CN201047046Y - Intercommunicating overpass passage - Google Patents

Intercommunicating overpass passage Download PDF

Info

Publication number
CN201047046Y
CN201047046Y CNU2007200851502U CN200720085150U CN201047046Y CN 201047046 Y CN201047046 Y CN 201047046Y CN U2007200851502 U CNU2007200851502 U CN U2007200851502U CN 200720085150 U CN200720085150 U CN 200720085150U CN 201047046 Y CN201047046 Y CN 201047046Y
Authority
CN
China
Prior art keywords
passage
underground
crossing
trunk roads
major trunk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200851502U
Other languages
Chinese (zh)
Inventor
刘毅中
江才明
聂恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200851502U priority Critical patent/CN201047046Y/en
Application granted granted Critical
Publication of CN201047046Y publication Critical patent/CN201047046Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model which relates to an intercommunication interchange channel comprises mutually crossed two or a plurality of main roads, and an underground channel is arranged at a crossroad, and two ends of the underground channel are provided with a slope way which is connected with one of the main roads, and each main road which is 100 meters to 1000 meters far from the crossroad is provided with a pedestrian and non-motorized vehicle underground crossing street channel, and one side of the pedestrian and non-motorized vehicle underground crossing street channel is provided with round arc shaped crossing street blind passes, and cuts of the round arcs are opposite to the crossroad, and the slope way which is connected with the road on two sides of the main road is arranged at two ends of the round arc shaped crossing street blind passes for the in and out of motor vehicles which turn left to change the driving direction. The utility model can leads the city motor vehicles do the fast and safe pass under the situation of no traffic lights.

Description

The interchange passage
Technical field
The utility model belongs to urban transportation facility.Particularly a kind of interchange passage.
Background technology
It is the bottleneck of urban road that the blocking up of urban road becomes the current of global problem, especially a road junction.To block up in order improving, shunt the current of all directions with regard to the mode that overpass bridge, viaduct have occurred, but this facility investment to be huge, floor space big and also destroyed around the view harmony.Cause the waste of resource, cost is too high.On the road of plane traffic, though by traffic lights control, dotted line can allow break-in to turn round in the traffic rules, a large amount of break-ins turns round that appearance of vehicle is easily stopped up and in order to reduce obstruction, the dotted line that allows to turn round is usually away from the intersection, and automobile still will run more road like this.And motor vehicle bides one's time and can not stop working at cross road mouth etc., and there is oil consumption in idle running.It is estimated that the car of a 1.6L discharge capacity waits red light one time, 2 minutes consuming time at least, 0.04 liter of oil consumption caused very big waste.
Summary of the invention
The purpose of this utility model is to provide a kind of interchange passage that city intersection does not have traffic lights that is used for.
The utility model is realized by following technical scheme:
A kind of interchange passage, comprise two or many major trunk roads crossing one another, be provided with underground passage at crossing intersection part, underground passage two is provided with the ramp and is connected with wherein major trunk roads. 100 meters to 1000 meters in the distance intersection, be equipped with the underground street passage of crossing of People's Bank of China and bicycle on every major trunk roads, be provided with circular arc and cross the street secret tunnel in underground street passage one side of crossing of People's Bank of China and bicycle, the opening of circular arc is all over against the intersection, circular arc secret tunnel two ends are provided with the ramp and are connected with road surface, major trunk roads both sides. and can be for the turnover of left-hand bend motor vehicle, to change travel direction.
For the T-shaped crossroad, the scheme that the utility model is more optimized is, selecting wherein, dead end highway is provided with underground passage at crossing intersection part, being equipped with the ramp on three major trunk roads of T-shaped intersection is connected with underground passage. 100 meters to 1000 meters in the distance intersection, be equipped with the underground street passage of crossing of People's Bank of China and bicycle on every major trunk roads, be provided with circular arc and cross the street secret tunnel in underground street passage one side of crossing of People's Bank of China and bicycle, the opening of circular arc is all over against the intersection, and circular arc secret tunnel two ends are provided with the ramp.
Because above-mentioned reasonable Arrangement has been taked in the utility model design, contrasting existing overhead grade separation has following advantage:
1. reduced investment.Overhead grade separation is mainly prestressed reinforced concrete structure, and pile foundation is also dark; The genuine overpass bridge of the full intercommunication of the utility model is mainly compacted subgrade and asphalt concrete pavement, and cost is much lower, and the upper strata road has utilized old roadbed and road surface can save engineering quantity.Therefore, identical works limit, investment only reaches 1/10th of overhead overpass bridge, and that the duration will lack is over half.
2. disturb light.Can layering, the framing construction, traffic control also is half-open semi-closure.Such as, the genuine construction of lower floor, the upper strata road is open to traffic as usual; Left side width of cloth construction, the right width of cloth can be open to traffic or the like.The Bu Cheng amount is few in addition, and the duration is short, and is relatively light to the interference of traffic.
3. the tunnel of underpass highway and other secret tunnels are used for traffic at ordinary times, and can do the people's air defense blindage wartime, and manufacturing products for both peacetime and wartime us has more far-reaching strategic importance.
Description of drawings
Fig. 1 is the structural representation of embodiment 1.
Fig. 2 is the structural representation of embodiment 2.
The specific embodiment
Embodiment 1, a kind of interchange passage, comprise two of crossing one another or many major trunk roads 1 and 2, be provided with underground passage 3 at crossing intersection part, underground passage two is provided with ramp 4 and is connected with major trunk roads 2. on the major trunk roads 1 and 2 at 500 meters, distance intersection, be equipped with the underground street passage 7 of crossing of People's Bank of China and bicycle, cross street passage 7 two ends and also be provided with ramp 6, be provided with circular arc and cross street secret tunnel 8 in underground passage 7 outsides, street of crossing of People's Bank of China and bicycle, the opening of circular arc is all over against the intersection, and circular arc secret tunnel two ends are provided with ramp 5 and are connected with the road surface of major trunk roads both sides.
Embodiment 2, comprise the T-shaped crossroad, selecting wherein, dead end highway is provided with underground passage 3 at crossing intersection part, being equipped with ramp 4 on three major trunk roads of T-shaped intersection is connected with underground passage. and on the major trunk roads at 200 meters, distance intersection, be equipped with the underground street passage 7 of crossing of People's Bank of China and bicycle, cross passage 7 two ends, street and also be provided with ramp 6.

Claims (3)

1. interchange passage, comprise two or many major trunk roads crossing one another, it is characterized in that: be provided with underground passage at crossing intersection part, underground passage two is provided with the ramp and is connected with wherein major trunk roads. and 100 meters to 1000 meters in the distance intersection are equipped with the underground street passage of crossing of People's Bank of China and bicycle on every major trunk roads.
2. interchange passage according to claim 1, it is characterized in that: be provided with circular arc and cross the street secret tunnel in underground street passage one side of crossing of People's Bank of China and bicycle, the opening of circular arc is all over against the intersection, and circular arc secret tunnel two ends are provided with the ramp and are connected with road surface, major trunk roads both sides.
3. interchange passage according to claim 1, it is characterized in that: two major trunk roads that cross one another are the T-shaped crossroad, wherein dead end highway is provided with underground passage 3 at crossing intersection part, is equipped with ramp 4 and is connected with underground passage on three major trunk roads of T-shaped intersection.
CNU2007200851502U 2007-06-05 2007-06-05 Intercommunicating overpass passage Expired - Fee Related CN201047046Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200851502U CN201047046Y (en) 2007-06-05 2007-06-05 Intercommunicating overpass passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200851502U CN201047046Y (en) 2007-06-05 2007-06-05 Intercommunicating overpass passage

Publications (1)

Publication Number Publication Date
CN201047046Y true CN201047046Y (en) 2008-04-16

Family

ID=39299622

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200851502U Expired - Fee Related CN201047046Y (en) 2007-06-05 2007-06-05 Intercommunicating overpass passage

Country Status (1)

Country Link
CN (1) CN201047046Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603248A (en) * 2013-12-06 2014-02-26 彭章义 Multifunctional flyover
CN104093906A (en) * 2012-11-12 2014-10-08 霍树添 T-junction structure
CN107217561A (en) * 2017-07-10 2017-09-29 王敬 The existing road in downtown area dredges the stifled system design scheme that passes unimpeded
CN112342853A (en) * 2020-10-27 2021-02-09 王岩 Crossroad people car reposition of redundant personnel traffic structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104093906A (en) * 2012-11-12 2014-10-08 霍树添 T-junction structure
CN104093906B (en) * 2012-11-12 2016-08-31 霍树添 T junction structure
CN103603248A (en) * 2013-12-06 2014-02-26 彭章义 Multifunctional flyover
CN107217561A (en) * 2017-07-10 2017-09-29 王敬 The existing road in downtown area dredges the stifled system design scheme that passes unimpeded
CN112342853A (en) * 2020-10-27 2021-02-09 王岩 Crossroad people car reposition of redundant personnel traffic structure

Similar Documents

Publication Publication Date Title
CN202247574U (en) Three-dimensional crossroad of traffic road
UA95102C2 (en) Hexagonal roadway system and traffic flow control
CN204530359U (en) City multilayer loop island overpass bridge
CN1888312A (en) City motor vehicle road system with no conflicting point
CN201047046Y (en) Intercommunicating overpass passage
CN203222713U (en) Three-dimensional crossed semi-underground overpass
CN104963252A (en) Urban multilayer roundabout viaduct
CN106381788A (en) Whole-net connection structure of urban road
CN201411610Y (en) Clothoid type intercommunicating flyover
CN203049396U (en) Quick intersection overpass
CN1102229A (en) Urban highway grade separation traffic system
CN211547125U (en) Special lane of multi-functional bicycle under city overpass
CN201024362Y (en) Conflict-free urban automobile road system
CN103898820A (en) Quasi rail transit road system
WO2014071540A1 (en) Crossroads structure to facilitate re-modelling of established crossroads
CN202509392U (en) Fast installing-dismounting city small car over-bridge
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN202671991U (en) Small universal unblocked overpass
CN110318309A (en) A kind of sunk type of underway intersection is dedicated to ride
CN205501746U (en) Light automobile steel of highway T crossing constructs overpass structures
CN202039260U (en) Overpass
CN204959529U (en) Fast -slow separation grade separation system
CN206385409U (en) Interchange overpass
CN203334150U (en) Fast intersection turning bridge
CN202450404U (en) Pavement structure for evacuating traffic jams

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080416

Termination date: 20100605