CN206539353U - A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus - Google Patents

A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus Download PDF

Info

Publication number
CN206539353U
CN206539353U CN201720219154.9U CN201720219154U CN206539353U CN 206539353 U CN206539353 U CN 206539353U CN 201720219154 U CN201720219154 U CN 201720219154U CN 206539353 U CN206539353 U CN 206539353U
Authority
CN
China
Prior art keywords
tunnel
liner
reserved
punishment
aperture apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720219154.9U
Other languages
Chinese (zh)
Inventor
牟开
张坤
赵铭伟
黄帅
安定宇
和兆建
姚剑
安鹏
靳秀红
王程宏
陈亚军
赵博文
李洁峰
张旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Branch Bridge Tunnel Reinforcement And Maintenance Engineering Co Ltd
Original Assignee
Shanxi Branch Bridge Tunnel Reinforcement And Maintenance Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Branch Bridge Tunnel Reinforcement And Maintenance Engineering Co Ltd filed Critical Shanxi Branch Bridge Tunnel Reinforcement And Maintenance Engineering Co Ltd
Priority to CN201720219154.9U priority Critical patent/CN206539353U/en
Application granted granted Critical
Publication of CN206539353U publication Critical patent/CN206539353U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to a kind of reserved inspection aperture apparatus of tunnel-liner infiltration punishment, including inspection hole mouthpiece cover, inspection hole three-way pipe and fixed crab-bolt.Described device can effectively solve the problem of punishment effect can not be checked after tunnel-liner infiltration punishment is completed.Compared with prior art, the reserved inspection hole apparatus structure of tunnel-liner infiltration punishment is simple, save material, can provide check device for tunnel-liner infiltration punishment work, can both check that water seepage of tunnel punishes effect, can play a part of local dredging in the later stage again.

Description

A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
Technical field
The utility model is related to Tunnel Engineering technical field, specifically provides a kind of reserved inspection of tunnel-liner infiltration punishment Aperture apparatus.
Background technology
Along infiltration position raggle when punishing tunnel-liner infiltration, it is necessary in lining cutting, by embedded semicircle drainpipe, Water is discharged to gutter, semicircle drainpipe periphery is then tamped with sealing agent and with cement mortar by its complementary space of raggle position Tamp.Because raggle pipe laying belongs to concealed work, it is impossible to effectively check infiltration punishment effect in the later stage.And run process in tunnel In, it is necessary to which whether running check lining cutting seeps water.
Tunnel-liner infiltration punishment is after using raggle pipe laying method, during the operation in later stage, over time Silting can occur for passage, embedded semicircle drainpipe, and its drainage effect can decline, it is easy to cause lining cutting that infiltration disease occurs again Evil, is unfavorable to tunnel structure.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of simple in construction, saving material and convenient and practical Tunnel-liner infiltration punishment reserved check aperture apparatus.
A kind of tunnel-liner infiltration punishment described in the utility model is reserved to check aperture apparatus, including inspection hole mouthpiece cover 1, Inspection hole three-way pipeline 3 and steel plate crab-bolt 4;The inspection hole three-way pipeline 3 fixed by steel plate crab-bolt 4 and hot-melt adhesive paste extremely The infiltration punishment raggle of tunnel-liner 5 is buried on semicircle drainpipe 2.
Further, the inspection hole three-way pipeline 3 is made up of straight tube 6 and transverse tube 7.
Further, the diameter of the straight tube 6 is identical with the diameter of semicircle drainpipe 2.
Further, the transverse tube 7 is semi-circular tube, and diameter and leads to than the big 2~4mm of diameter of the semicircle drainpipe 2 Steel plate crab-bolt is crossed to fix and hot-melt adhesive paste with semicircle drainpipe 2.
During tunnel-liner infiltration punishment, aperture apparatus is checked by reserved, you can observe directly semicircle drainpipe In drainage condition, realize check infiltration punishment effect purpose.Compared with prior art, the reserved inspection of tunnel-liner infiltration punishment Look into aperture apparatus simple in construction, can both check that water seepage of tunnel punishes effect, local dredging can be played a part of in the later stage again.
Brief description of the drawings
Fig. 1 is the reserved use schematic diagram for checking aperture apparatus of the utility model tunnel-liner infiltration punishment;
Fig. 2 is inspection hole three-way pipeline drawing.
Component, toponym and corresponding mark are shown in figure:
Inspection hole mouthpiece cover 1, semicircle drainpipe 2, inspection hole three-way pipeline 3, steel plate crab-bolt 4, tunnel-liner 5, inspection hole The straight tube 6 of three-way pipeline, the transverse tube 7 of inspection hole three-way pipeline.
Embodiment
The utility model is further illustrated with example below in conjunction with the accompanying drawings.
Reference picture 1, the reserved inspection aperture apparatus of the utility model tunnel-liner infiltration punishment, including:Including the inspection hole mouth of pipe Lid 1, inspection hole three-way pipeline 3 and steel plate crab-bolt 4.When tunnel carries out infiltration punishment, the reserved inspection aperture apparatus passes through steel plate Crab-bolt 4 is fixed and on hot-melt adhesive paste to semicircle drainpipe 2.
The inspection hole three-way pipeline 3 preferably makes in factory process, is made up of straight tube 6 and transverse tube 7.The diameter of straight tube 6 with The diameter of semicircle drainpipe 2 is identical, and transverse tube 7 is semi-circular tube, has a diameter larger than 2~4mm of semicircle drainpipe and is advisable, and passes through steel plate Crab-bolt 4 is fixed, and hot-melt adhesive paste.
During tunnel-liner infiltration punishment, aperture apparatus is checked by reserved, you can observe directly semicircle drainpipe In drainage condition, realize check infiltration punishment effect purpose.
During construction, first, along tunnel-liner seepage part raggle pipe laying;Second step, installs and fixes inspection hole three-way pipe Road;3rd step, after installation, inspection hole is closed with inspection hole mouthpiece cover;4th step, semicircle drainpipe week is tamped with sealing agent Side and its complementary space is tamped by raggle position with cement mortar;5th step, inspection hole mouthpiece cover can be opened at any time, check rises Control situation.
Engineering practice shows, problem is punished for water seepage of tunnel, checks aperture apparatus ratio only with chisel using installing to reserve The punishment infiltration of groove pipe laying, infiltration punishment effect can be checked in time, and be easy to later stage tunneltron to support and dredging semicircle drainpipe.
Example of the present utility model is explained in detail above in conjunction with accompanying drawing, but the utility model be not limited to it is above-mentioned Example, can also be before the utility model objective not be departed from the knowledge that those of ordinary skill in the art possess The various change made is put, protection domain of the present utility model is also should be regarded as.

Claims (4)

1. a kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus, it is characterised in that including inspection hole mouthpiece cover (1), check Hole three-way pipeline (3) and steel plate crab-bolt (4);The inspection hole three-way pipeline (3) is fixed and the company of hot melt by steel plate crab-bolt (4) Tunnel-liner (5) infiltration punishment raggle is connected to bury on semicircle drainpipe (2).
2. tunnel-liner infiltration punishment according to claim 1 is reserved to check aperture apparatus, it is characterised in that the inspection hole Three-way pipeline (3) is made up of straight tube (6) and transverse tube (7).
3. tunnel-liner infiltration punishment according to claim 2 is reserved to check aperture apparatus, it is characterised in that the straight tube (6) diameter is identical with semicircle drainpipe (2) diameter.
4. the reserved inspection aperture apparatus of tunnel-liner infiltration punishment according to Claims 2 or 3, it is characterised in that the horizontal stroke It is semi-circular tube to manage (7), and diameter and passes through steel plate crab-bolt and semicircle and arranged than the big 2~4mm of diameter of the semicircle drainpipe (2) Water pipe (2) is fixed and hot-melt adhesive paste.
CN201720219154.9U 2017-03-08 2017-03-08 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus Expired - Fee Related CN206539353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720219154.9U CN206539353U (en) 2017-03-08 2017-03-08 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720219154.9U CN206539353U (en) 2017-03-08 2017-03-08 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus

Publications (1)

Publication Number Publication Date
CN206539353U true CN206539353U (en) 2017-10-03

Family

ID=59942171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720219154.9U Expired - Fee Related CN206539353U (en) 2017-03-08 2017-03-08 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus

Country Status (1)

Country Link
CN (1) CN206539353U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825272A (en) * 2018-09-07 2018-11-16 西南交通大学 Lining construction seam infiltration drain structure and its implementation method
CN108979679A (en) * 2018-09-06 2018-12-11 山西省交通科学研究院 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979679A (en) * 2018-09-06 2018-12-11 山西省交通科学研究院 A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
CN108825272A (en) * 2018-09-07 2018-11-16 西南交通大学 Lining construction seam infiltration drain structure and its implementation method

Similar Documents

Publication Publication Date Title
CN104404985B (en) The construction method of basement bottom plate rear pouring tape waterproof construction
CN106013471B (en) A kind of construction method of expansion joint antiseep
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN106640154A (en) Treatment method and structure for water seepage of tunnel lining circular construction joint crack
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN206539353U (en) A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN207268004U (en) Toilet leakage protective system
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN109339118A (en) A kind of basement bottom board leakage-resistant device and construction method
CN206429253U (en) Seep water treatment structures in tunnel-liner circular construction joint crack
CN208153058U (en) It is a kind of for the discharge structure of tunnel inverted arch bottom underground water to be discharged
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
CN207419503U (en) Subterranean excavation leak stopping structure
CN207376843U (en) Expansion joint leakage-proof structure
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN103206009B (en) Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN208074294U (en) Side-type direct-burried part
CN207673354U (en) A kind of back-grouting device suitable for the tunnels shield formula TBM prefabricated pipe section liner structure
CN104975623A (en) Non-excavation leaking inspection well repairing method and repairing structure
CN206752531U (en) A kind of slight leakage plugging structure of diaphram wall
CN200940336Y (en) Wire connection well
CN107938691A (en) A kind of guiding device and its construction method for obstructing outer wall of basement casing rain leakage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20190308

CF01 Termination of patent right due to non-payment of annual fee