CN203866972U - Embedded component for filler wall tie bars - Google Patents

Embedded component for filler wall tie bars Download PDF

Info

Publication number
CN203866972U
CN203866972U CN201420142035.4U CN201420142035U CN203866972U CN 203866972 U CN203866972 U CN 203866972U CN 201420142035 U CN201420142035 U CN 201420142035U CN 203866972 U CN203866972 U CN 203866972U
Authority
CN
China
Prior art keywords
wall column
bar
polyethylene foam
expanded polyethylene
foam pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420142035.4U
Other languages
Chinese (zh)
Inventor
刘铁
杨建伟
邬建希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN SHUNTIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
HUNAN SHUNTIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN SHUNTIAN CONSTRUCTION GROUP CO Ltd filed Critical HUNAN SHUNTIAN CONSTRUCTION GROUP CO Ltd
Priority to CN201420142035.4U priority Critical patent/CN203866972U/en
Application granted granted Critical
Publication of CN203866972U publication Critical patent/CN203866972U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses an embedded component for filler wall tie bars. The embedded component comprises an embedded bar and a pearl cotton tube, wherein the embedded bar comprises a main body section for being sleeved with the pearl cotton tube; the two ends of the main body section are bent to form connecting sections in an extending mode respectively, so that the embedded bar is shaped like a Chinese character 'ji'. In the using process, the connecting sections are in lap joint with horizontal hoop reinforcements of wall column reinforcements and are welded and fixed to the horizontal hoop reinforcements and vertical reinforcements of the wall column reinforcements. When pouring is completed, the pearl cotton tube is exposed on the surface of a reinforced concrete wall column and is flush with the surface of the reinforced concrete wall column. When the embedded component for the filler wall tie bars is adopted to conduct embedment and reinforcement, holes do not need to be drilled in a concrete wall and formworks, so that construction is simpler, and construction quality is good.

Description

A kind of preburied component of infilled wall tie bar
Technical field
The utility model belongs to the realm of building construction, is specifically related to a kind of preburied component of infilled wall tie bar.
Background technology
In recent years, it is high that the earthquake that occurs in western China highlights frequency, destroys strong feature.Through correlative study, show, in earthquake disaster, more than 90% casualties and property loss are because building collapsing causes.At present, frame construction is still one of architecture structure form being most widely used now, and its conventional infilled wall is cut apart house and gone along with sb. to guard him, and forms frame wall filled with masonry structure.And when infilled wall and building frame structure are without being connected or connecting when not firm, the infilled wall even plane of very easily destroying in earthquake, collapse throws away outward.Therefore, how effectively improving the non-deformability of infilled wall, strengthen the anti-seismic performance of infilled wall, and strictly control construction quality, be related to broad masses of the people's security of the lives and property, is also to perplex for many years work order
One of difficult problem of position.
At present, the following two kinds of methods of the many employings of infilled wall tie bar construction:
(1), chemically-planted steel bar method: although the method construction technology is simple, very easily encounter wall column knot during boring
Reinforcing bar in structure causes useless hole, and can the performance of anchoring adhesive reach the service life of architectural design, and China does not still have relevant technical specification and quality inspection standard;
(2), the pre-buried method of joint bar: be to punch in template, a bar dowel is inserted and fixed from hole
On wall column component, after form removal, weld again spreading, its shortcoming is that punching has damage to template, form removal trouble, and cannot guarantee that tension rib position and brick layer coincide, drawknot effect is had a greatly reduced quality.
Utility model content
In order to solve the deficiencies in the prior art, the utility model provides a kind of preburied component of infilled wall tie bar
, adopt the preburied component of infilled wall tie bar carry out pre-buried and carry out lacing wire, need on concrete wall and in template, not hole, construction is simpler and construction quality is good.
The utility model provides a kind of preburied component of infilled wall tie bar, it comprises embedded bar and expanded polyethylene foam pipe, wherein, described embedded bar comprises the main paragraph of establishing for described expanded polyethylene foam pipe box, from the two ends of described main paragraph, bend respectively and extend a linkage section, by this, make described embedded bar be "Ji" type setting, during use, described linkage section overlaps and is welded and fixed mutually with horizontal hoop and the perpendicular muscle of wall column reinforcing bar with the horizontal hoop of wall column reinforcing bar, when casting complete, described expanded polyethylene foam pipe is revealed in the surface of steel concrete wall column, and described expanded polyethylene foam pipe is concordant with the surface of described steel concrete wall column.
Based on disclosing of technique scheme, the utility model provides a kind of preburied component of infilled wall tie bar to have following beneficial effect:
The utility model provides a kind of preburied component of infilled wall tie bar, it comprises embedded bar and expanded polyethylene foam pipe, wherein, described embedded bar comprises the main paragraph of establishing for described expanded polyethylene foam pipe box, from the two ends of described main paragraph, bend respectively and extend a linkage section, by this, make described embedded bar be "Ji" type setting, during use, described linkage section overlaps and is welded and fixed mutually with horizontal hoop and the perpendicular muscle of wall column reinforcing bar with the horizontal hoop of wall column reinforcing bar, when casting complete, described expanded polyethylene foam pipe is revealed in the surface of steel concrete wall column, and described expanded polyethylene foam pipe is concordant with the surface of described steel concrete wall column, adopt the preburied component of infilled wall tie bar carry out pre-buried and carry out lacing wire, need on concrete wall and in template, not hole, construction is simpler and construction quality is good.
Accompanying drawing explanation
Fig. 1 is the structural representation of the preburied component of a kind of infilled wall tie bar that the utility model proposes;
Fig. 2 is the structural representation of embedded bar of the preburied component of a kind of infilled wall tie bar that the utility model proposes;
Fig. 3 is the structural representation of expanded polyethylene foam pipe of the preburied component of a kind of infilled wall tie bar that the utility model proposes;
Fig. 4 is the schematic side view after the preburied component of a kind of infilled wall tie bar that the utility model proposes is installed;
Fig. 5 is the schematic top plan view after the preburied component of a kind of infilled wall tie bar that the utility model proposes is installed.
drawing reference numeral explanation
Embedded bar 1
Main paragraph 11
Linkage section 12
Expanded polyethylene foam pipe 2
Perpendicular muscle 3
Horizontal hoop 4
The specific embodiment
Below in conjunction with accompanying drawing and by the specific embodiment, further illustrate the technical solution of the utility model:
Refer to Fig. 1 to Fig. 5, the utility model provides a kind of preburied component (not label) of infilled wall tie bar, it comprises embedded bar 1 and expanded polyethylene foam pipe 2, wherein, described embedded bar 1 comprises for the sheathed main paragraph 11 of described expanded polyethylene foam pipe 2, from the two ends of described main paragraph 11, bend respectively and extend a linkage section 12, by this, make described embedded bar 1 be "Ji" type setting, during use, described linkage section 12 overlaps and is welded and fixed mutually with horizontal hoop 4 and the perpendicular muscle 3 of wall column reinforcing bar with the horizontal hoop 4 of wall column reinforcing bar, when casting complete, described expanded polyethylene foam pipe 2 is revealed in the surface of steel concrete wall column, and described expanded polyethylene foam pipe 2 is concordant with the surface of described steel concrete wall column.
Refer to Fig. 1 to Fig. 5, the utility model provides a kind of infilled wall tie bar construction method, and it comprises the following steps:
Step S01: reinforcing bar is processed into the embedded bar 1 of "Ji" type, thereby described embedded bar 1 comprises the linkage section 12 that supplies the sheathed main paragraph 11 of described expanded polyethylene foam pipe 2 and bend respectively extension from the two ends of described main body;
Step S02: described embedded bar 1 is installed in predetermined infilled wall tie bar position, described linkage section 12 and the horizontal hoop 4 of wall column reinforcing bar are overlapped, and be welded and fixed mutually with horizontal hoop 4 and the perpendicular muscle 3 of wall column reinforcing bar, then, described expanded polyethylene foam pipe 2 is cut to the main paragraph 11 that is wrapped in described embedded bar 1 along tubular axis line, seal with adhesive tape, then installation form, makes described expanded polyethylene foam pipe 2 contact with described template;
Step S03: when casting complete, described expanded polyethylene foam pipe 2 is revealed in the surface of steel concrete wall column, and described expanded polyethylene foam pipe 2 is concordant with the surface of described steel concrete wall column, then, find out the preburied component of infilled wall tie bar, tear adhesive tape, pull out described expanded polyethylene foam pipe 2, with steel brush, the foreign material such as the concrete slag on described embedded bar 1, cement paste are cleaned down, the main paragraph 11 of tension rib and described embedded bar 1 is welded.
By reference to the accompanying drawings the utility model has been carried out to exemplary description above; obvious realization of the present utility model is not subject to the restrictions described above; as long as the various improvement that adopted technical solutions of the utility model to carry out; or without improving, design of the present utility model and technical scheme are directly used in to other occasion, all in protection domain of the present utility model.

Claims (1)

1. the preburied component of an infilled wall tie bar, it is characterized in that, it comprises embedded bar and expanded polyethylene foam pipe, wherein, described embedded bar comprises the main paragraph of establishing for described expanded polyethylene foam pipe box, from the two ends of described main paragraph, bend respectively and extend a linkage section, by this, make described embedded bar be "Ji" type setting, during use, described linkage section overlaps and is welded and fixed mutually with horizontal hoop and the perpendicular muscle of wall column reinforcing bar with the horizontal hoop of wall column reinforcing bar, when casting complete, described expanded polyethylene foam pipe is revealed in the surface of steel concrete wall column, and described expanded polyethylene foam pipe is concordant with the surface of described steel concrete wall column.
CN201420142035.4U 2014-03-27 2014-03-27 Embedded component for filler wall tie bars Expired - Lifetime CN203866972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420142035.4U CN203866972U (en) 2014-03-27 2014-03-27 Embedded component for filler wall tie bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420142035.4U CN203866972U (en) 2014-03-27 2014-03-27 Embedded component for filler wall tie bars

Publications (1)

Publication Number Publication Date
CN203866972U true CN203866972U (en) 2014-10-08

Family

ID=51647942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420142035.4U Expired - Lifetime CN203866972U (en) 2014-03-27 2014-03-27 Embedded component for filler wall tie bars

Country Status (1)

Country Link
CN (1) CN203866972U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899012A (en) * 2014-03-27 2014-07-02 湖南顺天建设集团有限公司 Embedded member of filler wall binding rebar and filler wall binding rebar construction method
CN109057044A (en) * 2018-08-22 2018-12-21 中国二十二冶集团有限公司 Masonry tie wall bar shifts to an earlier date construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899012A (en) * 2014-03-27 2014-07-02 湖南顺天建设集团有限公司 Embedded member of filler wall binding rebar and filler wall binding rebar construction method
CN109057044A (en) * 2018-08-22 2018-12-21 中国二十二冶集团有限公司 Masonry tie wall bar shifts to an earlier date construction method

Similar Documents

Publication Publication Date Title
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN103899012A (en) Embedded member of filler wall binding rebar and filler wall binding rebar construction method
CN103485537A (en) Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure
CN107237424A (en) A kind of agent structure and the drawknot construction method of filling wall
CN203866972U (en) Embedded component for filler wall tie bars
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN103953121A (en) Pre-buried sleeve for wall tie bar, and positioning method thereof
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN204418389U (en) A kind of concrete-filled steel square tubular column and i shaped steel beam end plate embedded connecting structure
CN106760522A (en) A kind of concrete structure seam crossing prevents swollen mould mortar leakage prevention fixing device and method
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN105604339B (en) Secondary structure constructs column reinforcing method
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN205063330U (en) Close clearance double shear wall movement joint template
CN204252400U (en) A kind of reinforcing bar connector for earthquake-proof frame top story knee joint
CN209163138U (en) A kind of reservation device of the floor reserved steel bar for climbing formwork for construction
CN203867081U (en) Wall steel tie bar pre-buried sleeve
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN206385794U (en) A kind of wall-connecting piece and its connection system
CN206220467U (en) It is a kind of it is non-it is embedding can turnover type outer scaffold wall connector
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN201704695U (en) Slope reinforcement structure supported by glass fiber pre-stressed soil nails
CN105888282B (en) A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall
CN205476491U (en) Outer wall post template bottom consolidates uses pre -cast screw
CN210105272U (en) Shear force wall department external scaffolding draws knot structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Die

Inventor after: Yang Xinwei

Inventor after: Wu Jianxi

Inventor before: Liu Tie

Inventor before: Yang Jianwei

Inventor before: Wu Jianxi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU TIE YANG JIANWEI WU JIANXI TO: LIU YI YANG XINWEI WU JIANXI

CX01 Expiry of patent term

Granted publication date: 20141008