CN106436743A - 用于钢立柱导向插入施工的导向管 - Google Patents

用于钢立柱导向插入施工的导向管 Download PDF

Info

Publication number
CN106436743A
CN106436743A CN201610919250.4A CN201610919250A CN106436743A CN 106436743 A CN106436743 A CN 106436743A CN 201610919250 A CN201610919250 A CN 201610919250A CN 106436743 A CN106436743 A CN 106436743A
Authority
CN
China
Prior art keywords
pipe
guide pipe
perpendicularity
water pipe
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610919250.4A
Other languages
English (en)
Other versions
CN106436743B (zh
Inventor
卢礼顺
胡晓虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.
WUGUANG (SHANGHAI) BASE ENGINEERING Co.,Ltd.
Original Assignee
Kaiputian (shanghai) International Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaiputian (shanghai) International Trade Co Ltd filed Critical Kaiputian (shanghai) International Trade Co Ltd
Priority to CN201610919250.4A priority Critical patent/CN106436743B/zh
Publication of CN106436743A publication Critical patent/CN106436743A/zh
Application granted granted Critical
Publication of CN106436743B publication Critical patent/CN106436743B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

本发明涉及一种用于钢立柱导向插入施工的导向管,由方形钢管制成,所述方形钢管的高度H为3000—20000mm,方形钢管的截面内径500——2000mm,所述方形钢管的一侧设有浮标垂直度测定装置。所述浮标垂直度测定装置包括水管、浮球,所述水管的长度L=6m,内径为Φ24mm,所述水管下端封闭,所述浮球置于水管内的液体中,并通过绳索连接至水管下端中心。所述浮标垂直度测定装置的测量精度为1/700—1/1000。本发明用于钢立柱导向管插入法工艺,能确保一柱一桩垂直度的高精度,至少1/600以上,减小由于钢立柱的垂直偏差造成的后期工程问题。

Description

用于钢立柱导向插入施工的导向管
技术领域
本发明涉及一种用于超深超大基坑、盖挖逆作基坑、地铁换乘站基坑的一柱一桩,尤其是一种用于钢立柱导向插入施工的导向管。
背景技术
一柱一桩广泛应用于超深超大基坑、盖挖逆作基坑、地铁换乘站基坑。其施工垂直度要求比一般的工程桩高出许多,一般要求控制在1/500~1/600 。目前采用的一柱一桩施工方法,施工垂直度只能达到1/300 。如何确保一柱一桩垂直度的高精度,至少1/600以上,减小由于钢立柱的垂直偏差造成的后期工程问题? 急需要一种钢立柱导向管插入法工艺及导向管。
发明内容
本发明提出一种用于钢立柱导向插入施工的导向管,用于实现钢立柱导向管插入法工艺,确保一柱一桩垂直度的高精度,至少1/600以上,减小由于钢立柱的垂直偏差造成的后期工程问题。
为实现上述目的,本发明的技术方案是:一种用于钢立柱导向插入施工的导向管,由方形钢管制成,所述方形钢管的高度H为3000-20000mm,方形钢管的截面内径500-2000mm,所述方形钢管的一侧设有浮标垂直度测定装置。
所述浮标垂直度测定装置包括水管、浮球,所述水管的长度L=6m,内径为Φ24mm,所述水管下端封闭,所述浮球置于水管内的液体中,并通过绳索连接至水管下端中心。
所述浮标垂直度测定装置的测量精度为1/700-1/1000。
使用时,所述导向管置于护筒内,上部固定在台架上,下部四周分别通过水下千斤顶与护筒内壁连接,通过调节四个水下千斤顶,使导向管的垂直度至1/500~1/600;调整好垂直度的导向管内导向插入焊有定位钢板的钢立柱,钢立柱的定位钢板与导向管内壁之间的定位间隙为0.5-5mm。
本发明的有益效果是:
1、9m长距离导向管用于钢立柱的导向,导向精度高 ;
2、采用水下千斤顶及水管浮标互动,使导向管垂直精度高 ;
3、采用定位钢板确保了钢立柱插入偏差 ;
4、导向管结构简单,使用方便。
附图说明
图1为本发明的用于钢立柱导向插入施工的导向管结构主视图;
图2为图1的仰视图;
图3为浮标垂直度测定装置结构立体示意图;
图4为浮标垂直度测定装置结构俯视图;
图5为护筒、导向管、钢立柱及定位钢板和台架之间安装结构示意图;
图6为导向管垂直度调节定位过程示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
如图1,2 所示,本发明的用于钢立柱导向插入施工的导向管,由方形钢管20制成,方形钢管20高度H为3000-20000mm,方形钢管20的截面内径500-2000mm,方形钢管20的一侧设有浮标垂直度测定装置21。
如图3,4所示,浮标垂直度测定装置21包括水管23、浮球22。水管23的长度L=6m,内径为Φ24mm,水管23下端封闭,浮球22置于水管23内的液体中,并通过绳索24连接至水管23下端中心。浮标垂直度测定装置21的测量精度为1/700—1/1000。
如图5所示,使用时,导向管4置于护筒1内,上部通过固定板12固定在台架3上,下部四周分别通过水下千斤顶5与护筒1内壁连接,如图6所示,通过调节四个水下千斤顶5,使导向管4的垂直度至1/1000—1/3000,调整好垂直度的导向管4内导向插入焊有定位钢板11的钢立柱6,钢立柱6的定位钢板11与导向管4内壁之间的定位间隙为0.5-5mm。

Claims (4)

1.一种用于钢立柱导向插入施工的导向管(4),由方形钢管(20)制成,其特征在于: 所述方形钢管(20)的高度H为3000—20000mm,方形钢管(20)的截面内径500—2000mm,所述方形钢管(20)的一侧设有浮标垂直度测定装置(21)。
2.根据权利要求1所述的用于钢立柱导向插入施工的导向管,其特征在于:所述浮标垂直度测定装置(21)包括水管(23)、浮球(22),所述水管(23)的长度L=6m,内径为Φ24mm,所述水管(23)下端封闭,所述浮球(22)置于水管(23)内的液体中,并通过绳索(24)连接至水管(23)下端中心。
3.根据权利要求1所述的用于钢立柱导向插入施工的导向管,其特征在于:所述浮标垂直度测定装置(21)的测量精度为1/700—1/1000。
4.根据权利要求1-3任一所述的用于钢立柱导向插入施工的导向管,其特征在于:使用时,所述导向管(4)置于护筒(1),上部固定在台架(3)上,下部四周分别通过水下千斤顶(5)与护筒(1)内壁连接,通过调节四个水下千斤顶(5),使导向管(4)的垂直度至1/1000—1/3000;调整好垂直度的导向管(4)内导向插入焊有定位钢板(11)的钢立柱(6),钢立柱(6)的定位钢板(11)与导向管(4)内壁之间的定位间隙为0.5-5mm。
CN201610919250.4A 2016-10-21 2016-10-21 用于钢立柱导向插入施工的导向管 Active CN106436743B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610919250.4A CN106436743B (zh) 2016-10-21 2016-10-21 用于钢立柱导向插入施工的导向管

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610919250.4A CN106436743B (zh) 2016-10-21 2016-10-21 用于钢立柱导向插入施工的导向管

Publications (2)

Publication Number Publication Date
CN106436743A true CN106436743A (zh) 2017-02-22
CN106436743B CN106436743B (zh) 2019-10-01

Family

ID=58175611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610919250.4A Active CN106436743B (zh) 2016-10-21 2016-10-21 用于钢立柱导向插入施工的导向管

Country Status (1)

Country Link
CN (1) CN106436743B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034931A (zh) * 2017-05-05 2017-08-11 中国葛洲坝集团第五工程有限公司 钢管桩垂直度检测装置及深水钢管桩施工方法
CN107238421A (zh) * 2017-08-02 2017-10-10 任松 一种监测成组立模浇筑混凝土进度的浮标
CN108930271A (zh) * 2017-05-26 2018-12-04 上海雄程船舶工程有限公司 打桩施工中的工程桩导向装置
CN112195917A (zh) * 2020-09-28 2021-01-08 开普天(上海)岩土科技有限公司 一柱一桩施工中的钢立柱纠偏方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004169503A (ja) * 2002-11-22 2004-06-17 Sekisui House Ltd 鋼管杭の鉛直度確認装置
CN200952240Y (zh) * 2006-09-22 2007-09-26 祐彬营造股份有限公司 逆打工法钢柱吊放垂直控制结构
CN200964697Y (zh) * 2006-10-24 2007-10-24 郑明雄 逆打钢柱垂直定位装置
CN202599368U (zh) * 2012-04-01 2012-12-12 江门市汇成科技有限公司 一种浮标式气动量仪
JP2013060756A (ja) * 2011-09-14 2013-04-04 Hirose & Co Ltd 杭材の傾斜測定装置及び杭材の鉛直精度の確認方法
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN205369323U (zh) * 2015-12-18 2016-07-06 中国水利水电第十工程局有限公司 一种钻孔灌注桩混凝土界面监测装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004169503A (ja) * 2002-11-22 2004-06-17 Sekisui House Ltd 鋼管杭の鉛直度確認装置
CN200952240Y (zh) * 2006-09-22 2007-09-26 祐彬营造股份有限公司 逆打工法钢柱吊放垂直控制结构
CN200964697Y (zh) * 2006-10-24 2007-10-24 郑明雄 逆打钢柱垂直定位装置
JP2013060756A (ja) * 2011-09-14 2013-04-04 Hirose & Co Ltd 杭材の傾斜測定装置及び杭材の鉛直精度の確認方法
CN202599368U (zh) * 2012-04-01 2012-12-12 江门市汇成科技有限公司 一种浮标式气动量仪
CN104110035A (zh) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN205369323U (zh) * 2015-12-18 2016-07-06 中国水利水电第十工程局有限公司 一种钻孔灌注桩混凝土界面监测装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034931A (zh) * 2017-05-05 2017-08-11 中国葛洲坝集团第五工程有限公司 钢管桩垂直度检测装置及深水钢管桩施工方法
CN108930271A (zh) * 2017-05-26 2018-12-04 上海雄程船舶工程有限公司 打桩施工中的工程桩导向装置
CN108930271B (zh) * 2017-05-26 2023-10-31 上海雄程船舶工程有限公司 打桩施工中的工程桩导向装置
CN107238421A (zh) * 2017-08-02 2017-10-10 任松 一种监测成组立模浇筑混凝土进度的浮标
CN112195917A (zh) * 2020-09-28 2021-01-08 开普天(上海)岩土科技有限公司 一柱一桩施工中的钢立柱纠偏方法

Also Published As

Publication number Publication date
CN106436743B (zh) 2019-10-01

Similar Documents

Publication Publication Date Title
CN106436743A (zh) 用于钢立柱导向插入施工的导向管
CN210766774U (zh) 一种钢筋笼及格构柱的定位装置
US8887451B2 (en) Pivoting bracket for foundation support system
CN201065533Y (zh) 钢桩柱垂直度调控装置
CN104631338B (zh) 一种钢吊箱及定位施工方法
CN205449571U (zh) 便携式定距定深水环境检测用采样装置
CN104532843A (zh) 一种立柱桩的钢立柱定位调直方法
CN204040035U (zh) 一种钢护筒的定位导向结构
CN211665806U (zh) 一种预制桩的抗拉检测装置
CN112663613A (zh) 一种格构柱的垂直度控制装置及垂直度控制方法
CN104196248B (zh) 逆作法后插钢管柱垂直定位装置及其施工方法
CN107858923A (zh) 桩基钢筋笼孔内定位的方法
CN208586612U (zh) 一种钢护筒导向架
CN107604900B (zh) 桩基钢筋笼安装位置控制及混凝土灌注施工平台
CN105155545B (zh) 一种在防渗墙槽段浇筑过程中使用固定导管装置进行导管固定的方法
CN106404280A (zh) 用于微型土压力盒的多功能标定装置
CN217539856U (zh) 一种水利工程用管道连接装置
CN203811231U (zh) 水深测量装置
CN105714825A (zh) 适用于水泥土插芯组合桩的芯桩导向装置及芯桩导向方法
CN204040499U (zh) 逆作法后插钢管柱垂直定位装置
CN108982249A (zh) 防止上下剪切盒相对倾斜的杠杆式直剪仪及其试验方法
CN106555401B (zh) 用于导向管上部定位的台架
CN106545012B (zh) 钢立柱导向管插入法工艺
CN205975716U (zh) 新型桩端地基检测装置
CN201688093U (zh) 一种可调节的钢结构立柱底座

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201014

Address after: 200433, room 2077, 907 Huang Xing Road, Shanghai, Yangpu District

Patentee after: CAPTAIN (SHANGHAI) GEOTECH Co.,Ltd.

Patentee after: WUGUANG (SHANGHAI) BASE ENGINEERING Co.,Ltd.

Address before: 200082 room Huang Xing, No. 2077, Yangpu District Road, Shanghai, China, 907

Patentee before: KAIPUTIAN (SHANGHAI) INTERNATIONAL TRADE Co.,Ltd.

TR01 Transfer of patent right