CN106555401B - 用于导向管上部定位的台架 - Google Patents

用于导向管上部定位的台架 Download PDF

Info

Publication number
CN106555401B
CN106555401B CN201610919183.6A CN201610919183A CN106555401B CN 106555401 B CN106555401 B CN 106555401B CN 201610919183 A CN201610919183 A CN 201610919183A CN 106555401 B CN106555401 B CN 106555401B
Authority
CN
China
Prior art keywords
rack
guide pipe
casing
adjusting
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610919183.6A
Other languages
English (en)
Other versions
CN106555401A (zh
Inventor
卢礼顺
胡晓虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.
WUGUANG (SHANGHAI) BASE ENGINEERING Co.,Ltd.
Original Assignee
Kaiputian (shanghai) International Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaiputian (shanghai) International Trade Co Ltd filed Critical Kaiputian (shanghai) International Trade Co Ltd
Priority to CN201610919183.6A priority Critical patent/CN106555401B/zh
Publication of CN106555401A publication Critical patent/CN106555401A/zh
Application granted granted Critical
Publication of CN106555401B publication Critical patent/CN106555401B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明涉及一种用于导向管上部定位的台架,由角钢焊接成正方形框架,所述正方形框架的下面四角设有支撑角钢,支撑角钢之间连接有横杆,横杆中间装有加强螺栓,用于与护筒定位固定。台架通过位于四个支撑角钢外侧的机械千斤顶与基坑的地面钢板可调节连接。使用时,台架与护筒之间通过调节四个加强螺栓,使台架中心与护筒中心一致,并通过四个机械千斤顶调节,使台架中心轴线与护筒中心轴线重叠,调整好后的台架内插入导向管,导向管通过导向管定位钢板定位固定在台架上。本发明用于安装导向管,导向管用于钢立柱的导向,导向精度高;台架通过四个加强螺栓和四个机械千斤顶的调节中心和垂直度,能确保导向管上部的定位精度;台架结构简单,使用方便。

Description

用于导向管上部定位的台架
技术领域
本发明涉及一种用于超深超大基坑、盖挖逆作基坑、地铁换乘站基坑的一柱一桩,尤其是一种用于导向管上部定位的台架。
背景技术
一柱一桩广泛应用于超深超大基坑、盖挖逆作基坑、地铁换乘站基坑。其施工垂直度要求比一般的工程桩高出许多,一般要求控制在1/500~1/600 。目前采用的一柱一桩施工方法,施工垂直度只能达到1/300 。如何确保一柱一桩垂直度的高精度,至少1/600以上,减小由于钢立柱的垂直偏差造成的后期工程问题? 急需要一种钢立柱导向管插入法工艺以及导向管、台架。
发明内容
本发明提出一种用于导向管上部定位的台架,用于实现导向管上部定位,确保一柱一桩垂直度的高精度,减小由于钢立柱的垂直偏差造成的后期工程问题。
为实现上述目的,本发明的技术方案是:一种用于导向管上部定位的台架,由角钢焊接成正方形框架,所述正方形框架的下面四角设有支撑角钢,支撑角钢之间连接有横杆,横杆中间装有加强螺栓,用于与护筒定位固定。
所述正方形框架的外形尺寸为3650 mm×3650mm,其高度H为200—5000 mm。
所述台架通过位于四个支撑角钢外侧的机械千斤顶与基坑的地面钢板可调节连接。
使用时,所述台架与护筒之间通过调节四个加强螺栓,使台架中心与护筒中心一致,并通过调节四个机械千斤顶,使台架中心轴线与护筒中心轴线重叠,调整好后的台架内插入导向管,导向管通过导向管定位钢板定位固定在台架上。
本发明的有益效果是:
1、台架来连接长导向管,导向管用于钢立柱的导向,导向精度高 ;
2、台架通过四个加强螺栓和四个机械千斤顶的调节中心和垂直度,能确保导向管上部的定位精度;
3、台架结构简单,使用方便。
附图说明
图1为本发明的用于导向管上部定位的台架结构主视图;
图2为图1的俯视图;
图3为台架上导向管通过导向管定位钢板定位固定示意图;
图4为台架、护筒、导向管、钢立柱及定位钢板之间安装结构示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
如图1,2 所示,本发明的用于导向管上部定位的台架3,由角钢焊接成正方形框架31,正方形框架31的下面四角设有支撑角钢32,支撑角钢32之间连接有横杆33,横杆33中间装有加强螺栓35,用于与护筒1定位固定。正方形框架31的外形尺寸为3650 mm×3650mm,其高度H为200—5000 mm。台架3通过位于四个支撑角钢32外侧的四个机械千斤顶34与基坑的地面钢板可调节连接。
如图3,4所示,使用时,台架3与护筒1之间通过调节四个加强螺栓35,使台架3中心与护筒1中心一致,并通过调节四个机械千斤顶34,使台架3中心轴线与护筒(1)中心轴线重叠,调整好后的台架3内插入导向管4,导向管4置于护筒1,并用经纬仪30测量定位导向管4上部中心,使导向管4上部中心与护筒1中心一致,然后用导向管定位钢板12固定导向管4在台架3上,导向管4下部四周分别通过水下千斤顶5与护筒1内壁连接,通过调节四个水下千斤顶5,使导向管4的垂直度至1/1000—1/3000,调整好垂直度的导向管4内导向插入焊有定位钢板11的钢立柱6。

Claims (1)

1.一种用于导向管上部定位的台架(3),由角钢焊接成正方形框架(31),其特征在于:所述正方形框架(31)的下面四角设有四个支撑角钢(32),支撑角钢(32)之间连接有横杆(33),横杆(33)中间装有加强螺栓(35),用于与护筒(1)定位固定;使用时,所述台架(3)与护筒(1)之间通过调节四个加强螺栓(35),使台架(3)中心与护筒(1)中心一致,并通过调节四个机械千斤顶(34),使台架(3)中心轴线与护筒(1)中心轴线重叠,调整好后的台架(3)内插入导向管(4),导向管(4)通过导向管定位钢板(12)定位固定在台架(3)上;所述正方形框架(31)的外形尺寸为3650mm×3650mm,其高度H为200—5000mm;所述台架(3)通过位于四个支撑角钢(32)外侧的机械千斤顶(34)与基坑的地面钢板可调节连接;所述导向管(4)下部四周分别通过四个水下千斤顶(5)与护筒(1)内壁连接,通过调节四个水下千斤顶(5),使导向管(4)的垂直度至1/1000—1/3000,调整好垂直度的导向管(4)内导向插入焊有定位钢板(11)的钢立柱(6)。
CN201610919183.6A 2016-10-21 2016-10-21 用于导向管上部定位的台架 Active CN106555401B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610919183.6A CN106555401B (zh) 2016-10-21 2016-10-21 用于导向管上部定位的台架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610919183.6A CN106555401B (zh) 2016-10-21 2016-10-21 用于导向管上部定位的台架

Publications (2)

Publication Number Publication Date
CN106555401A CN106555401A (zh) 2017-04-05
CN106555401B true CN106555401B (zh) 2019-10-01

Family

ID=58443868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610919183.6A Active CN106555401B (zh) 2016-10-21 2016-10-21 用于导向管上部定位的台架

Country Status (1)

Country Link
CN (1) CN106555401B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195917A (zh) * 2020-09-28 2021-01-08 开普天(上海)岩土科技有限公司 一柱一桩施工中的钢立柱纠偏方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201258496Y (zh) * 2008-08-11 2009-06-17 上海市机械施工有限公司 一柱一桩校正装置
CN202492848U (zh) * 2011-12-14 2012-10-17 中铁大桥局股份有限公司 一种隐形附着式低高度导向架
CN102767182A (zh) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 格构柱校正架调垂体系以及施工方法
CN203411978U (zh) * 2013-07-19 2014-01-29 江苏江都建设集团有限公司 钢管柱灌注桩垂直度调节装置
CN203546728U (zh) * 2013-10-28 2014-04-16 中国建筑第四工程局有限公司 一种改进后逆作钢管柱的安装固定装置
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN204040035U (zh) * 2014-06-24 2014-12-24 中国建筑第八工程局有限公司 一种钢护筒的定位导向结构
CN105735319A (zh) * 2016-01-28 2016-07-06 上海建工二建集团有限公司 一种大直径钢管立柱桩快速定位调垂装置及施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5486863B2 (ja) * 2009-07-16 2014-05-07 株式会社竹中工務店 構真柱の垂直精度管理方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201258496Y (zh) * 2008-08-11 2009-06-17 上海市机械施工有限公司 一柱一桩校正装置
CN202492848U (zh) * 2011-12-14 2012-10-17 中铁大桥局股份有限公司 一种隐形附着式低高度导向架
CN102767182A (zh) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 格构柱校正架调垂体系以及施工方法
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN203411978U (zh) * 2013-07-19 2014-01-29 江苏江都建设集团有限公司 钢管柱灌注桩垂直度调节装置
CN203546728U (zh) * 2013-10-28 2014-04-16 中国建筑第四工程局有限公司 一种改进后逆作钢管柱的安装固定装置
CN204040035U (zh) * 2014-06-24 2014-12-24 中国建筑第八工程局有限公司 一种钢护筒的定位导向结构
CN105735319A (zh) * 2016-01-28 2016-07-06 上海建工二建集团有限公司 一种大直径钢管立柱桩快速定位调垂装置及施工方法

Also Published As

Publication number Publication date
CN106555401A (zh) 2017-04-05

Similar Documents

Publication Publication Date Title
CN209636847U (zh) 一种可调节塔吊基础预埋件精确定位工具
CN105525625A (zh) 一种固定型钢柱脚预埋螺杆的施工方法及装置
CN107090775A (zh) 一种满堂支架空间梁端索导管施工定位方法
CN204040035U (zh) 一种钢护筒的定位导向结构
CN105317052B (zh) 一种塔吊基础螺栓固定方法
CN104032969A (zh) 一种隔震支座预埋板精确定位及过程调控装置
CN103485539A (zh) 大型直埋式钢锚爪预埋件的施工控制方法
CN202000727U (zh) 钢管立柱调整底座
CN106555401B (zh) 用于导向管上部定位的台架
CN104372798A (zh) 全回转钻机施工工法
CN206408969U (zh) 一种用于调节盖梁纵横坡度的支撑装置
CN106436743A (zh) 用于钢立柱导向插入施工的导向管
CN203755707U (zh) 槽式预埋件的埋设定位工具
CN103451338A (zh) 高炉煤气系统上升管及五通球安装方法
CN102653943B (zh) 地下预埋钢柱调直限位装置
CN209837032U (zh) 一种超深逆作钢管柱垂直度控制装置
CN208899342U (zh) 一种用于水中承台施工的套箱下放导向限位结构
CN204849778U (zh) 一种格构柱吊装定位装置
CN109201971B (zh) 用于制作桩基钢筋笼的定位装置及其施工方法
CN110886332A (zh) 墙体基础托换装置及其施工方法
CN203323740U (zh) 一种建筑物沉降无损测量水准尺支架
CN215107496U (zh) 一种用于格构柱吊装和垂直度调节的过渡节
CN204163356U (zh) 一种安装内墙板用的设备
CN203256744U (zh) 逆作法钢管混凝土柱垂直度校正装置
CN211114907U (zh) 一种新型格构柱定位安装结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200082 room Huang Xing, No. 2077, Yangpu District Road, Shanghai, China, 907

Patentee after: CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.

Address before: 200082 room Huang Xing, No. 2077, Yangpu District Road, Shanghai, China, 907

Patentee before: KAIPUTIAN (SHANGHAI) INTERNATIONAL TRADE Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20201026

Address after: 200433, room 2077, 907 Huang Xing Road, Shanghai, Yangpu District

Patentee after: CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.

Patentee after: WUGUANG (SHANGHAI) BASE ENGINEERING Co.,Ltd.

Address before: 200082 room Huang Xing, No. 2077, Yangpu District Road, Shanghai, China, 907

Patentee before: CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.

TR01 Transfer of patent right