge device, the hinge device is a u-shaped anchor part and a shaft pin type connecting part, the shaft pin type connecting part is arranged in the u-shaped anchor part and is fixed through a shaft pin, so that the u-shaped anchor part and the shaft pin type connecting part are hinged together, the shaft pin type connecting part is fixed at one end of the platform frame, the u-shaped anchor part is fixed on the concrete beam column of the house, and the front side of the platform frame is also provided with the movable pipe head which. The invention has beautiful appearance design, flexible and convenient disassembly and installation, reliable safety performance, and can be repeatedly used in different places after the terrace, the pull rod, the pool, the leisure platform and the guardrail are disassembled.

Description

Detachable green terrace with garden carrier and manufacturing method thereof
Technical Field
the invention relates to a detachable green terrace with a garden carrier and a manufacturing method thereof.
Background
With the continuous improvement of the living standard of people, the urbanization process is accelerated, the high-rise building and the dense traffic network continuously erode the limited greening space of the city, and at the moment, people really feel that the green in life is so lacking. In order to improve the poor development mode, the city is full of green, people begin to develop to the space, an ultra-large green courtyard is provided for residents of each household from the time of plot planning and drawing design, and the ancient Chinese courtyard plot is extended in high-rise residences.
At present, in domestic residential district environmental greening, flowers, plants, landscapes and trees are generally arranged on public ground in a residential yard, and a garden is also built on a roof. Residential residents in a community can only go to one floor or a roof to view, but cannot participate in the whole processes of cultivation, watering, trimming, nursing and the like, and cannot meet the individual preference of the residents on flowers and plants and the unique privacy requirements of private households. In particular, in the early residential buildings, only a plurality of flowerpots can be arranged on the balcony, the balcony has a small area but has a large number of bearing functions, and the common balcony is not only a place for enjoying the cool and viewing, but also a place for washing clothes, drying clothes and placing sundries. With the continuous improvement of the living quality and the increase of the living area, the invention provides a leisure living space which can satisfy the rich and colorful living at home for residents, and the oversized living space not only can culture the flowers, plants and fish worms which are personally favored, but also can be used for viewing, body building, reading, meeting guests and playing chess. The courtyard type greening terrace is also a place where landscapes occur, and indoor space constructed by taking the courtyard type greening terrace as a core is mutually blended and mobile and changeable indoors and outdoors.
in the aspects of greening the environment of a residential area and changing the urban landscape, the modern development trend is followed, the design mode of one city in the past is changed, the design scheme of a single residential building is started, the design scheme is optimized, the old traditional design concept is changed, and more green buildings and elegant ecological environment are provided for the society.
The assembled greening terrace has the advantages of attractive appearance design, flexible and convenient disassembly and installation and reliable safety performance, and the terrace, the pull rod, the water pool, the leisure platform and the guardrail can be repeatedly used in different places after being disassembled.
disclosure of Invention
aiming at the problems in the prior art, the invention provides a detachable green terrace with a garden carrier, which belongs to an assembled greening terrace, and has the advantages of attractive appearance design, flexible and convenient detachment, reliable safety performance, and capability of being detached and reused in different places.
in order to achieve the purpose, the invention adopts the technical scheme that: the utility model provides a can dismantle green terrace that possess garden carrier, a can dismantle green terrace that possess garden carrier which characterized in that includes the platform frame, the platform frame form by the welding of shaped steel skeleton, the platform frame passes through hinge means and is connected with the concrete beam column in house, the platform frame include garden area and pavement.
the hinge device comprises a u-shaped anchor and a shaft pin type connecting piece, wherein the shaft pin type connecting piece is arranged in the u-shaped anchor and is fixed through a shaft pin, so that the u-shaped anchor and the shaft pin type connecting piece are hinged together, the shaft pin type connecting piece is fixed at one end of the platform frame, the u-shaped anchor is fixed on a concrete beam column of a house, and the u-shaped anchor is exposed out of a hinge rod.
a plurality of upward-inclined steel cable lifting noses are installed on two sides of the platform frame, downward-inclined anchors are installed on corresponding concrete beam columns, the downward-inclined anchors are provided with square anchor plates, the square anchor plates are fixed inside the concrete beam columns, and the upward-inclined steel cable lifting noses and the downward-inclined anchors are fixedly connected through short steel cable pull rods.
the two sides of the platform frame are provided with a guardrail inserting base and a fixed auxiliary steel cable pull rod pipe head, the auxiliary steel cable pull rod passes through the fixed auxiliary steel cable pull rod pipe head corresponding to each layer, the two ends of the auxiliary steel cable pull rod are fixed on the fixed auxiliary steel cable pull rod pipe heads of the topmost layer and the bottommost layer opposite-top platform frame,
Two movable pipe heads are arranged on the front side of the platform frame,
The cable wire pull rod passes corresponding portable tube head, and the one end of cable wire pull rod is fixed on the cantilever beam, and the other end is fixed on the bottom fixture, portable tube head include the sliding block to and install the tube head in the sliding block outside, platform frame's front side is equipped with the spout, the sliding block can remove along the spout, platform frame's front side still is equipped with align to grid's fixed orifices, the fixed orifices is on a parallel with the spout, the articulated card hole pole that is equipped with on the sliding block, the card hole pole can stretch into in the fixed orifices.
the cantilever beam is arranged at the top end of the floor.
A manufacturing method of a detachable green terrace with a garden carrier comprises the following steps: the method comprises the following steps:
(1) Setting a cantilever beam: the top end of a floor is provided with a cantilever beam, if a house is a newly-built house, the cantilever beam can be made into a reinforced concrete beam along with a house main body, and if the house is an old building, a steel part can be adopted and is reliably connected with a top layer of a house;
(2) Pre-burying a u-shaped anchor and a declination anchor on the wall surface of a floor where the terrace is installed, wherein the height of the declination anchor is greater than that of the u-shaped anchor in each floor;
(3) Selecting a proper platform frame, welding shaft pin type connecting pieces at two sides of one end of the platform frame close to the wall surface, symmetrically installing at least one group of upward inclined steel cable lifting noses on the rod bodies at two side surfaces of the platform frame, fixing an auxiliary steel cable pull rod pipe head at the front side of the platform frame,
And is placed on the floor to be installed through hoisting equipment, two shaft pin type connecting pieces of the platform frame are hinged with the wall surface pre-buried u-shaped anchor piece through shaft pins,
then, connecting the upward inclined steel cable hanging noses on the rod bodies on the two side surfaces of the platform frame with the downward inclined anchor parts by using short steel cable pull rods;
(4) Selecting floors to continuously install the terrace, repeating the step (2) and the step (3) until all platform frames needing floors are installed completely, then using auxiliary steel cable pull rods to penetrate through fixed auxiliary steel cable pull rod pipe heads corresponding to the side sides of all the platform frames to connect all the platform frames into a whole, enabling the auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pull rod pipe heads corresponding to each floor, enabling two ends of each auxiliary steel cable pull rod to be fixed on the fixed auxiliary steel cable pull rod pipe heads of the topmost floor and bottommost floor opposite-top platform frames, leading out two steel cable pull rods from a cantilever beam fixed at the top end, enabling each steel cable pull rod to penetrate through the movable pipe head corresponding to each platform frame until the steel cable pull rod penetrates through the movable pipe heads corresponding to all the platform frames, and finally determining the position of the other end of each steel cable pull rod, wherein the position is on a fixed object on the ground to enable the steel, after the two steel cable pull rods are fixed, the angle formed by the two steel cable pull rods is 30-90 degrees, and finally, the movable pipe head on each platform frame is fixed, so that the movable pipe head is fixed on the platform frame and cannot move.
In the step (4), after the steel cable pull rod penetrates through the movable pipe heads corresponding to all the platform frames, the movable pipe heads are fixed on the steel cable pull rod through two steel cable clamping heads.
the invention has the following advantages that the overhanging type green terrace is formed by obliquely drawing and horizontally suspending an assembled steel terrace manufactured in a processing plant on the outer side of a building by four adjustable steel rope riggings. The terrace is produced in a processing plant in a fixed length mode, and the processing speed is high, the precision is high, and the quality is good. When the device is transported to a field for installation, the device has no noise, small environmental influence conditions and reliable safety performance. The greening terrace can be designed, constructed and delivered simultaneously with a house. And the special design and production customization can be carried out after comprehensive analysis on the orientation, the form coefficient, the lighting requirement and the like of the house aiming at the original building. The invention fixes a plurality of terraces into a whole through the cantilever beam, the plurality of steel cable pull rods and the movable pipe head, has firm structure, and can be suitable for the fixed installation of terraces and floors with various heights because the movable pipe head can flexibly move before being fixed.
Drawings
FIG. 1 is a schematic plan view of the present invention;
FIG. 2 is a rear side view of the greening terrace;
FIG. 3 is a side view of a steel platform;
FIG. 4 is a schematic view of a declined anchor and a square anchor plate embedded concrete joint;
FIG. 5 is a schematic view of a horizontal hanging joint between a platform and a wall.
FIG. 6 is a schematic view of a cable tie connection for multiple terraces.
Fig. 7 is a view showing the structure of the movable tip.
1. a platform frame; 2. a leisure platform; 3. a garden; 4. a walkway; 5-axis pin type connecting pieces; 6. an upward inclined steel cable hanging nose; 7. a U-shaped anchor; 8. a concrete beam column; 9. a shaft pin; 10. the guardrail is inserted into the base; 11. a guy wire pull rod; 12. a declined anchor; 13. a square anchor plate; 14. a cantilever beam; 15. a wire rope pull rod; 16. the auxiliary steel cable pull rod fixing device comprises a fixed auxiliary steel cable pull rod pipe head 17, a fixed object 18, a movable pipe head 19, an auxiliary steel cable pull rod 101, a sliding groove 102, a fixing hole 201, a sliding block 202, a pipe head 203 and a hole clamping rod.
Detailed Description
The invention will be further explained with reference to the drawings.
the utility model provides a can dismantle green terrace that possess garden carrier, includes platform frame 1, platform frame 1 form by the welding of shaped steel skeleton, the platform frame is connected with the concrete beam column 8 in house through hinge means, the platform frame include garden 3 and pavement 4, leisure platform 2.
The hinge device comprises a u-shaped anchor 7 and a shaft pin type connecting piece 5, the shaft pin type connecting piece is arranged in the u-shaped anchor and is fixed through a shaft pin 9, so that the u-shaped anchor and the shaft pin type connecting piece are hinged together, the shaft pin type connecting piece is fixed at one end of the platform frame, the u-shaped anchor is fixed on a concrete beam column of a house, and the u-shaped anchor is exposed out of a hinge rod.
A plurality of upward-inclined steel cable lifting noses 6 are arranged on two sides of the platform frame 1, downward-inclined anchor parts 12 are arranged on corresponding concrete beam columns 8, the downward-inclined anchor parts 12 are provided with square anchor plates 13, the square anchor plates 13 are fixed inside the concrete beam columns 8, and the upward-inclined steel cable lifting noses 6 and the downward-inclined anchor parts 12 are fixedly connected through short steel cable pull rods 11.
the two sides of the platform frame 1 are provided with a guardrail inserting base 10 and a fixed auxiliary steel cable pull rod pipe head 16, an auxiliary steel cable pull rod 19 passes through the fixed auxiliary steel cable pull rod pipe head 16 corresponding to each layer, two ends of the auxiliary steel cable pull rod 19 are fixed on the fixed auxiliary steel cable pull rod pipe heads 16 of the top-most layer and the bottom-most layer opposite-top platform frame,
platform frame's front side install two portable tube heads, as shown in fig. 7, concrete structure is portable tube head includes sliding block 201, and install the tube head 202 in the sliding block outside, platform frame's front side is equipped with spout 101, the sliding block can remove along the spout, platform frame's front side still is equipped with align to grid's fixed orifices 102, the fixed orifices is on a parallel with the spout, the articulated card hole pole 203 that is equipped with on the sliding block, card hole pole can stretch into in the fixed orifices, it is fixed to have realized the removal of sliding block like this, the shelves need the sliding block to fix when the position that needs, only need move the sliding block before the fixed orifices that changes the position, stretch into card hole pole 203 and change the fixed orifices and realize fixedly, for better fixed, card hole pole end is opened has the lockhole, card hole pole 203 stretches into after changing the fixed orifices, the lockhole is pinned with the lockhole to the reuse lock, reach better fixed effect.
The steel cable pull rod penetrates through the corresponding movable pipe head, one end of the steel cable pull rod is fixed on the cantilever beam, and the other end of the steel cable pull rod is fixed on the bottom fixing object 17.
The cantilever beam is arranged at the top end of the floor.
a manufacturing method of a detachable green terrace with a garden carrier comprises the following steps: the method comprises the following steps:
(1) Setting a cantilever beam: the top end of a floor is provided with a cantilever beam, if a house is a newly-built house, the cantilever beam can be made into a reinforced concrete beam along with a house main body, and if the house is an old building, a steel part can be adopted and is reliably connected with a top layer of a house;
(2) Pre-burying a u-shaped anchor and a declination anchor on the wall surface of a floor where the terrace is installed, wherein the height of the declination anchor is greater than that of the u-shaped anchor in each floor;
(3) Selecting a proper platform frame, welding shaft pin type connecting pieces at two sides of one end of the platform frame close to the wall surface, symmetrically installing at least one group of upward inclined steel cable lifting noses on the rod bodies at two side surfaces of the platform frame, fixing an auxiliary steel cable pull rod pipe head at the front side of the platform frame,
and is placed on the floor to be installed through hoisting equipment, two shaft pin type connecting pieces of the platform frame are hinged with the wall surface pre-buried u-shaped anchor piece through shaft pins,
Then, connecting the upward inclined steel cable hanging noses on the rod bodies on the two side surfaces of the platform frame with the downward inclined anchor parts by using short steel cable pull rods;
(4) Selecting floors to continue installing the terrace, repeating the step (2) and the step (3) until all platform frames needing floors are installed completely, then using auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pull rod pipe heads corresponding to the side sides of all the platform frames to connect all the platform frames into a whole, using the auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pull rod pipe heads corresponding to each floor, fixing two ends of each auxiliary steel cable pull rod on the fixed auxiliary steel cable pull rod pipe heads of the corresponding platform frames at the topmost floor and the bottommost floor,
(5) Two steel cable pull rods are led out from the outer side of the cantilever beam fixed at the top end, each steel cable pull rod penetrates through the movable pipe head corresponding to each platform frame until the steel cable pull rods penetrate through the movable pipe heads corresponding to all the platform frames, and finally the position of the other end of each steel cable pull rod is determined.
Make the cable wire pull rod tighten firmly, two cable wire pull rods all tighten and fix the back, the angle that two cable wire pull rods formed is between 30-90, the structure of triangle-shaped is more firm, but at last the movable tube head on every platform frame of fixed, make movable tube head fix unable removal on the platform frame, then fix movable tube head on the cable wire pull rod with two cable wire dopes, a plurality of platform like this, two cable wire pull rods, but the movable tube head after the fixed just fixes as a whole, a firm structure has been formed, and this kind of movable tube head is convenient to be adjusted, be fit for the house floor of different height, length, as shown in fig. 6.

Claims (1)

1. a manufacturing method of a detachable green terrace with a garden carrier comprises the following steps: the method is characterized by comprising the following steps:
(1) Setting a cantilever beam: the top end of a floor is provided with a cantilever beam, if a house is a newly-built house, the cantilever beam can be made into a reinforced concrete beam along with a house main body, and if the house is an old building, a steel part can be adopted and is reliably connected with a top layer of a house;
(2) Pre-burying a u-shaped anchor and a declination anchor on the wall surface of a floor where the terrace is installed, wherein the height of the declination anchor is greater than that of the u-shaped anchor in each floor;
(3) Selecting a proper platform frame, welding shaft pin type connecting pieces at two sides of one end of the platform frame close to the wall surface, symmetrically installing at least one group of upward inclined steel cable lifting noses on rod bodies at two side surfaces of the platform frame, placing the platform frame on an installation floor through lifting equipment, hinging the two shaft pin type connecting pieces of the platform frame with a wall surface pre-embedded u-shaped anchor piece through shaft pins,
then, connecting the upward inclined steel cable lifting noses on the rod bodies on the two side surfaces of the platform frame with the downward inclined anchor parts by using short steel cable pull rods, fixing auxiliary steel cable pull rod pipe heads on the two sides of the platform frame, installing two movable pipe heads on the front side of the platform frame, wherein the movable pipe heads comprise sliding blocks and pipe heads installed on the outer sides of the sliding blocks, and the front side of the platform frame is provided with a sliding groove which can move along the sliding groove;
(4) selecting floors to continuously install the terrace, repeating the step (2) and the step (3) until all platform frames needing floors are installed completely, then using auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pull rod pipe heads corresponding to the side sides of all the platform frames to connect all the platform frames into a whole, enabling the auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pull rod pipe heads corresponding to each floor, fixing the two ends of the auxiliary steel cable pull rods on the corresponding fixed auxiliary steel cable pull rod pipe heads of the topmost and bottommost platform frames, leading out two steel cable pull rods from a cantilever beam fixed at the top end, enabling each steel cable pull rod to penetrate through the movable pipe head corresponding to each platform frame until the steel cable pull rod penetrates through the movable pipe heads corresponding to all the platform frames, and finally determining the position of the other end of each steel cable pull rod, wherein the position of the other end of each steel cable pull rod is on a fixed object, the steel cable pull rods are tightened firmly, after the two steel cable pull rods are fixed, the angle formed by the two steel cable pull rods is 30-90 degrees, and finally, the movable pipe head on each platform frame is fixed, so that the movable pipe head is fixed on the platform frame and cannot move.
CN201610914356.5A 2016-10-20 2016-10-20 Detachable green terrace with garden carrier and manufacturing method thereof Active CN106638933B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910924597.1A CN110644611B (en) 2016-10-20 2016-10-20 Can dismantle green balcony
CN201610914356.5A CN106638933B (en) 2016-10-20 2016-10-20 Detachable green terrace with garden carrier and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610914356.5A CN106638933B (en) 2016-10-20 2016-10-20 Detachable green terrace with garden carrier and manufacturing method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201910924597.1A Division CN110644611B (en) 2016-10-20 2016-10-20 Can dismantle green balcony

Publications (2)

Publication Number Publication Date
CN106638933A CN106638933A (en) 2017-05-10
CN106638933B true CN106638933B (en) 2019-12-17

Family

ID=58856323

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910924597.1A Active CN110644611B (en) 2016-10-20 2016-10-20 Can dismantle green balcony
CN201610914356.5A Active CN106638933B (en) 2016-10-20 2016-10-20 Detachable green terrace with garden carrier and manufacturing method thereof

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201910924597.1A Active CN110644611B (en) 2016-10-20 2016-10-20 Can dismantle green balcony

Country Status (1)

Country Link
CN (2) CN110644611B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012340B (en) * 2020-09-25 2021-07-30 中建一局集团第三建筑有限公司 Suspension connection node for large-span cantilever steel truss and construction method thereof

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU757666A1 (en) * 1978-05-15 1980-08-23 Kh Gorodskoe Zhilishchnoe Upra Apparatus for insuring balconys
JPH07268950A (en) * 1994-04-04 1995-10-17 Sekisui Chem Co Ltd Roof balcony unit and lifting lug
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
CN2765979Y (en) * 2005-01-27 2006-03-22 万科企业股份有限公司 Assembled balcony
KR100928671B1 (en) * 2007-11-27 2009-11-27 문동해 Fall accident prevention device with emergency escape device
CN201297036Y (en) * 2008-11-19 2009-08-26 常州第一建筑工程有限公司 Discharging platform
KR20090086928A (en) * 2009-07-27 2009-08-14 문근술 A rail of balcony for fire escape
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN201908429U (en) * 2011-01-27 2011-07-27 许昌中原建设(集团)有限公司 Assembly integral building overhanging discharging platform
CN202745352U (en) * 2012-05-24 2013-02-20 浙江精工钢结构有限公司 Combined-type high-altitude operation platform easy for assembly and disassembly
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN104389419B (en) * 2014-11-18 2016-06-08 杭州江润科技有限公司 Encorbelment and prop up mould structure for mounting platform and a constructional method
CN104481166B (en) * 2014-12-12 2017-01-11 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104712056A (en) * 2015-03-22 2015-06-17 徐林波 Semi-fixed and semi-movable high-rise escape balcony
CN105003070A (en) * 2015-07-31 2015-10-28 重庆渝发建设有限公司 Bilayer extensible unloading platform for building construction
CN105233433B (en) * 2015-11-02 2018-10-23 袁锡良 The emergent saving oneself activity balcony of building
CN105756186A (en) * 2016-05-04 2016-07-13 四川省建筑设计研究院 Assembly type prefabricated truss balcony and installation method therefor

Also Published As

Publication number Publication date
CN110644611A (en) 2020-01-03
CN106638933A (en) 2017-05-10
CN110644611B (en) 2021-06-25

Similar Documents

Publication Publication Date Title
CN106638933B (en) Detachable green terrace with garden carrier and manufacturing method thereof
CN108532741B (en) Detachable green terrace for building
CN201518609U (en) Greening plant curtain wall
Bera An overview of Vernacular architecture in India
CN205669179U (en) The column of fiberglass protective fence and guard rail
CN102304945A (en) Adapting piece of ultrathin wall steel structure stand column and horizontal beam and connection structure thereof
CN214403011U (en) Green's view wall
CN110397155B (en) Green balcony for multi-storey house
CN210959768U (en) Urban building water storage irrigation equipment
CN208294238U (en) A kind of parapeted prefabricated assembled Assembled surrounding wall of tool
CN113026932A (en) A balcony structure for full aluminium building of green assembled
CN202194246U (en) Connection piece of an ultrathin wall pillar in steel structure and a horizontal beam and its connection structure
CN201444798U (en) Combined type plant cultivation box
CN201192010Y (en) Outdoor flower shelf
CN219909550U (en) Greening building roof structure
CN204850563U (en) Characteristic corridor frame
CN204826756U (en) Entry formula corridor frame
CN110359623A (en) A kind of fabricated structure of Chinese fault
CN212130120U (en) Assembled yurt structure
CN206070729U (en) A kind of overhanging type green balcony
CN203769306U (en) Multi-ribbed floor system pouring formwork processing device
CN214430455U (en) Pole setting formula climbing plant growth device
CN216949800U (en) Landscape railing with three-dimensional greening and micro-irrigation functions
CN214273076U (en) Pavilion framework
CN205777889U (en) A kind of Novel garden fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191106

Address after: 210000 Room 301, No.156, Mengdu street, Jianye District, Nanjing City, Jiangsu Province

Applicant after: Nanjing Huaxia Tiancheng Construction Co., Ltd.

Address before: 221000 Jiangsu city of Xuzhou province Xuzhou high tech Industrial Development Zone, Second Industrial Park, Qianjiang Road No. 23

Applicant before: Xuzhou joy Electromechanical Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant