CN204850563U - Characteristic corridor frame - Google Patents

Characteristic corridor frame Download PDF

Info

Publication number
CN204850563U
CN204850563U CN201520595251.9U CN201520595251U CN204850563U CN 204850563 U CN204850563 U CN 204850563U CN 201520595251 U CN201520595251 U CN 201520595251U CN 204850563 U CN204850563 U CN 204850563U
Authority
CN
China
Prior art keywords
layer
crossbeam
characteristic
corridor
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520595251.9U
Other languages
Chinese (zh)
Inventor
李宝章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Aoya Design Inc
Original Assignee
SHENZHEN AOYA LANDSCAPE AND BUILDING PLANNING DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN AOYA LANDSCAPE AND BUILDING PLANNING DESIGN CO Ltd filed Critical SHENZHEN AOYA LANDSCAPE AND BUILDING PLANNING DESIGN CO Ltd
Priority to CN201520595251.9U priority Critical patent/CN204850563U/en
Application granted granted Critical
Publication of CN204850563U publication Critical patent/CN204850563U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model provides a characteristic corridor frame, sit bench, second crossbeam, left stand, right stand, rivet board and anticorrosive san cheong timber apron including back timber, third crossbeam, characteristic, both ends about the second crossbeam are installed respectively to top beam connected second crossbeam, left stand and right stand, and the characteristic is sat the bench and is installed in right stand below, and the third crossbeam sets up in second crossbeam lower part, and left stand and right stand are connected respectively to third crossbeam both ends, and left stand and right stand are all fixed in anticorrosive san cheong timber apron through the rivet board, the utility model relates to a rationally, light weight, high strength, anti -seismic performance superiority, energy -concerving and environment -protective, the construction cycle weak point of steel timber structure, the construction is simple and convenient, light and handy, and the outward appearance is pleasing to the eye, has fine use prospect.

Description

A kind of characteristic corridor
Technical field
The utility model is specifically related to a kind of characteristic corridor.
Background technology
Corridor can be applicable in various types of Garden Greenland, and the place being normally placed in beautiful scenery, also can the combination such as He Ting, corridor, waterside pavilion for having a rest and some scape, the landscape hardwork group of composition good looking appearance; In residential quarter green area, children's play area, corridor can for having a rest, shading, enjoy the cool; Replace veranda with corridor, can space be contacted; With grid wall climbing vine plant, scenery can be separated; Teahouse in gardens, cold drink portion, dining room etc., also can make mat shelter with corridor, setting is attended a banquet; Also the gate in gardens can be made with corridor.Traditional corridor is that primary raw material adds other material and coagulates conjunction and form mainly with timber, bamboo wood, stone material, metal, steel concrete, its maximum deficiency is: what be not easy to do is light and handy, engineering time is long, and the corridor of simple metal or reinforced concrete structure sight is not enough, and antidetonation superiority is not obvious.
Utility model content
The purpose of this utility model is for solving above-mentioned deficiency, provides a kind of characteristic corridor.
The purpose of this utility model is achieved through the following technical solutions:
A kind of characteristic corridor, comprise back timber, the 3rd crossbeam, characteristic bench, second cross beam, left column, right column, rivet plate and anticorrosion San Cheong wood flooring, back timber connects second cross beam, left column and right column are arranged on the two ends, left and right of second cross beam respectively, characteristic bench is arranged on below right column, 3rd crossbeam is arranged on second cross beam bottom, and the 3rd crossbeam two ends connect left column and right column respectively, and left column and right column are all fixed in anticorrosion San Cheong wood flooring by rivet plate.
Layer of concrete, rammed earth layer, nonwoven layer, drainage layer, fish tail and waterproof layer and deck is also provided with under anticorrosion San Cheong wood flooring; layer of concrete is arranged on anticorrosion San Cheong wood flooring lower floor; rammed earth layer is positioned at layer of concrete lower floor; nonwoven layer is arranged on rammed earth layer bottom; drainage layer is arranged on nonwoven layer bottom; fish tail and waterproof layer is in drainage layer bottom, and deck is arranged on the bottom.
Back timber and second cross beam all adopt wooden structure.
3rd crossbeam adopts steel work.
The utility model has effect useful as follows:
The utility model is reasonable in design, high-strength light, anti-seismic performance are superior, steel-wood structure energy-conserving and environment-protective, short construction period, easy construction, light and handy, appearance looks elegant, has good prospect of the application.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described:
As shown in Figure 1, a kind of characteristic corridor, comprise back timber 1, the 3rd crossbeam 2, characteristic bench 3, second cross beam 4, left column 5, right column 6, rivet plate 7 and anticorrosion San Cheong wood flooring 8, back timber 1 connects second cross beam 4, left column 5 and right column 6 are arranged on the two ends, left and right of second cross beam 4 respectively, characteristic bench 3 is arranged on below right column 6,3rd crossbeam 2 is arranged on second cross beam 4 bottom, 3rd crossbeam 2 two ends connect left column 5 and right column 6 respectively, and left column 5 and right column 6 are all fixed in anticorrosion San Cheong wood flooring 8 by rivet plate 7.
Layer of concrete 9, rammed earth layer 10, nonwoven layer 11, drainage layer 14, fish tail and waterproof layer 12 and deck 13 is also provided with under anticorrosion San Cheong wood flooring; layer of concrete 9 is arranged on anticorrosion San Cheong wood flooring 8 lower floor; rammed earth layer 10 is positioned at layer of concrete 9 lower floor; nonwoven layer 11 is arranged on rammed earth layer 10 bottom; drainage layer 14 is arranged on nonwoven layer 11 bottom; fish tail and waterproof layer 12 is in drainage layer 14 bottom, and deck 13 is arranged on the bottom.
Back timber and second cross beam all adopt wooden structure.
3rd crossbeam adopts steel work.
Adopt ergonomic design, install simple and convenient, ingredient is an entirety, can on-the-spot lightweight install; Short construction period, attractive and durable after corridor completes.Adopt a kind of combination construction mode that Modern Steel Structure combines with traditional wooden construction.Often the primary structure member such as post, beam adopts steel structural form, and the employing wooden construction of outsourcing, comprises the furred ceiling of finishing, door and window, railing, stair etc. and all use wooden construction, make corridor have traditional architectural style, and more sturdy and durable!
Manufacturing process: timber processing and forming, timber operation is shaped, job site unwrapping wire, foundation construction, in-site installation, according to specification of technical file and explanation, checks size between drawing and direction etc. one by one.Note the tie point between each parts, connected mode and size whether one_to_one corresponding, surface-veneer engineered.

Claims (4)

1. a characteristic corridor, comprise back timber, the 3rd crossbeam, characteristic bench, second cross beam, left column, right column, rivet plate and anticorrosion San Cheong wood flooring, it is characterized in that: back timber connects second cross beam, left column and right column are arranged on the two ends, left and right of second cross beam respectively, characteristic bench is arranged on below right column, 3rd crossbeam is arranged on second cross beam bottom, 3rd crossbeam two ends connect left column and right column respectively, and left column and right column are all fixed in anticorrosion San Cheong wood flooring by rivet plate.
2. a kind of characteristic corridor as claimed in claim 1; it is characterized in that: under described anticorrosion San Cheong wood flooring, be also provided with layer of concrete, rammed earth layer, nonwoven layer, drainage layer, fish tail and waterproof layer and deck; layer of concrete is arranged on anticorrosion San Cheong wood flooring lower floor; rammed earth layer is positioned at layer of concrete lower floor; nonwoven layer is arranged on rammed earth layer bottom; drainage layer is arranged on nonwoven layer bottom, and fish tail and waterproof layer is in drainage layer bottom, and deck is arranged on the bottom.
3. a kind of characteristic corridor as claimed in claim 1, is characterized in that: described back timber and second cross beam all adopt wooden structure.
4. a kind of characteristic corridor as claimed in claim 1, is characterized in that: the 3rd described crossbeam adopts steel work.
CN201520595251.9U 2015-08-10 2015-08-10 Characteristic corridor frame Expired - Fee Related CN204850563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520595251.9U CN204850563U (en) 2015-08-10 2015-08-10 Characteristic corridor frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520595251.9U CN204850563U (en) 2015-08-10 2015-08-10 Characteristic corridor frame

Publications (1)

Publication Number Publication Date
CN204850563U true CN204850563U (en) 2015-12-09

Family

ID=54741128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520595251.9U Expired - Fee Related CN204850563U (en) 2015-08-10 2015-08-10 Characteristic corridor frame

Country Status (1)

Country Link
CN (1) CN204850563U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639378A (en) * 2016-12-26 2017-05-10 埃瑞弗(上海)规划设计工程咨询股份有限公司 Landscape gallery frame with interpenetrating structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639378A (en) * 2016-12-26 2017-05-10 埃瑞弗(上海)规划设计工程咨询股份有限公司 Landscape gallery frame with interpenetrating structure
CN106639378B (en) * 2016-12-26 2023-09-15 埃瑞弗(上海)规划设计工程咨询股份有限公司 Landscape corridor frame with penetrating structure

Similar Documents

Publication Publication Date Title
KR101730460B1 (en) Korean-style houses constructed by using tradition wooden building constructing structure and steel structure and a construction method thereof
CN201095809Y (en) Movable ecological environmental protection wooden light house
CN204850563U (en) Characteristic corridor frame
CN204826756U (en) Entry formula corridor frame
CN204850562U (en) Corridor frame wo yunting
CN200975026Y (en) Movable frame junction
CN105421819B (en) A kind of method of construction of dry late formula local-style dwelling houses
CN206554324U (en) Realize that the Stone brick component of comprehensive fixation is assembled into the structure of wall, dam body
CN206859413U (en) Prefabricated house
CN211080757U (en) Steel wood bamboo composite board
CN206667025U (en) The wooden small arch bridge of gardens irrigation canals and ditches
CN110644611B (en) Can dismantle green balcony
Koones Prefabulous+ sustainable: Building and customizing an affordable, energy-efficient home
CN108532741B (en) Detachable green terrace for building
CN204060041U (en) Kiosk type combination body-building device
CN204590676U (en) A kind of novel gallery part for gardens decoration
CN205712466U (en) A kind of aluminium alloy house
Hersek Çomakdağ-Kızılağaç Village Houses in the Context of Rural Architectural Building Traditions That are Vanishing in Our Country
Gultekin et al. Traditional Akseki houses and cultural heritage tourism
CN202913568U (en) Wood-imitated section bar based on glass fiber reinforced cement concrete
Zhou et al. Analysis on the Application of Bamboo Environmental Species on Garden Building in the
CN205558357U (en) Outdoor wayside pavilion
CN207419853U (en) A kind of imitation wood section bar of special cement
CN204850686U (en) Modular enclosure
Nowak Technologies of constructing Warsaw’s green elevations in the context of global and Polish realizations

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Xinghua Road 518067 Guangdong city of Shenzhen province No. 6 Nanshan District Huajian Arts crafts emporium (also known as the library of the South China Sea) No. 5, No. 303 302B

Patentee after: SHENZHEN AOYA DESIGN Inc.

Address before: Xinghua Road 518067 Guangdong city of Shenzhen province No. 6 Nanshan District Huajian Arts crafts emporium (also known as the library of the South China Sea) No. 5, No. 303 302B

Patentee before: SHENZHEN AOYA LANDSCAPE AND ARCHITECTURAL PLANNING DESIGN CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee