CN106592451B - 一种拱桥加固装置及方法 - Google Patents

一种拱桥加固装置及方法 Download PDF

Info

Publication number
CN106592451B
CN106592451B CN201710074538.0A CN201710074538A CN106592451B CN 106592451 B CN106592451 B CN 106592451B CN 201710074538 A CN201710074538 A CN 201710074538A CN 106592451 B CN106592451 B CN 106592451B
Authority
CN
China
Prior art keywords
steel longeron
arch bridge
arch
concrete beam
original concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710074538.0A
Other languages
English (en)
Other versions
CN106592451A (zh
Inventor
张哲�
黄才良
朱巍志
王骞
王会利
谭岩斌
贾光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201710074538.0A priority Critical patent/CN106592451B/zh
Publication of CN106592451A publication Critical patent/CN106592451A/zh
Application granted granted Critical
Publication of CN106592451B publication Critical patent/CN106592451B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Abstract

本发明属于桥梁工程技术领域,提供了一种拱桥加固装置及方法。一种拱桥加固装置,在拱桥原混凝土横梁两侧,增设钢纵梁,拱桥原混凝土横梁穿过钢纵梁,钢纵梁与拱桥原混凝土横梁相互连接成一个整体;该钢纵梁为箱型结构,其内部布置加劲肋。在原拱桥下安装支架,支撑桥面体系;拆除原拱桥的吊杆;分段安装钢纵梁,拱桥原混凝土横梁穿过钢纵梁,钢纵梁与拱桥原混凝土横梁相互连接;安装新吊杆,新吊杆纵向穿过钢纵梁,其下端通过锚头与钢纵梁相连。本发明可以提高横梁‑桥面板体系拱桥的刚度。

Description

一种拱桥加固装置及方法
技术领域
本发明属于桥梁工程技术领域,涉及到桥梁工程中加固,特别涉及一种拱桥加固装置及方法。
背景技术
拱桥分为上承式拱桥、中承式拱桥和下承式拱桥。在中承式拱桥和下承式拱桥中常见横梁-桥面板体系拱桥,即吊杆上端和拱肋相联,下端和横梁相联,在横梁上铺设桥面板,形成桥面系,整个体系没有纵梁。这种体系构造简单,受力明确,但是存在刚度不足的问题,需要加固。目前,桥梁加固方法主要有增大截面法、粘贴钢板加固法、粘贴纤维复合材料加固法、体外预应力加固法和改变体系加固法。
发明内容
本发明的目的是提供一种拱桥加固方法,可以提高横梁-桥面板体系拱桥的刚度。
本发明的技术方案:
一种拱桥加固装置,在拱桥原混凝土横梁1两侧,增设钢纵梁3,拱桥原混凝土横梁1穿过钢纵梁3,钢纵梁3与拱桥原混凝土横梁1相互连接成一个整体;该钢纵梁3为箱型结构,其内部布置加劲肋4。
一种拱桥加固方法,步骤如下:
(1)在原拱桥下安装支架,支撑桥面体系;
(2)拆除原拱桥的吊杆2;
(3)分段安装钢纵梁3,拱桥原混凝土横梁1穿过钢纵梁3,钢纵梁3与拱桥原混凝土横梁1相互连接;
(4)安装新吊杆2,新吊杆2纵向穿过钢纵梁3,其下端通过锚头5与钢纵梁3相连。
本发明的效果和益处是通过增加纵梁,提高横梁-桥面板体系拱桥的刚度。
附图说明
图1是加固后断面图。
图2是加固后立面图。
图中:1拱桥原混凝土横梁;2新吊杆;3钢纵梁;4加劲肋;5锚头。
具体实施方式
以下结合技术方案和附图详细叙述本发明的具体实施方式。
实施例
三跨联拱桥,跨径布置为127+148+127米,桥梁宽度为32.5米,为横梁-桥面板体系拱桥。混凝土横梁高1.8米,宽1.1米。吊杆间距6米。
1.安装支架,支撑桥面体系。
2.拆除原桥吊杆。
3.制作钢纵梁。钢纵梁梁高4.8米,宽3米,壁厚20mm,内设多道纵向加劲肋,高160mm,厚16mm。
4.分段安装钢纵梁。拱桥原混凝土横梁穿过钢纵梁,钢纵梁与拱桥原混凝土横梁相互连接,形成整体。
5.安装新吊杆,下端通过锚头与钢纵梁相连。
6.钢材防腐并完成附属工程。
7.拆除支架。
材料特性:钢纵梁采用Q345q钢,吊杆采用LPES7-139平行钢丝索。
荷载等级:参照原桥荷载等级,满足实际通行要求,可保持不变也可有所提高。

Claims (1)

1.一种拱桥加固装置,其特征在于,在拱桥原混凝土横梁(1)两侧,增设钢纵梁(3),拱桥原混凝土横梁(1)穿过钢纵梁(3),钢纵梁(3)与拱桥原混凝土横梁(1)相互连接成一个整体;该钢纵梁(3)为箱型结构,其内部布置加劲肋(4);
拱桥加固的步骤如下:
(1)在原拱桥下安装支架,支撑桥面体系;
(2)拆除原拱桥的吊杆(2);
(3)分段安装钢纵梁(3),拱桥原混凝土横梁(1)穿过钢纵梁(3)的内部,钢纵梁(3)与拱桥原混凝土横梁(1)相互连接;
(4)安装新吊杆(2),新吊杆(2)纵向穿过钢纵梁(3),其下端通过锚头(5)与钢纵梁(3)相连。
CN201710074538.0A 2017-02-16 2017-02-16 一种拱桥加固装置及方法 Active CN106592451B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710074538.0A CN106592451B (zh) 2017-02-16 2017-02-16 一种拱桥加固装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710074538.0A CN106592451B (zh) 2017-02-16 2017-02-16 一种拱桥加固装置及方法

Publications (2)

Publication Number Publication Date
CN106592451A CN106592451A (zh) 2017-04-26
CN106592451B true CN106592451B (zh) 2018-07-06

Family

ID=58585597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710074538.0A Active CN106592451B (zh) 2017-02-16 2017-02-16 一种拱桥加固装置及方法

Country Status (1)

Country Link
CN (1) CN106592451B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868757A (zh) * 2019-04-08 2019-06-11 大连理工大学 一种悬吊体系拱桥的加固装置及方法
CN115125875A (zh) * 2022-08-16 2022-09-30 浙江交工高等级公路养护有限公司 一种桥面减载加固结构及施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218429A (ja) * 1998-02-12 2004-08-05 Nippon Steel Corp 橋梁構造
CN102322026A (zh) * 2011-08-24 2012-01-18 重庆交通大学 一种圬工拱桥的加固方法
CN103758046A (zh) * 2013-12-31 2014-04-30 中铁大桥局股份有限公司 钢管混凝土拱桥主梁结构的加固方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218429A (ja) * 1998-02-12 2004-08-05 Nippon Steel Corp 橋梁構造
CN102322026A (zh) * 2011-08-24 2012-01-18 重庆交通大学 一种圬工拱桥的加固方法
CN103758046A (zh) * 2013-12-31 2014-04-30 中铁大桥局股份有限公司 钢管混凝土拱桥主梁结构的加固方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
加设钢管桁架纵梁改造中承式拱桥悬挂桥道系的应用研究;彭桂瀚等;《公路工程》;20090630;全文 *
某大跨度钢管混凝土拱桥静动载检测、病害及其加固分析;欧耀文等;《郑州大学学报(工学版)》;20030930;全文 *

Also Published As

Publication number Publication date
CN106592451A (zh) 2017-04-26

Similar Documents

Publication Publication Date Title
Mavlonov et al. Strengthening reinforced concrete members
CN105064511A (zh) 预应力空心楼板与h型钢梁的连接构造及其施工方法
CN105484151B (zh) 一种增强预制混凝土节段间连接的构造及其施工方法
CN102535743B (zh) 无粘结预应力型钢混凝土梁
CN103334378B (zh) 混凝土自锚式悬索桥吊索少循环分级张拉施工方法
CN106592451B (zh) 一种拱桥加固装置及方法
CN104060542B (zh) 组合梁斜拉桥横桥向预应力施加装置及其施加方法
CN207739126U (zh) 一种新型装配式预应力钢混桥跨结构
CN107956201A (zh) 用于波形钢腹板pc 组合箱梁桥的双层波形钢腹板及施工
CN106567548B (zh) 方形原煤斗分段安装工法
CN104328747A (zh) 一种桥梁单板受力的加固方法及其施工方法
CN103194982B (zh) 桥梁边跨现浇段短悬臂支架施工方法
CN205036070U (zh) 一种悬挑架梁侧全预埋安装搭设装置
CN202611719U (zh) 隧道二次衬砌钢筋保护层厚度控制装置
CN106758773A (zh) 一种钢混组合梁桥的剪力连接件
CN102733321A (zh) 既有桥梁加固用悬吊支架体系及其搭建方法
CN205024843U (zh) 预应力空心楼板与h型钢梁的连接构造
CN104583496B (zh) 无弦杆桁元法与组合式节点桥梁
CN104110102A (zh) 一种用于快速准确定位的预应力波纹管固定装置及方法
CN103924741A (zh) 带十字形约束缀板箱形钢骨约束混凝土柱及作法
CN206693041U (zh) 索道桥钢横梁
CN103510521A (zh) 一种连接部件
CN108824175A (zh) Y型带法兰连接的悬挂式单轨用缓粘结预应力预制桥墩
CN203684115U (zh) 一种拓宽薄壁的混凝土箱梁
CN202882217U (zh) 无粘结预应力型钢混凝土梁

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant