CN110397155B - Green balcony for multi-storey house - Google Patents

Green balcony for multi-storey house Download PDF

Info

Publication number
CN110397155B
CN110397155B CN201910540512.XA CN201910540512A CN110397155B CN 110397155 B CN110397155 B CN 110397155B CN 201910540512 A CN201910540512 A CN 201910540512A CN 110397155 B CN110397155 B CN 110397155B
Authority
CN
China
Prior art keywords
fixed
platform frame
shaft pin
steel cable
shaped anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910540512.XA
Other languages
Chinese (zh)
Other versions
CN110397155A (en
Inventor
吴�荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jiahe Plant Protection Technology Co.,Ltd.
Original Assignee
Anhui Jiahe Plant Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jiahe Plant Protection Technology Co ltd filed Critical Anhui Jiahe Plant Protection Technology Co ltd
Priority to CN201910540512.XA priority Critical patent/CN110397155B/en
Publication of CN110397155A publication Critical patent/CN110397155A/en
Application granted granted Critical
Publication of CN110397155B publication Critical patent/CN110397155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a green balcony for a multi-storey house, which comprises a platform frame, wherein the platform frame is formed by welding profile steel skeletons, the platform frame is connected with a concrete beam column of a house through a hinge device, the hinge device is a u-shaped anchor part and a shaft pin type connecting part, the shaft pin type connecting part is arranged in the u-shaped anchor part and is fixed through a shaft pin, so that the u-shaped anchor part and the shaft pin type connecting part are hinged together, the shaft pin type connecting part is fixed at one end of the platform frame, the u-shaped anchor part is fixed on the concrete beam column of the house, and the front side of the platform frame is also provided with a movable pipe head which is connected. The invention has beautiful appearance design, flexible and convenient disassembly and installation, reliable safety performance, and can be repeatedly used in different places after the terrace, the pull rod, the pool, the leisure platform and the guardrail are disassembled.

Description

Green balcony for multi-storey house
The division application original application has the original application number of 201610914428.6, the application date of 2016, 10 and 20, and the name of 'a green balcony for a multi-storey house and a manufacturing method thereof'.
Technical Field
The invention relates to a green balcony for a multi-storey house.
Background
With the continuous improvement of the living standard of people, the urbanization process is accelerated, the high-rise building and the dense traffic network continuously erode the limited greening space of the city, and at the moment, people really feel that the green in life is so lacking. In order to improve the poor development mode, the city is full of green, people begin to develop into space, an oversized green balcony is provided for residents of each household from the time of cell planning and drawing design, and the ancient Chinese courtyard plot is extended in high-rise residences.
At present, in domestic residential district environmental greening, flowers, plants, landscapes and trees are generally arranged on public ground in a residential yard, and a garden is also built on a roof. Residential residents in a community can only go to one floor or a roof to view, but cannot participate in the whole processes of cultivation, watering, trimming, nursing and the like, and cannot meet the individual preference of the residents on flowers and plants and the unique privacy requirements of private households. In the aspects of greening the environment of a residential area and changing the urban landscape, the modern development trend is followed, the design mode of one city in the past is changed, the design scheme of a single residential building is started, the design scheme is optimized, the old traditional design concept is changed, and more green buildings and elegant ecological environment are provided for the society.
The assembled greening balcony has the advantages of attractive appearance design, flexible and convenient disassembly and assembly, reliable safety performance, and capability of being repeatedly used in different places after the balcony, the pull rod, the water tank, the leisure platform and the guardrail are all disassembled.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a green balcony for a multi-storey house, which belongs to an assembled greening balcony, has the advantages of attractive appearance design, flexible and convenient disassembly and assembly, reliable safety performance, and capability of being repeatedly used in different places after the balcony, the pull rod, the water tank, the leisure platform and the guardrail are all disassembled.
In order to achieve the purpose, the invention adopts the technical scheme that: a detachable green balcony with garden carrier for multi-storey house is composed of a platform frame consisting of garden area and walkway and made of steel skeleton through welding, and a hinge unit for connecting said platform frame to concrete beams and columns of house, and the thickness of said platform frame is 5-50 cm.
The hinge device comprises a u-shaped anchor and a shaft pin type connecting piece, wherein the shaft pin type connecting piece is arranged in the u-shaped anchor and is fixed through a shaft pin, so that the u-shaped anchor and the shaft pin type connecting piece are hinged together, the shaft pin type connecting piece is fixed at one end of the platform frame, the u-shaped anchor is fixed on a concrete beam column of a house, and the u-shaped anchor is exposed out of a hinge rod.
A plurality of upward-inclined steel cable lifting noses are installed on two sides of the platform frame, downward-inclined anchors are installed on corresponding concrete beam columns, the downward-inclined anchors are provided with square anchor plates, the square anchor plates are fixed inside the concrete beam columns, and the upward-inclined steel cable lifting noses and the downward-inclined anchors are fixedly connected through short steel cable pull rods.
The side of the platform frame is provided with a guardrail inserting base, two sides of the platform frame are respectively provided with 2 fixed auxiliary steel cable pipe heads, an auxiliary steel cable pull rod passes through the corresponding fixed auxiliary steel cable pipe head on each layer, two ends of the auxiliary steel cable pull rod are fixed on the fixed auxiliary steel cable pipe heads of the top-most layer and the bottom-most layer opposite-top platform frame,
two movable pipe heads are arranged on the front side of the platform frame,
the cable wire pull rod passes the portable tube head that corresponds, and the one end of cable wire pull rod is fixed on the cantilever beam, and the other end is fixed on the bottom fixture, portable tube head include sliding block and fixed block, sliding block and fixed block pass through the dead lever and connect, are fixed with the tube head in the fixed block outside, and the sliding block lower extreme has the card rail piece, the card rail piece be the notch type, the front side of platform frame is equipped with the spout, the spout is the notch type, card rail piece cooperatees with the spout, the exposed face of the front side of platform frame has the rack, has fixed dop between fixed block and the rack, fixed dop and fixed block pass through linear electric motor and be connected.
The cantilever beam is arranged at the top end of the floor.
A manufacturing method of a detachable green balcony with a garden carrier comprises the following steps: the method comprises the following steps:
(1) setting a cantilever beam: the top end of a floor is provided with a cantilever beam, if a house is a newly-built house, the cantilever beam can be made into a reinforced concrete beam along with a house main body, and if the house is an old building, a steel part can be adopted and is reliably connected with a top layer of a house;
(2) pre-burying a u-shaped anchor and a declination anchor on the wall surface of a floor of an installation balcony, wherein the height of the declination anchor is greater than that of the u-shaped anchor in each floor;
(3) selecting a proper platform frame, welding shaft pin type connecting pieces at two sides of one end of the platform frame close to the wall surface, symmetrically installing at least one group of upward inclined steel cable lifting noses on the rod bodies at two side surfaces of the platform frame, installing a movable pipe head at the front side of the platform frame, arranging a guardrail inserting base at the side of the platform frame, respectively installing 2 fixed auxiliary steel cable pipe heads at two sides of the platform frame,
and is placed on the floor to be installed through hoisting equipment, two shaft pin type connecting pieces of the platform frame are hinged with the wall surface pre-buried u-shaped anchor piece through shaft pins,
then, connecting the upward inclined steel cable hanging noses on the rod bodies on the two side surfaces of the platform frame with the downward inclined anchor parts by using short steel cable pull rods;
(4) selecting floors to continue installing the balcony, repeating the step (2) and the step (3) until all platform frames needing floors are installed completely, then penetrating all fixed auxiliary steel cable pipe heads corresponding to the side sides of all platform frames by using auxiliary steel cable pull rods to connect all platform frames into a whole, penetrating the auxiliary steel cable pull rods through each layer of corresponding fixed auxiliary steel cable pipe heads, fixing the two ends of each auxiliary steel cable pull rod on the fixed auxiliary steel cable pipe heads of the topmost and bottommost opposite top platform frames, leading out two steel cable pull rods from cantilever beams fixed at the top ends, penetrating each steel cable pull rod through the corresponding movable pipe head of each platform frame until the steel cable pull rods penetrate through the corresponding movable pipe heads of all platform frames, and finally determining the position of the other ends of the steel cable pull rods, wherein the position is on a fixture on the ground so that the steel cable pull rods are tightened and fixed, after the two steel cable pull rods are fixed, the angle formed by the two steel cable pull rods is 35-85 degrees, and finally, the movable pipe head on each platform frame is fixed, so that the movable pipe head is fixed on the platform frame and cannot move.
In the step (4), after the steel cable pull rod penetrates through the movable pipe heads corresponding to all the platform frames, the movable connecting pipe heads are fixed on the steel cable pull rod through two steel cable clamping heads.
The invention has the following advantages that the overhanging balcony is formed by obliquely pulling and horizontally suspending an assembled steel balcony manufactured in a processing plant on the outer side of a building by four adjustable steel rope riggings. Because the balcony is produced at the processing factory scale, the processing speed is fast, the precision is high, of high quality. When the device is transported to a field for installation, the device has no noise, small environmental influence conditions and reliable safety performance. The greening balcony can be designed, constructed and delivered simultaneously with a house. And the special design and production customization can be carried out after comprehensive analysis on the orientation, the form coefficient, the lighting requirement and the like of the house aiming at the original building. The balcony fixing device fixes a plurality of balconies into a whole through the cantilever beam, the plurality of steel cable pull rods and the movable pipe head, has firm structure, and can be suitable for fixing and installing balconies and floors with various heights because the movable pipe head can be flexibly moved before being fixed.
Drawings
FIG. 1 is a schematic plan view of the present invention;
FIG. 2 is a rear side view of the greening balcony;
FIG. 3 is a side view of a steel platform;
FIG. 4 is a schematic view of a declined anchor and a square anchor plate embedded concrete joint;
FIG. 5 is a schematic view of a horizontal hanging joint between a platform and a wall.
Fig. 6 is a schematic view of a plurality of balcony wire rope tension bar connections.
Fig. 7 is a view showing the structure of the movable tip.
Fig. 8 is a side view of fig. 7.
1. A platform frame; 2. a leisure platform; 3. a garden; 4. a walkway; 5-axis pin type connecting pieces; 6. an upward inclined steel cable hanging nose; 7. a u-shaped anchor; 8. a concrete beam column; 9. a shaft pin; 10. the guardrail is inserted into the base; 11. a guy wire pull rod; 12. a declined anchor; 13. a square anchor plate; 14. a cantilever beam; 15. a wire rope pull rod; 16. the device comprises a fixed auxiliary steel cable pull rod pipe head, 17, a fixed object, 18, a movable pipe head, 19, an auxiliary steel cable pull rod, 20, a movable pipe head, 101, a sliding groove, 102, a rack, 201, a sliding block, 202, a fixed rod, 203, a fixed chuck, 204, a fixed block, 205 pipe heads, 206, a clamping rail block, 207 and a linear motor.
Detailed Description
The invention will be further explained with reference to the drawings.
The green balcony for the multi-storey house comprises a platform frame 1, wherein the platform frame 1 is formed by welding profile steel frameworks, the platform frame is connected with concrete beam columns 8 of a house through a hinge device, and the platform frame comprises a garden 3, a walkway 4 and a leisure platform 2. The thickness of the platform frame is 5-50cm,
the hinge device comprises a u-shaped anchor 7 and a shaft pin type connecting piece 5, the shaft pin type connecting piece is arranged in the u-shaped anchor and is fixed through a shaft pin 9, so that the u-shaped anchor and the shaft pin type connecting piece are hinged together, the shaft pin type connecting piece is fixed at one end of the platform frame, the u-shaped anchor is fixed on a concrete beam column of a house, and the u-shaped anchor is exposed out of a hinge rod.
A plurality of upward-inclined steel cable lifting noses 6 are arranged on two sides of the platform frame 1, downward-inclined anchor parts 12 are arranged on corresponding concrete beam columns 8, the downward-inclined anchor parts 12 are provided with square anchor plates 13, the square anchor plates 13 are fixed inside the concrete beam columns 8, and the upward-inclined steel cable lifting noses 6 and the downward-inclined anchor parts 12 are fixedly connected through short steel cable pull rods 11.
Two sides of the platform frame 1 are provided with a guardrail inserting base 10 and a fixed auxiliary steel cable pull rod pipe head 16, each side is provided with 2 fixed auxiliary steel cable pull rod pipe heads 16,
the auxiliary steel cable pull rod 19 passes through the corresponding fixed auxiliary steel cable pipe head 16 of each layer, the two ends of the auxiliary steel cable pull rod 19 are fixed on the fixed auxiliary steel cable pipe heads 16 of the opposite top platform frame at the topmost layer and the bottommost layer,
the front side of the platform frame is provided with two movable pipe heads, as shown in fig. 7, the specific structure is that the movable pipe heads comprise sliding blocks 201 and fixed blocks 204, the sliding blocks 201 are connected with the fixed blocks 204 through fixed rods 202, the fixed blocks 204 are arranged on the outer side of the platform frame,
the outer side of the fixed block is fixed with a pipe head 205, the lower end of the sliding block is provided with a track clamping block 206, the track clamping block is of a notch type, the front side of the platform frame is provided with a sliding groove 101, the sliding groove is of a notch type, the track clamping block 206 is matched with the sliding groove 101, thus, the clamping rail block 206 is connected with the sliding chute 101 in a sliding way, the exposed surface of the front side of the platform frame is provided with the rack 102, the fixed clamping head 203 is arranged between the fixed block 204 and the rack 102, the fixed chuck 203 is connected with the fixed block 204 through the linear motor 207, the rack 102 and the fixed chuck 203 are both in a sawtooth shape, the length of the rack 102 is longer, the fixed chuck 203 is shorter, when the linear motor 207 contracts, the fixed chuck 203 also contracts, the movable pipe head can slide freely, when the linear motor 207 drives the fixed chuck 203 to extend until the fixed chuck is meshed with the rack 102, the movable pipe head is completely fixed at the position, and the fixing effect is realized.
The steel cable pull rod penetrates through the corresponding movable pipe head, one end of the steel cable pull rod is fixed on the cantilever beam, and the other end of the steel cable pull rod is fixed on the bottom fixing object 17.
The cantilever beam is arranged at the top end of the floor.
A method for manufacturing a detachable balcony of a multi-storey house comprises the following steps: the method comprises the following steps:
(1) setting a cantilever beam: the top end of a floor is provided with a cantilever beam, if a house is a newly-built house, the cantilever beam can be made into a reinforced concrete beam along with a house main body, and if the house is an old building, a steel part can be adopted and is reliably connected with a top layer of a house;
(2) pre-burying a u-shaped anchor and a declination anchor on the wall surface of a floor of an installation balcony, wherein the height of the declination anchor is greater than that of the u-shaped anchor in each floor;
(3) selecting a proper platform frame, welding shaft pin type connecting pieces at two sides of one end of the platform frame close to the wall surface, symmetrically installing at least one group of upward inclined steel cable lifting noses on the rod bodies at two side surfaces of the platform frame, installing a movable pipe head at the front side of the platform frame, arranging a guardrail inserting base at the side of the platform frame, respectively installing 2 fixed auxiliary steel cable pipe heads at two sides of the platform frame,
and is placed on the floor to be installed through hoisting equipment, two shaft pin type connecting pieces of the platform frame are hinged with the wall surface pre-buried u-shaped anchor piece through shaft pins,
then, connecting the upward inclined steel cable hanging noses on the rod bodies on the two side surfaces of the platform frame with the downward inclined anchor parts by using short steel cable pull rods;
(4) selecting floors to continuously install the balcony, repeating the step (2) and the step (3) until all platform frames needing floors are installed, then using auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pipe heads corresponding to the side sides of all the platform frames to connect all the platform frames into a whole, using the auxiliary steel cable pull rods to penetrate through the fixed auxiliary steel cable pipe heads corresponding to each floor, fixing two ends of each auxiliary steel cable pull rod on the fixed auxiliary steel cable pipe heads of the top-most layer and the bottom-most layer opposite-top platform frames,
(5) two steel cable pull rods are led out from the outer side of the cantilever beam fixed at the top end, each steel cable pull rod penetrates through the movable pipe head corresponding to each platform frame until the steel cable pull rods penetrate through the movable pipe heads corresponding to all the platform frames, and finally, the position of the other end of each steel cable pull rod is determined.
So that the steel cable pull rods are tightened firmly, after the two steel cable pull rods are tightened and fixed, the angle formed by the two steel cable pull rods is 35-85 degrees, the triangular structure is more stable, finally, the movable pipe head on each platform frame is fixed, so that the movable pipe head is fixed on the platform frame and cannot move, then, the movable connecting pipe head is fixed on the steel cable pull rods by using two steel cable clamping heads,
thus, the platforms, the two steel cable pull rods and the fixed movable pipe heads are fixed into a whole to form a stable structure, and the movable pipe heads are convenient to adjust and suitable for residential floors with different heights and lengths, as shown in figure 6.

Claims (2)

1. The hinge device is a u-shaped anchor and a shaft pin type connecting piece, the shaft pin type connecting piece is arranged in the u-shaped anchor and is fixed through a shaft pin, so that the u-shaped anchor and the shaft pin type connecting piece are hinged together, the shaft pin type connecting piece is fixed at one end of the platform frame, the u-shaped anchor is fixed on the concrete beam column of the house, and the u-shaped anchor is exposed out of a hinge rod;
a plurality of upward-inclined steel cable lifting noses are arranged on two sides of the platform frame, downward-inclined anchors are arranged on corresponding concrete beam columns, the downward-inclined anchors are provided with square anchor plates, the square anchor plates are fixed in the concrete beam columns, and the upward-inclined steel cable lifting noses and the downward-inclined anchors are fixedly connected through short steel cable pull rods;
the avris of platform frame is equipped with guardrail grafting base, and 2 fixed supplementary cable wire tube heads are respectively installed to the both sides of platform frame, and supplementary cable wire pull rod passes every layer of fixed supplementary cable wire tube head that corresponds, and the both ends of supplementary cable wire pull rod are fixed on the fixed supplementary cable wire tube head of top layer and bottom opposite vertex platform frame, the front side of platform frame install two portable tube heads, the cable wire pull rod passes corresponding portable tube head, and the one end of cable wire pull rod is fixed on cantilever beam, and the other end is fixed on the bottom fixture, portable tube head include sliding block and fixed block, sliding block and fixed block pass through the dead lever and connect, the fixed block outside is fixed with the tube head, the sliding block lower extreme has the clamping rail piece, the clamping rail piece be the brake type, the front side of platform frame is equipped with the spout, the spout is the brake type, clamping rail piece cooperatees with the spout, the exposed surface, a fixing clamping head is arranged between the fixing block and the rack, and the fixing clamping head is connected with the fixing block through a linear motor.
2. A green balcony for multi-storied houses in accordance with claim 1, wherein said cantilever beam is provided at the top end of the story.
CN201910540512.XA 2016-10-20 2016-10-20 Green balcony for multi-storey house Active CN110397155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910540512.XA CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610914428.6A CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building
CN201910540512.XA CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610914428.6A Division CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building

Publications (2)

Publication Number Publication Date
CN110397155A CN110397155A (en) 2019-11-01
CN110397155B true CN110397155B (en) 2020-12-18

Family

ID=58856365

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610914428.6A Active CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building
CN201910540512.XA Active CN110397155B (en) 2016-10-20 2016-10-20 Green balcony for multi-storey house

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610914428.6A Active CN106638934B (en) 2016-10-20 2016-10-20 A kind of green balcony and preparation method thereof for multi-storey building

Country Status (1)

Country Link
CN (2) CN106638934B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07268950A (en) * 1994-04-04 1995-10-17 Sekisui Chem Co Ltd Roof balcony unit and lifting lug
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
CN2765979Y (en) * 2005-01-27 2006-03-22 万科企业股份有限公司 Assembled balcony
KR20090054618A (en) * 2007-11-27 2009-06-01 문동해 Crash accident prevention with emergence escape apparatus
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN201908429U (en) * 2011-01-27 2011-07-27 许昌中原建设(集团)有限公司 Assembly integral building overhanging discharging platform
CN202745352U (en) * 2012-05-24 2013-02-20 浙江精工钢结构有限公司 Combined-type high-altitude operation platform easy for assembly and disassembly
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104712056A (en) * 2015-03-22 2015-06-17 徐林波 Semi-fixed and semi-movable high-rise escape balcony
CN105003070A (en) * 2015-07-31 2015-10-28 重庆渝发建设有限公司 Bilayer extensible unloading platform for building construction
CN105756186A (en) * 2016-05-04 2016-07-13 四川省建筑设计研究院 Assembly type prefabricated truss balcony and installation method therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2693846B2 (en) * 1990-02-15 1997-12-24 積水化学工業株式会社 Prefabricated house with balcony
SE469181B (en) * 1991-05-22 1993-05-24 Weland Aluminium Ab BALCONY DEVICE
CN201297036Y (en) * 2008-11-19 2009-08-26 常州第一建筑工程有限公司 Discharging platform
CN105233433B (en) * 2015-11-02 2018-10-23 袁锡良 The emergent saving oneself activity balcony of building

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07268950A (en) * 1994-04-04 1995-10-17 Sekisui Chem Co Ltd Roof balcony unit and lifting lug
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
CN2765979Y (en) * 2005-01-27 2006-03-22 万科企业股份有限公司 Assembled balcony
KR20090054618A (en) * 2007-11-27 2009-06-01 문동해 Crash accident prevention with emergence escape apparatus
CN201801953U (en) * 2010-08-17 2011-04-20 俞天阳 Aerated balcony
CN201908429U (en) * 2011-01-27 2011-07-27 许昌中原建设(集团)有限公司 Assembly integral building overhanging discharging platform
CN202745352U (en) * 2012-05-24 2013-02-20 浙江精工钢结构有限公司 Combined-type high-altitude operation platform easy for assembly and disassembly
CN203429783U (en) * 2013-07-25 2014-02-12 中国建筑第八工程局有限公司 Tower crane driver high-altitude walking passageway
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104712056A (en) * 2015-03-22 2015-06-17 徐林波 Semi-fixed and semi-movable high-rise escape balcony
CN105003070A (en) * 2015-07-31 2015-10-28 重庆渝发建设有限公司 Bilayer extensible unloading platform for building construction
CN105756186A (en) * 2016-05-04 2016-07-13 四川省建筑设计研究院 Assembly type prefabricated truss balcony and installation method therefor

Also Published As

Publication number Publication date
CN106638934A (en) 2017-05-10
CN110397155A (en) 2019-11-01
CN106638934B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN104831812A (en) Whole assembly-type precast concrete frame structure, structural part production technology and mounting method
Brookes et al. The building envelope: applications of new technology cladding
CN106320521A (en) Pure part plate combined industrialized house assembling structure which can be rapidly erected
EP0038800B1 (en) Skeleton-frame system for the erection of building constructions
Hopkins Reading Architecture Second Edition: A Visual Lexicon
CN107217815A (en) A kind of resistance to compression, safety-type assembling type steel structure elevator
CN110397155B (en) Green balcony for multi-storey house
CN108532741B (en) Detachable green terrace for building
CN110644611B (en) Can dismantle green balcony
CN106522222A (en) Operation process based on realization of embedded pile foundation in forming of furniture plant
CN208294238U (en) A kind of parapeted prefabricated assembled Assembled surrounding wall of tool
CN210856905U (en) Pedestrian landscape cable-stayed bridge based on bridge tower structure of sightseeing tower
CN107130691A (en) A kind of overhead type modular house and its production method
CN106436891B (en) Detachable balcony of multi-storey building and preparation method thereof
CN108252432A (en) A kind of modular architectural system
Gábor-Szabó 100-year-old water towers of the Zielinski engineers´ bureau
Weismantle et al. Case Study: Kingdom Tower, Jeddah
CN212641749U (en) Assembled Dong minority drum building wooden framework
NL2031707B1 (en) Modular building and construction method
CN217870922U (en) Self-balancing type mortise and tenon stone structure system
CN216108978U (en) Assembled building structure system of circle bamboo-bamboo recombined material combination
CN211666120U (en) Wood structure ceiling for hotel entrance
Bober et al. Geometric modeling of solids for structural systems inspired by Waclaw Zalewski
Jeżowski Budowa dźwigu w pałacu Izraela Poznańskiego w Łodzi–studium przypadku
Ranara Publikum Nynäshamn: Social-ecological Architecture in Public Municipal Space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201130

Address after: 233500 next door to Civil Affairs Bureau, west side of Dongcheng Road, Mengcheng County, Bozhou City, Anhui Province

Applicant after: Anhui Jiahe Plant Protection Technology Co.,Ltd.

Address before: 221000 No. 24 Qianjiang Road, Second Industrial Park, Xuzhou High-tech Industrial Development Zone, Xuzhou City, Jiangsu Province

Applicant before: XUZHOU LETAI MECHANICAL AND ELECTRIC TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant