CN106549341A - A kind of cable laying method of cast-in-place foamed concrete sheath - Google Patents

A kind of cable laying method of cast-in-place foamed concrete sheath Download PDF

Info

Publication number
CN106549341A
CN106549341A CN201611132820.1A CN201611132820A CN106549341A CN 106549341 A CN106549341 A CN 106549341A CN 201611132820 A CN201611132820 A CN 201611132820A CN 106549341 A CN106549341 A CN 106549341A
Authority
CN
China
Prior art keywords
plastic foil
foil air
foam concrete
cable
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611132820.1A
Other languages
Chinese (zh)
Other versions
CN106549341B (en
Inventor
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU RONGXING ELECTRIC Co.,Ltd.
Original Assignee
Qingdao Lantian Chuangxian Technology Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Lantian Chuangxian Technology Services Ltd filed Critical Qingdao Lantian Chuangxian Technology Services Ltd
Priority to CN201611132820.1A priority Critical patent/CN106549341B/en
Publication of CN106549341A publication Critical patent/CN106549341A/en
Application granted granted Critical
Publication of CN106549341B publication Critical patent/CN106549341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A kind of cable laying method of cast-in-place foamed concrete sheath of the present invention is mainly used in the laying of building engineering field cable, its construction simple and fast, cheap;The present invention is mainly made up of plastic foil air rod 1, support 2, foam concrete 3, joint 6;The present invention main construction method be:Step one, excavates cable trench 6;Step 2, places multiple supports 2 by certain spacing;Step 3, is placed multiple plastic foil air rods 1 and is fixed with 2 colligation of multiple supports;Step 4, pours foam concrete 3;Step 5, after foam concrete 3 condenses reaches intensity, backfill 4 is backfilled, and cutting away the sealing end of multiple plastic foil air rods 1 just can cabling according to a conventional method.

Description

A kind of cable laying method of cast-in-place foamed concrete sheath
Technical field
Present invention is mainly used for the laying of building engineering field cable.
Background technology
Current cable laying has two methods, and one kind is first to make cable duct, and cable is laid in cable duct, and the method is needed Substantial amounts of manpower and materials construction cable ditch is consumed, it is extremely uneconomical;Another kind of method is first to excavate groove, re-lays steel thimble, Cable is worn in steel thimble, the earthwork is finally backfilled, although the method is simple, substantial amounts of tube material need to be consumed, equally also without Ji.
The content of the invention
Instant invention overcomes drawbacks described above, it constructs simple and fast, cheap;The present invention is mainly by plastic foil air rod (1), support(2), foam concrete (3), joint(6)Composition;Plastic foil air rod(1)Inside it is filled with air and has certain resisting Compressive Strength, multiple supports(2)It is placed on the cable trench for having dug(5)It is interior, multiple plastic foil air rods(1)With multiple supports(2) Colligation is fixed, joint(6)By two plastic foil air rods(1)Docking;The present invention main construction method be:Step one, excavates Cable trench(6);Step 2, places multiple supports by certain spacing(2);Step 3, places multiple plastic foil air rods(1) And with multiple supports(2)Colligation is fixed;Step 4, pours foam concrete (3);Step 5, reaches when foam concrete (3) condenses To after intensity, by backfill(4)Backfill, cuts away multiple plastic foil air rods(1)Sealing end just can lay according to a conventional method Cable.
Description of the drawings
Description of reference numerals:1- plastic foil air rods, 2- supports, 3- foam concrete, 4- backfills, 5- grooves, 6- connect Head, 7- cables.
Fig. 1 is the facade generalized section of the present invention.
Fig. 2 is the elevational schematic view of construction method step of the present invention.
Fig. 3 is the elevational schematic view of construction method step of the present invention two.
Fig. 4 is the elevational schematic view of construction method step of the present invention three.
Fig. 5 is the elevational schematic view of construction method step of the present invention four.
Fig. 6 is the elevational schematic view of construction method step of the present invention five.
Fig. 7 is the elevational schematic view of inventive joint 6.
Specific embodiment
The content of the invention has been described in detail the specific embodiment of the present invention, is not repeated herein;Need explanation:One. plastics Film air rod 1 and support 2 can complete in factory process.Two. as 3 mass of foam concrete is little lightweight, pouring bubble During foam concrete 3, lateral pressure meeting very little of the foam concrete 3 to plastic foil air rod 1, plastic foil air rod 1 itself are poured There is certain comprcssive strength, therefore, when foam concrete 3 is poured, plastic foil air rod 1 will not flattening deformation;When foam is mixed After 3 solidification of solidifying soil reaches intensity, the sealing end of multiple plastic foil air rods 1 is cut away, multiple holes will be formed in foam concrete 3 Hole, the plastic foil of plastic foil air rod 1 also serve as the inwall of hole and remain in foam concrete 3, make hole become smooth, electricity Cable is more easily passed.Three. although, than normal concrete low intensity, the native intensity of ratio is much higher and price is low for foam concrete 3 Honest and clean, the present invention exactly using this feature of foam concrete, that is, can guarantee that the cable in hole will not be subject to crushing, reduce again and apply Work cost.Four. the present invention equally need to be by cable laying code requirement design contact well, in order to the laying and inspection of cable certainly Repair.Five. plastic foil air rod 1 can be designed to different sizes, to meet the needs of different size cable.

Claims (1)

1. a kind of cable laying method of cast-in-place foamed concrete sheath, is characterized in that:It is mainly by plastic foil air rod(1)、 Support(2), foam concrete (3), joint(6)Composition;Plastic foil air rod(1)Inside it is filled with air and has certain pressure resistance Degree, multiple supports(2)It is placed on the cable trench for having dug(5)It is interior, multiple plastic foil air rods(1)With multiple supports(2)Colligation It is fixed, joint(6)By two plastic foil air rods(1)Docking;The present invention main construction method be:Step one, excavates cable Groove(6);Step 2, places multiple supports by certain spacing(2);Step 3, places multiple plastic foil air rods(1)And with Multiple supports(2)Colligation is fixed;Step 4, pours foam concrete (3);Step 5, reaches by force when foam concrete (3) condenses After degree, by backfill(4)Backfill, cuts away multiple plastic foil air rods(1)Sealing end just can cabling according to a conventional method .
CN201611132820.1A 2016-12-10 2016-12-10 A kind of cable laying method of cast-in-place foamed concrete sheath Active CN106549341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611132820.1A CN106549341B (en) 2016-12-10 2016-12-10 A kind of cable laying method of cast-in-place foamed concrete sheath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611132820.1A CN106549341B (en) 2016-12-10 2016-12-10 A kind of cable laying method of cast-in-place foamed concrete sheath

Publications (2)

Publication Number Publication Date
CN106549341A true CN106549341A (en) 2017-03-29
CN106549341B CN106549341B (en) 2017-12-05

Family

ID=58397280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611132820.1A Active CN106549341B (en) 2016-12-10 2016-12-10 A kind of cable laying method of cast-in-place foamed concrete sheath

Country Status (1)

Country Link
CN (1) CN106549341B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113300311A (en) * 2021-05-31 2021-08-24 中电保力(北京)科技有限公司 Waterproof method for cable well or cable channel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101364718A (en) * 2007-08-08 2009-02-11 上海宝冶建设有限公司 Heavy cable laying system and laying method
CN101789570A (en) * 2010-03-30 2010-07-28 中国第一冶金建设有限责任公司 Methods for manufacturing and using cable-laying tool for cable coil in construction site
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN102545104A (en) * 2011-12-09 2012-07-04 山东电力集团公司东营供电公司 Manufacturing process for improving 10 kV cold-shrinkage cable ends
CN102856841A (en) * 2012-10-11 2013-01-02 山东铝业工程有限公司 Mechanical laying method for large-section overhead cable
CN104600643A (en) * 2015-01-27 2015-05-06 国家电网公司 Fabricated type cable through-wall fixing device and cable through-wall laying construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101364718A (en) * 2007-08-08 2009-02-11 上海宝冶建设有限公司 Heavy cable laying system and laying method
CN101789570A (en) * 2010-03-30 2010-07-28 中国第一冶金建设有限责任公司 Methods for manufacturing and using cable-laying tool for cable coil in construction site
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN102545104A (en) * 2011-12-09 2012-07-04 山东电力集团公司东营供电公司 Manufacturing process for improving 10 kV cold-shrinkage cable ends
CN102856841A (en) * 2012-10-11 2013-01-02 山东铝业工程有限公司 Mechanical laying method for large-section overhead cable
CN104600643A (en) * 2015-01-27 2015-05-06 国家电网公司 Fabricated type cable through-wall fixing device and cable through-wall laying construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113300311A (en) * 2021-05-31 2021-08-24 中电保力(北京)科技有限公司 Waterproof method for cable well or cable channel

Also Published As

Publication number Publication date
CN106549341B (en) 2017-12-05

Similar Documents

Publication Publication Date Title
US9353887B2 (en) Multi-purpose micro-trench insert
CN104389314A (en) Grouting reinforcement device and method for shallow clay
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN106549341A (en) A kind of cable laying method of cast-in-place foamed concrete sheath
JP2013164103A (en) Embedded pipe structure and method for constructing embedded pipe structure
CN208950162U (en) It is easily installed the concrete column of supporting beam and the connection structure of itself and supporting beam
CN103899012A (en) Embedded member of filler wall binding rebar and filler wall binding rebar construction method
JP2011094443A (en) Method for constructing wall surface work by using bag body
CN103074886A (en) Grouted geogrid
WO2015158169A1 (en) Construction process of pipe pile and dedicated boring device thereof
CN104500842A (en) Pipe pillow and method of paving pipeline by utilizing pipe pillow
KR20150098135A (en) precast pile for watertight wall
CN108661014B (en) Post-construction hardening reinforced cement board
JP2008019663A (en) Tunnel construction method
CN204960317U (en) Ground anchor
KR101254189B1 (en) Directional grouting method and device
CN104481553A (en) Water stop method for contact part of shield segment and cast-in-place concrete
CN214462618U (en) Casing pipe die plate assembly for split screw
CN108086542A (en) A kind of concrete structure pipe construction through walls reserves structure and construction method
CN203866972U (en) Embedded component for filler wall tie bars
CN204715427U (en) A kind of inclinometer pipe spreading casing protection structure
KR101645635B1 (en) Polyethylene pipe inserted rebirthing method
CN108474192A (en) There is the anchor and its installation method of fixing device for forcing down the pressing plate side on ground slope
JP2000134779A (en) Light-weight unit tube
CN103306320A (en) Method for treating crack water seepage of shear wall of basement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210111

Address after: No.1 Port Industrial Park, gaogangkou street, Taizhou City, Jiangsu Province, 225321

Patentee after: Jiang Yongfeng

Address before: 266555 Room 701, Building 457, Huangpujiang Road, Huangdao District, Qingdao City, Shandong Province

Patentee before: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210122

Address after: 225000 South Industrial Park, Hanjiang Economic Development Zone, Hanjiang District, Yangzhou City, Jiangsu Province

Patentee after: YANGZHOU RONGXING ELECTRIC Co.,Ltd.

Address before: No.1 Port Industrial Park, gaogangkou street, Taizhou City, Jiangsu Province, 225321

Patentee before: Jiang Yongfeng

TR01 Transfer of patent right
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170329

Assignee: ANBULEILA YANGZHOU NEW ENERGY TECHNOLOGY CO.,LTD.

Assignor: YANGZHOU RONGXING ELECTRIC Co.,Ltd.

Contract record no.: X2024980008216

Denomination of invention: Cable laying method with cast-in-place foam concrete sheath

Granted publication date: 20171205

License type: Common License

Record date: 20240627

EE01 Entry into force of recordation of patent licensing contract