CN106592410A - Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module - Google Patents
Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module Download PDFInfo
- Publication number
- CN106592410A CN106592410A CN201710016838.3A CN201710016838A CN106592410A CN 106592410 A CN106592410 A CN 106592410A CN 201710016838 A CN201710016838 A CN 201710016838A CN 106592410 A CN106592410 A CN 106592410A
- Authority
- CN
- China
- Prior art keywords
- bridge
- supercrust
- integrated box
- parking tier
- storehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/08—Garages for many vehicles
- E04H6/12—Garages for many vehicles with mechanical means for shifting or lifting vehicles
- E04H6/18—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
- E04H6/188—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions using only vertical transport means
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a bridge and garage integrated box type module which comprises at least one pavement layer and at least one parking layer, wherein the pavement layer and the parking layer are arranged up and down in parallel and the pavement layer and the parking layer are integrally connected with each other through a connecting piece. A mounting method for the bridge and garage integrated box type module comprises the following steps: arranging piers along the road extending direction; arranging the bridge and garage integrated box type modules on the piers and successively splicing front and back; forming a road after splicing the pavement layers of the bridge and garage integrated box type modules; forming a garage after splicing the parking layers of the bridge and garage integrated box type modules; adding ramp ways and connecting the road with the garage. According to the bridge and garage integrated box type module and the mounting method thereof provided by the invention, a large quantity of materials and construction cost can be saved, the utilization of the urban traffic resources is greatly promoted and the construction time is greatly shortened.
Description
Technical field
The present invention relates to urban construction bridging field, more particularly to a kind of bridge storehouse integrated box pattern block and bridge storehouse integrated box pattern
The installation method of block.
Background technology
At present, due to automobile quantity abruptly increase, traffic route garage area relative narrower, part road direct of travel does not conform to
The cause influences such as reason, viaduct single function, cause the not smooth situation of present serious traffic congestion and logistics, serious restriction
Auto industry and relevant industries normal development, while also constrain the fast development of the entire society productivity.In order to solve this
An individual increasingly severe worldwide traffic congestion difficult problem, causes governments at all levels' consumption huge fund, work hard regulation traffic congestion, such as:Build
If viaduct, widening road, build subway, build fast rail electric car and automobile limit purchase.But, due to exploding for automobile quantity, these do
Method all cannot fundamentally solve traffic jam issue.
Parking lot is typically built in residential quarter, on the way ground of street corner, now newly-built mansion and residential quarter underground parking
Position, as China's reform and opening-up is continued deeper into, the violent speed development of social economy, and each big city downtown and developed area city
Center parking stall is nervous and affect vehicle to go down town parking difficulty.
In order to solve above-mentioned traffic, parking problem, first road and parking lot are built together.Referring to Publication No.:
In CN102425088A- elevated multilayer stereo steel structure traffic bridges, CN102535907A- three-dimensional paring lot of city-center overhead viaduct
State's patent, is top driving, the pattern of bottom parking, but it is using traditional pattern of building, waste of material and construction
Cost it is big, substantially reduce the utilization of urban transportation resource, additionally, there may be build man-hour it is long the drawbacks of.
The content of the invention
It is an object of the present invention to provide a kind of bridge storehouse integrated box pattern block.
To reach above-mentioned purpose, the technical solution used in the present invention is:
A kind of bridge storehouse integrated box pattern block, including at least one of which supercrust, at least one of which parking tier, described supercrust, parking
Layer be arranged in parallel in the vertical direction, is linked into an integrated entity by connecting portion between described supercrust and described parking tier.
Preferably, at least side of described supercrust and/or described parking tier is provided with enclosing portion.
It is further preferred that being provided with positioned at least side of the supercrust described in next layer or described parking tier described
Enclosing portion, and described enclosing portion extends to and forms described positioned at the supercrust described in upper strata or described parking tier bottom
Connecting portion.
Preferably, it is provided with the spacer portion for extending along the longitudinal direction on described supercrust and/or described parking tier.
It is further preferred that being provided with described interval on the supercrust described in next layer or described parking tier
Portion, and described spacer portion extends to the connection described in being formed positioned at the supercrust described in upper strata or described parking tier bottom
Portion.
Preferably, described supercrust and described parking tier are provided with one layer, and described supercrust is located at described
The top of parking tier.
It is a further object to provide a kind of installation method of bridge storehouse integrated box pattern block.
To reach above-mentioned purpose, the technical solution used in the present invention is:
A kind of installation method of bridge storehouse integrated box pattern block, arranges bridge pier, by described bridge storehouse one including along road bearing of trend
Body box module is arranged on described bridge pier and is spliced successively in front and back, the road of multiple described bridge storehouse integrated box pattern blocks
Road is formed after surface layer splicing, after the parking tier splicing of multiple described bridge storehouse integrated box pattern blocks garage is formed, add side slope
The road and described garage led the way described in connection.
Preferably, the supercrust of described bridge storehouse integrated box pattern block, the left and right sides of parking tier are provided with enclosing portion, add
Plus described side slope is when leading the way, the enclosing portion described in part is first removed, formed at least side of described supercrust, parking tier
Connection breach, described side slope is led the way by the described road surface of described connection breach connection and described garage.
Preferably, the supercrust of described bridge storehouse integrated box pattern block, the middle setting of parking tier have prolongs along the longitudinal direction
The spacer portion stretched, removes the spacer portion described in part and forms the breach that turns around.
Preferably, elevator is connected between described garage and ground.
Because above-mentioned technical proposal is used, the present invention has compared with prior art following advantages and effect:
The bridge storehouse integrated box pattern block of the present invention and the installation carried out to it, can in a large number save material and the cost built, greatly
The big utilization for improving urban transportation resource, greatly shortens the engineering time.
Description of the drawings
Accompanying drawing 1 is the structural representation of the present embodiment jackshaft storehouse integrated box pattern block;
Accompanying drawing 2 is the structural representation in the present embodiment jackshaft storehouse;
Accompanying drawing 3 is the structural representation in the present embodiment jackshaft storehouse(Omit road surface part).
Wherein:1st, bridge storehouse integrated box pattern block;10th, supercrust;11st, parking tier;12nd, connecting portion;13rd, enclosing portion;130、
Connection breach;14th, spacer portion;140th, turn around breach;2nd, bridge pier;3rd, side slope is led the way;4th, elevator.
Specific embodiment
Below in conjunction with the accompanying drawings and case study on implementation the invention will be further described:
A kind of bridge storehouse integrated box pattern block, including at least one of which supercrust 10, at least one of which parking tier 11, supercrust 10, parking
Layer 11 be arranged in parallel in the vertical direction, is linked into an integrated entity by connecting portion 12 between supercrust 10 and parking tier 11.
In order to ensure the safety for travelling or parking cars on supercrust 10, parking tier 11, in supercrust 10 and parking tier
11 left and right sides is provided with enclosing portion 13.It is oriented to travel or parking cars on satisfy the need surface layer 10 and parking tier 11
Or shunting, the spacer portion 14 for extending along the longitudinal direction is provided with supercrust 10 and parking tier 11, spacer portion 14 is arranged
One or more, so as to form one or more track.
Connecting portion 12 has two kinds of forms:Enclosing portion 13 on next layer of supercrust 10 or parking tier 11 extends to position
Connecting portion 12 is formed in upper strata supercrust 10 or the bottom of parking tier 11;Or on next layer of supercrust 10 or parking tier 11
Spacer portion 14 is extended to and forms connecting portion 12 positioned at upper strata supercrust 10 or the bottom of parking tier 11.
As shown in Figure 1:In the present embodiment:Supercrust 10 and parking tier 11 are provided with one layer, and supercrust 10 is located at and stops
The top of layer 11, the both sides of supercrust 10 are provided with enclosing portion 13, and the middle setting of supercrust 10 has a spacer portion 14;Stop
The both sides of layer 11 are also provided with enclosing portion 13, are also equipped with a spacer portion 14 in the middle of parking tier 11, and parking tier 11
Enclosing portion 13, spacer portion 14 extend to the bottom of supercrust 10 and form connecting portion 12, and supercrust 10 and parking tier 11 are connected into into one
Individual all-in-one-piece module.
Wherein:The parking tier 11 of each bridge storehouse integrated box pattern block 1 can be provided such as 7-12 parking stall according to size,
A kind of installation method of bridge storehouse integrated box pattern block, using bridge storehouse integrated box pattern block 1 as shown in Figure 1, specifically includes:
Bridge pier 2 is set along road bearing of trend, bridge storehouse integrated box pattern block 1 is arranged on bridge pier 2 and is spelled successively in front and back
Connect, the supercrust 10 of multiple bridge storehouse integrated box pattern blocks 1 forms road, the parking of multiple bridge storehouse integrated box pattern blocks 1 after splicing
Self-service garage is formed after the splicing of layer 11;
The enclosing portion 13 of part supercrust 10 and the both sides of parking tier 11 is removed, in supercrust 10, at least side shape of parking tier 11
Into connection breach 130, addition side slope leads the way 3 by the connection road surface of connection breach 130 and garage, realizes the company in road surface and garage
It is logical;
Remove part supercrust 10 and 11 mid portion spacer portion of parking tier 14 forms the breach 140 that turns around, positioned at the He of supercrust 10
The vehicle of parking tier 11 can be turned around by the breach 140 that turns around, it is current etc. to circulate;
Additionally, connecting elevator 4 between garage and ground, it is easy to pedestrian or vehicle discrepancy garage to be passed through, stopped or taken
Car etc..
Can be carried out by modes such as bolts between bridge storehouse integrated box pattern block 1 and bridge storehouse integrated box pattern block 1, bridge pier 2
Connection, fastening, it is ensured that the safety of whole bridge library structure.
A kind of bridge library structure as shown in Figure 2,3, the bridge library structure is and is installed to be formed by the installation method in bridge storehouse.
Above-described embodiment technology design only to illustrate the invention and feature, its object is to allow person skilled in the art
Scholar will appreciate that present disclosure and implement according to this, can not be limited the scope of the invention with this.It is all according to the present invention
Equivalence changes or modification that spirit is made, all should be included within the scope of the present invention.
Claims (10)
1. a kind of bridge storehouse integrated box pattern block, it is characterised in that:It is described including at least one of which supercrust, at least one of which parking tier
Supercrust, parking tier be arranged in parallel in the vertical direction, connecting portion is passed through between described supercrust and described parking tier
Link into an integrated entity.
2. integrated box pattern block in bridge storehouse according to claim 1, it is characterised in that:Described supercrust and/or described
At least side of parking tier is provided with enclosing portion.
3. integrated box pattern block in bridge storehouse according to claim 2, it is characterised in that:Positioned at the supercrust described in next layer or
At least side of described parking tier is provided with described enclosing portion, and described enclosing portion is extended to positioned at described in upper strata
Described connecting portion is formed on supercrust or described parking tier bottom.
4. integrated box pattern block in bridge storehouse according to claim 1, it is characterised in that:Described supercrust and/or described
The spacer portion for extending along the longitudinal direction is provided with parking tier.
5. integrated box pattern block in bridge storehouse according to claim 4, it is characterised in that:Positioned at the supercrust described in next layer or
Be provided with described spacer portion on described parking tier, and described spacer portion extend to positioned at the supercrust described in upper strata or
Described connecting portion is formed on described parking tier bottom.
6. integrated box pattern block in bridge storehouse according to claim 1, it is characterised in that:Described supercrust and described parking
Layer is provided with one layer, and described supercrust is located at the top of described parking tier.
7. the installation method of the bridge storehouse integrated box pattern block in a kind of claim 1 to 6 described in any one claim, it is special
Levy and be:Bridge pier is set including along road bearing of trend, described bridge storehouse integrated box pattern block is arranged on described bridge pier
And spliced successively in front and back, road is formed after the supercrust splicing of multiple described bridge storehouse integrated box pattern blocks, it is multiple described
Bridge storehouse integrated box pattern block parking tier splicing after form garage, add side slope and lead the way the described road of connection and described car
Storehouse.
8. installation method according to claim 7, it is characterised in that:The supercrust of described bridge storehouse integrated box pattern block,
The left and right sides of parking tier is provided with enclosing portion, when the described side slope of addition is led the way, the enclosing portion described in part is first removed, in institute
Supercrust, at least side formation connection breach of parking tier stated, described side slope is led the way and connected by described connection breach
Described road surface and described garage.
9. installation method according to claim 7, it is characterised in that:The supercrust of described bridge storehouse integrated box pattern block,
The middle setting of parking tier has the spacer portion for extending along the longitudinal direction, removes the spacer portion described in part and forms the breach that turns around.
10. installation method according to claim 7, it is characterised in that:Connect elevator between described garage and ground.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710016838.3A CN106592410A (en) | 2017-01-10 | 2017-01-10 | Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module |
PCT/CN2017/077027 WO2018129802A1 (en) | 2017-01-10 | 2017-03-17 | Bridge and garage integrated box type module and mounting method therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710016838.3A CN106592410A (en) | 2017-01-10 | 2017-01-10 | Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106592410A true CN106592410A (en) | 2017-04-26 |
Family
ID=58583220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710016838.3A Pending CN106592410A (en) | 2017-01-10 | 2017-01-10 | Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106592410A (en) |
WO (1) | WO2018129802A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577715A (en) * | 2018-12-11 | 2019-04-05 | 安徽江淮汽车集团股份有限公司 | A kind of transmission method of automatic parking lot |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2638480A1 (en) * | 1988-10-27 | 1990-05-04 | Krupp Tech Indles | New mechanical underground parking area |
CN202073022U (en) * | 2011-05-06 | 2011-12-14 | 张国信 | Multifunctional combination bridge of urban street |
CN103255693A (en) * | 2013-05-23 | 2013-08-21 | 苏州荣生大方路桥建设工程有限公司 | Assembled type three-dimensional urban road system and rapid installing method |
CN203394124U (en) * | 2013-07-30 | 2014-01-15 | 郭宏斌 | Automobile storage yard |
CN205206425U (en) * | 2015-12-09 | 2016-05-04 | 厦门三赢企业管理咨询有限公司 | City minor road sky parking field |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4953249A (en) * | 1989-09-11 | 1990-09-04 | Warwick Jack A | Modular overpass or raised parking structure |
CN1916287A (en) * | 2005-08-16 | 2007-02-21 | 李晓亮 | Bridge with parking garage |
CN201460335U (en) * | 2009-06-15 | 2010-05-12 | 李云波 | Urban road underground parking garage layout structure |
CN202380788U (en) * | 2012-01-06 | 2012-08-15 | 陈仁多 | Three-dimensional parking lot below elevated bridge in city center |
CN203741691U (en) * | 2014-02-20 | 2014-07-30 | 苏州荣宝升城市建设有限公司 | Assembled type temporary steel bridge |
-
2017
- 2017-01-10 CN CN201710016838.3A patent/CN106592410A/en active Pending
- 2017-03-17 WO PCT/CN2017/077027 patent/WO2018129802A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2638480A1 (en) * | 1988-10-27 | 1990-05-04 | Krupp Tech Indles | New mechanical underground parking area |
CN202073022U (en) * | 2011-05-06 | 2011-12-14 | 张国信 | Multifunctional combination bridge of urban street |
CN103255693A (en) * | 2013-05-23 | 2013-08-21 | 苏州荣生大方路桥建设工程有限公司 | Assembled type three-dimensional urban road system and rapid installing method |
CN203394124U (en) * | 2013-07-30 | 2014-01-15 | 郭宏斌 | Automobile storage yard |
CN205206425U (en) * | 2015-12-09 | 2016-05-04 | 厦门三赢企业管理咨询有限公司 | City minor road sky parking field |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577715A (en) * | 2018-12-11 | 2019-04-05 | 安徽江淮汽车集团股份有限公司 | A kind of transmission method of automatic parking lot |
Also Published As
Publication number | Publication date |
---|---|
WO2018129802A1 (en) | 2018-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147600B (en) | Method for using miniature open stereo garage arranged by narrow and small roadside | |
CN105971336A (en) | Use method of structure type of three-dimensional garage and passenger foot-bridge combination body across and above road | |
WO2014071543A1 (en) | Municipal crossroads structure | |
CN204530359U (en) | City multilayer loop island overpass bridge | |
CN102730011A (en) | Monorail suspension type dual-power electric bus | |
CN102730004A (en) | Overhead type public traffic operation scheme | |
CN103643607B (en) | Totally-enclosed full-overpass bus rapid transit approach system | |
CN2706555Y (en) | Overhead parking area for use above urban road | |
CN104963252A (en) | Urban multilayer roundabout viaduct | |
CN202099708U (en) | Novel low overpass for road intersection | |
CN111455799B (en) | Double-layer assembled viaduct and construction method thereof | |
CN106592410A (en) | Bridge and garage integrated box type module and mounting method for bridge and garage integrated box type module | |
WO2020048459A1 (en) | Monorail transportation-based spatial transport system | |
CN104195909A (en) | Non-elevated tiny urban cross overpass | |
CN103898820B (en) | Quasi rail transit road system | |
CN201047046Y (en) | Intercommunicating overpass passage | |
CN1779075A (en) | Two-storey and three-storey connected overpass without cross with one-storey on ground surface | |
CN108978384A (en) | A kind of ground straight trip viaduct | |
CN204139677U (en) | The underground garage that roadside strip people car is upper and lower altogether | |
WO2008025201A1 (en) | An overhead low-speed road | |
CN204676382U (en) | People walks level land car and walks up and down only this bus and to give in each other intersection | |
CN207194547U (en) | The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge four | |
CN1928240A (en) | Vehicle and passerby shared pedstrain bridge | |
CN103088733A (en) | Anti-congestion three-dimensional traffic system | |
CN203308140U (en) | Parking garage arranged at crossroad |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |