CN106593034B - A kind of short-term training ground green shade parking lot and its construction method - Google Patents

A kind of short-term training ground green shade parking lot and its construction method Download PDF

Info

Publication number
CN106593034B
CN106593034B CN201610955078.8A CN201610955078A CN106593034B CN 106593034 B CN106593034 B CN 106593034B CN 201610955078 A CN201610955078 A CN 201610955078A CN 106593034 B CN106593034 B CN 106593034B
Authority
CN
China
Prior art keywords
water
parking
parking lot
supply line
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610955078.8A
Other languages
Chinese (zh)
Other versions
CN106593034A (en
Inventor
谷成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610955078.8A priority Critical patent/CN106593034B/en
Publication of CN106593034A publication Critical patent/CN106593034A/en
Application granted granted Critical
Publication of CN106593034B publication Critical patent/CN106593034B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Environmental Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of short-term training ground green shade parking lot and its construction method, parking area are slope, and the side close to lane is higher than the side far from lane;The lower side in parking area and parking lot surrounding are designed with growth belt, and interval kind is implanted with arbor on growth belt;It is equipped with water storage band in below ground beside growth belt, is embedded with water supply line in water storage band;Water supply line includes main pipeline and the lateral from main pipeline stretching;Main pipeline is arranged along growth belt, and the water outlet of lateral is embedded in around arbor.Parking position of the present invention designs gentle slope to trees direction, it concentrates the place of Xiang Youshu to collect rainwater, and underground piping is injected by sedimentation etc., groundwater supply pipeline is located on water suction aggregate, the aggregate water suction water storage effect that absorbs water is good, provides sufficient nutrient and moisture to forest.The present invention not only gives city car owner to provide excellent parking environment, but also increases greenery area and fanned out from point to area by adjustment region miniclimate, adjusts big ecology, alleviates heat island phenomenon.

Description

A kind of short-term training ground green shade parking lot and its construction method
Technical field
The invention belongs to green shade parking lot technical field of construction, and in particular to a kind of short-term training and its is applied at ground green shade parking lot Work method.
Background technique
The present invention is that inventor is alleviated urban heat island and write in more measures in one of Surface parking lots application.In recent years due to Ecology is destroyed, and city hot island phenomenon is more serious, and summer temperature is higher and higher, and city is 1 degree higher than suburb mean temperature, portion Region-by-region is up to 6 degree, and some area surface temperatures are up to nearly 70 degree, and ground fried egg, self-burning of vehicle, stranded occupant cause Middle administration's phenomenon happens occasionally.
In summer, exposed vehicle interior temperature in the sun can be very high, and some areas are even as high as nearly 70 degree, in general;Vapour Vehicle is exposed to the sun one hour or more, and the pollutants such as interior formaldehyde are doubled and redoubled, and automotive temp is excessively high mainly following harm:
1, interior trim noxious material is released, and car is under normal temperature state, and in closing 2 hours, interior formaldehyde generally surpasses It is unhealthful to mark 2 times or more, is still more summer high temperature;
2, vehicle component, tire aging accelerate, and influence vehicle service life;
3, route high temperature easily melts, and easily causes vehicle spontaneous combustion after short circuit;
4, vehicle paint gloss is thin out, fades, and influences beauty;
5, passenger is detained interior, and the lower high temperature that is exposed to the sun is easy to produce dizzy fault, and serious person will lead to slow poisoning;
6, after vehicle summer is exposed to the sun, in vehicle as food steamer, seat is entered the straight hurricane of sweat, unhealthful.
Surface parking lots are largely large area hardened ground at present, and only a small amount of greenbelt cannot play effectively parking stall Shade effect, the automobile of Surface parking lots is exposed in the sun.
Moreover, the maintenance of existing greening of parking yard band generally requires special garden maintenance worker as irrigated, and wastes A large amount of manpower and water source, virtually increase the construction and maintenance cost in parking lot, the resources such as rainwater snow-broth cannot get good Good utilization, and it is unfavorable for the growth of trees in greenbelt.
Summary of the invention
The purpose of the present invention is to provide a kind of rapid-result ground green shade parking lot and its construction methods, are forest in parking lot Fast-growth condition is provided, the maintenance for solving existing greening of parking yard band, which is irrigated, needs special garden maintenance worker, waste A large amount of manpower and water source, virtually increase the construction and maintenance cost in parking lot, the resources such as rainwater snow-broth cannot get good Good utilization, and the problem of be unfavorable for the growth of trees in greenbelt.
To realize the above-mentioned technical purpose, the present invention adopts the following technical scheme:
A kind of short-term training ground green shade parking lot, including lane and parking area, the parking area are divided into several parking stalls, institute Parking stall is stated equipped with car stop, it is characterised in that: the parking area is slope, and one far from lane is higher than close to the side in lane Side;The lower side in the parking area and parking lot surrounding are designed with growth belt, and interval kind is implanted with arbor on the growth belt;Institute It states and is equipped with water storage band in below ground beside growth belt, be embedded with water supply line in the water storage band;The water supply line includes Main pipeline and the lateral stretched out from main pipeline;The main pipeline is arranged along growth belt, and upper end is connected to upper hose;The branch The water outlet of pipeline is embedded in around arbor.
As optimal technical scheme, the parking lot is rectangle, including parallel spaced lane and is distributed in lane The parking area of two sides, correspondingly, the water supply line includes that periphery is stopped around the rectangle water supply line in parking lot and centre along two The "-" type water supply line of growth belt arrangement between vehicle area, the rectangle water supply line are mutually connected with "-" type water supply line It is logical.
It is further preferred that sedimentation and water filling port are arranged at intervals on the main pipeline, the sedimentation and water filling port It is connected to main pipeline by lateral.Sedimentation, which has, collects rainwater, water storage, dredging effect, using mixed masonry is built, in parking lot Interior precipitating well lid uses load-bearing catch basin cover, and water filling port is built using brick material, and major function is that soil is prevented to pour into water injection pipe Mouthful.
It is further preferred that the range of grade of the parking area is 0.5%~1%;Preferred slope is 1%.
It is further preferred that 250~350mm below the earth's surface of the water supply line embedment water storage band.
It is further preferred that the top of the water storage band is soil horizon, bottom is water suction aggregate layer.
It is further preferred that the width of the water suction aggregate layer is 250~350mm, with a thickness of 450~550mm;The confession Waterpipe is horizontally embedded in water suction aggregate layer.
It is further preferred that one layer of braiding is arranged between water suction aggregate layer and the soil horizon expects separation layer.
It is further preferred that the water suction aggregate layer is broken foamed concrete block, broken air-mixed concrete pieces, floats Stone, vermiculite or haydite.
In addition, the present invention also provides the construction methods in above-mentioned rapid-result ground green shade parking lot, which is characterized in that including as follows Step:
Step 1: parking lot addressing and integral layout setting: carrying out parking lot addressing as needed, and be laid out to it Setting, determines the setting position of lane, parking area, growth belt and water storage band;
Step 2: water storage band is arranged and is laid with water supply line: in 1000~1500mm beside the growth belt of parking lot periphery Water storage band is set, including digs tunnel, is laid with water suction aggregate layer, is laid with water supply line, is laid with braiding material separation layer and carries out soil Earth backfill;Sedimentation and water filling port are set simultaneously when being laid with water supply line;
Step 3: the construction in lane and parking area: slope is arranged in parking area, and the side close to lane is higher than far from lane Side;
Step 4: the arrangement of growth belt: after the completion of lane and parking area are constructed, carrying out the arrangement of growth belt, planting Plantation arbor is taken, has 2-4 lateral water outlet around every arbor;
Step 5: parking Division parking stall: parking area is subjected to parking stall division, each parking stall is correspondingly arranged car stop, And take into account the shading effect of arbor;So far, rapid-result ground green shade parking lot construction is completed.
Compared with prior art, the technical advantages of the present invention are that:
1, the present invention plants trees between Surface parking lots periphery and parking stall, forms green shade parking lot, ground divides into water supplying pipe The method that road forms underground bank accelerates arboreal growth, and selected tree species are that tree crown is big, and blade is big, and the straight forest of trunk grows up to Tree crown afterwards is connected in the sky, plays the role of sunshade, with the parking stall of guarantee below under green shade shielding;
2, parking position designs gentle slope to trees direction, concentrates the place of Xiang Youshu to collect rainwater, and pass through precipitating Well etc. injects underground bank pipeline, can increase and swim on the ground, underground water, provides sufficient nutrient, moisture to forest, keeps plant raw Long vigorous, big tree with deep roots, it is flourishing, accelerate arboreal growth, the tree crown for accelerating adjacent trees is connected in the sky.Dry season, water Source can solve the easy Evaporation Phenomenon of ground watering, water-saving, water storage quoted from region tank or municipal water supply to groundwater supply bank Effect is good;
3, water supply line is located on water suction aggregate, above sets coating, prevents soil filling water suction aggregate from losing water suction water storage Effect sets water filling port at 1.5 meters away from tree, at least guarantees the water source supply in 3 directions of every tree, water suction aggregate water suction water storage effect Fruit is good, and lasting moisture can be provided to trees, accelerates arboreal growth;Sedimentation, which has, collects rainwater, water storage, and dredging effect uses Mixed masonry is built, the precipitating well lid in parking lot uses load-bearing catch basin cover, and water filling port is built using brick material, and major function is resistance Only soil pours into water filling nozzle.
To sum up, by rapid-result green shade parking lot, excellent parking environment can not only be provided to city car owner, raising drives, Comfort level by bus provides healthy clean environment for car owner, and increases greenery area, by adjustment region miniclimate, with point Zone face adjusts big ecology, alleviates heat island phenomenon.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become It becomes apparent from and is easier to understand, these attached drawings are only schematical, are not intended to limit the present invention, in which:
Fig. 1 is the schematic view of facade structure in rapid-result ground green shade parking lot of the present invention;
Fig. 2 is the integral planar structural schematic diagram in rapid-result ground green shade parking lot of the present invention;
Fig. 3 is sedimentation setting structure schematic diagram;
Fig. 4 is water filling port setting structure schematic diagram;
Fig. 5 is water storage band setting structure schematic diagram.
Appended drawing reference: the lane 1-, the parking area 2-, 3- water supply line, 31- main pipeline, 32- lateral, 33- upper hose, 4- car stop, 5- arbor, 6- sedimentation, 7- water storage band, 8- water filling port, the ground 9-, 10- soil horizon, 11- braiding material separation layer, 12- Absorb water aggregate layer.
Specific embodiment
Hereinafter, the embodiment in rapid-result ground green shade parking lot of the invention is described with reference to the accompanying drawings.It records herein Embodiment is specific specific embodiment of the invention, for illustrating design of the invention, be it is explanatory and illustrative, It should not be construed as the limitation to embodiment of the present invention and the scope of the invention.In addition to the embodiment recorded herein, art technology Personnel can also use obvious other technical solutions based on the claim of this application book and specification disclosure of that, These technical solutions include using the technical side for making any obvious substitutions and modifications to the embodiment recorded herein Case.
The attached drawing of this specification is schematic diagram, aids in illustrating design of the invention, it is schematically indicated the shape of each section And its correlation.It note that for the ease of clearly showing the structure of each component of the embodiment of the present invention, between each attached drawing Do not drawn according to identical ratio.Identical reference marker is for indicating identical part.
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Such as Fig. 1 and Fig. 2, the present invention devises a kind of rapid-result ground green shade parking lot, including lane 1 and parking area 2, described Parking area 2 is divided into several parking stalls, and the parking stall is equipped with car stop 4, it is characterised in that: the parking area 2 is slope, is leaned on The side in nearly lane 1 is higher than the side far from lane 1;The range of grade of the parking area 2 is 0.5%~1%;Preferred slope is 1%.The lower side in the parking area 2 and both side ends are designed with growth belt, and interval kind is implanted with arbor 5 on the growth belt;Institute It states beside growth belt on ground 9 to have water storage band 7, is embedded with water supply line 3 in the water storage band 7;The water supply line 3 Including main pipeline 31 and the lateral 32 stretched out from main pipeline;The main pipeline 31 is arranged along growth belt, and upper end is connected to upper water Pipe 33;The water outlet of the lateral 32 is embedded in around arbor 5.
The present invention plants trees between Surface parking lots periphery and parking stall, forms green shade parking lot, ground divides into water supply line The method for forming underground bank accelerates arboreal growth, and selected tree species are that tree crown is big, and blade is big, the straight forest of trunk, after growing up to Tree crown be connected in the sky, play the role of sunshade, to guarantee parking stall below under green shade shielding.
Parking position designs gentle slope to trees direction, concentrates the place of Xiang Youshu to collect rainwater, and pass through sedimentation Deng injection underground bank pipeline, it can increase and swim on the ground, underground water provides sufficient nutrient, moisture to forest, makes plant growth Vigorous, big tree with deep roots is flourishing, accelerates arboreal growth, and the tree crown for accelerating adjacent trees is connected in the sky.Dry season, water source Can solve the easy Evaporation Phenomenon of ground watering, water-saving, water storage effect quoted from region tank or municipal water supply to groundwater supply bank Fruit is good.
Wherein, such as Fig. 2, the parking lot that the present embodiment is related to is rectangle, including parallel spaced lane 1 and point Cloth in the parking area 2 of lane two sides, correspondingly, the water supply line 3 include periphery around the rectangle water supply line in parking lot and The "-" type water supply line of growth belt arrangement of the centre between two parking areas 2, the rectangle water supply line and "-" type supply water Pipeline interconnects.
In addition, be arranged at intervals with sedimentation 6 and water filling port 8 on the main pipeline 31, the sedimentation 6 and water filling port 8 with Main pipeline 31 is connected to by lateral.The water supply line 3 is embedded to 250~350mm of the earth's surface of water storage band 7 or less.The storage The top of water band 7 is soil horizon 10, and bottom is water suction aggregate layer 12;It is arranged one between the water suction aggregate layer 12 and soil horizon 10 Layer braiding material separation layer 11, is generally woven with snakeskin and is expected.The width of the water suction aggregate layer 12 is 250~350mm, with a thickness of 450~550mm;The water supply line 3 is horizontally embedded in water suction aggregate layer 12.The water suction aggregate layer 12 is broken foaming Concrete block, broken air-mixed concrete pieces, float stone, vermiculite or haydite.Water supply line is located on water suction aggregate, above sets covering Layer prevents soil filling water suction aggregate from losing water suction water reservation, and water filling port 8 is preferably located at 1.5 meters away from tree, is at least guaranteed every The water source supply in 3 directions of tree, water suction aggregate water suction water storage effect is good, can provide lasting moisture to trees, accelerates trees Growth;Sedimentation, which has, collects rainwater, water storage, and dredging effect, using mixed masonry is built, the precipitating well lid in parking lot uses load-bearing Catch basin cover, water filling port are built using brick material, and major function is that soil is prevented to pour into water filling nozzle;
In addition, the present invention also provides the construction methods in above-mentioned rapid-result ground green shade parking lot, which is characterized in that including as follows Step:
Step 1: parking lot addressing and integral layout setting: carrying out parking lot addressing as needed, and be laid out to it Setting, determines the setting position of lane 1, parking area 2, growth belt and water storage band 7;
Step 2: setting and is laid with water supply line 3 at water storage band 7: 1000 beside the growth belt of parking lot periphery~ Water storage band 7 is arranged in 1500mm, including digs tunnel, be laid with water suction aggregate layer 12, be laid with water supply line 3, be laid with braiding material isolation Layer 11 and progress soil backfill;Sedimentation 6 and water filling port 8 are set simultaneously when being laid with water supply line 3;
Step 3: the construction in lane 1 and parking area 2: slope is arranged along lane direction of travel, close to the side of lane entrance Higher than the side far from lane entrance;
Step 4: the arrangement of growth belt: after the completion of lane 1 and parking area 2 are constructed, carrying out the arrangement of growth belt, planting Plant takes plantation arbor 5, has 32 water outlet of 2-4 lateral around every arbor 5;
Step 5: parking area 2 divides parking stall: parking area 2 being carried out parking stall division, each parking stall is correspondingly arranged car stop 4, and take into account the shading effect of arbor 5;So far, rapid-result ground green shade parking lot construction is completed.
To sum up, by rapid-result green shade parking lot, excellent parking environment can not only be provided to city car owner, raising drives, Comfort level by bus provides healthy clean environment for car owner, and increases greenery area, by adjustment region miniclimate, with point Zone face adjusts big ecology, alleviates heat island phenomenon.The foregoing is merely presently preferred embodiments of the present invention, not to limit this hair Bright, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention Protection scope within.

Claims (7)

1. a kind of short-term training ground green shade parking lot, including lane (1) and parking area (2), the parking area (2) are divided into several stop Parking stall, the parking stall are equipped with car stop (4), it is characterised in that: the parking area (2) is slope, close to the side of lane (1) Higher than the side far from lane (1);The lower side of the parking area (2) and both side ends are designed with growth belt, the plantation It takes interval kind and is implanted with arbor (5);In ground (9) to have water storage band (7) beside the growth belt, the water storage band (7) Inside it is embedded with water supply line (3);The water supply line (3) includes main pipeline (31) and the lateral from main pipeline stretching (32);The main pipeline (31) is arranged along growth belt, and upper end is connected to upper hose (33);It buries the water outlet of the lateral (32) It is located at around arbor (5);
Be arranged at intervals with sedimentation (6) and water filling port (8) on the main pipeline (31), the sedimentation (6) and water filling port (8) with Main pipeline (31) is connected to by lateral;
The range of grade of the parking area (2) is 0.5%~1%;
The top of the water storage band (7) is soil horizon (10), and bottom is water suction aggregate layer (12);
One layer of braiding is set between the water suction aggregate layer (12) and soil horizon (10) and expects separation layer (11).
2. a kind of rapid-result ground green shade parking lot according to claim 1, it is characterised in that: the parking lot is rectangle, Including parallel spaced lane (1) and it is distributed in the parking areas (2) of lane two sides, correspondingly, the water supply line (3) packet The "-" type that periphery is included around the rectangle water supply line in parking lot and the intermediate growth belt arrangement between two parking areas (2) supplies water Pipeline, the rectangle water supply line and "-" type water supply line interconnect.
3. a kind of rapid-result ground green shade parking lot according to claim 1, it is characterised in that: the slope of the parking area (2) Degree is 1%.
4. a kind of rapid-result ground green shade parking lot according to claim 1, it is characterised in that: the water supply line (3) is buried Enter 250~350mm of the earth's surface of water storage band (7) or less.
5. a kind of rapid-result ground green shade parking lot according to claim 1, it is characterised in that: the water suction aggregate layer (12) Width be 250~350mm, with a thickness of 450~550mm;The water supply line (3) is horizontally embedded in water suction aggregate layer (12) In.
6. a kind of rapid-result ground green shade parking lot according to claim 1, it is characterised in that: the water suction aggregate layer (12) For broken foamed concrete block, broken air-mixed concrete pieces, float stone, vermiculite or haydite.
7. a kind of construction method in short-term training ground green shade parking lot, feature described in -6 any one exist according to claim 1 In including the following steps:
Step 1: parking lot addressing and integral layout setting: carrying out parking lot addressing as needed, and be laid out and set to it Set, determine lane (1), parking area (2), growth belt and water storage band (7) setting position;
Step 2: setting and is laid with water supply line (3) at water storage band (7): 1000 beside the growth belt of parking lot periphery~ Water storage band (7) are arranged in 1500mm, including dig tunnel, be laid with water suction aggregate layer (12), be laid with water supply line (3), be laid with braiding Expect separation layer (11) and carry out soil backfill, is arranged sedimentation (6) simultaneously when being laid with water supply line (3), and apart from arbor (5) Water filling port (8) are set at 1.5 meters;
Step 3: the construction of lane (1) and parking area (2): slope is arranged in parking area (2), is higher than close to the side of lane (1) remote Side from lane (1);
Step 4: the arrangement of growth belt: after the completion of lane (1) and parking area (2) constructs, carrying out the arrangement of growth belt, planting Plant takes plantation arbor (5), there is the water outlet of 2-4 lateral (32) around every arbor (5);
Step 5: parking area (2) divide parking stall: parking area (2) being carried out parking stall division, each parking stall is correspondingly arranged car stop (4), and the shading effect of arbor (5) is taken into account, so far, the construction of rapid-result ground green shade parking lot is completed.
CN201610955078.8A 2016-11-03 2016-11-03 A kind of short-term training ground green shade parking lot and its construction method Expired - Fee Related CN106593034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610955078.8A CN106593034B (en) 2016-11-03 2016-11-03 A kind of short-term training ground green shade parking lot and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610955078.8A CN106593034B (en) 2016-11-03 2016-11-03 A kind of short-term training ground green shade parking lot and its construction method

Publications (2)

Publication Number Publication Date
CN106593034A CN106593034A (en) 2017-04-26
CN106593034B true CN106593034B (en) 2019-04-05

Family

ID=58590383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610955078.8A Expired - Fee Related CN106593034B (en) 2016-11-03 2016-11-03 A kind of short-term training ground green shade parking lot and its construction method

Country Status (1)

Country Link
CN (1) CN106593034B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296231A (en) * 2018-03-13 2019-02-01 柯磊明 A kind of sponge ecology parking lot

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1632266A (en) * 2005-01-03 2005-06-29 宁波德安城市生态技术集团有限公司 Environmental protection parking lot
EP1837441A1 (en) * 2006-03-20 2007-09-26 Jan Cornelis Parking place
KR20100019644A (en) * 2008-08-11 2010-02-19 김정훈 Outdoor parking lot structure having protecting device for woody plant
CN103864228A (en) * 2014-03-21 2014-06-18 中国环境科学研究院 Minimally invasive excavated multimedium underground percolating in-situ recharge underground water treatment device
CN204024144U (en) * 2014-04-18 2014-12-17 福建省春天园林工程有限公司 A kind of novel Lin Yin parking lot
CN104264773A (en) * 2014-09-16 2015-01-07 苏州德华生态环境科技有限公司 Flow storage wetland system for treating parking lot rainwater and adjusting microclimate
KR20160064622A (en) * 2014-11-28 2016-06-08 김정현 Parking garage have planting area
CN105781167A (en) * 2016-05-19 2016-07-20 苏州大学 Configuratin and energy conservation effect assessment method for inclined type shadeway parking lot tree species
CN105804198A (en) * 2016-04-06 2016-07-27 上海交通大学 Greenbelt structure integrating rainwater storage and utilization
CN205476690U (en) * 2015-04-01 2016-08-17 江苏省林业科学研究院 Ecological parking area of buried pipe type
CN106022611A (en) * 2016-05-19 2016-10-12 苏州大学 Vertical configuration of trees in shaded parking lot and energy-saving effect assessment method for configuration

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1632266A (en) * 2005-01-03 2005-06-29 宁波德安城市生态技术集团有限公司 Environmental protection parking lot
EP1837441A1 (en) * 2006-03-20 2007-09-26 Jan Cornelis Parking place
KR20100019644A (en) * 2008-08-11 2010-02-19 김정훈 Outdoor parking lot structure having protecting device for woody plant
CN103864228A (en) * 2014-03-21 2014-06-18 中国环境科学研究院 Minimally invasive excavated multimedium underground percolating in-situ recharge underground water treatment device
CN204024144U (en) * 2014-04-18 2014-12-17 福建省春天园林工程有限公司 A kind of novel Lin Yin parking lot
CN104264773A (en) * 2014-09-16 2015-01-07 苏州德华生态环境科技有限公司 Flow storage wetland system for treating parking lot rainwater and adjusting microclimate
KR20160064622A (en) * 2014-11-28 2016-06-08 김정현 Parking garage have planting area
CN205476690U (en) * 2015-04-01 2016-08-17 江苏省林业科学研究院 Ecological parking area of buried pipe type
CN105804198A (en) * 2016-04-06 2016-07-27 上海交通大学 Greenbelt structure integrating rainwater storage and utilization
CN105781167A (en) * 2016-05-19 2016-07-20 苏州大学 Configuratin and energy conservation effect assessment method for inclined type shadeway parking lot tree species
CN106022611A (en) * 2016-05-19 2016-10-12 苏州大学 Vertical configuration of trees in shaded parking lot and energy-saving effect assessment method for configuration

Also Published As

Publication number Publication date
CN106593034A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN201495549U (en) Abandoned automobile tire and packing composite ecological protecting slope
CN110249844A (en) A kind of shade tree tree pond with drainage device
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN100532728C (en) Method for sand-prevention, sand-fixation and planting in desert area
KR100553005B1 (en) The construction method and system of the housetop tree planting
CN105781031A (en) Green roof structure with rainwater retaining ability
CN108951667B (en) Integrated reinforcing method for green ecological side slope
CN103422466B (en) A kind of black smelly river regulation and restoration methods
CN106013624A (en) Technical method of green sponge roof modified on basis of grass planting plate
CN107881875A (en) A kind of karst ecology parking lot and its building method
CN105210494A (en) Loess steep slope is mixed hands over Afforestation method
KR101138018B1 (en) Extensive green roof system and construction method
CN106593034B (en) A kind of short-term training ground green shade parking lot and its construction method
CN207714637U (en) A kind of water storage kind plant roof
CN101548615A (en) Porous nest brick 3D green plant technology
CN206308584U (en) Urban road drainage system
CN106613428A (en) Planting system for preventing water and soil loss
KR102414455B1 (en) Slope anchor block system using Vegetation plate
CN108990782A (en) For a long time naturally to the husky core pipe device and implementation method of big tree root supplement rainwater
CN202090355U (en) Plant-growing side slope ecological protection structure capable of preventing rain wash
CN210507524U (en) Underground garage roof for collecting rainwater and conserving vegetation
CN109457792B (en) Courtyard rainwater collection and purification structure
JP2017079632A (en) Foam insulation bed for plant cultivation
CN205567228U (en) Ecological tree pond
CN105019687A (en) Method for radically controlling desert

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405