CN108086542A - A kind of concrete structure pipe construction through walls reserves structure and construction method - Google Patents

A kind of concrete structure pipe construction through walls reserves structure and construction method Download PDF

Info

Publication number
CN108086542A
CN108086542A CN201711103876.9A CN201711103876A CN108086542A CN 108086542 A CN108086542 A CN 108086542A CN 201711103876 A CN201711103876 A CN 201711103876A CN 108086542 A CN108086542 A CN 108086542A
Authority
CN
China
Prior art keywords
wall
pipe
concrete
walls
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711103876.9A
Other languages
Chinese (zh)
Inventor
王贵荣
薛原
麻永锋
姜露
邹丽文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201711103876.9A priority Critical patent/CN108086542A/en
Publication of CN108086542A publication Critical patent/CN108086542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of concrete structure pipe constructions through walls to reserve structure, including wall preformed hole template, primary structure wall side form, one week trapezoidal cystosepiment of installation of wall preformed hole template interlude, and wall preformed hole template both ends are pierced by primary structure side form.The present invention also provides the construction method of the above-mentioned reserved structure of application, provisions for grouting of the invention can effectively avoid clogging not closely knit enough the drawbacks of causing leakage, can not handling after structure backfill between original wall bushing and wall pipe.Use the reserved structure of the present invention and construction method, it is ensured that seamless between wall pipe and concrete contacts, and prevents from leaking.

Description

A kind of concrete structure pipe construction through walls reserves structure and construction method
Technical field
The invention belongs to the realm of building construction, and in particular to a kind of concrete structure pipe construction through walls reserves structure and construction Method.
Background technology
Coal-burning power plant's project basement, underground, all kinds of pool construction wall pipe conventional construction methods in ground are at present:Mixed Wall bushing is reserved on Xtah Crude Clay structure side wall, after then installation is complete after formal wall pipe, is clogged between casing and wall pipe Bituminous hemp fiber or the closure of back-grouting material.The shortcomings that technique is:
1st, clogged using Bituminous hemp fiber, influenced by construction environment and construction quality, there are Seepages substantially.
2nd, underground structure reserves wall bushing, can not find to leak before structure backfill, after the completion for the treatment of structure backfill, leakage Point pole is difficult.
3rd, carry out back-grouting between wall bushing and wall pipe, grouting material is extremely difficult pour it is closely knit, back-grouting material with It is easily leaked between service sleeve.
The content of the invention
The purpose of the present invention provides a kind of concrete structure wall pipe to overcome the problems, such as existing in the prior art and defect The reserved structure of construction and construction method, can effectively prevent and leaked at wall pipe, it is ensured that the density of back-grouting.
A kind of concrete structure pipe construction through walls reserves structure, including wall preformed hole template, primary structure wall side form, One week trapezoidal cystosepiment of installation of wall preformed hole template interlude, and wall preformed hole template both ends are pierced by primary structure side form
(It prevents concreting process medial end portions from blocking, while is conducive to hole form removable).
Further, the trapezoidal cystosepiment and the outer surface of preformed hole template are pasted using plastic adhesive tape.
Further, when wall shapes, pre-buried at least a pvc pipe, the pvc pipe are stretched above the trapezoidal cystosepiment Go out concrete side walls.
Further, wall pipe is after installation is complete, the then installation form of wall two.
Further, set between adjacent pvc pipe in 30 ° of angles.
A kind of concrete structure wall pipe grouting method, includes the following steps:
A, first by reserving hole dimensioned hole template, and in one week trapezoidal cystosepiment of installation of hole template interlude, foam Plate is pasted onto template surface using plastic adhesive tape;
Wall preformed hole template is passed through to the primary structure wall side form fixed, pour walls concrete b,;Meanwhile reserved At the top of hole one or more φ 75PVC pipe is buried by 45° angle(When wall feed-through pipeline is relatively large in diameter, φ 75PVC pipes are 3), end is stretched Go out concrete side walls;
C, after walls concrete pours completion and shapes, wall preformed hole template and trapezoidal cystosepiment are removed, wall pipe is installed;
D, wall pipe then installs secondary grouting template after installation is complete in wall two, passes through ф 75PVC pipes above hole and carries out two Secondary grouting.
The provisions for grouting of the present invention can effectively avoid clogging between original wall bushing and wall pipe it is not closely knit enough cause ooze Leakage, the drawbacks of can not being handled after structure backfill.Use the reserved structure of the present invention and construction method, it is ensured that wall pipe and coagulation Seamless contact between soil, prevents from leaking.
Description of the drawings
Fig. 1 is the reserved structure diagram of the present invention.
Fig. 2 is the construction side schematic view of the present invention.
Specific embodiment
With reference to adding, the present invention will be further described.
Concrete structure pipe construction through walls of the present invention reserves structure, including primary structure walls concrete 1, primary structure wall Side mould 2, wall preformed hole template 3, trapezoidal cystosepiment 4, plastic adhesive tape 5, back-grouting pipe φ 75PVC pipes 6.Wall preformed hole 3 interlude of template, one week trapezoidal cystosepiment 4 of installation, and wall preformed hole template both ends are pierced by primary structure side form 2.
The trapezoidal cystosepiment of the present invention is process by polyethylene foam sheet, and cystosepiment forms the preformed hole hole wall after shaping Concave structure, trapezoidal cystosepiment is fixed on wall using wire nail 7 to be reserved on casement, and wire nail quantity, which is subject to cystosepiment, to be consolidated, Cystosepiment and template surface are completely pasted using plastic adhesive tape.
The reserved structure of present invention construction, when primary structure walls concrete 1 shapes, exists according to wall pipe preformed hole size Its pre-buried at least pvc pipe 6 in top is set in 30 ° of angles between adjacent pvc pipe.Pvc pipe stretches out concrete walls body sidewall.It wears For wall coil 7 after installation is complete, wall two then installs secondary grouting template 8.
According to said structure, the present invention also provides a kind of concrete structure wall pipe grouting method, method is as follows:
First by reserving hole dimensioned hole template, trapezoidal cystosepiment is pasted in one week in template outside using plastic adhesive tape.It is reserved Casement plate passes through the primary structure wall side form fixed, meanwhile, it is buried according to reserving hole size at the top of hole by 45° angle One to three are managed for back-grouting φ 75PVC, and pvc pipe stretches out concrete side walls, and adjacent two pipes are arranged by 30 ° of angles, PVC Pipe is bound on concrete structure reinforcing bars, and pvc pipe both ends, which should all block, to prevent from blocking in concreting process.
After the completion of walls concrete pours, wall preformed hole template and trapezoidal cystosepiment are removed, wall pipe 7 is installed;It wears Wall coil is after installation is complete, in then installation form 8 of wall two, then carries out back-grouting by pvc pipe.To be more after the completion of grouting Go out the pvc pipe excision of wall, and be in the milk to pvc pipe inside, tamp.
Trapezoidal foam is pasted on the outside of template and extended by plastic adhesive tape of the present invention, so in form removal, is conveniently dragged and is unloaded Cystosepiment and template, since preformed hole template mid diameter is big, both ends diameter is small, and the projection portion on the outside of template is according to hard Material would become hard to directly extract reserving hole template after primary structure concreting, therefore the moulding on the outside of preformed hole template Using 50mm thickness cystosepiments, cystosepiment is integral using plastic adhesive tape and template stickup, and after the completion of concreting, cystosepiment is Soft material, worker will be easy to extract template.
The present invention uses trapezoidal cystosepiment, and preformed hole surrounding is designed to concave surface moulding, is equivalent to the insertion of back-grouting material In primary structure, the possibility of wall pipe periphery leakage after structure backfill is avoided well.Simultaneously along 45° angle at the top of preformed hole The pvc pipe of pre-buried φ 75 treats that formal Pipe installing is completed, in wall both sides installation form, the PVC that then grouting material passes through φ 75 Pipe enters on the inside of template, between wall feed-through pipeline and a concrete back-grouting can guarantee it is seamless contact, be avoided that wall pipe with Concrete filling is not closely knit enough to cause leakage.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. Imitate embodiment.But it is every without departing from technical solution of the present invention content, technical spirit according to the invention is to above example institute Any simple modification, equivalent variations and the remodeling made still fall within the protection domain of technical solution of the present invention.

Claims (6)

1. a kind of concrete structure pipe construction through walls reserves structure, including wall preformed hole template, primary structure wall side form, It is characterized in that, one week trapezoidal cystosepiment of installation of wall preformed hole template interlude, and wall preformed hole template both ends are worn Go out primary structure side form.
2. a kind of concrete structure pipe construction through walls according to claim 1 reserves structure, which is characterized in that the ladder Shape cystosepiment and the outer surface of preformed hole template are pasted using plastic adhesive tape.
3. a kind of concrete structure pipe construction through walls according to claim 1 reserves structure, which is characterized in that wall shapes When, the pre-buried at least pvc pipe in trapezoidal cystosepiment top, the pvc pipe stretches out concrete side walls.
4. a kind of concrete structure pipe construction through walls according to claim 3 reserves structure, which is characterized in that wall pipe is pacified After the completion of dress, the then installation form of wall two.
5. a kind of concrete structure pipe construction through walls according to claim 3 reserves structure, which is characterized in that adjacent PVC It is set between pipe in 30 ° of angles.
6. a kind of concrete structure wall pipe construction method, which is characterized in that include the following steps:
A, first by reserving hole dimensioned hole template, and in one week trapezoidal cystosepiment of installation of hole template interlude, foam Plate is pasted onto template surface using plastic adhesive tape;
Wall preformed hole template is passed through to the primary structure wall side form fixed, pour walls concrete b,;Meanwhile reserved One or more pvc pipe is buried by 45° angle at the top of hole, concrete side walls are stretched out in end;
C, after walls concrete pours completion and shapes, wall preformed hole template and trapezoidal cystosepiment are removed, wall pipe is installed;
D, wall pipe then installs secondary grouting template after installation is complete in wall two, passes through pvc pipe above hole and carries out secondary filling Slurry.
CN201711103876.9A 2017-11-10 2017-11-10 A kind of concrete structure pipe construction through walls reserves structure and construction method Pending CN108086542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711103876.9A CN108086542A (en) 2017-11-10 2017-11-10 A kind of concrete structure pipe construction through walls reserves structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711103876.9A CN108086542A (en) 2017-11-10 2017-11-10 A kind of concrete structure pipe construction through walls reserves structure and construction method

Publications (1)

Publication Number Publication Date
CN108086542A true CN108086542A (en) 2018-05-29

Family

ID=62170119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711103876.9A Pending CN108086542A (en) 2017-11-10 2017-11-10 A kind of concrete structure pipe construction through walls reserves structure and construction method

Country Status (1)

Country Link
CN (1) CN108086542A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854821A (en) * 2018-12-24 2019-06-07 中建三局第三建设工程有限责任公司 A kind of pin-connected panel side row's antiseep support and its pre-embedded construction method
CN111764426A (en) * 2020-06-30 2020-10-13 中国二十二冶集团有限公司 Construction method for small and medium-sized special-shaped pre-buried hole template of equipment foundation

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446138A (en) * 2008-12-19 2009-06-03 上海市第五建筑有限公司 Reconstructed project wall external decoration material anti-seepage construction method
CN202577970U (en) * 2012-04-23 2012-12-05 中国二冶集团有限公司 Reserved hole mold
CN202689550U (en) * 2012-05-08 2013-01-23 中建六局建设发展有限公司 Combined mould for reserved hole of foundation bolt convenient to demould
CN202969928U (en) * 2012-12-13 2013-06-05 中国建筑第五工程局有限公司 Hole leaving tool of concreting wall
CN203247600U (en) * 2012-11-22 2013-10-23 陕西煤业化工建设(集团)有限公司 Equipment foundation bolt preformed hole die
CN203347229U (en) * 2013-06-27 2013-12-18 国家电网公司 Bolt preformed hole die
CN203487779U (en) * 2013-09-30 2014-03-19 中建三局建设工程股份有限公司 Tool type stock mould for masonry constructional column concrete pouring
CN203603480U (en) * 2013-12-02 2014-05-21 山西四建集团有限公司 Recoverable embedded type reserved hole shaping mold
CN203905485U (en) * 2014-05-23 2014-10-29 山东三箭建设工程股份有限公司 Form for reservation of water service pipe channel in cast-in-place concrete wall
CN205591363U (en) * 2016-03-25 2016-09-21 青岛中建联合建设工程有限公司 Building outer wall is encorbelmented scaffold frame shaped steel and is reserved hole shutoff structure
CN205857717U (en) * 2016-07-30 2017-01-04 浙江天诚中央空调工程有限公司 A kind of shear wall air-conditioning preformed hole through walls finished product built-in fitting
CN107191685A (en) * 2017-07-07 2017-09-22 上海民防建筑研究设计院有限公司 A kind of Novel civil air defense engineering tubular construction through walls

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446138A (en) * 2008-12-19 2009-06-03 上海市第五建筑有限公司 Reconstructed project wall external decoration material anti-seepage construction method
CN202577970U (en) * 2012-04-23 2012-12-05 中国二冶集团有限公司 Reserved hole mold
CN202689550U (en) * 2012-05-08 2013-01-23 中建六局建设发展有限公司 Combined mould for reserved hole of foundation bolt convenient to demould
CN203247600U (en) * 2012-11-22 2013-10-23 陕西煤业化工建设(集团)有限公司 Equipment foundation bolt preformed hole die
CN202969928U (en) * 2012-12-13 2013-06-05 中国建筑第五工程局有限公司 Hole leaving tool of concreting wall
CN203347229U (en) * 2013-06-27 2013-12-18 国家电网公司 Bolt preformed hole die
CN203487779U (en) * 2013-09-30 2014-03-19 中建三局建设工程股份有限公司 Tool type stock mould for masonry constructional column concrete pouring
CN203603480U (en) * 2013-12-02 2014-05-21 山西四建集团有限公司 Recoverable embedded type reserved hole shaping mold
CN203905485U (en) * 2014-05-23 2014-10-29 山东三箭建设工程股份有限公司 Form for reservation of water service pipe channel in cast-in-place concrete wall
CN205591363U (en) * 2016-03-25 2016-09-21 青岛中建联合建设工程有限公司 Building outer wall is encorbelmented scaffold frame shaped steel and is reserved hole shutoff structure
CN205857717U (en) * 2016-07-30 2017-01-04 浙江天诚中央空调工程有限公司 A kind of shear wall air-conditioning preformed hole through walls finished product built-in fitting
CN107191685A (en) * 2017-07-07 2017-09-22 上海民防建筑研究设计院有限公司 A kind of Novel civil air defense engineering tubular construction through walls

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董莲旭: "电气配合中配电箱预留问题探讨", 《山西建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854821A (en) * 2018-12-24 2019-06-07 中建三局第三建设工程有限责任公司 A kind of pin-connected panel side row's antiseep support and its pre-embedded construction method
CN111764426A (en) * 2020-06-30 2020-10-13 中国二十二冶集团有限公司 Construction method for small and medium-sized special-shaped pre-buried hole template of equipment foundation

Similar Documents

Publication Publication Date Title
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN104389314A (en) Grouting reinforcement device and method for shallow clay
CN207004570U (en) A kind of tunnel longitudinal drainage blind pipe fixed structure
CN204187141U (en) A kind of through-flooring tube circumference leakage preventing structure
CN108086542A (en) A kind of concrete structure pipe construction through walls reserves structure and construction method
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN105239729A (en) Construction method for restoration of secondary hole excavation in constructed roof for pipeline penetration
CN104846935B (en) Head-tank treating seepage remodeling method
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN206956783U (en) A kind of assembling type device for detecting manhole
CN207727733U (en) The spliced gutter that can be had enough to meet the need
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN105673933B (en) Wall feed-through pipeline waterproof sealing construction method after a kind of
CN209309459U (en) Pipeline balance briquetting
CN205677030U (en) A kind of drainage inspection well backfill structure
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN110130667A (en) A kind of method of the pre-buried pipeline finished product protection of flooring
CN206539353U (en) A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
CN102296618A (en) Sleeve with anchor rod penetrating through diaphragm wall
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN204691791U (en) The waterproof construction of rectangular top pipe
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN209354782U (en) A kind of F fashioned iron bellmouth armored concrete inner lining glass fiber reinforced plastic reinforced plastic composite jack pipe
CN107059944A (en) Basement seepage point gradually leak stopping structure and construction method
CN106812324A (en) A kind of method that outer wall of basement increases wall bushing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529

RJ01 Rejection of invention patent application after publication