CN203256744U - 逆作法钢管混凝土柱垂直度校正装置 - Google Patents

逆作法钢管混凝土柱垂直度校正装置 Download PDF

Info

Publication number
CN203256744U
CN203256744U CN 201320190528 CN201320190528U CN203256744U CN 203256744 U CN203256744 U CN 203256744U CN 201320190528 CN201320190528 CN 201320190528 CN 201320190528 U CN201320190528 U CN 201320190528U CN 203256744 U CN203256744 U CN 203256744U
Authority
CN
China
Prior art keywords
steel
perpendicularity
construction method
verticality
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320190528
Other languages
English (en)
Inventor
白秉英
赵建立
岳齐贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN 201320190528 priority Critical patent/CN203256744U/zh
Application granted granted Critical
Publication of CN203256744U publication Critical patent/CN203256744U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及基坑工程桩基施工领域,一种逆作法钢管混凝土柱垂直度校正装置,它包括一个钢护筒,其特征是:还包括四个钢支座、一个十字形调整架、两个垂直度检测杆、四个垂直度调整千斤顶和四个微调千斤顶;十字形调整架设置于钢支座顶面且其底部与待测钢管顶面牢固链接,四个垂直度调整千斤顶分别设于十字形调整架四个端点的下方,四个微调千斤顶水平设置于待测钢管外壁垂直度检测杆分别垂直牢固连接于待测钢管顶部。本实用新型采用上述装置及施工方法,其主要针对逆作法一柱一桩钢管柱的施工作业;同时,通用性强,制作简单,用较低的成本解决了逆作法一柱一桩钢管柱垂直度的控制。构造简单,制作容易,操作方便。

Description

逆作法钢管混凝土柱垂直度校正装置
技术领域
本实用新型涉及基坑工程桩基施工领域,尤其涉及基坑工程桩基维护设备领域。
背景技术
    近几年基坑逆作法施工越来越多地被采用。基坑逆作法施工,即先沿建筑物地下室边线或基坑四周施工地下连续墙,同时施工基坑内部的工程桩和立柱桩,然后施工地下室顶板作为横向支撑,随后逐层向下开挖土方和浇筑各层地下结构,直至底板封底。逆作法施工具有围护结构变形量小,对邻近建筑的影响小,占用施工空间小,缩短施工时间等优点。
由于国家规范对钢管混凝土柱的垂直度有严格控制要求。现有施工方法都很复杂,不利于操作,亦不利于推广。如邵凯平在《逆作法一桩一柱施工“垂直度两点控制法”的应用》一文中采用两点控制法,但须开挖工作井,调整时操作人员在工作井内作业,工序复杂,作业效率低。
发明内容
本实用新型的目的在于克服现有传统施工设备的缺陷,提供一种占地面积小,作业精确度高,操作方便的逆作法钢管混凝土柱垂直度校正装置。
为了达到上述目的,本实用新型是这样实现的:
一种逆作法钢管混凝土柱垂直度校正装置,它包括一个钢护筒,其特征是:还包括四个钢支座、一个十字形调整架、两个垂直度检测杆、四个垂直度调整千斤顶和四个微调千斤顶;所述钢支座每两个为一组,相互垂直交叉布置,十字形调整架设置于两组钢支座顶面且其底部与待测钢管顶面牢固链接,四个垂直度调整千斤顶分别设于十字形调整架四个端点的下方并位于同一水平面上,四个微调千斤顶水平设置于待测钢管外壁并分别与四个垂直度调整千斤顶处于同一纵向平面内,两个垂直度检测杆分别垂直牢固连接于待测钢管顶部,且分别与十字形调整架两个互相垂直的端点处于同一纵向平面内。
所述的逆作法钢管混凝土柱垂直度校正装置,钢护筒的长度为1.5米;微调千斤顶设置于钢护筒顶端以下1米处。
本实用新型采用上述设计,使用时,通过经纬仪观察垂直度检测杆的所处位置来调节相应的千斤顶以最终达到校正钢管的垂直度,如此,操作方便,精度准确,且所占作业面积也小。
附图说明
图1为本实用新型的俯视图。
图2为本实用新型的左视图。
具体实施方式
以下通过具体实施例进一步说明本实用新型。
如图1、图2所示的一种逆作法钢管混凝土柱垂直度校正装置,它包括一个1.5米长的钢护筒2,其特征是:还包括四个钢支座7、一个十字形调整架4、两个垂直度检测杆3、四个垂直度调整千斤顶6和四个微调千斤顶5;所述钢支座7每两个为一组,相互垂直交叉布置,十字形调整架4设置于两组钢支座7顶面且其底部与待测钢管1顶面牢固链接,四个垂直度调整千斤顶6分别设于十字形调整架4四个端点的下方并位于同一水平面上,四个微调千斤顶5水平设置于待测钢管1外壁并分别与四个垂直度调整千斤6顶处于同一纵向平面内,两个垂直度检测杆3分别垂直牢固连接于待测钢管1顶部,且分别与十字形调整架4两个互相垂直的端点处于同一纵向平面内。
所述的四个微调千斤顶5设置于钢护筒2顶端以下1米处。
本实用新型采用上述设计,使用时,通过经纬仪观察垂直度检测杆的所处位置来调节相应的千斤顶以最终达到校正钢管的垂直度,如此,操作方便,精度准确,且所占作业面积也小。

Claims (3)

1. 一种逆作法钢管混凝土柱垂直度校正装置,它包括一个钢护筒,其特征是:还包括四个钢支座、一个十字形调整架、两个垂直度检测杆、四个垂直度调整千斤顶和四个微调千斤顶;所述钢支座每两个为一组,相互垂直交叉布置,十字形调整架设置于两组钢支座顶面且其底部与待测钢管顶面牢固链接,四个垂直度调整千斤顶分别设于十字形调整架四个端点的下方并位于同一水平面上,四个微调千斤顶水平设置于待测钢管外壁并分别与四个垂直度调整千斤顶处于同一纵向平面内,两个垂直度检测杆分别垂直牢固连接于待测钢管顶部,且分别与十字形调整架两个互相垂直的端点处于同一纵向平面内。
2.根据权利要求1所述的逆作法钢管混凝土柱垂直度校正装置,其特征是:钢护筒的长度为1.5米。
3.根据权利要求1或2所述的逆作法钢管混凝土柱垂直度校正装置,其特征是:微调千斤顶设置于钢护筒顶端以下1米处。
CN 201320190528 2013-04-16 2013-04-16 逆作法钢管混凝土柱垂直度校正装置 Expired - Fee Related CN203256744U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320190528 CN203256744U (zh) 2013-04-16 2013-04-16 逆作法钢管混凝土柱垂直度校正装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320190528 CN203256744U (zh) 2013-04-16 2013-04-16 逆作法钢管混凝土柱垂直度校正装置

Publications (1)

Publication Number Publication Date
CN203256744U true CN203256744U (zh) 2013-10-30

Family

ID=49469323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320190528 Expired - Fee Related CN203256744U (zh) 2013-04-16 2013-04-16 逆作法钢管混凝土柱垂直度校正装置

Country Status (1)

Country Link
CN (1) CN203256744U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN104878775A (zh) * 2015-05-26 2015-09-02 中建三局集团有限公司 一种可周转的逆作法钢管柱调垂导向装置及其施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN104878775A (zh) * 2015-05-26 2015-09-02 中建三局集团有限公司 一种可周转的逆作法钢管柱调垂导向装置及其施工方法

Similar Documents

Publication Publication Date Title
CN104110035A (zh) 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN202658909U (zh) 逆作法钢柱定位架
CN205296874U (zh) 桩柱一体化信息化施工监测定位装置
CN110219326B (zh) 逆作法一柱一桩水下调垂施工工艺
CN201065533Y (zh) 钢桩柱垂直度调控装置
CN102888865B (zh) 立柱桩施工中钢构件垂直度的校正方法及装置
CN210238595U (zh) 逆作法一柱一桩水下调垂施工装置
CN203583497U (zh) 一种逆作钢管柱垂直度校正装置
CN104264902A (zh) 钢管柱圆盘定位装置、钢管混凝土柱与桩基连接结构
CN208604645U (zh) 一种竖向圆柱管孔任意点中心测量装置
CN202850027U (zh) 逆作法桩基施工钢立柱定位调垂装置
CN104878786B (zh) 斜直交替群桩-土-结构相互作用实验模型
CN203256744U (zh) 逆作法钢管混凝土柱垂直度校正装置
CN102966254B (zh) 用于短线匹配法施工的测量塔的设置方法
CN202866304U (zh) 逆作法钢管柱底部定位器
CN203878631U (zh) 基坑支护斜直交替悬臂桩相似模拟实验平台
CN103061454A (zh) 一种钢管混凝土柱在地下深孔内的安装定位方法
CN204753656U (zh) 斜直交替群桩-土-结构相互作用实验模型
CN102759350B (zh) 吊车梁施工高空测量方法
CN216787147U (zh) 深基坑支护换撑体系
CN216081453U (zh) 一种平面水平度测量装置
CN214089959U (zh) 一种格构柱定位装置
CN202850507U (zh) 一种逆作法桩基施工钢立柱定位调垂装置
CN106123873B (zh) 垂直投影定位测量装置定位投点施工方法
CN204944479U (zh) 一种拼宽桥梁基础沉降差异观测装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131030

Termination date: 20210416

CF01 Termination of patent right due to non-payment of annual fee